MECHANICAL EQUIPMENTS OF BUILDINGMECHANICAL EQUIPMENTS OF BUILDING
(Vertical Transprtatin!(Vertical Transprtatin!
ELEVATORS – hoisting mechanismELEVATORS – hoisting mechanismTwo Types: Electric & HydraulicTwo Types: Electric & Hydraulic
Electric E – tall !uildings"#$ motor operatedElectric E – tall !uildings"#$ motor operated
Hydraulic E – plunger %antennaeic"moa!le rod'Hydraulic E – plunger %antennaeic"moa!le rod'
ELEVATOR TRA$T(O) *A$H()ESELEVATOR TRA$T(O) *A$H()ES
+ ,earless – spun and worm+ ,earless – spun and worm
- ,eared – gear and worm- ,eared – gear and worm
Electric E : ca!leElectric E : ca!le Hydraulic E: plungerHydraulic E: plunger
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 2/36
ELECT"IC E# MA$O" PA"TSELECT"IC E# MA$O" PA"TS
++ $ar"$a! –$ar"$a! – load carrying unitload carrying unit
-- $a!le –$a!le – rope. / 0 1 in norope. / 0 1 in no
22 #rie machine –#rie machine – power unitpower unit
// $ounterweights –$ounterweights – !alances the weight"/34 o5 capacity load!alances the weight"/34 o5 capacity load
66 ,uide Rail 0,uide Rail 0 !rac7et!rac7et
11 Sha5t"Hoistway –Sha5t"Hoistway – hatchway"hatchhatchway"hatch
88 9enthouse –9enthouse – machine room a!oe hoistwaymachine room a!oe hoistway
Eleator 9it –Eleator 9it – 5rom sill leel o5 the lowest landing5rom sill leel o5 the lowest landing
;; $ontrol E<uipment –$ontrol E<uipment – electrical panelelectrical panel
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 3/36
ELECT"IC E# OTHE" PA"TSELECT"IC E# OTHE" PA"TS++ $ontrol 9anel – electrical panel. controller$ontrol 9anel – electrical panel. controller
-- *otor ,enerators %*otor $ontrol'.,enerator =ield $ontrol –*otor ,enerators %*otor $ontrol'.,enerator =ield $ontrol –goerns acceleration> speed> retardation> stopping o5 eleatorgoerns acceleration> speed> retardation> stopping o5 eleator
22 ,uide Shoes,uide Shoes
// $ompensating $hain –$ompensating $hain – welded0lin7 chain 5or hoist rope weight welded0lin7 chain 5or hoist rope weight
compensationcompensation66 ?u55er –?u55er – stops descending car or counterweights !eyond normal limitstops descending car or counterweights !eyond normal limit
o5 traelo5 trael
11 ,oernor –,oernor – mechanical speed control mechanismmechanical speed control mechanism
88 Secondary Sheae –Secondary Sheae – pulley on a gearless machinepulley on a gearless machine
Sa5ety –Sa5ety – large clamp. anchors the car to the !uildinglarge clamp. anchors the car to the !uilding
;; Limit SwitchesLimit Switches
+3+3 Operating #eiceOperating #eice
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 4/36
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 5/36
Machine room-lessMachine room-less
elevatorelevator
An independent machine roomAn independent machine room
is not required any more whenis not required any more when
choosing machine room-lesschoosing machine room-less
elevator solutions. Theelevator solutions. The
permanentpermanent magnetma
gnet
synchronous gearless drives
ynchronous gearless driveunitunit
is installed inside of the shaftis installed inside of the shaft,,
so that the space of traditionalso that the space of traditional
machine rooms is obviated andmachine rooms is obviated and
the costs for buildingthe costs for building
construction are consequentlyconstruction are consequently
reduced. In addition this maesreduced. In addition this maes
the architectural design morethe architectural design more
!e"ible and adaptable.!e"ible and adaptable.
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 6/36
#u$er#u$er
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 7/36
H%D"AULIC E# MA$O" PA"TSH%D"AULIC E# MA$O" PA"TS$ar"$a!$ar"$a!
