Larson Incitti Architects Page 1 of 2 2570 FNE ECE PROPOSAL REQUEST [X] Owner [X] Mechanical [X] Architect [X] Electrical [X] Contractor [ ] Acoustical [ ] Civil [ ] Food Service [ ] Landscape [ ] Geotechnical [ ] Structural [ ] Other Project: Far Northeast ECE PR Number: PR-04 Project No: 1505 Issue Date: July 5, 2016 Owner: School District 27J Architect: Larson Incitti Architects 18551 E. 160 th Avenue 1900 Wazee Street, #1539 Brighton, CO 80601 Denver, Colorado 80202 Contractor: GH Phipps Contract For: New Building 5995 Greenwood Plaza Blvd. Ste. 100 Greenwood Village, CO 80111 Submit an itemized quotation for changes in the Contract Sum and/or Time related to proposed modifications to the Contract Documents described below. THIS IS NOT A CHANGE ORDER OR A DIRECTIVE TO PROCEED WITH THE WORK DESCRIBED HEREIN. Description: Boiler changes. Revised duct routes per RFI-21. Added emergency lighting noted in lighting submittal. MECHANICAL: PR04-M1.0 RE: Drawing Sheet M1.0 LEVEL 1 HVAC PLAN a. Revised medium pressure duct routing and sizes for classroom VAV boxes. PR04-M3.1 RE: Drawing Sheet M3.1 ENLARGED MECHANICAL PLANS a. Revised line work and equipment call-outs for 2 nd Boiler and Secondary Boiler pumps HWP- 1 & HWP-2. PR04-M7.1 RE: Drawing Sheet M7.1 MECHANICAL SCHEDULES a. Revised pump schedule to match Electrical plans in pump hp sizing requirements from Permit set. b. Revised Boiler Schedule for single Hydronic boiler with (2) modules capable of providing the same hydronic boiler capacity as the Permit set boilers. PR04-M8.1 RE: Drawing Sheet M8.1 MECHANICAL SCHEMATICS a. Revised Schematic for single hydronic boiler. b. Revised Sequence of operations to exclude the 2 nd hydronic boiler. HWP-1 & HWP-2 are now integral to B-1 ELECTRICAL: PR04-E1 RE: Drawing Sheets E2.1 Level 1 Power Plan: a. Maintenance Room 104C: Revised to match mechanical changes. PR04-E2 RE: Drawing Sheets E3.1 Plans; Level 1 Lighting Plan: a. Clinic: Added EM light fixture. b. Reception: Added EM light fixtures. c. Workroom: Added EM light fixtures
Transcript

Larson Incitti Architects Page 1 of 2 2570 FNE ECE

PROPOSAL REQUEST

[X] Owner [X] Mechanical [X] Architect [X] Electrical [X] Contractor [ ] Acoustical [ ] Civil [ ] Food Service [ ] Landscape [ ] Geotechnical [ ] Structural [ ] Other

Project: Far Northeast ECE PR Number: PR-04 Project No: 1505 Issue Date: July 5, 2016 Owner: School District 27J Architect: Larson Incitti Architects 18551 E. 160th Avenue 1900 Wazee Street, #1539 Brighton, CO 80601 Denver, Colorado 80202 Contractor: GH Phipps Contract For: New Building 5995 Greenwood Plaza Blvd. Ste. 100 Greenwood Village, CO 80111

Submit an itemized quotation for changes in the Contract Sum and/or Time related to proposed modifications to the Contract Documents described below. THIS IS NOT A CHANGE ORDER OR A DIRECTIVE TO PROCEED WITH THE WORK DESCRIBED HEREIN.

Description: Boiler changes. Revised duct routes per RFI-21. Added emergency lighting noted in lighting

submittal. MECHANICAL: PR04-M1.0 RE: Drawing Sheet M1.0 LEVEL 1 HVAC PLAN

a. Revised medium pressure duct routing and sizes for classroom VAV boxes. PR04-M3.1 RE: Drawing Sheet M3.1 ENLARGED MECHANICAL PLANS

a. Revised line work and equipment call-outs for 2nd Boiler and Secondary Boiler pumps HWP-1 & HWP-2.

PR04-M7.1 RE: Drawing Sheet M7.1 MECHANICAL SCHEDULES a. Revised pump schedule to match Electrical plans in pump hp sizing requirements from

Permit set. b. Revised Boiler Schedule for single Hydronic boiler with (2) modules capable of providing the

same hydronic boiler capacity as the Permit set boilers. PR04-M8.1 RE: Drawing Sheet M8.1 MECHANICAL SCHEMATICS

a. Revised Schematic for single hydronic boiler. b. Revised Sequence of operations to exclude the 2nd hydronic boiler. HWP-1 & HWP-2 are

now integral to B-1 ELECTRICAL: PR04-E1 RE: Drawing Sheets E2.1 Level 1 Power Plan:

a. Maintenance Room 104C: Revised to match mechanical changes.

PR04-E2 RE: Drawing Sheets E3.1 Plans; Level 1 Lighting Plan: a. Clinic: Added EM light fixture. b. Reception: Added EM light fixtures. c. Workroom: Added EM light fixtures

DW

T

T

T T

T

T

T

T

T

TT

T

T

T T

T

T

CO

²

CO

²

CO

²

CO

²

CO

²

CO

²

CO

²

CO

²

CO²

CO

²

CO

²

CO

²

CO

²

T

T

75432

A

B

C

1

D

D.2

D.1

A.3

7.1

5.3

3.3

C.7

C.8

D3

1.8 6

6.2

4.2

A.9

1.2

MULTIPURPOSE

103

CONFERENCE

102

CORRIDOR

100

OFFICE

101F

OFFICE

101E

OFFICE

101D

UNISEX

101BA

CLINIC

101B

RECEPTION

101A

WORKROOM

101C

VESTIBULE

100A

MDF

114A UNISEX

114B

WOMEN

100C

MEN

100B

CLASSROOM

113

CLASSROOM

112

CLASSROOM

111

CLASSROOM

110

STORAGE

113A

STORAGE

112B

UNISEX

112A

UNISEX

110A

STORAGE

111A

STORAGE

110B

CORRIDOR

105

FOOD

SERVICE

104A

STORAGE

103A

CUSTODIAL

104B

MECHANICAL

104C

STORAGE

104CA

O/S1

O/S1

CLASSROOM

106

CLASSROOM

107

CLASSROOM

108

CLASSROOM

109

UNISEX

106A

STORAGE

106B

STORAGE

107A

UNISEX

108A

STORAGE

108B

STORAGE

109A

OUTDOOR

STORAGE

O/S2

VAV-03

VAV-02

VAV-09

VAV-01

VAV-04

VAV-06

VAV-07

VAV-08

VAV-12

VAV-17

VAV-05

UH-1

CUH-232x20 SA/RA UP

32x18 SA/RA UP

36x20 SA/RA UP

M3.1

1

8"Ø EA UPTO EF-4

8"Ø EA UPTO EF-5

10x10 EA UPTO EF-6

8"Ø EA UPTO EF-2

8"Ø EA UPTO EF-3

1

2 2

2

2

3

12"x10" SA

SD-18"Ø

(TYP. 2)280

RG-1

8"x8" SA

10"x10" SA

SD-1

42010"Ø RG-1

SD-1

706"Ø

SD-1

1206"Ø

8"x8" SA

8"x8" SA

SD-1

856"Ø

SD-1

856"Ø

RG-1

RG-1SD-1

2708"Ø

RG-110"x8" SA

SD-1

8"Ø

(TYP. 2)320

12"x

12"

SA

24"x

18"

SA

16"x

12"

SA

20"x

14"

SA

RG-1

SD-1

10"Ø

(TYP. 2)430

14"x12" SA

SG-1

22x12

(TYP. 3)1000

26"x

16"

SA

RG-1

RG-1SD-1

706"Ø

SD-1

1006"Ø

10"x

10"

SA

16"x

12"

SA

SD-2

8"Ø

(TYP. 2)230

SD-1

8"Ø

(TYP. 2)230

24"x10" SA

24"x10" SA

SD-18"Ø

(TYP. 2)280

SD-2

8"Ø

(TYP. 2)280

14"x

14"

SA

12"x

10"

SA

VAV-10

RG-1

SD-28"Ø

(TYP. 2)280

14"x

14"

SA

12"x

10"

SA

SD-18"Ø

(TYP. 2)280

RG-1

VAV-13

14"x

14"

SA

12"x

10"

SA

SD-28"Ø

(TYP. 2)280

SD-1

8"Ø

(TYP. 2)280

RG-1

24"x10" SA

24"x10" SA

RG-1RG-1

RG-1 RG-1

VAV-19

SD-28"Ø

(TYP. 2)305

12"x

10"

SA

14"x

14"

SA

SD-1

8"Ø

(TYP. 2)305

VAV-15 VAV-18RG-1

VAV-14

SD-1

8"Ø

(TYP. 2)255

SD-2

8"Ø

(TYP. 2)255

SD-2

8"Ø

(TYP. 2)230

SD-1

8"Ø

(TYP. 2)230

16"x

12"

SA

10"x

10"

SA

10"x

10"

SA

16"x

12"

SA

12"x

10"

SA

14"x

14"

SA

SD-1

8"Ø

(TYP. 2)280

SD-2

8"Ø

(TYP. 2)280

SD-1

3008"Ø

SD-1

3008"Ø

VAV-16

10"x8" SA

RG-1

RG-1

SD-1

40010"Ø

10"x10" SA

CUH-1

4

RG-1

TG-1

12x12(TYP. 2)

TG-1

12x12(TYP. 2)

TG-1

12x12(TYP. 2)

TG-112x12

(TYP. 2)

TG-1

12x12(TYP. 2)

TG-112x12

(TYP. 2)

VAV-11

EG-1

14012x12

EG-1

14012x12

6"x6" EA

EG-1

7012x12

10"x8" SACORRIDOR

104

SD

-1

100

6"Ø

RG-1

SG-1

14012x12

SG-1

14012x12

SG-1

14012x12

SG-1

14012x12

EF-7

FC-1

SD-1

606"Ø

SD-1

606"Ø

SD-1

606"Ø

SD-1

606"Ø

SD-1

606"Ø

SD-1

606"Ø

SD-1

606"Ø

SD-1

606"Ø

EH-15

6

7

8

10

10 10

P

P

P

WORKROOM

114

32"x18" SA

10"ø

SA

8"ø

SA

6

1. PROVIDE CEILING MOUNTED EXHAUST FAN WITH CONTROLINTERLOCKED TO LIGHT SWITCH.

2. PROVIDE ROOF MOUNTED EXHAUST FAN WITH CONTROLINTERLOCKED TO LIGHT SWITCH.

3. PROVIDE ROOF MOUNTED EXHAUST FAN ON OCCUPANCY TIMECLOCK WITH CURB & CONTROLS.

4. PROVIDE RECESSED CEILING MOUNTED CABINET UNIT HEATER,CONTROLS, ELECTRICAL, SUPPORTS, AND HYDRONIC PIPING.REFERENCE SHEET M5.1.

5. PROVIDE RECESSED WALL MOUNTED ELECTRIC HEATER. MFR:MARLEY, MODEL: SRA1012DSF, 1 KW, 120V, 8.4 AMPS.

6. PROVIDE SPLIT SYSTEM FAN COIL UNIT FOR MDF ROOM. PROVIDESUPPORTS, ELECTRICAL, CONTROLS, GROUND FILTER BOX,CONDENSATE PUMP, AND COPPER REFRIGERANT LINE SET ROUTED TOASSOCIATED ROOFTOP CONDENSING UNIT. SEE SHEET M1.2 FORCONTINUATION.

7. PROVIDE VAV BOX WITH HYDRONIC REHEAT COIL. CONTRACTOR TOVERIFY MAINTENANCE ACCESS FOR INSTALLED LOCATION, TYPICAL.

8. PROVIDE CEILING MOUNTED TRANSFER GRILLES, DUCTWORK, ANDSUPPORTS, TYPICAL.

9. PROVIDE RECESSED CABINET UNIT HEATER, CONTROLS,ELECTRICAL, SUPPORTS, AND HYDRONIC PIPING. COORDINATELOCATION WITH ARCHITECT.

10. PROVIDE DIFFERENTIAL STATIC PRESSURE SENSOR IN DUCTWORKLOCATED 2/3 DOWNSTREAM FROM AIR HANDLER.

KEY NOTES (THIS SHEET)

SHEET:

OF:

DESIGNED BY:DRAWN BY:CHECKED BY:DATE:SCALE:

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

APPROVED CONTRACT DOCUMENT

DATE:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER, COSCHOOL DISTRICT NO. 1 SITE NO. 196

DWG. NO.

DEPARTMENT OF FACILITY MANAGEMENT

DENVER PUBLIC SCHOOLS

LARSON INCITTI ARCHITECTS1900 WAZEE ST. SUITE 1539

DENVER, CO 80202

303-292-4304

AS NOTED CONSTRUCTION DOCUMENTS

953.001

SCHOOL NO. 1107

72M1.0

PP2570 FAR NORTHEAST ECECATHAY ST., DENVER, CO 80249

JRKMJC

02/11/16

LEVEL 1 HVAC PLAN

1107 -

2570 -

OR

- M

1.0

MLR

SCALE: 1/8" = 1'-0"1LEVEL 1 HVAC PLAN

SUITE 1500

80202

3 0 3 . 3 8 2 . 1 9 2 0T :

3 0 3 . 3 8 2 . 1 9 3 0

717 17th Street,

F :

DENVER, CO

High Performance Building Consultants

w w w . m e g r o u p . c o m

Job #:

Rme UPG

51

1 07/01/16 PR-04

NORTH

6

M

3

A

10x10 EA UP TO EF-1

UH-2

EEW/SHR-1

FS-1

EF-8

L-1

HWP-3 HWP-4

GWH-1

2"FD-1

DCP-1

2 1/2" G

1 1

/4"

G

2 1

/2"

G

1-1/2" V UP

6"ø E

A

4"ø EA

B-1

1

8

4

6

5

2

3 6

9

6"ø EA

3"ø EA

10

1" CW

2 1/2" HW

1 1

/4"

CD

11

TMV-3

MSB-1

7

2' - 0"

2' -

8"

6

6

1. PROVIDE WALL LOUVER W/ FIRE DAMPER MOUNTED MININUM 3'0"ABOVE DOOR.

2. PROVIDE DUCT MOUNTED EXHAUST GRILL W/ 10"X10" DUCT UP TOROOF EXHAUST FAN, EF-1.REF.SHT M1.2.

3. PROVIDE BOILER VENT DUCTWORK UP TO ROOF OUTLET.REFERANCE SHT M1.2.

4. PROVIDE DOMESTIC HOT WATER HEATER FLUE DUCTWORK UPTO ROOF OUTLET. REFERANCE SHEET M1.2.

5. PROVID NATURAL GAS PIPING HIGH IN SPACE UP TO ROOFEQUIPMENT. SEE SHEET M1.2 FOR CONTINUATION.

6. PROVIDE CONDENSATE PIPING WITH UNISTRUT SOPPORTSLOCATED 4'0" O.C TO NEAREST INDIRECT DRAIN RECEPTACLE.

7. PROVIDE BUILDING AUTOMATION SYSTEM CONTROL PANELMOUNTED ON WALL. COORDINATE FINAL LOCATION WITH ARCHITECT,FURNITURE, AND DPS STAFF.

8. COORDINATE LOCATION OF EMERGENCY POWER OFF SHUTDOWN BUTTON W/ ELECTRICAL, PIPING, AND BOILER EQUIPMENT.REF TO DETAIL 3, E2.1.

9. PROVIDE HYDRONIC UNIT HEATER MOUNTED 8'0" A.F.F.COORDINATE LOCATION WITH PIPING.

10. PROVIE CEILING MOUNTED EXHAUST FAN WITH CONTROLINTERLOCKED TO LIGHT SWITCH.

11. PROVIDE AND ROUTE LAUNDRY DRYER VENT UP THROUGH ROOFTO OUTLET FITTING WITH BACKDRAFT DAMPER.

KEY NOTES (THIS SHEET)

3

A

2"

HW

R

3/4

" H

WR

2"

HW

S

3/4" HWR

3/4" HWS

2"

HW

R

2"

HW

S

UH-2 HWP-3 HWP-4

TEA

AS-1

CHEMICAL POTFEEDER

MECHANICAL

104C

CUSTODIAL

104B

6

6

B-1

SHEET:

OF:

DESIGNED BY:DRAWN BY:CHECKED BY:DATE:SCALE:

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

APPROVED CONTRACT DOCUMENT

DATE:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER, COSCHOOL DISTRICT NO. 1 SITE NO. 196

DWG. NO.

