2000MW PAVAGADA Solar Park
Pre-Bid Meeting, 13-01-2016NTPC, Noida
A JV company viz., Karnataka Solar Power Development
Corporation Private Limited “KSPDCPL” has been formed
on 12th March 2015 between SECI, GoI and KREDL, GoK for
development of Ultra mega solar parks in Karnataka.
Consequently the name has been changed to KSPDCL on
28.09.2015
KSPDCL has identified the following backward districts asper recommendations of Nanjundappa committee forestablishment of solar parks in Karnataka:◦ Pavagada Taluk, Tumkur District◦ Sirasangi, Savadatti Tq, Belagavi district.◦ Hagaribommanahalli Tq, Bellary District.◦ Hulikatti, Savadatti Tq, Belagavi district.◦ Yellamanagudda, Savadatti Tq, Belagavi district.◦ Yakapura, Kalaburgi District.
Formation of new company to overseedevelopment of solar parks in Karnataka
Firstly, it is proposed to develop 2000MW solar park
at Pavagada Taluk, Tumkur District. 11,000 acres of
land identified in 5 villages viz., Balasamudra,
Tirumani, Kyataganacharlu, Vallur & Rayacharlu.
DPR for solar Park has been prepared by M/s. PWC.
Application for Grid connectivity and Long Term
Access made with Powergrid on 24.06.2015.
Pavagada Solar Park
44
150 km from Bengaluru International Airport, 115 KM from
Ananthapura, AP, Railway Station.
Data from IMD Max Min
Daily Ambient Temperature (ºC) 30.6 23.2
Wind speed (m/s) 4.6 1.4
Relative humidity (%) 74.1 44.7
Rainfall (mm) 900 600
Average GHI in kWh/sq.mt per
year
2387 1752
Village Name Latitude Longitude
Valluru 140 16’10.94’’N 77023’18.17”E
Rayacharlu 140 16’57.05’’N 77026’54.79”E
Ballasamudra 140 15’ 19.67’’N 77024’28.68”E
Kyathaganacharlu 140 18’33.18’’N 77022’42.38”E
Thirumani 140 14’59.27’’N 77025’42.52”E
PROPOSED MAP OF PAVAGADA SOLAR POWER PARK
66
27.02.2015: GoK accorded approval for formation of KSPDCL.
19.03.2015: MNRE accorded approval to set up 2000MW Pavagada Solar
Park.
14.10.2015: GoK vide notification approved to acquire identified land of
Kythaganacharlu, Valluru, Ballasamudra, Thirumani & Rayacharlu Villages
of Nagalamadike Hobli, Pavagada Taluk, Tumkur District by KSPDCL for
setting up of 2000 MW Pavagada Solar park.
14.12.2015: NOC issued by Forest Dept., GoK to the effect that "No
Reserved" or "No Semi Reserved" Forest Region exists in the area
earmarked (viz., Vallur, Tirumani, Ballasamudra, Kyataganacharlu and
Rayacharlu) for establishing 2000MW Pavagada Solar Park”.
29.10.2015: GoK accorded approval to the proposal of KSPDCL to establish
Solar park with all the infrastructure facilities for 2000MW solar power
generation at around 11000 acres of land indentified at above 5 villages
on 30 year lease rental basis.
KSPDCL has opened website with URL www.kspdcl.in.
Following Details have been uploaded in the KSPDCL Website
No Objection Certificate issued by Forest Dept., GoK to the effect that 'No
Reserved' or 'No Semi Reserved' Forest Region exists in the area earmarked
(viz., Vallur, Tirumani, Ballasamudra, Kyataganacharlu and Rayacharlu)
Evacuation Layout module
Evacuation Plan module
Soil investigation report
Model Implementation Support Agreement
Model Land Sub Lease Agreement
Charges to be paid by SPDs to KSPDCL
Plot Plan PDF Drawings
Plot Plan Autocad Drawings
Hydrological Report and Ground Water Analysis Report
chemical analysis of Pavagada Ground Water
Land allotment
11000 Acres has been identified by KSPDCL for development of
2000MW Pavagada Solar Park .
Out of 2016 nos. of lan d owners, 1115 nos of land owners have
submitted consent letters.
330 applications have been submitted to DC office for obtaining
conversion fine of individual farmers.
It is proposed to enter into Lease Agreements with the land owners
w.e.f. 18-01-2016.
Entire area of 11000 acres required for solar park will be under
KSPDCL possession by 18-02-2016.
Tentative plot & power allocation from proposed 2000MW solar park
is as follows:
Allocation of Solar Power
Capacity Entity Scheme
600MW NTPC JNNSM- State Specific Bundling Scheme with
unallocated thermal power
400MW SECI VGF
1000MW NTPC Bundling Scheme with thermal stations completing 25
yrs of life
NTPC has invited tenders for selection of Solar Power Developers for
600MW.NTPC has been allotted 250MW each in Block 6 (Thirumani) & Block 7
(Rayacharlu) & 100MW in Block 5(Thirumani)
• NTPC has been allotted 600MW under JNNSMscheme in Pavagada Solar Park.