9lunger –9lunger – inside moa!le part o5 ainside moa!le part o5 a
hydraulic @ac7hydraulic @ac7
Spring ?u55er –Spring ?u55er – ele w" speed lessele w" speed less
than -33 5pmthan -33 5pm
,uide Shoes –,uide Shoes – guide car along railsguide car along rails
,uide Rails,uide Rails
Sha5t"HoistwaySha5t"HoistwayEleator *achine RoomEleator *achine Room
Eleator 9itEleator 9it
$ontrol System$ontrol System
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 8/36
H%D"AULIC E# OTHE" PA"TSH%D"AULIC E# OTHE" PA"TS
++ =loor Stop and Limit Switch=loor Stop and Limit Switch
-- $reepage and Leeling $ar Switch$reepage and Leeling $ar Switch
22 $ar ,ate Switch$ar ,ate Switch
// ,ate Vale,ate Vale
66 $ontroller$ontroller
11 *otor & 9ump with Tan7*otor & 9ump with Tan7
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 9/36
%umbwaiter%umbwaiter
&lectric hydraulic or electric cable&lectric hydraulic or electric cable 'apacity up to ()) lbs'apacity up to ()) lbs *latform up to + square feet*latform up to + square feet *ower any) or //)0)*ower any) or //)0) 1elf-Maintained controls, call 2 send1elf-Maintained controls, call 2 send
Options & AccessoriesOptions & Accessories 1tainless steel cab1tainless steel cab 'ab in use light'ab in use light Minimum frame constructionsMinimum frame constructions
3frame requires anchoring4 utili5es3frame requires anchoring4 utili5esless !oor spaceless !oor space
'hoice of colors, enamel paint'hoice of colors, enamel paint Safety FeaturesSafety Features 6alling platform safety device6alling platform safety device 1ide thrust rollers1ide thrust rollers 7vertravel safety stops7vertravel safety stops 1lac cable limit switch 3cable unit41lac cable limit switch 3cable unit4
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 10/36
6reight &levator6reight &levator
'argo lift'argo lift
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 11/36
'onveyor'onveyor
#ucet 'onveyor#ucet 'onveyor
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 12/36
ESCALATO"ESCALATO"“ “ The angle of inclination of an escalator shall notThe angle of inclination of an escalator shall not
exceed 30exceed 30° from the horizontal” ( ° from the horizontal” ( NBC Sec.1302NBC Sec.1302 ) )
2- wide – ;3B"min %normal'2- wide – ;3B"min %normal'
/ wide – +-3B"min %rush hours'/ wide – +-3B"min %rush hours'
*ACOR 9ARTS*ACOR 9ARTS
+ TRDSS – welded steel 5rame+ TRDSS – welded steel 5rame
- S9RO$ET ASSE*?L(ES- S9RO$ET ASSE*?L(ES
2 #R(V(), *A$H()ES2 #R(V(), *A$H()ES
/ ?ALLDSTRA#E ASSE*?LF/ ?ALLDSTRA#E ASSE*?LF
6 HA)#RA(LS6 HA)#RA(LS
1 E)#LESS ?ELT1 E)#LESS ?ELT
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 13/36
ESCALATO"ESCALATO"*ACOR 9ARTS*ACOR 9ARTS
+ TRDSS – welded steel 5rame+ TRDSS – welded steel 5rame
- S9RO$ET ASSE*?L(ES- S9RO$ET ASSE*?L(ES
2 #R(V(), *A$H()ES2 #R(V(), *A$H()ES
/ ?ALLDSTRA#E ASSE*?LF/ ?ALLDSTRA#E ASSE*?LF
6 HA)#RA(LS6 HA)#RA(LS
1 E)#LESS ?ELT1 E)#LESS ?ELT
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 14/36
ESCALATO"ESCALATO"OTHER 9ARTSOTHER 9ARTS
+ Trac7s+ Trac7s
- Emergency ?ra7e- Emergency ?ra7e
2 $ontroller2 $ontroller
/ Emergency Stop ?utton/ Emergency Stop ?utton
6 ey Operated $ontrol Switches6 ey Operated $ontrol Switches
#rushes are pitched downward todiscourage the retention of liquids andother contaminants along the brush
surface.