DEPARTMENT OF FACILITY MANAGEMENT

DENVER PUBLIC SCHOOLS

LARSON INCITTI ARCHITECTS1900 WAZEE ST. SUITE 1539

DENVER, CO 80202

303-292-4304

AS NOTED CONSTRUCTION DOCUMENTS

953.001

SCHOOL NO. 1107

72M3.1

PP2570 FAR NORTHEAST ECECATHAY ST., DENVER, CO 80249

JRKMJC

02/11/16

ENLARGED MECHANICALPLANS

1107 -

2570 -

OR

- M

3.1

MLR

SUITE 1500

80202

3 0 3 . 3 8 2 . 1 9 2 0T :

3 0 3 . 3 8 2 . 1 9 3 0

717 17th Street,

F :

DENVER, CO

High Performance Building Consultants

w w w . m e g r o u p . c o m

Job #:

Rme UPG

SCALE: 1/2" = 1'-0"1ENLARGED MECHANICAL ROOM PLAN

SCALE: 1/2" = 1'-0"2ENLARGED MECHANICAL ROOM HYDRONIC PLAN

54

1 03/31/16 RFI-006

2 07/01/16 PR-046

GAS FIRED ROOFTOP UNIT SCHEDULEMARK

RTU-1

RTU-2

RTU-3

NOTES:

1.

2.

3.

4.

MANUFACTURER

AAON

AAON

AAON

ALL UNIT SELECTIONS SHALL BE SELECTED FOR 5280 FT. ELEVATION.

PRE-FILTERS SHALL BE MERV 8, FINAL FILTERS SHALL BE MERV 13.

REFRIGERANT SHALL BE R410-A.

PROVIDE ADDITIONAL 120/1 CIRCUIT FOR LIGHTS AND CONVENIENCE OUTLET.

MODEL

RN-020-8-0-EA09-549

RN-020-8-0-EA09-549

RN-020-8-0-EA09-549

SERVES

WEST ADMIN/OFFICE AREA

CENTRAL CLASSROOMS

EAST CLASSROOMS

SUPPLY FAN

SA

CFM

8,000

8,000

8,000

ESP

("WC)

2.0

2.0

2.0

TSP

("WC)

4.2

4.2

4.2

5.

6.

7.

8.

HP

10

10

10

MODULATING GAS HEAT

DIGITAL COMPRESSOR

VFD ON SUPPLY FANS

DIRECT DRIVE SUPPLY FANS

MIN

OSA

(CFM)

2,400

2,400

2,400

EXHAUST FAN

EA

CFM

7,200

7,200

7,200

ESP

("WC)

0.5

0.5

0.5

TSP

("WC)

1.2

1.2

1.2

COOLING COIL (DX)

TOT.

(MBH)

201

201

201

SENS.

(MBH)

179

179

179

10.

11.

EER

12.0

12.0

12.0

PROVIDE WITH RETURN CO2 SENSOR AND MODULATING OA DAMPER

PROVIDE OUTSIDE AIRFLOW MEASURING STATION.

A.P.D.

"W.C.

EAT (°F)

DB/WB

95/65

95/65

95/65

LAT (°F)

DB/WB

55/53

55/53

55/53

HEATING COIL (NAT GAS)

CAPACITY

(MBH)

180.6

180.6

180.6

A.P.D.

"W.C.

0.2

0.2

0.2

EAT (°F)

DB

36

36

36

LAT (°F)

DB

107

107

107

ELECTRICAL

MCA

126

126

126

MOPD

150

150

150

V/PH/HZ

208/3/60

208/3/60

208/3/60

SIZE

(LxWxH)

(IN)

110x64x59

110x64x59

110x64x59

WEIGHT

(LBS)

2,944

2,944

2,944

NOTES

1-11

1-11

1-11

VAV BOX SCHEDULE

MARK

VAV-01

VAV-02

VAV-03

VAV-04

VAV-05

VAV-06

VAV-07

VAV-08

VAV-09

VAV-10

VAV-11

VAV-12

VAV-13

VAV-14

VAV-15

VAV-16

VAV-17

VAV-18

VAV-19

NOTES:

1.

2.

3.

MANUFACTURER

PRICE

PRICE

PRICE

PRICE

PRICE

PRICE

PRICE

PRICE

PRICE

PRICE

PRICE

PRICE

PRICE

PRICE

PRICE

PRICE

PRICE

PRICE

PRICE

ALL CAPACITIES ARE AT 5280 FT.

HEATING COIL CAPACITIES BASED ON 140°F EWT, 110°F LWT, 55°F EAT, 85°F LAT, AND MAXIMUM CFM.

PROVIDE WITH 3-WAY CONTROL VALVE.

MODEL

SDV5

SDV5

SDV5

SDV5

SDV5

SDV5

SDV5

SDV5

SDV5

SDV5

SDV5

SDV5

SDV5

SDV5

SDV5

SDV5

SDV5

SDV5

SDV5

SERVES

101A RECEPTION

101B CLINIC

101D OFFICE

101E, 101F OFFICES

100 CORRIDOR

102 CONFERENCE

103 MULTIPURPOSE

103A,104,104A STORAGE

114 TEACHER'S LOUNGE

113 CLASSROOM

105 CORRIDOR WEST

106 CLASSROOM

112 CLASSROOM

107 CLASSROOM

111 CLASSROOM

105 CORRIDOR EAST

108 CLASSROOM

110 CLASSROOM

109 CLASSROOM

INLET

("Ø)

4

6

6

4

8

10

14

6

8

10

6

10

10

10

10

8

10

10

10

MIN

(CFM)

160

90

70

90

440

320

3000

190

400

970

190

920

1120

1010

970

140

920

1210

1120

HEATING

(CFM)

170

350

190

100

640

320

2600

270

490

970

400

920

1120

1010

970

450

920

1210

1120

COOLING

(CFM)

190

420

270

170

640

860

3000

270

560

1180

400

1000

1180

1070

1180

600

1000

1270

1180

MAX APD

(IN W.C.)

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

MIN

MBH

6.3

10.1

6.6

3.2

17.8

11.4

88.9

7.7

14.1

27.0

11.4

26.5

32.2

29.4

27.0

12.7

26.5

34.5

32.2

HYDRONIC

CONNECT SIZE

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1"

1/2"

1/2"

3/4"

1/2"

3/4"

3/4"

3/4"

3/4"

1/2"

3/4"

3/4"

3/4"

MAX WPD

(FT W.C.)

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GPM

0.6

1.0

0.6

0.5

1.5

0.8

6.0

0.6

1.3

2.0

1.0

2.0

3.0

2.5

2.0

1.0

2.0

3.5

3.0

NOTES

1,2

1,2,3

1,2

1,2

1,2

1,2

1,2

1,2

1,2

1,2

1,2

1,2

1,2

1,2

1,2

1,2

1,2

1,2

1,2,3

BOILER SCHEDULE

MARK

B-1

NOTES:

1.

2.

3.

4.

MANUFACTURER

REILLO

OUTPUT CAPACITIES ARE AT 5280 FT.

PROVIDE CONDENSING GAS BOILER WITH ACID NEUTRALIZATION KIT, SEALED COMBUSTION, DIRECT VENT, AND VENTLESS GAS REGULATOR.

PROVIDE WITH 8:1 TURNDOWN AND LOW NOX EMISSIONS.

PROVIDE WITH DEDICATED MODULE PRIMARY PUMP.

MODEL

AR1000

SERVES

HEATING LOOP

TYPE

GAS FIRED

FUEL

NG

FUEL PRESSURE

(IN WC)

14

TOT. INPUT

(MBH)

1000

TOT. OUTPUT

@ S.L. (MBH)

768.8

INPUT/

MODULE

500.0

# OF

MODULES

2

EFFICIENCY

96%

FLUID

0% GLYCOL

GPM

25

WPD

FT

9.5

EWT

(°F)

110

LWT

(°F)

150

V/PH/HZ

120/1/60

FLA

1.8

NOTES

1, 2, 3, 4

PUMP SCHEDULE

MARK

HWP-3

HWP-4

NOTES:

1. PROVIDE DDC INTERFACE.

2. PROVIDE WITH DIFFERENTIAL PRESSURE SENSORS, CONTROLS, FITTINGS, VALVES, SUPPORTS AND ELECTRICAL.

MANUFACTURER

BELL AND GOSSET

BELL AND GOSSET

MODEL

1.25AAB e-90

1.25AAB e-90

SERVES

HYDRONIC HEATING

HYDRONIC HEATING

TYPE

IN-LINE

IN-LINE

GPM

30

30

HEAD(FT)

45

45

FLUID

WATER

WATER

MOTOR(HP)

1 1/2

1 1/2

MOTOR(RPM)

3600

3600

VFD

YES

YES

VOLT/PH/HZ

208-230/460

208-230/460

FLA

2

2

WEIGHT (LBS)

63

63

NOTES

ALL

ALL

FAN SCHEDULE

MARK

EF-1

EF-2-5

EF-6

EF-7, 8

NOTES:

1.

2.

3.

4.

MANUFACTURER

GREENHECK

GREENHECK

GREENHECK

GREENHECK

ALL CAPACITIES ARE AT 5280 FT.

PROVIDE WITH EXHAUST SAFETY GRILLE.

PROVIDE WITH ROOF CURB.

INTERLOCK FAN TO OPERATE BASED ON THERMOSTAT CALL FOR COOLING. INTERLOCK WITH INTAKE LOUVER.

MODEL

G-085-VG

G-070-VG

G-070-VG

SP-B110

SERVES

104B MAINTENANCE

CLASSROOM UNISEX RESTROOM

100B MEN'S, 100C WOMEN'S

101BA UNISEX RESTROOM, CUSTODIAL 104B

TYPE

DOWNBLAST CENTRIFUGAL

DOWNBLAST CENTRIFUGAL

DOWNBLAST CENTRIFUGAL

INLINE CEILING

CFM

360

140

250

100

ESP

(IN WC)

0.30

0.30

0.30

0.30

MOTOR

(HP/W)

0.04

0.02

0.03

0.03

FAN

RPM

1725

1725

1725

1725

DRIVE

DIRECT

DIRECT

DIRECT

DIRECT

BACKDRAFT

DAMPER

GRAVITY

GRAVITY

GRAVITY

GRAVITY

VOLT/PH/HZ

115/1/60

115/1/60

115/1/60

115/1/60

NOTES

1-4

1-4

1-4

1, 5

HOT WATER UNIT HEATER SCHEDULE

MARK

CUH-1

CUH-2

UH-1

UH-2

NOTES:

1.

2.

3.

4.

MANUFACTURER

RITTLING

RITTLING

RITTLING

RITTLING

CAPACITIES ARE AT 5280 FT.

HEATING CAPACITIES ARE BASED ON 0% PROPYLENE GLYCOL, 140°F EWT, 110°F LWT, 65°F EAT.

PROVIDE WITH FACTORY MOUNTED DISCONNECT SWITCH.

PROVIDE WITH INTERNAL TEMPERATURE SENSOR.

MODEL

RC 390-08

RFRW-340-02

RH-18

RH-18

SERVES

VESTIBULE 100A

CORRIDOR 105

O/S1

MAINTENANCE 104B

TYPE

HORIZONTAL CEILING

VERTICAL CABINET

VERTICAL

VERTICAL

CFM

689

183

310

310

MBH

34.5

10.1

4.9

4.9

GPM

5

2

1

1

CONNECTION

SIZE (IN)

1"

3/4"

1/2"

1/2"

WPD

(FT WC)

0.8

0.5

0.3

0.3

MOTOR

(HP/W)

(0.1/--)

(0.1/--)

(0.1/--)

(0.1/--)

VOLT/PH/HZ

120/1/60

120/1/60

120/1/60

120/1/60

AMPS

1.13

0.35

0.7

0.7

WEIGHT

(LBS)

170

90

37

37

NOTES

1,2,3,4

1,2,3,4

1,2,3

1,2,3

GRILLE, REGISTER, & DIFFUSER SCHEDULE

MARK

SD-1

SD-2

SG-1

TG-1

RG-1

EG-1

NOTES:

1.

2.

3.

MANUFACTURER

PRICE

PRICE

PRICE

PRICE

PRICE

PRICE

PROVIDE WITH O.B.D.

PROVIDE WITH PLENUM BOX.

PROVIDE WITH RETURN AIR SOUND BOOT. REF. DETAIL 7 SHEET M5.1.

MODEL

SCD

SDS-100

520

PDDR

PDDR

PDDR

TYPE

3-CONE LOUVERED FACE

LINEAR SLOT DIFFUSER (4 SLOTS)

3/4" SPACING, DOUBLE DEFLECTION ADUSTABLE

PERFORATED FACE NON-DUCTED RETURN

PERFORATED FACE NON-DUCTED RETURN

PERFORATED FACE

NECK

SEE PLANS

SEE PLANS

SEE PLANS

SEE PLANS

SEE PLANS

SEE PLANS

MATERIAL

STEEL

STEEL

ALUMINUM

STEEL

STEEL

STEEL

FRAME TYPE

LAY-IN

LAY-IN

DUCT MOUNT

LAY-IN

LAY-IN

LAY-IN

COLOR

WHITE

WHITE

BRUSHED

WHITE

WHITE

WHITE

NOTES

2

1

3

1

LOUVER SCHEDULE

MARK

L-1

NOTES:

1.

2.

3.

MANUF. &

MODEL OR EQUAL

GREENHECK ESD-635

FLANGE FRAME, BIRD SCREEN, DRAINABLE BLADES, AND MOTORIZED DAMPER.

PROVIDE IN CLASS I COLOR ANODIZED FINISH PER AAMA 611 AA-M12C22A42,

COATING NOT LESS THAN 0.7MM THICK.

PROVIDE FIRE DAMPER.

SERVES

MAINT 104C OA

AIRFLOW

(CFM)

350

MIN. FREE AREA

(SQ. FT)

0.43

SIZE

(IN)

12x24

MAX FREE AREA

VEL. FPM

814

NOTES

1,2

SPLIT COOLING SYSTEM SCHEDULE

MARK

FC-1

CU-1

NOTES:

1.

2.

3.

MANUFACTURER

CARRIER

CARRIER

ALL CAPACITIES ARE AT 5280 FEET.

PROVIDE WITH LOW AMBIENT CONTROL, WIND BAFFLES, AND WINTER START CONTROL.

PROVIDE WITH CONDENSATE PUMP CAPABLE OF LIFTING 15 FT. OF HEAD.

MODEL

FB4CNF024000

38HDR024---3

LOCATION

MDF 114A

ROOF

FAN INFO

CFM

795

-

E.S.P.

-

-

COOLING CAPACITY

REFRIG.

R-410A

R-410A

SENSIBLE

(MBH)

22.07

22.07

ELECTRICAL DATA

MCA

3.5

14.1

MOPD

15

25

VOLT/PH/HZ

208/1/60

208/1/60

DIMENSIONS

LXDXH

(IN)

22x18x50

12x32x34

WEIGHT

(LBS)

150

180

NOTES

1,3

2

6

6

6

SHEET:

OF:

DESIGNED BY:DRAWN BY:CHECKED BY:DATE:SCALE:

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

APPROVED CONTRACT DOCUMENT

DATE:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER, COSCHOOL DISTRICT NO. 1 SITE NO. 196

DWG. NO.

