Presentation Of PT Bara Ria Sukses
Promoted By Bapak H. Daniel Candra
JAMBI COAL TERMINAL 1
SUPPORTED BY PT. JALDHI MARINE SERVICES
Graphs Of Coal Production In Jambi Province In 2007 - 2013
2007 2008 2009 2010 2011 2012 20130.00
2,000,000.00
4,000,000.00
6,000,000.00
8,000,000.00
JAMBI COAL TERMINAL 2
Coal production in the period 2007-2013 showed an increase
•2007 total production reached 2,215,496.24 MT•2008 total production reached 4,216,057.27 MT•2009 total production reached 3,198,868.39 MT•2010 total production reached 7,011,018.13 MT•2012 total production reached 6,565,306.28 MT•2013 total production reached 3,500,000.00 MT
JAMBI COAL TERMINAL 3
JAMBI - SUMATRACOAL TERMINAL AND
TRANSPORTATIONLOGISTIC
THROUGH BATANG HARI RIVER SYSTEM
SUPPORTED BY PT. JALDHI MARINE
SERVICESPromoted By Bapak Haji Daniel Candra
JAMBI COAL TERMINAL 4
DISTANCE COMPARATION
PADANG PORT RIAU PORT TALANG DUKU JCT TENAM
M.BUNGO SITE 287 KM 376 KM 309 KM 205 KM
SAROLANGOON SITE 361 KM 536 KM 269 KM 196 KM
TEBO SITE 331 KM 335 KM 261 KM 124 KM
JAMBI COAL TERMINAL 5
Parameter Typical Rej.Total Moisture (ARB) 39% >41%
Inherent Moisture (ADB) 12-14%
Gross Calorific Value (ARB) 3500 Kcal/Kg. < 3400 Kcal/kg
Ash Content (ADB) 6% >8%Sulphur (ADB) 0.50% > 0.80%Volatile Matter (ADB) 40-44%
Fixed Carbon (ADB) By diff. Size (0 to 50 mm) 90% Min HGI 55
Technical Specifications as per ASTM/ISO Standard. (ARB – As Received Basis)(ADB – Air Dry Basis)
Full spec of GAR 3500
JAMBI COAL TERMINAL 6
Parameter Typical Rej.
Total Moisture (ARB) 20%>22%
Inherent Moisture (ADB) 12-14%
Gross Calorific Value (ARB) 5200 Kcal/Kg.< 5000 Kcal/kg
Ash Content (ADB) 3,73% >5%Sulphur (ADB) 0.57% > 0.80%
Volatile Matter (ADB) 36,10%
Fixed Carbon (ADB) 47,58 Size (0 to 50 mm) 90% Min HGI 55
Technical Specifications as per ASTM/ISO Standard. (ARB – As Received Basis)(ADB – Air Dry Basis)
Full Spec Gar 5200
JAMBI COAL TERMINAL 7
Full spec of gar
Customer Sample ID
unit
Pit 427
Lab Sample IDPg14
00337Weight Of Sample 4,880 g
Analysis 1.As Received Basis (Ar) Total Moisture ( % ) 23.29Ash Content ( % ) 1.66Volatille Matter ( % ) 32.46Fixed Carbon ( % ) 42.6Total Sulphur ( % ) 0.5Gross Calorific Value cal/gr 59022.Air Dried Basis (Adb) Moisture In The Analysis Sample ( % ) 11.04Ash Content ( % ) 1.92Volatille Matter ( % ) 37.64Fixed Carbon ( % ) 49.4Total Sulphur ( % ) 0.58Gross Calorific Value cal/gr 6845
JAMBI COAL TERMINAL 8
Coal Mining Company In Jambi
in Jambi have 347 of coal mining company already have permit from Government206 coal mining company already do exploration and 141 company have legal permit from Government for production and exploitation
Coal Resource In Jambi
coal resources in Provinces Jambi as per declare from Jambi government is big which total sources reaching up to 1,5 billion tons have yet exploration and total coal has been produced up to now about 50 million tons.
JAMBI COAL TERMINAL 9
The Project Highlights
PT.Bara Ria Sukses is committed to offer a Total Coal LogisticsSolution from Jambi Mine hinterlands, Sumatera to overseasDestination by
Establishing coal loading river terminal at tenam area
Establishing a REALIABLE,SUSTANIABLE and COMMON USER terminal and river transport system in batang hari river
Establishing of coal transshipment Terminal at sukombong to add flexibility to barge logistics chain.
JAMBI COAL TERMINAL 10
The Bothra Group
Since its formation in 1977, Bothra Group has evolved from aConventional Stevedoring, clearing and Forwading agency to a multidimensional shipping and port logistics group of companies including cargo terminal operations
Bothra Group enjoys a reputation beyond the shipping sector by his group in indonesia namely PT.Jaldhi Marine Services for a competent an reliable end to end logistics service provider with shipping and overland logistic solutions tailored to customer needs.and in keeping with its philosophy, PT.Jaldhi Marine Services is now commited to established a Coal Transport logistics in jambi through Batang Hari River Syatem
JAMBI COAL TERMINAL 11
Today’s situation – The dificulties for Coal Miners to export the produce
The mines located in the coal consession areas of jambi face great difficulties and challenges to move the mined coal to a mother vessel anchored at the nearest sea anchorage – Muara Sabak
This is due to inadequate road infrastructure from mines to talang duku a distance of nesrly 150 km, the nearest point to reach the barge loading facility
governmental restrictions in use of public roads for coal haulage purpose
social problem as public protest due to daily traffic jams , pollutions and daily accidents until some deaths due to inexperience and illegal truckings
JAMBI COAL TERMINAL 12
Some accidents of coal trucking
JAMBI COAL TERMINAL 13
PT.Bara Ria Sukses – Jaldhi’s Project intends to achieve…
The aim of this projects is to increase the Reliability andAvaliability of Logistics Service in this region by using the Batang Hari river system and thus open up the abundant resources of this region to the world
JAMBI COAL TERMINAL 14
JAMBI COAL TERMINAL 15
JAMBI COAL TERMINAL 16
JAMBI COAL TERMINAL 17
Barging Line Up
JAMBI COAL TERMINAL 18
JAMBI COAL TERMINAL 19
JAMBI COAL TERMINAL 20
JAMBI COAL TERMINAL 21
JAMBI COAL TERMINAL 22
JAMBI COAL TERMINAL 23
Jambi Coal Terminal –Work in progress
JAMBI COAL TERMINAL 24
---THANK YOU---
The TimelineThe Project is estimated to be Commissioned before the mid of 2015
And with this Jaldhi , Bothra Group shall be setting a new , efficient and eco-friendly logistics solution for Cola Mining hinterland of Jambi