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 15/36
ESCALATO"ESCALATO"
ARRA),E*E)TARRA),E*E)T
&# Crisscrss&# Crisscrss
- 9arallel- 9arallel
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 16/36
ESCALATO"ESCALATO"
ARRA),E*E)TARRA),E*E)T
+ $risscross+ $risscross
'# Parallel'# Parallel
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 17/36
MovingMoving
walrampwalramp
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 18/36
MovingMoving
walrampwalramp
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 19/36
MovingMoving
walrampwalramp
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 20/36
Heating> Ventilating & Air $onditioningHeating> Ventilating & Air $onditioning
%HVA$' –%HVA$' – process o5process o5 treating air to control its temperaturetreating air to control its temperature
TF9ES O= A$:TF9ES O= A$:
++ GA$D – thru the wallGA$D – thru the wall
-- Split Type %$ondenser & Eaporator'Split Type %$ondenser & Eaporator'
22 $entralied %#ucting"*echanical Room'$entralied %#ucting"*echanical Room'
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 21/36
Heating> Ventilating & Air $onditioningHeating> Ventilating & Air $onditioning
%HVA$' –%HVA$' – process o5process o5 treating air to control its temperaturetreating air to control its temperature
TF9ES O= A$:TF9ES O= A$:
++ GA$D – thru the wallGA$D – thru the wall
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 22/36
Heating> Ventilating & Air $onditioningHeating> Ventilating & Air $onditioning
%HVA$' –%HVA$' – process o5process o5 treating air to control its temperaturetreating air to control its temperature
TF9ES O= A$:TF9ES O= A$:
Split Type %$ondenser & Eaporator'Split Type %$ondenser & Eaporator'
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 23/36
Heating> Ventilating & Air $onditioningHeating> Ventilating & Air $onditioning
%HVA$' – process o5 treating air to control its temperature%HVA$' – process o5 treating air to control its temperature
TF9ES O= A$:TF9ES O= A$:
Split Type %$ondenser & Eaporator'Split Type %$ondenser & Eaporator'
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 24/36
Heating> Ventilating & AirHeating> Ventilating & Air
$onditioning$onditioning
%HVA$' – process o5 treating%HVA$' – process o5 treating
air to control its temperatureair to control its temperature TF9ES O= A$:TF9ES O= A$:
Split Type %$ondenser &Split Type %$ondenser &Eaporator'Eaporator'
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 25/36
Heating> Ventilating & Air $onditioningHeating> Ventilating & Air $onditioning
%HVA$' –%HVA$' – process o5process o5 treating air to control its temperaturetreating air to control its temperature
Varia!le Air VolumeVaria!le Air VolumeA simple VAV Systemincludes the following:•Central air handler with
variable-volume supply fan, acooling coil, possibly a heatcoil controls, filters, a mixingbox, and a return or relief fan•Supply duct•VAV "box," with a thermostat
and supply diffusers for eachindependently controlledspace•hermostat and unit controller •!eturn plenum or duct
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 26/36
8A88A8
All-air systems fall into twoAll-air systems fall into twogeneral categories - constantgeneral categories - constantvolume and variable air volumevolume and variable air volume38A84. 'onstant air volume38A84. 'onstant air volumesystems accomplish coolingsystems accomplish coolingand heating by varying theand heating by varying the
supply air temperature andsupply air temperature andeeping the air volumeeeping the air volumeconstant.constant.
8A8 systems eep the air8A8 systems eep the airtemperature constant and varytemperature constant and varythe air supply volume. 8A8the air supply volume. 8A8
systems are easy to control, aresystems are easy to control, areenergy e9cient, and allow fairlyenergy e9cient, and allow fairlygood room control. A drawbacgood room control. A drawbacis possible poor ventilationis possible poor ventilationunder low load conditions, andunder low load conditions, andhumidity control is di9culthumidity control is di9cultunder widely varying latentunder widely varying latentloads.loads.
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 27/36
'A8'A8
A 'ontinuous Air 8olume system uses fans andA 'ontinuous Air 8olume system uses fans andducts to distribute air through a large volume ofducts to distribute air through a large volume ofspace. :eturn ducts then send ;used< air bac tospace. :eturn ducts then send ;used< air bac tothe fans and heaters for reconditioning. As thethe fans and heaters for reconditioning. As thename implies, this type of system is great for large,name implies, this type of system is great for large,continuous spaces, rather than smaller, dividedcontinuous spaces, rather than smaller, dividedbuildings. 7ne ey point of a 'A8 is that thebuildings. 7ne ey point of a 'A8 is that thetemperature and air quality can be preciselytemperature and air quality can be preciselycontrolled. This is important for hospitals orcontrolled. This is important for hospitals or
laboratories.laboratories. 'A8 systems include using a constant air volume'A8 systems include using a constant air volume
reheat system, a multi-5one system, and a furnace.reheat system, a multi-5one system, and a furnace.
%uctwor is ept to a minimum here, and as we allnow, there is never enough room for ductworanyway.
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 28/36
'A8'A8
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 29/36
'A8'A8
The multi-5onesystem 3shownabove4 separatesspaces somewhat
lie a 8ariable Air8olume, or 8A8,system. The mainlarge space iscontrolled e"actly
lie a normal 'A8,but the smallerareas can have theirown thermostat andducting from the
fan.
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 30/36
'A8'A8
The multi-5onesystem 3shownabove4 separatesspaces somewhat
lie a 8ariable Air8olume, or 8A8,system. The mainlarge space iscontrolled e"actly
lie a normal 'A8,but the smallerareas can have theirown thermostat andducting from the
fan.
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 31/36
Toners A' Toners A'
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 32/36
'ooling Tower'ooling Tower
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 33/36
'entrali5ed Air 'onditioning'entrali5ed Air 'onditioning
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 34/36
Air =andling >nit 3A=>4Air =andling >nit 3A=>4
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 35/36
6an 'oil >nit6an 'oil >nit
AiAi
7/21/2019 PPT MECHANICAL EQUIPMENTS OF BUILDING.ppt
http://slidepdf.com/reader/full/ppt-mechanical-equipments-of-buildingppt 36/36
AirAir
'urtain'urtain