DEPARTMENT OF FACILITY MANAGEMENT

DENVER PUBLIC SCHOOLS

LARSON INCITTI ARCHITECTS1900 WAZEE ST. SUITE 1539

DENVER, CO 80202

303-292-4304

AS NOTED CONSTRUCTION DOCUMENTS

953.001

SCHOOL NO. 1107

72M7.1

PP2570 FAR NORTHEAST ECECATHAY ST., DENVER, CO 80249

JRKMJC

02/11/16

MECHANICAL SCHEDULES

1107 -

2570 -

OR

- M

7.1

MLR

SUITE 1500

80202

3 0 3 . 3 8 2 . 1 9 2 0T :

3 0 3 . 3 8 2 . 1 9 3 0

717 17th Street,

F :

DENVER, CO

High Performance Building Consultants

w w w . m e g r o u p . c o m

Job #:

Rme UPG

56

1 06/24/16 CA REVISIONS

2 07/01/16 PR-046

TT

S

DP

TS

T

T

TERMINAL BOX WITH HW REHEAT

THE UNIT HAS A BACNET CARD AND COMMUNICATES POINTS BACK TO THE BAS.

THE UNIT SHALL OPERATE TO ACHIEVE THE OCCUPIED/UNOCCUPIED SPACE

TEMPERATURE SET POINTS AS DESCRIBED IN THE TEMPERATURE CONTROL

NOTES.

OCCUPIED MODE:

THE HOT WATER VALVE SHALL BE ENABLED BY A SPACE TEMPERATURE SENSOR.

THE SET POINT SHALL BE AS DEFINED IN THE GENERAL NOTES.

WHEN THE TERMINAL BOX RECEIVES A CALL FOR COOLING THE PRIMARY AIR

VALVE SHALL MODULATE BETWEEN MINIMUM AND MAXIMUM POSITION. THE AIR

VALVE SHALL MODULATE OPEN TO REDUCE TEMPERATURE. THE AIR VALVE

SHALL MODULATE TO MINIMUM TO ALLOW SPACE TEMPERATURE TO RISE.

WHEN THE TERMINAL BOX RECIEVES A CALL FOR HEATING THE PRIMARY AIR

VALVE AND HOT WATER VALVE MODULATE TOGETHER FROM THE BOX MINIMUM

FLOW TO THE BOX HEATING MAXIMUM FLOW TO MAINTAIN THE SPACE

TEMPERATURE SET POINT. THE BOX AIR VALVE SHALL OPEN AND HW VALVE

MODULATE OPEN TO RAISE THE SPACE TEMPERATURE. THE BOX AIR VALVE AND

HW VALVE SHALL CLOSE TO REDUCE SPACE TEMPERATURE.

UNOCCUPIED MODE:

MAINTAIN UNOCCUPIED SET POINTS.

POINTS LIST (DESCRIPTION / TYPE):

HW VALVE POSITION / AI

PRIMARY AIR VALVE POSITION / AI

AIRFLOW CFM / AI

ROOM TEMPERATURE / AI

ROOM TEMPERATURE SET POINT / AO

CO2 PPM / AI

CO2 CONTROL SEQUENCE:

VAV TERMINAL BOXES SERVING DENSELY OCCUPIED SPACES AND EQUIPPED

WITH CO2 SENSORS SHALL RESET THEIR MINIMUM FLOW TO 25% OF MAXIMUM

FLOW WHEN CO2 IS BELOW 1000 PPM. WHEN CO2 IS ABOVE 1000 THE BOX SHALL

PROVIDE ITS SCHEDULED MINIMUM FLOW.

DOMESTIC WATER CIRC PUMP

THE BAS SHALL ENABLE THE CIRC PUMP ACCORDING TO THE

OCCUPIED/UNOCCPIED SCHEDULE. THE PUMP SHALL RUN DURING OCCUPIED

HOURS AND BE OFF DURING UNOCCUPIED HOURS. A CURRENT SWITCH SHALL

INDICATE PUMP STATUS. AN ALARM SHALL BE GENERATED IF THE PUMP IS

ENABLED AND FAILS TO START.

POINTS LIST (DESCRIPTION / TYPE):

START-STOP / DO

STATUS / DI

UNOCCUPIED LOW TEMP ALARM

IF ANY OF THE SPACES SERVED BY RTU-1 ARE BELOW THE UNOCCUPIED SET

POINT BY BY 5°F AN ALARM SHALL BE GENERATED AT THE OPERATOR'S WORK

STATION AND THE HEATING PLANT ENABLED. IF ANY OF THE SPACES SERVED BY

RTU-2 OR 3 ARE BELOW THE UNOCCUPIED SET POINT BY 5°F AN ALARM SHALL BE

GENERATED AT THE OPERATOR'S WORKSTATION.

SPLIT SYSTEM

THE SPLIT SYSTEM OPERATES UNDER ITS FACTORY MOUNTED CONTROLS. THE

ROOM TEMPERATE SET POINT SHALL BE 80F. THE BAS WILL MONITOR THE ROOM

TEMPERATURE.

POINTS LIST (DESCRIPTION / TYPE):

ROOM TEMPERATURE / AI

CABINET HEATER

THE CABINET HEATER SHALL BE ENABLED BY A SPACE TEMPERATURE SENSOR.

THE SET POINT SHALL BE 70F. CABINET HEATERS WILL NOT BE INTEGRATED

INTO THE BAS.

B-1

AUTO AIRVENT

AIRSEPARATOR

PUMPHWP-4

VFDP-X

KWHR

STATUS

SPEED

START / STOP

TEA-1

CHEMICALPOT

FEEDER

PUMPHWP-3

VFDP-X

KWHR

STATUS

SPEED

START / STOP

HPWS TEMP-BAS

DP SENSORSEE M2.1 FOR

LOCATION.

PRESSURE RELIEFVALVE SET TO 50 PSI

HPWS TEMP-BAS

HPWR TEMP-BAS

2" HWS

2" HPWR

2" HWS

2" HPWS

2" HWS

2" HWS

GENERAL:

1. PROVIDE ALL NECESSARY HARDWARE, SOFTWARE, RELAYS, CONTACTS, WIRING AND CONDUITS TO ACCOMPLISH THE

FOLLOWING CONTROL SEQUENCES FOR THE HEATING, VENTILATING AND AIR CONDITIONING SYSTEM.

2. CONTROLS SHALL BE DIRECT DIGITAL (DDC). ACTUATORS FOR VALVES, DAMPERS AND TERMINAL CONTROLLERS SHALL BE

ELECTRIC/ELECTRONIC CONTROL.

3. BAS CONTRACTOR SHALL COORDINATE ALL INTERFACE REQUIREMENTS.

4. PROVIDE INDIVIDUAL INPUTS OR OUTPUTS FOR EACH POINT LISTED IN THE POINTS LISTS. PROVIDE ANY ADDITIONAL POINTS

NOT LISTED IN THE POINTS LIST, BUT REQUIRED TO MEET THE SEQUENCES OF OPERATION, AT NO ADDITIONAL COST TO THE

OWNER. ALL ANALOG OUTPUTS SHALL BE 4-20MA, 0-10VDC OR 0-20VDC UNLESS OTHERWISE INDICATED. AO=ANALOG

OUTPUT, AI=ANALOG INPUT, DO=DIGITAL (BINARY) OUTPUT, DI=DIGITAL (BINARY) INPUT.

5. ALL SET POINTS SHALL BE ADJUSTABLE.

6. OCCUPIED SET POINT IS 70 F HEATING. UNOCCUPIED SET POINTS IS 67 F HEATING.

7. OCCUPIED SET POINT IS 75 F COOLING. COOLING WILL NOT BE CONTROLLED IN UNOCCUPIED MODE.

8. OCCUPIED CO2 SET POINT IS 1100 PPM. CO2 WILL NOT BE CONTROLLED IN UNOCCUPIED MODE.

TRENDING:

1. SYSTEM SHALL INCORPORATE BACNET COMMUNICATION AND SHALL PROVIDE A WEB BASED INTERFACE FOR REMOTE

MONITORING.

2. ALL POINTS SHALL BE VISIBLE AT THE OPERATOR'S WORK STATION. POINTS ARE SPECIFIED EITHER IN DISCRETE POINTS LISTS

FOR UNITS WITH BACNET INTERFACE CARDS OR AS DESCRIBED IN THE SEQUENCE OF OPERATION FOR EQUIPMENT THAT

REQUIRES FIELD INSTALLED BAS CONTROLS.

3. THE BAS SHALL BE PROGRAMMED TO SCAN AND ARCHIVE ALL DIGITAL AND ANALOG INPUTS AND OUTPUTS EVERY 15 MINUTES.

THE ARCHIVE SHALL STORE 18 MONTHS OF DATA.

4. DATA TOTALIZING AND AVERAGING: STORE HOURLY VALUES FOR 5 YEARS, MONTHLY FOR 20 YEARS.

5. EACH BAS SYSTEM GRAPHIC SCREEN SHALL CONTAIN A DATA ENTRY BOX AND ADJOINING “TREND PLOT” BUTTON SO THAT

THE USER CAN DISPLAY A 24 HOUR TREND PLOT FOR ANY DAY IN THE PRECEDING 18 MONTHS BY SELECTING FROM THE

POINTS MONITORED FOR THAT SYSTEM.

6. THE BAS SHALL BE CAPABLE OF CREATING RUN TIME REPORTS VIA USER SELECTION AT THE OPERATOR'S TERMINAL.

7. ALL DATA SHALL BE ACCESSIBLE REMOTELY.

TEMPERATURE CONTROL NOTES

EARLY MORNING OPTIMUM START

THE BAS SHALL HAVE AN OPTIMUM START SEQUENCE TO BRING THE FACILITY UP TO

OCCUPIED SET POINT AT THE TIME OF BUILDING OCCUPANCY.

BOILERS

THE BAS WILL ENABLE AND DISABLE THE BOILERS BY INTERFACING WITH THEIR

FACTORY CONTROLS. THE BAS SHALL FIRST START THE LEAD BUILDING PUMP. ONCE

THE PUMP PROVES OPERATION THE BAS SHALL ENABLE THE BOILERS. THE BOILERS

WILL THEN OPERATE UNDER THEIR FACTORY CONTROLS TO MAINTAIN 140 F (HWS)

TEMPERATURE. THE BOILER CONTROL PANELS SHALL ALSO START/STOP THE

BOILER CIRCULATION PUMPS.

POINTS LIST (DESCRIPTION/TYPE):

SYSTEM GRAPHIC

HWS TEMPERATURE / AI

HWR TEMPERATURE / AI

B-1 ENABLE-DISABLE / DO

B-1 ALARM / DI

B-1 FIRING RATE / AI

EMERGENCY POWER OFF / DI

ALARMS SHALL BE GENERATED AT THE USER INTERFACE

HEATING WATER PUMPSTHE FOLLOWING PUMPS ARE DUTY/STANDBY: HW PUMPS (P-1 AND P-2). THE

PUMPS SWITCH LEAD STATUS AFTER EVERY 1000 HOURS OF OPERATION.PERFORM SWITCH OVER ON NEXT START UP AFTER LEAVING UNOCCUPIEDMODE.

MODULATE THE DUTY HW PUMP VFD TO MAINTAIN 20' AT THE DIFFERENTIALPRESSURE SENSOR LOCATED REMOTELY IN THE SYSTEM. DIFFERENTIAL SETPOINT SHALL BE CONFIRMED DURING COMMISSIONING.

IF THE DUTY PUMP'S CURRENT SWITCH SHOWS FAILURE START THE LAGPUMP AND GENERATE AN ALARM.POINTS LIST (DESCRIPTION / TYPE):

P-1 START-STOP / DOP-2 START-STOP / DOP-3 START-STOP / DO

P-4 START-STOP / DO

P-1 VFD SPEED / AO

P-2 VFD SPEED / AO

P-1 STATUS / DIP-2 STATUS / DI

P-3 STATUS / DIP-4 STATUS / DI

P-1 KWHR / AIP-2 KWHR /AI

HW DIFFERENTIAL PRESSURE SET SET POINT / AOHW DIFFERENTIAL PRESSURE READING / AI

TOILET/LOCKER ROOM FANS

THE BAS SHALL ENABLE THIS FAN ACCORDING TO THE OCCUPIED/UNOCCUPIED

SCHEDULE FOR EACH FAN/SPACE. THE FAN SHALL RUN DURING OCCUPIED HOURS

AND BE OFF DURING UNOCCUPIED HOURS. A CURRENT SWITCH SHALL INDICATE FAN

STATUS. AN ALARM SHALL BE GENERATED IF THE FAN IS ENABLED AND FAILS TO

START.

POINTS LIST (DESCRIPTION / TYPE):

START-STOP / DO

STATUS / DI

SPACE DIFFERENTIAL PRESSURE

MODULATE THE SMOKE EXHAUST/RELIEF AIR FANS (SEF-6,7,8,9,10) TO MAINTAIN

BUILDING STATIC PRESSURE SET POINT FOR LOBBY AND 2ND LEVEL. EACH FAN

SHALL OPERATE AT THE SAME FREQUENCY.

INCREASE THE EXHAUST FAN SPEED TO PRODUCE A GREATER NEGATIVE PRESSURE.

DECREASE THE EXHAUST FAN SPEED TO PRODUCE A GREATER POSITIVE PRESSURE.

STAGE FANS ON/OFF INDIVIDUALLY AFTER 5 MINUTES OF UNDER/OVER PRESSURE.

SPACE STATIC PRESSURE SETPOINT SHALL BE +0.05 IN W.C. RELATIVE TO OUTSIDE.

SEF-6,7,8,9,10 POINTS:

START/STOP / DO

FAN VFD SPEED / AI

SPACE POINT:

BUILDING PRESSURE / AI

OUTSIDE PRESSURE / AI

RELATIVE PRESSURE DIFFERENTIAL

BUILDING PRESSURE SET POINT / AO

RTU-1, 2, 3 CONTROL SEQUENCES

The BAS shall provide the following control sequence.

2.01 CONTROL DEVICESA. Sensors

1. Duct-mounted temperature sensor, 8” probe, industry standard, Type III, 10K thermistor, + /- 0.4 °F accuracy.

2. Outdoor temperature sensor, weather protective enclosure for upright mounting, Type III,10K thermistor, +/- 0.4 °F accuracy.

3. Duct static pressure transducer, 0-5 in w c pressure range, 5 VDC operation, tubing (by

others) from sensor to static pressure pickup tube must not exceed 250 ft and must becontinuous without splices.

4. Building static pressure sensor, glass filled polyester case, tensioned stainless steeldiaphragm and insulated stainless steel electrode, 0.0 to 5.0 VDC output in response to a -0.25

to +0.25 in WC pressure differential, +/-1% of full scale accuracy.B. Air flow measurement digital transmitters.

1. E-BUS adapter board for connecting either EBTRON or Paragon airflow digital transmitters

to the VCB-X controller.

2.02 CONTROL SEQUENCE

A. Supply Fan Operation1. When the supply fan is enabled, and a 1 minute min off timer is met, the supply fan relay is

activated while the other outputs are held off until their minimum off timers are met.2. When the supply fan is enabled an adjustable fan starting delay is initiated to provide a

staggered start of multiple HVAC units.3. When going into Occupied Mode, an adjustable length purge mode is initiated. The fan

runs with the economizer closed, and heating and cooling are disabled.

4. When the supply fan is disabled, it is held on for 2 minutes after heating or cooling stops.5. Occupied mode operation: The supply fan runs continuously.6. Unoccupied mode operation: The supply fan cycles on a call for heating or cooling.

7. The supply fan operates at variable speed to control the duct static pressure setpoint.8. The supply fan VFD range shall be 34-100%.

B. Exhaust Fan Operation1. The exhaust fan operates at variable speed to control the building static pressure setpoint.

2. The exhaust fan VFD range shall be 5-100%C. Supply Air Tempering

1. The operating mode (Heating or Cooling) is determined by the outdoor air sensor.

2. If the outside air temperature is greater than the outside air cooling setpoint, the unit is incooling mode, controlling to the supply air setpoint.

3. If the outside air temperature is less than the outside air heating setpoint, the unit is in

heating mode, controlling to the supply air setpoint.D. Occupied/Unoccupied Selection. Selecting occupied and unoccupied operation is determined by

the schedule, which is user adjustable through the Graphical User Interface and can bedownloaded to the unit controller over the system network.

E. Optimal Start. For optimal start the unit monitors how long it takes the return air temperature toreach the warm-up or cool-down target temperature each day and adjusts the starting timeaccordingly. After 6 normally scheduled starts the routine will have gathered enough data to

provide a fairly accurate pre-start based on learned conditions. This is an ongoing process of thesix previous starts, so the unit automatically adjusts for changing seasons.