• Out of 600MW,
500MW under open category &
100 MW under DCR category
• 250MW in Thirumani village: Block 6 (open)
• 250MW in Rayacharlu village: Block 7 (open)
• 100MW in Thirumani village: part of Block5(DCR)
• Solar Power Developer will have toconstruct 66/11 kV pooling substation foronward transmission of power generatedfrom their units.
• 66kV voltage to be stepped to 220kV levelfor which 8 No.s of 220/66 kV PoolingSubstations along with other infrastructureare proposed to be executed on totalturnkey basis for evacuation 2000MWpower.
• For evacuation of power from solar park, a400/220KV substation is planned inside thesolar park premises to be built by M/sPGCIL.
Evacuation Scheme
KSPDCL has invited tender on 09-12-2015 for establishing 4 nos of 2 x 150 MVA,
220/66kV stations at Nagalamadike Hobli in Pavagada Taluk, Tumkur District along
with connected Transmission lines and Terminal Bays on Total Turnkey Basis, in two
lots ( Lot1 & Lot 2 ) as under:
LOT 1:
• Establishing 2x150MVA, 220/66kV sub station at Tirumani Sy no. 154/2,3,4 & 5
• Establishing 2x150MVA, 220/66kV sub station at Tirumani Sy no. 131/1 & 2
• Establishing 2x150MVA, 220/66kV sub station at Rayacharlu Sy no. 225/1,2 & 3
• Establishing 2x150MVA, 220/66kV sub station at Rayacharlu Sy no. 175
• Construction of 220kV SC line for a distance of 12kms
• 220kV DC line for a distance of 4 kms and
• 220 kv multi circuit line for a distance of 11kms from the proposed 220/66kV
substation, in solar park to PGCIL station in solar par
LOT 2:
• Establishing 2x150MVA, 220/66kV sub station at Kyataganacharlu Sy no. 44
• Establishing 2x150MVA, 220/66kV sub station at Vallur Sy no. 242
• Establishing 2x150MVA, 220/66kV sub station at Vallure Sy no. 166
• Establishing 2x150MVA, 220/66kV sub station at Ballasamudra Sy no.35/2
• Construction of 220kV SC line for a distance of 6kms
• 220kV DC line for a distance of 2 kms and
• 220 kv multi circuit line for a distance of 3kms from the proposed 220/66kV
substation, in solar park to PGCIL station in solar park
• As per the notified tender, following are
the schedule of events:– Pre Bid Meeting Date: 22-01-2016 14:30:00
– Last Date & Time for Tender Queries/Clarifications: 21-01-2016
13:00:00
– Last Date & Time for receipt of tenders: 10-02-2016 12:00:00
– Date & Time for Opening of Technical Bid: 12-02-2016
12:30:00
– Date & Time for Opening of Financial Bid: 15-02-2016 12:30:00
Charges Payable to KSPDCL by Solar Power Developers S.No. Description
Charges Remarks 1. Upfront charges/One time Solar Power Park
Development Expenses Rs. 27.27 Lakhs/MW Service tax and any other
applicable taxes, duties, cess, and other Government levies payable by
SPPD are to be reimbursed by SPD as per the prevailing norms from time to
time. 2. Annual O&M Charges Escalated at 5% every year Rs. 2.65
Lakhs/MW 3. Annual Land Lease Rent per MW (with 5% escalation once in
every 2 years) Rs.1.20 Lakhs (5 Acres per MW will be allotted to SPD) 4.
Local area development fund Rs.5 Lakh/MW in 5 equal installments @ Rs.1
Lakh/MW/year after COD for 5 years, assuming the Project Cost as Rs. 5 Cr
per MW 5. Non-refundable facilitation fee Rs. 10,000 per MW as per GoK
Solar Policy 2014-21.
Sl.No. Description Charges Remarks
1. Upfront charges/One time Solar
Power Park Development
Expenses
Rs. 27.27 Lakhs/MW
Service tax and any other applicable taxes, duties, cess, and other
Government levies payable by SPPD are to be reimbursed by SPD as per the prevailing norms from time to time.
2. Annual O&M Charges
Escalated at 5% every yearRs. 2.65 Lakhs/MW
3. Annual Land Lease Rent per
MW (with 5% escalation once in
every 2 years)
Rs.1.20 Lakhs (5 Acres per
MW will be allotted to SPD)
4. Local area development fund Rs.5 Lakh/MW in 5 equal
installments @ Rs.1
Lakh/MW/year after COD
for 5 years, assuming the
Project Cost as Rs. 5 Cr per
MW
5. Non-refundable facilitation fee Rs. 10,000 per MW as per
GoK Solar Policy 2014-21 .
Charges Payable to KSPDCL by Solar Power Developers