19
SONU MUKESH RANJAN SRISHTI YUTHIKA PRESENTED BY:- sentation on KINLEY WATER NT
Transcript
Page 1: PPT OF OM

SONU MUKESH

RANJAN SRISHTI

YUTHIKA

PRESENTED BY:-

Presentation on KINLEY WATER PLANT

Page 2: PPT OF OM

INTRODUCTION.

The Kinley brand is used by Coca-Cola for Packaged Mineral water bottle.

Kinley water comes with the assurance of safety from The Coca-Cola Company and sold in many large European and Asian countries.

Page 3: PPT OF OM

Mineral Water Plant Cost.

Page 4: PPT OF OM

Transformation Process.

Page 5: PPT OF OM

Process Of Production

RAW WATER SUPPLY PUMP : is required for feeding raw water from underground/overhead raw water storage tank to PSF to ACF and then on to MCF with required flow rate of per Hour. The pump is fitted with suction/discharge pipe work, isolation valves and pressure monitor

PRESSURE SAND FILTER : is used for remove all the suspended solids and dust particles from the raw water.

ACTIVATED CARBON FILTER : All the physical impurities such as odour and color of raw water is removed here.

SOFTNER FILTRATION : This is used for remove small micro pollutants and hardness.

KINLEY

Page 6: PPT OF OM

CONT…..

MICRON CARTRIDGE FILTER : The Module consists of Multiple Polypropylene Cartridges with size of 10/5 Micron that prevents micron size particles up to 5 micron.

CHEMICAL DOSING PUMP : This is electronic chemical injection system to remove all scale formation minerals from process raw water to reverse osmosis membranes and is precautionary measure to shield the membranes from blockage of pores.

HIGH PRESSURE PUMP: The High Pressure Pump supply raw water with pressure as required to RO Membranes.

REVERSE OSMOSIS SYSTEM:R.O. System removes 90-95% of Total Dissolved Solids by the art of ‘Reverse Osmosis Process’. This system consist of a S.S Skid for mounting of high pressure tubes in FRP with resistance of 150 psi for pressure housing spiral.

PRODUCT WATER STORAGE TANK : This is a vertical storage tank which is completely made in high quality stainless steel required for storage of the processed product water.

Page 7: PPT OF OM

Production Process Model

Page 8: PPT OF OM

 Water Treatment are classified into the following categories

1. Wastewater Treatment

Residential wastewater treatment covers the mechanisms and processes used to treat waters that have been contaminated in some way by anthropogenic Residential or Residential activities prior to its release into the environment or its re-use.

Page 9: PPT OF OM

2. Boiler Water Treatment

Boiler water treatment is a type of Residential water treatment focused on removal or chemical modification of substances potentially damaging to the boiler. Varying types of treatment are used at different locations to avoid foaming.

Page 10: PPT OF OM

cooling towers can be used to remove heat from various sources such as machinery or heated process material. The primary use of large, Residential cooling towers is to remove the heat absorbed in the circulating cooling water systems.

3. Cooling Water Treatment

Page 11: PPT OF OM

Sewage treatment is the process of removing contaminants from wastewater, including household sewage and runoff (effluents). It includes physical, chemical, and biological processes to remove physical, chemical and biological contaminants.

4. Sewage Treatment

Page 12: PPT OF OM

Distribution Process

Page 13: PPT OF OM

Cost of ProductionThe Table highlights the Cost incurred per 1 ltr bottle.

Page 16: PPT OF OM

Plant Layout

Layout for Mineral Water Plant

Page 17: PPT OF OM

Risk Factors

(a) Execution Failure:-Such a plant calls for detailed steps to get executed in time, with detailed clear-cut duties explained. If not, there is a mess of things & plant fails to get executed in time, in turn it will be left with LOSSES.

(b) No Proper Co-ordination :- After finalize the plant supplier, failing to do a proper co-ordination with the major reason. Non-appointment of a Project OR not maintaining schedules will result in delay in execution

(c) No Documentation :- People go by intuition, without doing proper study on what they have to sell, what market they have, how are they going about it etc. And they do not keep any documentation about this. Then misunderstandings happen.

(d) Absence of Parallel execution system :- It means , at a time it will need to carry out various cycles, absence of this will again

increase project period.

Page 18: PPT OF OM

NET TAKE AWAY

•Kinley is most preferred because of its availability.

• Kinley is considered hygienic water.

• Kinley scores above the other brands in terms of brand awareness.

• Majority of the people ask for Kinley when they purchase packaged drinking water.

Page 19: PPT OF OM

GROUP-08

SONURANJANSRISHTIMUKESHYUTHIKA

THANK YOU