F. Unoccupied Operation

1. The BMS monitors the spaces served by the unit and enables occupied mode whenheating or cooling is required during unoccupied hours.

2. Unoccupied heating and cooling are obtained when the RTU controller compares the returnair temperature to the warm-up and cool-down target temperatures. The unoccupied space

heating and cooling setpoints are set such that they are below and above the target temperaturesand their dead bands do not overlap. Thus the unit will perform unoccupied heating and coolingcalls with the outside air damper closed.

a. Unoccupied Space Heating Setpoint = 65 °Fb. Morning Warm-up Target Temperature = 71 °Fc. Unoccupied Space Cooling Setpoint = 81 °F

d. Morning Cool-down Target Temperature = 75 °Fe. Space Temperature Deadband = +/- 2 °F

3. Off Mode: During unoccupied mode, if there is no call for heating or cooling, the unit is off.G. HVAC Operating Modes

1. Heating and Cooling modes are selected by the outside air temperature sensor.2. Cooling Mode

a. Cooling is enabled when the outdoor air temperature (OAT) rises 1 °F above the Cooling

Setpoint (55 °F). Cooling is disabled when the outdoor air temperature falls 1 °F below theCooling Setpoint.

b. Mechanical cooling is enabled if the OAT is 1 °F above the Cooling Lockout Setpoint (55°F) and disabled when the OAT is 1 °F below the Cooling Lockout Setpoint. If the OAT

disables mechanical cooling while it is operating, it will stage off as minimum run times andstage down delays are satisfied.

3. Cooling Mode - Digital Compressor

a. The Copeland Control Board requires a 24VAC enable and a 1-5 VDC input where 1.0VDC is 0% capacity and 5.0VDC is 100% capacity. When the signal falls below 10%capacity (1.25VDC on decreasing demand) the Variable Capacity Compressor Controller

will shut down the compressor. When the signal rises above 10% capacity (1.44 VDC onincreasing demand) and the anti-short cycle timer has timed out, the Variable Capacitycompressor controller will start the compressor again.

b. Typical One Circuit Unit: (one variable capacity compressor & one on/off compressor)

c. There will be the following set of terminals. [Y1], [Y2], [DC1-] & [DC1].d. Staging Up Sequence: When the supply air temperature sensor rises above the supply air

set point, the RTU controller enables [Y1] and sends a 1.44 -5 VDC signal to [DC1-] &

[DC1+]. The variable scroll compressor will go to its minimum position and modulate up asneeded. When the variable compressor reaches 100%, the stage up delay will begin. If it isstill at 100% when the delay expires, [Y2] is enabled. The RTU controller then sets the

variable compressor back down to it minimum position and modulates it as needed.e. Staging Down Sequence: The on/off [Y2] will remain enabled until the variable compressor

call falls below its minimum position. Once [Y2] is disabled, the RTU controller sets thevariable compressor to 100% and modulates it as needed.

f. Standard Compressor 5 minute run time and off time delays safeties are required.g. BAS shall control temperature between 50 deg and 65 deg as the low and high DAT's

respectively.

4. Economizera. Economizer is enabled when the Outdoor Air dry bulb temperature is 1 °F below the

Economizer Enable Setpoint (70 °F) . Economizer is disabled when the OAT is 1°F above

the Economizer Enable setpoint.

b. Economizer is the 1st stage of cooling and controls to the Supply Air Setpoint. The

economizer modulates between the Economizer Minimum Position and 100%. If the

economizer is at 100% and the Supply air Temperature is above setpoint, mechanical

cooling is enabled and the economizer is held at 100%. If cooling stages are currently

running, and economizer is enabled, it opens to 100%.

c. In Unoccupied Mode, the economizer can be used for night setback free cooling otherwise

its closed.

5. Heating Mode

a. Heating is enabled when the OAT falls 1 °F below the Heating Setpoint (55 °F). Heating is

disabled when the outdoor air temperature rises 1 °F above the Heating Setpoint.

b. The Gas burner is enabled when the OAT is 1 °F below the Heating Lockout Setpoint (50

°F). Heating is disabled when the OAT is 1 °F above the Heating Lockout Setpoint. If the

OAT disables heating while it is operating, it stages off as minimum run times and stage

down delays are satisfied.

6. Heating Mode - Modulating Gas Burner

a. A MODGAS-X expansion board controls the modulating gas burners.

b. An enable signal, Supply Air Temperature Setpoint, and Supply Air Temperature Reset (if

applicable) are sent from the third party RTU controller to the MODGAS-X.

c. The MODGAS-X uses these values to stage and modulate the gas burner(s) to maintain

the supply air temperature setpoint.

H. Morning Warm-Up Mode

1. When Occupied Mode is enabled and the return air temperature is below the Morning

Warm-Up Target Temperature, Warm-Up is initiated. Heating is controlled to the Supply Air

Temperature setpoint.

2. Warm-Up ends when the return air temperature rises above the Target Temperature or the

Time Period expires. The outdoor air damper remains closed during Warm-Up mode.

3. Only one Warm-Up mode is allowed per occupied cycle.

I. Morning Cool-down Mode Operation

1. When Occupied Mode is enabled and the return air temperature above the Morning

Cool-Down Target Temperature, Cool-Down is initiated. Cooling is controlled to the Supply Air

Temperature setpoint.

2. Cool-Down ends when the return air temperature drops below the Target Temperature or

the Time Period expires. The outdoor air damper remains closed during Cool-Down mode.

3. Only one Cool-Down mode is allowed per occupied cycle.

J. Supply Air Temperature Reset

1. The BMS resets the supply air temperature over BACnet.

K. Duct Static Pressure Reset.

1. The BMS resets the duct static pressure setpoint over BACnet.

L. Minimum Outside Air Flow Rate Reset.

1. The BMS resets the minimum outside airflow rate setpoint over BACnet.

M. The following Sensors are installed in the unit by BAS.

1. Emergency Shutdown Contact

2. Fan Proving Sensor

3. Dirty Filter Sensor

4. Outdoor Air Temperature Sensor

5. Return Air Temperature Sensor

N. Temperature Protection

1. Temperature protection is activated when the supply air temperature (SAT) rises above the

High Cutoff Temperature (immediate) or drops below the Low Cutoff Temperature (for 10

minutes). In either case, an alarm is created. Both cutoff setpoints are adjustable. This mode

shuts off the unit (with a 3 minute fan off delay) until the mode is cancelled.

2. The mode is cancelled when the SAT drops 5 degrees below the High Cutoff Temperature

Setpoint or rises 5 degrees above the Low Temp Cutoff Temperature Setpoint or when the unit

changes back into Occupied Operation.

O. Outdoor Air Lockouts

1. The compressors are disabled during Cooling Mode when the outdoor air temperature is

below the Compressor Cooling Lockout Setpoint.

2. Heating is disabled when the outdoor air temperature is above the Heating Lockout

Setpoint.

P. Sensor Failure Alarms

1. Supply Air Temperature Failure Alarm: open or short circuit is detected on the supply air

temperature sensor input. Once the alarm is generated, the unit will shut down. If a sensor is

detected after the unit has alarmed, the alarm is cleared and the unit will restart.

2. Outdoor Air Temperature Sensor Failure Alarm: open or short circuit on the outdoor air

temperature sensor input. When this occurs, the outdoor air reading is set to the half point

between the Cooling and Heating Lockout Setpoints. This will allow cooling and heating to

continue operating.

3. Compressor Discharge Failure Alarm: unit is configured to have a digital scroll compressor,

but the sensor is not detected or shorted.

Q. Mechanical Failure Alarms

1. Proof of Flow Interlock Alarm. A proof of flow switch provides a 24 VAC wet contact

closure when the supply fan is operating. If this contact opens while the fan is called to run, all

heating and cooling is disabled, and a Fan Proving Alarm is generated.

2. Dirty Filter Alarm. A differential pressure switch provides a 24 VAC wet contact closure to

indicate a dirty filter status. A Dirty Filter Alarm is generated when filter pressure drop exceeds

the configured value.

3. Emergency Shutdown Alarm.

a. An input from the fire alarm will initiate instantaneous shutdown of the unit and will

generate an alarm condition.

R. Failure Mode Alarms

1. High Supply Temp Alarm: supply air temperature rises above the High Cutoff Temperature

setpoint (immediate). This mode shuts off the unit (with a 3 minute fan off delay) until the mode

is cancelled. This mode is canceled when the SAT drops 5 degrees below the High Cutoff

Temperature setpoint or when the unit changes back into Occupied Operation.

2. Low Supply Temp Alarm: supply air temperature drops below the Low Cutoff Temperature

setpoint (for 10 minutes). This mode is canceled when the SAT rises 5 degrees above the Low

Cutoff Temperature setpoint or when the unit changes back into Occupied Operation.

3. High Control Temp Alarm: controlling sensor temperature rises above the Cooling Mode

Enable Setpoint plus the Control Mode High Alarm Offset setpoint.

4. Low Control Temp Alarm: controlling sensor temperature drops below the Heating Mode

Enable Setpoint minus the Control Mode Low Alarm Offset setpoint.

5. Digital compressor Cutoff Alarm: digital compressor discharge temperature is above 268 °F

or the sensor is shorted, which will read a temperature of 300 °F.

6. Digital Compressor Lockout Alarm: 5 Digital Compressor High Temperature Cutoffs occur

within four hours. The digital compressor is locked out and manual reset is required. If the unit

runs for 60 minutes without a digital compressor discharge temperature alarm, the counter is

reset to zero.

7. High Head Pressure Alarm: head pressure exceeds an acceptable limit. The alarm is

cleared if the head pressure falls below acceptable limits.

2"

2"

3/4

"

3/4

"

3/4

"

2"

2"

SEQUENCE OF OPERATION

8

6

6

SHEET:

OF:

DESIGNED BY:DRAWN BY:CHECKED BY:DATE:SCALE:

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

APPROVED CONTRACT DOCUMENT

DATE:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER, COSCHOOL DISTRICT NO. 1 SITE NO. 196

DWG. NO.

DEPARTMENT OF FACILITY MANAGEMENT

DENVER PUBLIC SCHOOLS

LARSON INCITTI ARCHITECTS1900 WAZEE ST. SUITE 1539

DENVER, CO 80202

303-292-4304

AS NOTED CONSTRUCTION DOCUMENTS

953.001

SCHOOL NO. 1107

72M8.1

PP2570 FAR NORTHEAST ECECATHAY ST., DENVER, CO 80249

JRKMJC

02/11/16

MECHANICAL SCHEMATICS

1107 -

2570 -

OR

- M

8.1

MLR

SUITE 1500

80202

3 0 3 . 3 8 2 . 1 9 2 0T :

3 0 3 . 3 8 2 . 1 9 3 0

717 17th Street,

F :

DENVER, CO

High Performance Building Consultants

w w w . m e g r o u p . c o m

Job #:

Rme UPG

58

1 07/01/16 PR-046

REF. DW

S S

S

SS

S

S

S

S

S

SS

S

S

SS

S

SS

S

S S

S S

SS

SS

FF

AC

PF

M

S

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

J

JJ

JJ

J

J

J

J

CLK

CLK

CLK

CLK

CLK

CLK

CLK

CLK

CLK

CLK

CLK

J

CLK

CLK

CR

CR

CR

CR

CR

CRJ

KP

CRCRCRCR

KP

J

DC

DC

DCDCDCDC

DC

DC DC

DC

DC

DC

J

MD

MD

MD

MD MD

MD

MD

MD

MD

MDMD

MD

MD

MD

CR

J

REF.

CR

SP

DTSTSFSS

CLK

JF

J

DC

J

REF.DW

CR

1. PROVIDE 208V-1ø, 30A STRAIGHT BLADE RECEPTACLE FOR ELECTRICDRYER. VERIFY EXACT POWER REQUIREMENTS PRIOR TO INSTALLATION.

2. PROVIDE A JUNCTION BOX AND 120V POWER CONNECTION TOMECHANICAL CONTROLS. VERIFY EXACT LOCATION AND QUANTITY WITHMECHANICAL CONTRACTOR PRIOR TO INSTALLATION.

3. ALL DUPLEX AND QUADPLEX GENERAL USE RECEPTACLES IN THISAREA SHALL BE TAMPER RESISTANT TYPE.

4. PROVIDE 208V-1ø NEMA L6-20R RECEPTACLE (STANDARD DPS: TYPE 4OUTLET) FOR CONNECTION TO COMMUNICATIONS EQUIPMENT. CIRCUITUSING 2 #10, 1 #10G - 3/4"C. COORDINATE EXACT REQUIREMENTS PRIORTO INSTALLATION.

5. PROVIDE 120V-1ø NEMA 5-20R QUADPLEX RECEPTACLE (STANDARDDPS: TYPE 3 OUTLET) WITH 2 DEDICATED CIRCUITS FOR CONNECTION TOCOMMUNICATIONS EQUIPMENT. COORDINATE EXACT REQUIREMENTSPRIOR TO INSTALLATION..

6. PROVIDE FLUSH MOUNTED EPO, PILLA #ST120PBFN1 WITH CLEARHINGED COVER #PILCH4COV1 TO INTERRUPT POWER TO BOILEREQUIPMENT AND GAS WATER HEATERS. EPO SHALL SHUNT-TRIPBOILERS 'B-1' AND 'B-2' AND GAS WATER HEATERS 'GWH-1' AND 'GWH-2'CIRCUIT BREAKERS IN PANEL 'P2'.

7. PROVIDE A CEILING JUNCTION BOX AND 120V-1ø POWER CONNECTIONTO VOICE AMPLIFICATION SYSTEM. COORDINATE EXACT LOCATION ANDREQUIREMENTS PRIOR TO INSTALLATION.

8. 18" LADDER RACK SHOWN FOR REFERENCE ONLY.

9. ALL RECEPTACLES IN THIS ROOM SHALL BE FLUSH MOUNTED INTELECOM PLYWOOD. COORDINATE WITH IT CONTRACTOR PRIOR TOROUGH-IN.

10. PROVIDE 12"W x 4"H x 1/4"D COPPER GROUND BAR. TIE INTO MAINBUILDING GROUND BAR LOCATED IN MAIN ELECTRICAL ROOM USING #3/0INS. CU GROUND CONDUCTOR. MOUNT AT 6'-6" AFF.

11. ROUTE #6 INS. CU GROUND FROM COPPER GROUND BAR TOEQUIPMENT RACK. ROUTE #6 INS CU GROUND FROM COPPER GROUNDBAR TO LADDER RACK. COORDINATE WITH IT CONTRACTOR PRIOR TOINSTALLATION.

12. PROVIDE A JUNCTION BOX AND 120V - 1ø POWER CONNECTION TOIRRIGATION CONTROLLER. COORDINATE EXACT LOCATION ANDREQUIREMENTS PRIOR TO INSTALLATION.

13. PROVIDE 120V POWER CONNECTIONS AND ALL NECESSARYCONTROL CONNECTIONS TO MAGNETIC HOLD OPEN DEVICES.COORDINATE DEVICE LOCATIONS WITH ARCHITECTURAL PLANS.COORDINATE POWER AND CONTROL WIRING REQUIREMENTS WITHMANUFACTURER'S INSTALLATION REQUIREMENTS. DOORS SHALL BERELEASED TO CLOSE UPON FIRE ALARM INITIATION. FIRE ALARM SYSTEMSHALL ALSO BE INTERCONNECTED WITH SECURITY SYSTEM AND SHALLRELEASE DOORS UPON AUXILIARY BUILDING LOCK-DOWN. SIGNAL FROMSECURITY SYSTEM THROUGH FIRE ALARM PANELBOARDINTERCONNECTION REQUIREMENTS AND EXACT SEQUENCE OFOPERATION AND RE-SET WITH SECURITY SYSTEM AND FIRE ALARMSYSTEM DESIGNER'S AND INSTALLERS.

14. PROVIDE FLUSH FLOOR BOX WITH (4) SECTIONS AND (2) 20A DUPLEXRECEPTACLES. FLOOR BOX SHALL BE WIREMOLD #RFB4-CI-1, RATEDFOR INSTALLATION IN SLAB ON GRADE. PROVIDE WITH (2) CIHT-D DUPLEXRECEPTACLE BRACKETS FOR COMMUNICATION DEVICES. COVER SHALLBE FLUSH FLANGED BRUSHED ALUMINUM TYPE, WITH CARPET INSETDEPRESSION IN COVER, #FPCT-CAL. PROVIDE WITH (2) #RFBCIKITPOWER/COMMUNICATIONS BARRIER KITS. COORDINATE COMMUNICATIONDEVICES, CABLES, AND CONDUIT REQUIREMENTS WITH COMMUNICATIONPLANS. VERIFY EXACT LOCATION WITH ARCHITECTURAL PLANS ANDFURNITURE VENDER PRIOR TO INSTALLATION.

15. PROVIDE A 1-1/2" CONDUIT SLEEVE FOR CONNECTION TO EXTERIORWAP (WIRELESS ACCESS POINT). CONDUIT SLEEVE SHALL BE LOCATEDAT 12' A.F.F AND NO LONGER THAN 2' IN LENGTH. VERIFY EXACTLOCATION AND REQUIREMENTS WITH DPS IT PERSONNEL PRIOR TOINSTALLATION.

16. AIPHONE SYSTEM MASTER CONTROLLER.

17. AIPHONE SYSTEM DOOR SUBSTATION.

18. KEY PAD FOR MOTION INTRUSION DETECTION SYSTEM.

19. PROVIDE (2) 4" UNDERGROUND CONDUITS ROUTED FROM MDF ROOMTO BUILDING EAST PROPERTY LINE FOR CENTURY LINK DEMARCATION.VERIFY EXACT LOCATION OF STUB-UPS WITH DPS IT PERSONNEL PRIORTO INSTALLATION.

KEY NOTES (THIS SHEET)

1. MAKE ALL FINAL ELECTRICAL CONNECTIONS TO EQUIPMENT REQUIRINGELECTRICAL CONNECTION. THIS SHALL INCLUDE BUT NOT BE LIMITED TO ALLMECHANICAL AND OTHER EQUIPMENT INCLUDED IN THIS PROJECT

2. PROVIDE FUSES SIZED PER EQUIPMENT MANUFACTURER'SREQUIREMENTS.

3. DISCONNECT SWITCH LOCATIONS ARE SHOWN DIAGRAMMATICALLY ANDSHALL BE INSTALLED IN ACCESSIBLE LOCATION TO SUIT EQUIPMENT ANDSPACE. DISCONNECT SWITCHES SHALL BE WITHIN SIGHT OF THE EQUIPMENTTHEY SERVE AND MOUNTED AT 6'-3" MAXIMUM, TO TOP OF CABINET. MAINTAINNEC WORK SPACE AND REQUIREMENTS.

4. RECEPTACLES INDICATED TO BE MOUNTED ABOVE COUNTER ARE TO BEMOUNTED HORIZONTALLY 6" ABOVE COUNTER.

5. COORDINATE AND VERIFY EXACT MOUNTING LOCATIONS OF WALL ANDFLOOR DEVICES WITH ARCHITECTURAL ELEVATIONS, AND ANY FURNITUREOR SPECIALTY EQUIPMENT SUPPLIER DRAWINGS PRIOR TO ROUCH-IN.

6. COORDINATE EXACT REQUIREMENTS AND LOCATIONS OF MECHANICALEQUIPMENT WITH MECHANICAL DRAWINGS AND MECHANICAL CONTRACTORPRIOR TO ROUGH-IN.

7. CEILING MOUNTED JUNCTION BOX FOR WIRELESS ACCESS POINT SHALL BEON THE CLOUD ON TOP OF THE DROP CEILING IN EACH CLASSROOM.

GENERAL NOTES (THIS SHEET)

GFI

75432

A

B

C

1

D

D.2

D.1

A.3

7.1

5.3

3.3

C.7

C.8

D3

1.8 6

6.2

4.2

A.9

1.2

+42"GFI

GFI

2

GFIGFI

MULTIPURPOSE

103STORAGE

103A

CUSTODIAL

104B

MECHANICAL

104C

STORAGE

104CA

STORAGE

108B

STORAGE

109A

CLASSROOM

109CLASSROOM

108

UNISEX

108A

STORAGE

106BSTORAGE

107A

UNISEX

106A

CLASSROOM

107

STORAGE

110BSTORAGE

111A

UNISEX

110A

CLASSROOM

110

STORAGE

112B

STORAGE

113A

UNISEX

112A

CLASSROOM

112

CLASSROOM

113

CLASSROOM

111

RECEPTION

101A

CLINIC

101B

OFFICE

101D

VESTIBULE

100A

CONFERENCE

102

O/S1

O/S1

FOOD

SERVICE

104A

MEN

100B WOMEN

100C

MDF

114A

UNISEX

114B

CORRIDOR

105

CLASSROOM

106

OFFICE

101F

WORKROOM

101C

UNISEX

101BA

CORRIDOR

101

CORRIDOR

100

OUTDOOR

STORAGE

O/S2

GFI

GFI

GFI GFI

GFIGFI

WPGFI

1

+42"GFI

EWC

WPGFI

2

WPGFI

+96"

WPGFI

2

GFIGFI

+96"

+96"

2

2

WPGFI

/10P1GFI

/11P1

22

2

OFFICE

101E

CUH-2

+96"

2

2

2

2

2

22

2 2

2

2

2

2

4

2

2

22

GFI GFI

3

33

3

3

3

33

3 33

3

3

3

3

XCELCT CABINET

XCELMETER

+42"GFI

SHORTTHROWPROJECTOR - TYP.

2

7

77

7

7

7

7

7

WPGFI

E2.1

2

/28P122

+48"

2

2

2

2

22 2 2

/43P1

/43P1

/43P1

/43P1

/49P1 /45P1 /47P1

/55P1

/54P1

/36P1

/38P1 /38P1 /40P1 /40P1

/36P1

/43P1

/55P1

/55P1

/5P1

/1P1

/1P1 /1P1

/1P1

/3P1

/1P1

/2P1 /2P1

/2P1

/6P1

/2P1

/2P1

/71P1/71P1

/4P1

/7P1

/7P1

+96"

/7P1

/7P1 /7P1 /9P1

/8P1

/8P1/8P1GFI

/8P1

/44P1

/77P1/77P1

/44P1

/44P1

/44P1/44P1

/44P1/81P1

/81P1

/81P1

/26P1

/26P1

/26P1

/26P1

/28P1

/28P1

/28P1

/28P1

/28P1

/28P1

/28P1 /42P1

/50P1

/50P1/52P1

/52P1

/50P1

/34P1

/34P1 /30P1

/34P1

/34P1

/32P1/32P1

/32P1

/32P1

/13P1

/13P1/17P1

/13P1

/13P1

/15P1

/13P1

/13P1

/13P1

/32P1

/32P1

/32P1

/25P1

/77P1

/24P1

/77P1/20P1

/19P1

/42P1

/25P1

/77P1

/44P1

/25P1

/27P1

/14P1

/14P1

/14P1

/19P1

/20P1

/25P1

/74,76P1

/14P1

/19P1

/20P1

/20P1

/25P1

/23P1

/42P1

/77P1

/16P1

/18P1

/19P1

/21P1/22P1

/72P1

/32P1

+96"

/72P1/72P1

/51P1

2

/8P1/7P1/2P1/1P1

E2.1

3

E2.1

4

/14P1

/19P1

CUH-1

/ 7P2

/ 8P2

EF-8

EF-7

12

/48P1

/ 53P1

+96"/12P1

2

/8P1

/8P1

/14P1 /14P12

WPGFI

/19P1

/19P1

/19P12

/20P1 /20P12

/20P1

WP

/25P2

FC-1

EH-1/ 26P2

/ 22,24P2

/ 32P2

/ 32P2

13

/25P1

/13P1

/81P1

+60"

/81P114

15

+72"AFF

/32P1

17

18

17

17

16

WORKROOM

114

+96"

/83P1

U.CREF.

/17P1

/18P1

/23P1

/24P1

/5P1

/6P1

/11P1

/12P1

/42P12

+60"

+96"/43P1

2

2AC

2

/34P12

2

1

1

1 1 1 1

1

1

2

2

MDF

114A

/56P1

/56P1

/56P1

+18"/58P1/60P1

/57,59P1

/73,75P1

/68P1/66P1

/65P1/63P1

/62P1/64P1

/67P1/69P1

+18"

+72"

+72"

+18"+18"

+18"

4

4

5

9

55

5

5

1011

8

18

1

32

A

A.3

P1

MSB

P2

P3

MECHANICAL

104C

WPGFI

UH-2

MECH. CONTROLS

ACCESS. CONTROLS

4

/61P1

/79P1

O/S1

O/S1

/ 28P2

/ 27P2

DCP-1

GWH-1

/ 16,18,20P2

6

UH-1/ 29P2

/ 29P2

+42"GFI

+42"GFI

+42"GFI

HWP-3 HWP-4

/ 15,17,19P2

/79P1

/79P1

/79P1/79P1

TIME CLOCK

/5P3

2

CO

1

2 1

1

1

1

B1/31P2

2

2

C.7

C.8

GFI

GFI

GFI

REF.

GFI

DISPOSALCOFFEE MAKER

MICROWAVE

DISHWASHER

/31P1 /39P1/41P1/33P1

/37P1

/29P1

/35P1

+60"GFI

WORKROOM

114

SHEET:

OF:

DESIGNED BY:DRAWN BY:CHECKED BY:DATE:SCALE:

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

APPROVED CONTRACT DOCUMENT

DATE:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER, COSCHOOL DISTRICT NO. 1 SITE NO. 196

DWG. NO.

DEPARTMENT OF FACILITY MANAGEMENT

DENVER PUBLIC SCHOOLS

LARSON INCITTI ARCHITECTS1900 WAZEE ST. SUITE 1539

DENVER, CO 80202

303-292-4304

AS NOTED CONSTRUCTION DOCUMENTS

953.001

SCHOOL NO. 1107

72E2.1

PP2570 FAR NORTHEAST ECECATHAY ST., DENVER, CO 80249

JPOT

02/11/16

LEVEL 1 POWER PLAN

1107 -

2570 -

OR

- E

2.1

JP

SUITE 1500

80202

3 0 3 . 3 8 2 . 1 9 2 0T :

3 0 3 . 3 8 2 . 1 9 3 0

717 17th Street,

F :

DENVER, CO

High Performance Building Consultants

w w w . m e g r o u p . c o m

Job #:

Rme UPG

SCALE: 1/8" = 1'-0"1LEVEL 1 POWER PLAN

SCALE: 1/4" = 1'-0"2ENLARGED MDF ROOM 114A

SCALE: 1/4" = 1'-0"3ENLARGED MAINTENANCE 104C

SCALE: 1/4" = 1'-0"4ENLARGED PARTIAL WORKROOM 114

67

1 05/13/16 PR #2 - MISC. PLAN CHANGES

2 07/01/16 PR-04

3

3

3

TRACK TRACKTRACK

VS

VS

VS

VS

VSVS

OS OS VS

VS

VS

VS

VS

VS

VS

VS

VS

VS

VS

VS

VS

VS

VS

VS

VS

VS

a,bLV

VS

LV

D

LVD LVD

VS

VS VS

VS

VS

VS

VS

VS

VS

VS

VS

VS

VS

VS

VS

VS

DLDLDLDL

DL

VS

DL

VS

aLV

Da

LV

D

VS

b LV

D

a LV

D

a LV

Db L

VD

aLV

Db

LV

Da

,bLV

a,b

LV

a,b

LV

a LV

Db L

VD

bLV

Da

LV

Da

,bLV

aLVD

bLVD

bL

VD

aL

VD

aL

VD

bL

VD

a,bLV

DL

bLV

Da

LV

D

3bLVD

3aLVD

3

3

3

3 3

3

3

LV

LV

LV

a,b

LV

DL

VS

VS

3

DL

DL

DL

DL

VSVS

VS

VS

3cLVD

CLV

D

J

J

J

3c

LV

D3b

LV

D3a

LV

D

LV

D

J

1. PROVIDE A LOW-VOLTAGE SWITCH FOR AFTER-HOUR OVERRIDE OFLIGHTING FIXTURES IN CORRIDORS/VESTIBULES. LIGHTING CIRCUITSSERVING CORRIDORS/VESTIBULES SHOULD BE ROUTED THROUGHASTRONOMIC TIME CLOCK. REFER TO ONE-LINE DIAGRAM ON SHEET E4.1FOR ADDITIONAL INFORMATION.

2. LIGHTING CIRCUITS SERVING EXTERIOR FIXTURES SHALL BE ROUTEDTHROUGH ASTRONOMIC TIME CLOCK. REFER TO ONE-LINE DIAGRAM ONSHEET E4.1 FOR ADDITIONAL INFORMATION.

3. DAYLIGHT ZONE NOT REQUIRED IN THIS SPACE PER THE EXCEPTION IN2015 IECC SECTION C405.2.3. TOTAL WATTAGE OF GENERAL LIGHTINGDOES NOT EXCEED 150 WATTS.

4. PROVIDE A JUNCTION BOX AND 120V POWER CONNECTION TO COVELIGHTING DRIVER THAT MUST BE ACCESSIBLE ABOVE THE CEILING.

5. PROVIDE A JUNCTION BOX, CONDUIT, AND DMX CABLING PER THEMANUFACTURERS REQUIREMENTS STUBBED ABOVE CEILING FOR RGBLIGHTING CONTROL BOX (CBX BY LUMENPULSE) AND RGB LIGTHINGCONTROLLER (LUMENTOUCH 2.0 BY LUMENPULSE) IN RECEPTION. MOUNTRGB LIGHTING CONTROLLER AT LEAST 48" AFF. CONFIRM EXACTLOCATION OF CONTROL BOX AND CONTROLLER WITH OWNER ANDARCHIECT. RGB CONTROL BOX AND CONTROLLER ARE FOR FIXTURE R3.DAISY CHAIN FIXTURE R3 USING DMX WIRE TO THE RGB CONTROL BOXPER THE MANUFACTURERS REQUIRMENTS TO THE CONTROL BOX.

KEY NOTES (THIS SHEET)

1. CONFIRM MOUNTING HEIGHT AND LOCATION OF ALL LUMINAIRES ANDDEVICES WITH ARCHITECT PRIOR TO ROUGH IN.

2. CONNECT ALL EMERGENCY LIGHTING AHEAD OF LOCAL SWITCHING.

3. CONNECT ALL EXIT SIGNS AHEAD OF LOCAL SWITCHING.

4. ALL CELING AND WALL MOUNTED VACANCY SENSORS SHOWN SHALL BEDUAL TECHNOLOGY TYPE.

5. REFER TO ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANSFOR EXACT MOUTNING LOCATIONS OF LUMINAIRE.

6. COORDINATE LUMINAIRE LOCATIONS WITH MECHANICAL PIPING,DUCTWORK, ETC. TO AVOID CONFLICTS. SEE SPECIFICATIONS FORCOORDINATION REQUIREMENTS.

7. FIELD COORDINATE EXACT LOCATIONS OF CEILING MOUNTED VACANCYAND OCCUPANCY SENSORS PER MANUFACTURER'S INSTRUCTIONS. THELOCATIONS OF THE VACANCY SENSORS ARE DIAGRAMMATIC. DO NOTLOCATE VACANCY SENSORS WITHIN THREE FEET OF AN HVAC SUPPYDEVICE. IF ADDITIONAL SENSORS ARE NEEDED FOR COMPLETE COVERAGEOF SPACE, THEY SHALL BE PROVIDED AND INSTALLED BY THE CONTRACTORAS REQUIRED TO PROVIDE COMPLETE SPACE COVERAGE.

8. CONTRACTOR SHALL PROVIDE ALL NECCESSARY SWITCH PACKS FORVACANCY AND OCCUPANCY SENSORS TO PROVIDE FUNCTION INDICATED.

9. ALL EXIT SIGNS SHALL BE CIRCUITED TO LIGHTING CIRCUIT SERVINGOTHER LUMINAIRES IN THE SAME SPACE AS THE EXIT SIGNS.

10.LOSS OF UTILITY POWER SHALL ENERGIZE ALL EGRESS LIGHTING. THEDESIGN SHALL MEET ALL UL STANDARDS FOR LIFE SAFETY REQUIREMENTS.

11. VACANCY/OCCUPANCY SENSORS SHALL BE SET AT A MAXIMUM 15MINUTE TIMEOUT.

12. VACANCY SENSORS SHALL AUTOMATICALLY TURN OFF ALL LIGTHINGWITHIN 30 MINUTES OF ALL OCCUPANTS LEAVING THE SPACE PER 2015 IBCCC405.2.1.1

GENERAL NOTES (THIS SHEET)

75432

A

B

C

1

D

D.2

D.1

A.3

7.1

5.3

3.3

C.7

C.8

D3

1.8 6

6.2

4.2

A.9

1.2

L1L2

L2 L1E

L1

L1

S3

S3

S3

S3E

S3

S3E S3

S3E

S3

S3E

R1

R1

R1 R1

R1

R1

D1 D1

D1

D1 D1

D1

D1D1

R1R1

R1R1

S1E

S1ES1E

D1 D1

D1

D1 D1

L2

L2E

D1 D1

D1

D1D1

D1

D1

D1

D1

D1 D1

D1 D1

S3

D1

D1E D1E

D1

L2EL2E

R1

R1R1

R1R1R1

R1

R1E

R1E

R1

D1

D1 D1

D1E

D1

D1

D1

D1D1

R1ER1

R1

R1

R1

R1 R1

R1

L2 L2

L2E

L2

L2E

L1

R1E

R1

R1E

R1R1

R1

R1 R1

D1D1

D1

D1D1

D1

D1 D1

D1

D1

D1D1

D1

STORAGE

108B

STORAGE

109A

CLASSROOM

109

CLASSROOM

108

UNISEX

108A

STORAGE

106B

STORAGE

107A

UNISEX

106A

CLASSROOM

107

STORAGE

110B

STORAGE

111A

UNISEX

110A

CLASSROOM

110

STORAGE

112B

STORAGE

113A

UNISEX

112A

CLASSROOM

112

CLASSROOM

113

MULTIPURPOSE

103

CLASSROOM

111

RECEPTION

101A

CLINIC

101B

OFFICE

101D

OFFICE

101E

VESTIBULE

100A

CONFERENCE

102

STORAGE

103A

CUSTODIAL

104B

MECHANICAL

104C

O/S1

O/S1

STORAGE

104CA

FOOD

SERVICE

104A

MEN

100B

WOMEN

100C

MDF

114A

UNISEX

114B

CORRIDOR

105

CLASSROOM

106

OFFICE

101F

WORKROOM

101C

UNISEX

101BA

CORRIDOR

101

CORRIDOR

100

OUTDOOR

STORAGE

O/S2

L2

L2E

L2E

L2

W2E

W2E

L2

L2E

R2

W2E

R1

R1

S3E

R1R1

R1E

a,b

a,b

a

R1E

b

a

b

a

b

a

a,b

a,b

a

aa

bb

b

a

b

a

b

a

b

a a

aa

b

aa

b

a

a

a

a,b

a,b

a

bbb ba,b

a,b

a,b

a,b

a,b

a,bb b

a

bb

a a a

b

a

b

a,b

a,b

a,b

a,bb

b

b

a

a a

a a

b

a,b

D1

a

a

ac

c

c

c

X1

X1

X2

X1

D1

X1C1 C1 C1C1 C1 C1 C1 C1 C1

L2E

L2

a

a

X1

R1 R1

a

a

a

b

b

b

b

b b

R1S3

R4

R4

W3E

W3E

W3E

W3EW3E

a

a a

W3E

R3

R3 R3 R3

R3

R3

R3

R3

a

R4

R4

R4

R4

R4R4

R4 R4

b

b

b

b

a

S1E

b

b a a

R4

R4

D1

D1

a

D1

b

a

a

a

ab

b

HATCH REPRESENTSDAYLIGHT ZONE. TYPICAL

a

b

b

/ 6P3

/ 6P3 / 6P3

/ 6P3

/ 6P3

/ 6P3

/ 6P3

/ 6P3

/ 6P3 / 6P3

/ 6P3/ 6P3

/ 11P3

/ 11P3

/ 11P3

/ 11P3

/ 11P3

/ 11P3

/ 11P3

/ 11P3

/ 11P3

/ 11P3

/ 11P3

/ 11P3/ 11P3

/ 11P3 / 11P3

/ 11P3/ 11P3

/ 11P3

/ 11P3/ 11P3

/ 8P3

/ 1P3

/ 1P3

/ 1P3

/ 1P3

/ 1P3 / 1P3

/ 1P3

/ 1P3

/ 1P3 / 1P3

/ 12P3/ 10P3

/ 1P3 / 1P3

/ 1P3

/ 1P3/ 1P3

/ 12P3

/ 4P3

/ 4P3

/ 4P3/ 4P3

/ 4P3

/ 4P3 / 4P3

/ 4P3

/ 4P3

/ 4P3/ 4P3

/ 4P3

/ 4P3

/ 4P3/ 4P3

/ 12P3

/ 12P3

/ 12P3

/ 12P3

/ 12P3

/ 12P3

/ 12P3

/ 12P3

/ 12P3/ 12P3

/ 12P3

/ 12P3

/ 12P3

/ 12P3/ 12P3

/ 12P3

/ 12P3

/ 12P3/ 12P3

/ 12P3

/ 12P3/ 12P3/ 12P3

/ 10P3

/ 12P3

/ 12P3

/ 10P3

/ 10P3/ 10P3/ 10P3

/ 10P3

/ 10P3

/ 17P3

/ 17P3

/ 17P3

/ 10P3

/ 10P3

/ 2P3

/ 2P3

/ 2P3/ 2P3

/ 2P3 / 2P3

/ 2P3/ 2P3

/ 2P3

/ 2P3

/ 2P3

/ 2P3

/ 2P3/ 2P3

/ 3P3/ 3P3

/ 3P3

/ 3P3

/ 3P3/ 3P3

/ 3P3

/ 3P3/ 3P3

/ 3P3 / 3P3/ 3P3/ 3P3

/ 3P3

/ 3P3

/ 17P3

/ 17P3

/ 17P3

/ 17P3/ 17P3

/ 17P3

/ 17P3

/ 17P3

/ 17P3

/ 17P3

/ 17P3/ 17P3

/ 17P3 / 17P3 / 17P3

/ 17P3

/ 17P3

/ 8P3

/ 9P3/ 9P3

/ 9P3

/ 9P3

/ 9P3/ 9P3

/ 9P3

/ 9P3

/ 9P3

/ 9P3

/ 9P3

/ 9P3

/ 9P3

/ 9P3

/ 9P3

/ 9P3

/ 9P3/ 9P3

/ 9P3 / 9P3

/ 9P3

/ 9P3 / 9P3

/ 9P3

/ 9P3

/ 9P3 / 9P3

/ 9P3

/ 2P3

/ 8P3

/ 12P3

/ 10P3

R1CORRIDOR

104

CORRIDOR

105

CORRIDOR

105

/ 10P3

R1/ 9P3

/ 12P3

/ 12P3

/ 17P3

/ 10P3

W2E/ 8P3

a

R2/ 17P3

R2/ 17P3

R2/ 17P3

S3/ 7P3

L2E/ 10P3

L2

/ 10P3

D2

D2

/ 10P3

/ 10P3

R1 R1

R2

R1R1

/ 9P3 / 9P3

/ 9P3

/ 9P3/ 9P3

3

2

1

1

2

3

a

a

aa

a

a

aa

a

aa

a

a,b

b

b

b

a

c

c

a,ba,b

/ 6P3

/ 6P3

NL

NL

NL

D1 D1/ 17P3 / 17P3

c

c

S3

S3

S3

S3

/ 11P3

/ 11P3

/ 11P3

/ 11P3

S1E

S1

S1

S1

S1E

S1

S1

S1

S1

S1E

S1E

S1

S1

S1

S1E

S1

S1

S1

S1

S1E

/ 2P3

/ 2P3

/ 2P3

S1E

S1

S1

S1

S1

S1E

S1E

S1

S1

S1

S1E

S1E

S1

S1

S1

S1

S1

S1E

S1E

S1

S1

S1

S1

S1E

S1

S1

S1

S1E

S1E

S1

S1

S1

S1

S1E

S1E

S1

S1

S1E

S1E

S1

S1

S1

S1

S1E

S1E

S1

S1

S1E

S1

S1

S1

S1

S1

S1E

S1

S1

S1

S1E

D1/ 3P3b

/ 3P3

/ 3P3

/ 3P3

/ 3P3

/ 3P3

/ 3P3

/ 3P3

/ 3P3

/ 3P3

/ 3P3

/ 3P3

/ 3P3

/ 3P3

/ 3P3

/ 3P3

/ 3P3

/ 3P3

/ 3P3

/ 3P3

/ 3P3

S1E

S1

S1

/ 2P3

/ 2P3

/ 2P3

//

/

/

/

/

/

/

/

/ 2P3

/ 2P3

/ 2P3

/ 2P3

/ 2P3

/ 2P3

/ 2P3

/ 2P3 / 2P3

/ 2P3

/ 2P3

/ 2P3

/ 2P3

/ 2P3

/ 2P3

/ 4P3

/ 4P3

/ 4P3

/ 4P3

/ 4P3

/ 4P3

/ 4P3

/ 4P3

/ 4P3

/ 4P3

/ 4P3

/ 4P3

/ 4P3

/ 4P3

/ 4P3

/ 4P3/ 4P3

/ 4P3

/ 4P3

/ 4P3

/ 1P3

/ 1P3

/ 1P3

/ 1P3

/ 1P3

/ 1P3/ 1P3

/ 1P3

/ 1P3

/ 1P3

/ 1P3

/ 1P3

/ 1P3

/ 1P3

/ 1P3

/ 1P3/ 1P3

/ 1P3

/ 1P3

/ 1P3

b

b

b

b

b

b b

b

b

b b

b

b

b

D1/ 1P3b

D1/ 1P3b

D1/ 4P3

b

b

b

b

b

b

b bb

b

b

b

b

D1/ 2P3a

b

b

b b

b

b

b

b

a

b

b

b

b

b

b

b

b

D1/ 2P3b

D1/ 3P3

b

b

b b

b

b

b

b

b

b

b

b

D1/ 4P3 b

D1/ 12P3

C1 C1 C1/ 6P3 / 6P3 / 6P3

aa

4

4

4

/13P3

/13P3

/13P3

C2C2C2

MULTIPURPOSE

103

a

WORKROOM

114

1

1

5

2

2

2

2

2

2

2

CLASSROOMS:1. PROVIDE TWO (2) VACANCY SENSORS ON THE CEILING TO CONTROL THEENTIRE ROOM. MANUAL ON, AUTO OFF.2. PROVIDE LOW VOLTAGE SWITCH AT THE ENTRY DOOR FOR MANUAL CONTROLOVERRIDE.3. PROVIDE LOW VOLTAGE DIMMER SWITCHES AT TEACHER STATION FORMANUAL CONTROL OVERRIDE.4. THE LOW VOLTAGE SWITCH NEAR THE ENTRY WAY DOOR SHALL TURN ON ALLLIGHTING TO 50% LIGHT LEVELS. THE DIMMER SWITCH(ES) LOCATED AT THETEACHER STATION SHALL BE MANUAL ON TO 100% LIGHTING LEVELS OR 100%OFF.5. IF THERE IS A DAYLIGHT ZONE, THE LUMINAIRES WITHIN THAT ZONE SHALL BECONTROLLED BY A DAYLIGHT SENSOR. THAT SENSOR WILL DIM THE LIGHTS ASINTERIOR LIGHT LEVELS GO UP.

RESTROOMS:UNISEX RESTROOMS SHALL BE CONTROLLED USING A SWITCH WITH ANINTEGRATED VACANCY SENSORS FOR MANUAL ON/AUTO OFF. RESTROOMSLOCATED NEAR ADMIN AREA SHALL BE CONTROLLED WITH A CEILING MOUNTEDOCCUPANCY SENSOR FOR AUTO ON/AUTO OFF.

CORRIDOR/VESTIBULE/COMMON AREA:1. CORRIDORS/VESTIBULE/COMMON AREA LUMINAIRES SHALL BE CONTROLLEDTO COME ON DURING SCHOOL HOURS AND TURN OFF AFTER SCHOOL HOURSTHROUGH AN ASTRONOMICAL TIME CLOCK.2. IF THERE IS A DAYLIGHT ZONE, THE LUMINAIRES WITHIN THAT ZONE SHALL BECONTROLLED BY A DAYLIGHT SENSOR. THAT SENSOR WILL DIM THE LIGHTS ASINTERIOR LIGHT LEVELS GO UP.

ADMIN OFFICES:INDIVIDUAL OFFICES SHALL BE CONTROLED USING A VACANCY SENSOR FORMANUAL ON/AUTO OFF AND A LOW VOLTAGE DIMMER SWITCH, WHICH SHALL BELOCATED AN THE ENTRY DOOR FOR MANUAL CONTROL OVERRIDE AND DIMMINGCONTROL.

CONFERENCE ROOM:PROVIDE A SINGLE VACANCY SENSOR ON THE CEILING TO CONTROL ENTIREROOM FOR MANUAL ON/ AUTO OFF. PROVIDE TWO LOW VOLTAGE DIMMERSWITCHES AT ENTRY DOOR FOR MANUAL CONTROL. IF THERE IS A DAYLIGHTZONE, THE LUMINAIRES WITHIN THAT ZONE SHALL BE CONTROLLED BY ADAYLIGHT SENSOR. THAT SENSOR WILL DIM THE LIGHTS AS INTERIOR LIGHTLEVELS GO UP.

MULTIPURPOSE:1. PROVIDE FOUR (4) VACANCY SENSORS ON THE CEILING TO CONTROL THEENTIRE ROOM. MANUAL ON, AUTO OFF.2. PROVIDE THREE WAY LOW VOLTAGE DIMMER SWITCHES ALONG NORTH WALLAND ENTRY WAY FOR MANUAL CONTROL OVERRIDE.3. IF THERE IS A DAYLIGHT ZONE, THE LUMINAIRES WITHIN THAT ZONE SHALL BECONTROLLED BY A DAYLIGHT SENSOR. THAT SENSOR WILL DIM THE LIGHTS ASINTERIOR LIGHT LEVELS GO UP.

JANITOR/STORAGE ROOMS:INDIVIDUAL ROOMS SHALL BE CONTROLLED USING A SWITCH WITH ANINTEGRATED VACANCY SENSORS FOR MANUAL ON/AUTO OFF.

EXTERIOR BUILDING MOUNTED LIGHTS:LUMINAIRES SHALL BE CONTROLED USING AN ASTRONOMICAL TIME CLOCK FORON/OFF TIMES.

LIGHTING CONTROL NOTES (THIS SHEET)

SHEET:

OF:

DESIGNED BY:DRAWN BY:CHECKED BY:DATE:SCALE:

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

APPROVED CONTRACT DOCUMENT

DATE:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER, COSCHOOL DISTRICT NO. 1 SITE NO. 196

DWG. NO.

DEPARTMENT OF FACILITY MANAGEMENT

DENVER PUBLIC SCHOOLS

LARSON INCITTI ARCHITECTS1900 WAZEE ST. SUITE 1539

DENVER, CO 80202

303-292-4304

AS NOTED CONSTRUCTION DOCUMENTS

953.001

SCHOOL NO. 1107

72E3.1

PP2570 FAR NORTHEAST ECECATHAY ST., DENVER, CO 80249

JPOT

02/11/16

LEVEL 1 LIGHTING PLAN

1107 -

2570 -

OR

- E

3.1

JP

SUITE 1500

80202

3 0 3 . 3 8 2 . 1 9 2 0T :

3 0 3 . 3 8 2 . 1 9 3 0

717 17th Street,

F :

DENVER, CO

High Performance Building Consultants

w w w . m e g r o u p . c o m

Job #:

Rme UPG

SCALE: 1/8" = 1'-0"1LEVEL 1 LIGHTING PLAN

69

1 05/13/16 PR #2 - MISC. PLAN CHANGES

2 07/01/16 PR-04

2

LUMINAIRE SCHEDULE

TYPE

C1

C2

D1

D1E

D2

L1

L1E

L2

L2E

R1

R2

R3

R4

S1

S1E

S2

S2E

W2E

W3E

Z1

Z2

X1

X2

GENERAL NOTES:

1.

2.

3.

4.

SCHEDULED NOTES:

1.

2.

3.

4.

5.

6.

DESCRIPTION

9" OPEN LED CYLINDER, WHITE REFLECTOR, PRISMATIC ACRYLIC LENS,

WITH AIRCRAFT CABLE.

WHITE LED TAPE LIGHT FOR COVE LIGHTING, POLYURETHANE COATING, CLASS II

COMPLIANT, DIMMING CONTROL. PROVIDE 4 INCH EXTENSIONS FOR A CONTINUOUS

RUN OF TAPE LIGHT ALONG RAII OF COVE WAVES. SEE PLANS FOR EXACT RUN LENGTH OF EACH COVE.

6" RECESSED CAN LIGHT LED, OPEN REFLECTOR, CLEAR TRIM, SEMI-SPECULAR FINISH,

6" RECESSED CAN LIGHT LED, OPEN REFLECTOR, CLEAR TRIM, SEMI-SPECULAR FINISH WITH

EMERGENCY BATTERY PACK AND INTEGRAL TEST SWITCH.

2" RECESSED ARCHITECTURAL LED DOWNLIGHT WITH CLEAR AND SLEF-FLANGED TRIM,

WITH WIDE BEAM ANGLE, HIGH CRI (90+), AND NEW CONSTRUCTION HOUSING

NARROW 2" WIDE SUSPENDED DIRECT LINEAR LED WITH FROSTED FLUSH SHIELD,

WHITE FINISH, AND MOUNTABLE TO GRID CEILING USING AIRCRAFT CABLE

NARROW 2" WIDE SUSPENDED DIRECT LINEAR LED WITH FROSTED FLUSH SHIELD,

WHITE FINISH, MOUNTABLE TO GRID CEILING USING AIRCRAFT CABLE WITH

EMERGENCY BATTERY PACK AND INTEGRAL TEST SWITCH.

NARROW 2" WIDE SUSPENDED DIRECT/INDIRECT LINEAR LED WITH FROSTED FLUSH SHIELD,

WHITE FINISH, AND MOUNTABLE TO GRID CEILING USING AIRCRAFT CABLE

NARROW 2" WIDE SUSPENDED DIRECT/INDIRECT LINEAR LED WITH FROSTED FLUSH SHIELD,

WHITE FINISH, MOUNTABLE TO GRID CEILING USING AIRCRAFT CABLE WITH

EMERGENCY BATTERY PACK AND INTEGRAL TEST SWITCH.

2X2 VOLUMETRIC RECESSED LED TROFFER WITH CURVED RIBBED DIFFUSER, CENTER

BASKET DESIGN, HIGH EFFICACY LED LIGHT ENGINE

7' RECESSED DIRECT LINEAR LED FROSTED FLUSH SHIELDING, WHITE FINISH.

TRIMLESS 6' (L) X 2 11/16" RECESSED VERTICAL MOUNT LINEAR LED WITH 8 DIFFERENT

COLORS, SPACKLE FLANGE TRIM.

4' LINEAR GRID MOUNTED LED LUMINAIRE, FROSTED SHEILDING, HIGH REFLECTIVE

WHITE PAINT WITH ALUMINUM TRIM RAILS

SUSPENDED DIRECT/INDIRECT LED LUMINAIRE. 40% UPLIGHT, 60% DOWNLIGHT

SOFTSHINE LENS, ADJUSTABLE CABLE AND GRAPPERS, AND DUST COVER.

SEE PLANS FOR LENGTHS.

SUSPENDED DIRECT/INDIRECT LED LUMINAIRE. 40% UPLIGHT, 60% DOWNLIGHT

SOFTSHINE LENS, ADJUSTABLE CABLE AND GRIPPERS, DUST COVER

AND EMERGENCY BATTERY BACK UP. SEE PLANS FOR LENGTHS

4 FT LENSED LED STRIP LIGHT WITH WIRE GUARD

4FT LENSED LED STRIP LIGHT WITH WIRE GUARD WITH EMERGENCY BATTERY PACK

WET AND COLD LISTED ARCHITECTURAL EMERGENCY SCONCE LIGHT WITH SELF-DIAGNOSTICS,

90 MINUTE BACK UP BATTERY AND FORWARD THROW OPTICS

8' DIRECT/INDIRECT WALL MOUNTED LINEAR LED, FROSTED FLUSH SHIELD

17" CYLINDRICAL EXTERIOR POLE MOUNTED ROUND ROADWAY LED LUMINAIRE - SINGLE HEAD.

TYPE III DISTRIBUTION WITH FULL CUT OFF, PHOTOCELL, BRONZE FINISH (TO MATCH EXISTING)

17" CYLINDRICAL EXTERIOR POLE MOUNTED ROUND ROADWAY LED LUMINAIRE.

TWIN POLE MOUNT AT 180 DEGREES. TYPE III DISTRIBUTION WITH FULL CUT OFF, PHOTOCELL,

BRONZE FINISH (TO MATCH EXISTING)

SINGLE FACE DIECAST SATIN ALUMINUM LED EXIST SIGN WITH GREEN LETTERS,

90-MINUTE BATTERY PACK, AND SELF-DIAGNOSTICS.

SEE PLANS FOR DIRECTIONAL ARROWS.

DOUBLE FACE DIECAST SATIN ALUMINUM LED EXIST SIGN WITH GREEN LETTERS,

90-MINUTE BATTERY PACK, AND SELF-DIAGNOSTICS.

SEE PLANS FOR DIRECTIONAL ARROWS.

COORDINATE CEILING AND WALL MOUNTING WITH ARCHITECTURAL PLANS, ELEVATIONS, AND DETAILS.

VERIFY TRIM COMPATIBILITY WITH CEILING TYPE PRIOR TO SUBMITTALS.

VERIFY LINEAR RUN LENGTHS PRIOR TO SUBMITTALS.

CONTRACTOR SHOULD PROVIDE FIVE (5) ADDITIONAL SPARE FIXTURES OF EACH TYPE TO OWNER.

FINISH TO BE VERIFIED BY ARCHITECT.

INCLUDE ALL HARDWARE FOR A FULLY FUNCTIONAL COVE LIGHTING SYSTEM.

SEE PLANS FOR TOTAL RUN LENGTH.

COORDINATE 8 DIFFERENT COLORS WITH ARCHITECT.

PROVIDE ALL EQUIPMENT FOR A FULLY FUNCTIONAL LED TAPE COVE LIGHT SYSTEM. SEE PLANS FOR APPROXIMATE RUN LENGTH.

CONTROL SYSTEM TO BE COORDINATED WITH LUMINAIRE MANUFACTURER.

MANUFACTURER

OR APPROVED

EQUIVALENT

V2

PEACHTREE LIGHTING

LEDINSPIRATIONS

LITHONIA

PORTFOLIO

LITHONIA

PORTFOLIO

GOTHAM

HALO

NULITE

NEORAY

NULITE

NEORAY

NULITE

NEORAY

LITHONIA

NEORAY

LITHONIA

METALUX

NULITE

NEORAY

LUMENPULSE

LEDI LIGHTING

NULITE

PEERLESS

NEO-RAY

PEERLESS

NEO-RAY

LITHONIA

METALUX

LITHONIA

METALUX

LITHONIA

SURE-LITES

NULITE

NEO-RAY

PHILLIPS

PHILLIPS

LITHONIA

SURE-LITES

LITHONIA

SURE-LITES

CATALOG SERIES NUMBER

OR APPROVED EQUIVALENT

C3LP-N-V-D-30-83-35-20-XX-AC

C9BLR-32-35K-W-RPA-WH-CAB-C-10-120/277

TAPE LIGHT: PE-V2-3500-B

DRIVERS: DR-192W-24VDC-DIM (QTY 2), DR-96W-24VDC-DIM

4" EXTENSION CABLE: EXT-4IN-U

LDN6 35/20 L06AR X

LD6A10D010TE ERW6A10835 6LW0LI

LDN6 35/20 L06AR 120 EL

LD6A10D010TE EMBOD ERW6A10835 6LW0LI

ICO 35/1000 2AR LSS 55D MVOLT UGZ CRI90 NCH

H457ICAT1E ELG406 935WH

RP2-4D-03L35-120-DIM-1C-FRL-X-X-48-6

S22-DP1-35-X-6-120-STD-I-C-S92S-W

RP2-4B-03L35-120-DIM-1B-FRL-X-X-48-6

S22-DP1-35-X-6-120-STD-I-E-S92S-W

RP2-4B-05DN/09UP-L35-120-DIM-1C-FRL-X-X-48-12

S22-DP1-35-X-XX-120-STD-I-C-S92S-W

RP2-4B-05DN/09UP-L35-120-DIM-1B-FRL-X-X-48-12

S22-DP1-35-X-12-120-STD-I-B-S92S-W

2BLT2 33l ADP EZ1 LP835

22EN-LD1-34-UNV-L835-CD1-U

RT4-06-L35-120-DIM-1C-FRF-WH-7

S22-DR-1L35-X-XX-1-DD-S1-S92-W

LL12R-120-C6-DRORGB-NO-SFG-XX-VS

CONTROL SYSTEM: XXX

LEDi : #CH-R-3513-6FT LENGHT

LEDi: INSPIRE RGB INDOOR (6FT LENGTH)

LEDi: DR-60W-24DC-NON DIM with handheld RGB controller

RG2-09-L35-UNV-D-1C-FR-L-4

BRM9L LO 40/60 SSH 4 R4 120 1SE EL LP835 X 4 ACG X DU

J3-UL-3L35-AD-120-AC-X-X-4-STD-W

BRM9L LO 40/60 SSH 4 R4 120 SCT LP835 X 4 ACG X DU

J3-UL-3L35-AB-UNV-AC-X-X-4-STD-W

ZL1N L48 2500LM FST MVOLT 35K 80CRI WH WGZ48

4SNLED-LD4-28SL-UNV-L835K-CD1-U-WG/SNF-4FT

ZL1N L48 2500LM FST MVOLT 35K 80CRI E7W WH WGZ48

4SNLED-LD4-28SL-UNV-EL7W-L835K-CD1-U-WG/SNF-4FT

AFNBNEXTFWD

AEL246SD

RW4-B-06DN/06UP-L35-UNV-DIM-1C-FRF-WH-8

S23-DIW-1L35-SR-8-U-SI-S93-W

CA17L-1-3-85LA-NW-BRA-PCR

CA17L-2-3-85LA-NW-BRA-PCR

LX W 3 G EL N

LPX7SD

LX W 3 G EL N

LPX7SD

LAMPS

(QTY) TYPE

3000 LUMENS

3500K

80 CRI

159 LUMENS/FT

3500K

80 CRI

2000 LUMENS

3500K

80 CRI

2000 LUMENS

3500K

80 CRI

3500K

90 CRI

1400 LUMENS

3500K

80 CRI

1400 LUMENS

3500K

80 CRI

4200 LUMENS

3500K

80 CRI

4200 LUMENS

3500K

80 CRI

3200 LUMENS

3500K

80 CRI

363 LM/FT

3500K

80 CRI

1910 LM/4FT

3500K

80 CRI

3544 LUMENS

3500K

90 CRI

3606 LUMENS/4 FT

3500K

80 CRI

3606 LUMENS/4 FT

3500K

80 CRI

2500 LUMENS

3500K

80 CRI

2500 LUMENS

3500K

80 CRI

4000K

80 CRI

739 LUMENS

3500K

80 CRI

8700 LUMENS

4000K

80 CRI

17400 LUMENS

4000K

80 CRI

LED

LED

INPUT

WATTS

29

3.5 W/FT

35

35

13.4

4.2W/FT

4.2W/FT

4.2W/FT

4.2W/FT

30

4.2 W/FT

6 W/FT

31.16

31/4 FT

31/4 FT

22

22

10.8

17

68

136

4

4

MINIMUM

LUMINAIRE

EFFICACY

102

45 PER FT

56

56

75

83 PER 4 FT

83 PER 4 FT

83 PER 4 FT

83 PER 4 FT

108

86 PER FT

80 PER FT

114

116

116

129

129

43

227

227

VOLTAGE

120

120/24

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

MOUNTING

R

X

X

X

X

X

X

X

S

X

X

X

X

X

X

X

X

X

X

X

X

P

X

X

X

W

X

NOTES

1

5

1

1

1,3

1,3

1,3

1,3

1

4,6

1

1

1

1

1

4

1

1

MECHANICAL EQUIPMENT SCHEDULEKEY

B-1

CUH-1

CUH-2

UH-1

UH-2

EH-1

DCP-1

EF-1

EF-2

EF-3

EF-4

EF-5

EF-6

EF-7

EF-8

FC-1

CU-1

GWH-1

HWP-3

HWP-4

RTU-1

RTU-2

RTU-3

NOTES:

1.

2.

3.

4.

5.

ITEM

BOILER

UNIT HEATER

UNIT HEATER

UNIT HEATER

UNIT HEATER

ELECTRIC HEATER

CIRC PUMP

EXHAUST FAN

EXHAUST FAN

EXHAUST FAN

EXHAUST FAN

EXHAUST FAN

EXHAUST FAN

EXHAUST FAN

EXHAUST FAN

FAN COIL

CONDENSING UNIT

GAS WATER HEATER

PUMP

PUMP

ROOF TOP UNIT

ROOF TOP UNIT

ROOF TOP UNIT

VARIABLE FREQUENCY DRIVE PROVIDED BY DIV 23 CONTRACTOR AND INSTALLED BY DIV 26 CONTRACTOR.

UNIT SHALL BE FURNISHED WITH INTEGRAL DISCONNECTING SWITCH BY MANUFACTURER.

PROVIDE MOTOR RATED SWITCH SIZED PER NAMEPLATE RATINGS.

PROVIDE NEMA 3R FUSED DISCONNECTING SWITCH.

DPST: DOUBLE-POLE, SINGLE-THROW DISCONNECT.

LISTED LOAD

HP

1/12

1/12

1/12

1/12

1/12

1/12

1/12

1/12

1/12

1-1/2

1-1/2

FLA

1.8

1.13

0.35

0.7

0.7

3.5

14.1

5

100.8

100.8

100.8

KW

1000

EQUIV.

LOAD (VA)

216

136

42

84

84

1000

264

264

264

264

264

264

264

264

264

728

2933

600

2486

2486

36314

36314

36314

VOLTS

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

208

208

120

208

208

208

208

208

PH

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

3

3

3

3

3

FEEDERS

CONDUCTORS

2 # 12, 1 # 12 G

2 # 12, 1 # 12 G

2 # 12, 1 # 12 G

2 # 12, 1 # 12 G

2 # 12, 1 # 12 G

2 # 12, 1 # 12 G

2 # 12, 1 # 12 G

2 # 12, 1 # 12 G

2 # 12, 1 # 12 G

2 # 12, 1 # 12 G

2 # 12, 1 # 12 G

2 # 12, 1 # 12 G

2 # 12, 1 # 12 G

2 # 12, 1 # 12 G

2 # 12, 1 # 12 G

2 # 12, 1 # 12 G

2 # 10, 1 # 10 G

2 # 12, 1 # 12 G

3 # 12, 1 # 12 G

3 # 12, 1 # 12 G

3 # 1, 1 # 6 G

3 # 1, 1 # 6 G

3 # 1, 1 # 6 G

CONDUIT

3/4

3/4

3/4

3/4

3/4

3/4

3/4

3/4

3/4

3/4

3/4

3/4

3/4

3/4

3/4

1

3/4

1

3/4

3/4

1 1/2

1 1/2

1 1/2

DISCONNECT

DISC SW

Sto

Sto

Sto

Sto

Sto

Sto

Sto

Sto

Sto

DPST

30 A 3 P

Sto

30 A 3 P

30 A 3 P

200 A 3P

200 A 3P

200 A 3P

FUSE

25

15

15

150

150

150

CIRCUIT NUMBER

P2

P2

P2

P2

P2

P2

P2

P2

P2

P2

P2

P2

P2

P2

P2

P2

P2

P2

P2

P2

MSB

MSB

MSB

NOTES

3

2

2

2

2

2

5

4

1

1

3

3

3

1

1

SHEET:

OF:

DESIGNED BY:DRAWN BY:CHECKED BY:DATE:SCALE:

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

APPROVED CONTRACT DOCUMENT

DATE:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER, COSCHOOL DISTRICT NO. 1 SITE NO. 196

DWG. NO.

DEPARTMENT OF FACILITY MANAGEMENT

DENVER PUBLIC SCHOOLS

LARSON INCITTI ARCHITECTS1900 WAZEE ST. SUITE 1539

DENVER, CO 80202

303-292-4304

AS NOTED CONSTRUCTION DOCUMENTS

953.001

SCHOOL NO. 1107

72E5.1

PP2570 FAR NORTHEAST ECECATHAY ST., DENVER, CO 80249

JPOT

02/11/16

ELECTRICAL SCHEDULES

1107 -

2570 -

OR

- E

5.1

JP

SUITE 1500

80202

3 0 3 . 3 8 2 . 1 9 2 0T :

3 0 3 . 3 8 2 . 1 9 3 0

717 17th Street,

F :

DENVER, CO

High Performance Building Consultants

w w w . m e g r o u p . c o m

Job #:

Rme UPG

71

1 07/01/16 PR-04

SHEET:

OF:

DESIGNED BY:DRAWN BY:CHECKED BY:DATE:SCALE:

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

APPROVED CONTRACT DOCUMENT

DATE:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER, COSCHOOL DISTRICT NO. 1 SITE NO. 196

DWG. NO.

DEPARTMENT OF FACILITY MANAGEMENT

DENVER PUBLIC SCHOOLS

LARSON INCITTI ARCHITECTS1900 WAZEE ST. SUITE 1539

DENVER, CO 80202

303-292-4304

AS NOTED CONSTRUCTION DOCUMENTS

953.001

SCHOOL NO. 1107

72E5.2

PP2570 FAR NORTHEAST ECECATHAY ST., DENVER, CO 80249

JPOT

02/11/16

ELECTRICAL SCHEDULES

1107 -

2570 -

OR

- E

5.2

JP

SUITE 1500

80202

3 0 3 . 3 8 2 . 1 9 2 0T :

3 0 3 . 3 8 2 . 1 9 3 0

717 17th Street,

F :

DENVER, CO

High Performance Building Consultants

w w w . m e g r o u p . c o m

Job #:

Rme UPG

Notes:

A Appliance 6950 VA 65.00% 4518 VA

E Equipment 30358 VA 30358 VA 30358 VA

LM Largest Motor 36314 VA 125.00% 45393 VA Total Est. Demand: 541 A

M Motor 81060 VA 100.00% 81060 VA Total Conn.: 546 A

R Receptacle 32220 VA 65.52% 21110 VA Total Est. Demand: 194834 VA

C Continuous Total Conn. Load: 196819 VA

L Lighting 9917 VA 125.00% 12396 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Amps: 609 A 522 A 512 A

Total Conn. Load: 72906 VA 62455 VA 61459 VA

8 PREPARED SPACE -- -- -- -- -- -- -- 0 VA --

7 RTU-3 M 200 A 150 A 3 12105 VA 12105 VA 12105 VA 36314 VA

6 RTU-2 M 200 A 150 A 3 12105 VA 12105 VA 12105 VA 36314 VA

5 RTU-1 LM 200 A 150 A 3 12105 VA 12105 VA 12105 VA 36314 VA

4 PANEL P3 E; L 400 A 40 A 3 2854 VA 3999 VA 3264 VA 10117 VA

3 PANEL P2 E; M 400 A 40 A 3 5243 VA 3752 VA 3656 VA 12650 VA

2 PANEL P1 R; E; A 400 A 400 A 3 28495 VA 18390 VA 18225 VA 65110 VA

1 SPD E 60 A 60 A 3 0 VA 0 VA 0 VA 0 VA

CKT Circuit Description Load Classification Frame Trip Poles Phase A Phase B Phase C Load Notes

Enclosure: Type 1 MCB Rating: 800 A

Mounting: Surface Wires: 4 Mains Rating: 800 A

Supply From: Phases: 3 Mains Type: MCB

Location: MECHANICAL 104C Volts: 120/208 Wye A.I.C. Rating: 42,000

Switchboard: MSB

Notes:

A Appliance 6950 VA 65.00% 4518 VA

E Equipment 25940 VA 100.00% 25940 VA Spare Capacity: 82 A

LM Largest Motor Total Est. Demand: 143 A

M Motor Total Conn.: 181 A

R Receptacle 32220 VA 65.52% 21110 VA Total Est. Demand: 51568 VA

C Continuous Total Conn. Load: 65110 VA

L Lighting

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Phase Balance 65 % A-B 99 % B-C 64 % C-A

Total Amps: 238 A 153 A 152 A

Total Load: 28495 VA 18390 VA 18225 VA

83 DOOR HOLD OPEN E 20 A 1 200 0 1 20 A -- SPARE 84

81 REC - CONFERENCE 102 R 20 A 1 900 0 1 20 A -- SPARE 82

79 REC - MECH. ROOM R 20 A 1 900 0 1 20 A -- SPARE 80

77 REC - STORAGE 110-112 R 20 A 1 1080 0 1 20 A -- SPARE 78

75 1275 1500 76

73L6-20R IT EQUIP. - MDF 114A E 20 A 2

1275 15002 30 A E REC - DRYER - CUST. 104B

74

71 STORAGES 106B, 107A R 20 A 1 360 540 1 20 A R REC - RR 100B, 100C 72

69 QUAD - IT EQUIP. MDF 114A E 20 A 1 1000 540 1 20 A R REC - ROOF 70

67 QUAD - IT EQUIP. MDF 114A E 20 A 1 1000 1000 1 20 A E QUAD - IT EQUIP. MDF 114A 68

65 QUAD - IT EQUIP. MDF 114A E 20 A 1 1000 1000 1 20 A E QUAD - IT EQUIP. MDF 114A 66

63 QUAD - IT EQUIP. MDF 114A E 20 A 1 1000 1000 1 20 A E QUAD - IT EQUIP. MDF 114A 64

61 REC - OS/1 R 20 A 1 180 1000 1 20 A E QUAD - IT EQUIP. MDF 114A 62

59 1275 1000 1 20 A E QUAD - IT EQUIP. MDF 114A 60

57L6-20R IT EQUIP. - MDF 114A E 20 A 2

1275 1000 1 20 A E QUAD - IT EQUIP. MDF 114A 58

55 REC - STOR/CUST 103-104 R 20 A 1 540 540 1 20 A R REC - MDF 104 56

53 FIRE ALARM CONTROL PANEL E 20 A 1 500 1200 1 20 A E WASHER - CUST. 104B 54

51 REC -OUTDOOR STORAGE R 20 A 1 180 360 1 20 A R REC - WORK 104 52

49 REC - MULTI. PURPOSE 103 GFI R 20 A 1 180 540 1 20 A R REC - WORK 101C, UNI 101 50

47 REC - MULTI. PURPOSE 103 GFI R 20 A 1 180 240 1 20 A E IRRIGATION CONTROLLER 48

45 REC - MULTI. PURPOSE 103 GFI R 20 A 1 180 0 1 20 A -- SPARE 46

43 REC - MULTIPURPOSE 103 R; E 20 A 1 1400 1260 1 20 A R REC - CORRIDOR 105 44

41 APPLI - WORK 114 A 20 A 1 1000 720 1 20 A R REC - CORRIDOR 100, 104 42

39 APPLI - WORK 114 A 20 A 1 1000 480 1 20 A R; E EQUIP - FOOD SERVICE 104A GFI 40

37 DISHWASHER - WORK 114 A 20 A 1 1200 600 1 20 A E EQUIP - FOOD SERVICE 104A GFI 38

35 DISPOSAL - WORK 114 A 20 A 1 800 360 1 20 A R EQUIP - FOOD SERVICE 104A 36

33 APPLI - WORK 114 GFI A 20 A 1 1000 1080 1 20 A R REC - CLINIC 101B 34

31 REFRIGERATOR - WORK 114 A 20 A 1 800 1620 1 20 A R REC - RECEP, VESTI 100A 32

29 MICROWAVE - WORK 114 A 20 A 1 1150 180 1 20 A R REGRIGERATOR - CLINIC 101B 30

27 COPER - WORK 114 E 20 A 1 300 1440 1 20 A R REC - OFFICE 101E, 101F 28

25 REC - WORK ROOM 114 R 20 A 1 1260 720 1 20 A R REC - OFFICE 101D 26

23 REC - CLASS 112 PROJECTOR R; E 20 A 1 680 680 1 20 A R; E REC - CLASS 113 PROJECTOR 24

21 QUAD REC - CLASS 112 AC GFI R 20 A 1 360 360 1 20 A R QUAD REC - CLASS 113 AC GFI 22

19 REC - CLASS 112 R 20 A 1 1620 1620 1 20 A R REC - CLASS 113 20

17 REC - CLASS 110 PROJECTOR R; E 20 A 1 680 680 1 20 A R; E REC - CLASS 111 PROJECTOR 18

15 QUAD REC - CLASS 110 AC GFI R 20 A 1 360 360 1 20 A R QUAD REC - CLASS 111 AC GFI 16

13 REC - CLASS 110 R 20 A 1 1440 1620 1 20 A R REC - CLASS 111 14

11 REC - CLASS 108 PROJECTOR R; E 20 A 1 680 680 1 20 A R; E REC - CLASS 109 PROJECTOR 12

9 QUAD REC - CLASS 108 AC GFI R 20 A 1 360 360 1 20 A R QUAD REC - CLASS 109 AC GFI 10

7 REC - CLASS 108 R 20 A 1 1080 1440 1 20 A R REC - CLASS 109 8

5 REC - CLASS 106 PROJECTOR R; E 20 A 1 680 680 1 20 A R; E REC - CLASS 107 PROJECTOR 6

3 QUAD RECEPT - CLASS 106 AC... R 20 A 1 360 360 1 20 A R QUAD REC - CLASS 107 AC GFI 4

1 REC - CLASS 106 R 20 A 1 1080 1080 1 20 A R REC - CLASS 107 2

CKT Circuit Description Load Class Trip PolesA

(VA)B

(VA)C

(VA) Poles Trip Load Class Circuit Description CKT

Enclosure: Type 1

Mounting: Surface Wires: 4 Bus Rating: 225 A

Supply From: MSB Phases: 3 Mains Type: MLO

Location: MECHANICAL 104C Volts: 120/208 Wye A.I.C. Rating: 22,000

Branch Panel: P1

Notes:

A Appliance

E Equipment 4218 VA 100.00% 4218 VA Spare Capacity: 190 A

LM Largest Motor Total Est. Demand: 35 A

M Motor 8432 VA 100.00% 8432 VA Total Conn.: 35 A

R Receptacle Total Est. Demand: 12650 VA

C Continuous Total Conn. Load: 12650 VA

L Lighting

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Phase Balance 72 % A-B 97 % B-C 70 % C-A

Total Amps: 44 A 31 A 30 A

Total Load: 5243 VA 3752 VA 3656 VA

53 SPACE -- -- -- 0 0 -- -- -- SPACE 54

51 SPACE -- -- -- 0 0 -- -- -- SPACE 52

49 SPACE -- -- -- 0 0 -- -- -- SPACE 50

47 SPACE -- -- -- 0 0 -- -- -- SPACE 48

45 SPACE -- -- -- 0 0 -- -- -- SPACE 46

43 SPACE -- -- -- 0 0 -- -- -- SPACE 44

41 SPACE -- -- -- 0 0 -- -- -- SPACE 42

39 SPACE -- -- -- 0 0 -- -- -- SPACE 40

37 SPACE -- -- -- 0 0 -- -- -- SPACE 38

35 SPARE -- 20 A 1 0 0 -- -- -- SPACE 36

33 SHUNT-TRIP -- -- -- 0 0 -- -- -- SPACE 34

31 B-1 E 20 A 1 1380 178 1 20 A E CUH-1, CUH-2 32

29 UH-1, UH-2 E 20 A 1 168 0 -- -- -- SHUNT-TRIP 30

27 DCP-1 E 20 A 1 264 0 1 20 A E GWH-1 28

25 MECHANICAL CONTROLS E 20 A 1 500 1000 1 20 A E EH-1 26

23 1467 364 24

21CU-1 M 25 A 2

1467 3642 15 A E FC-1

22

19 829 300 20

17 829 300 18

15

HWP-4 M 15 A 3

829 300

3 15 A M HWP-3

16

13 0 0 14

11 0 0 12

9

SPARE -- 15 A 3

0 0

3 15 A -- SPARE

10

7 EF-7 M 20 A 1 264 264 1 20 A M EF-8 8

5 EF-6 M 20 A 1 264 264 1 20 A M EF-3 6

3 EF-5 M 20 A 1 264 264 1 20 A M EF-2 4

1 EF-4 M 20 A 1 264 264 1 20 A M EF-1 2

CKT Circuit Description Load Class Trip PolesA

(VA)B

(VA)C

(VA) Poles Trip Load Class Circuit Description CKT

Enclosure: Type 1

Mounting: Surface Wires: 4 Bus Rating: 225 A

Supply From: MSB Phases: 3 Mains Type: 225 A

Location: MECHANICAL 104C Volts: 120/208 Wye A.I.C. Rating: 22,000

Branch Panel: P2

1. CIRCUIT TO BE CONTROLLED VIA ASTRONOMIC TIME CLOCK. REFER TO ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

Notes:

A Appliance

E Equipment 200 VA 100.00% 200 VA Spare Capacity: 65 A

LM Largest Motor Total Est. Demand: 35 A

M Motor Total Conn.: 28 A

R Receptacle Total Est. Demand: 12596 VA

C Continuous Total Conn. Load: 10117 VA

L Lighting 9917 VA 125.00% 12396 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Phase Balance 71 % A-B 82 % B-C 87 % C-A

Total Amps: 24 A 34 A 28 A

Total Load: 2854 VA 3999 VA 3264 VA

23 SPACE -- -- -- 0 0 -- -- -- SPACE 24

21 SPACE -- -- -- 0 0 -- -- -- SPACE 22

19 SPACE -- -- -- 0 0 -- -- -- SPACE 20

17 LTG - ADMIN L 20 A 1 670 0 -- -- -- SPACE 18

15 SPARE -- 20 A 1 0 0 -- -- -- SPACE 16

13 LTG - COVE LIGHTING L 20 A 1 373 0 1 20 A -- SPARE 14

11 LTG - BACK OF HOUSE L 20 A 1 592 1118 1 20 A L LTG - CORRIDOR 105 (NOTE 1) 12

9 LTG - ADMIN L 20 A 1 1007 608 1 20 A L LTG - CORRIDOR 100, 101 (NOTE... 10

7 LTG - EXTERIOR STORAGE L 20 A 1 22 44 1 20 A L LTG - EXT. LIGHTING (NOTE 1) 8

5 TIME CLOCK E 20 A 1 200 683 1 20 A L LTG - MULTIPURPOSE 103 (NOT... 6

3 LTG - CLASSROOM 112, 113 L 20 A 1 1185 1199 1 20 A L LTG - CLASSROOM 108, 109 4

1 LTG - CLASSROOM 106, 107 L 20 A 1 1199 1216 1 20 A L LTG - CLASSROOM 110, 111 2

CKT Circuit Description Load Class Trip PolesA

(VA)B

(VA)C

(VA) Poles Trip Load Class Circuit Description CKT

Enclosure: Type 1

Mounting: Surface Wires: 4 Bus Rating: 100 A

Supply From: MSB Phases: 3 Mains Type: MLO

Location: MECHANICAL 104C Volts: 120/208 Wye A.I.C. Rating: 22,000

Branch Panel: P3

72

1 06/16/2016

RFI-065

2 07/01/16 PR-04

11

2

Larson Incitti Architects Page 2 of 2 2570 FNE ECE

PR04-E3 RE: Drawing Sheets E5.1 Plans; Electrical Schedules: a. Revised Mechanical Equipment Schedule.

PR04-E4 RE: Drawing Sheets E5.2 Plans; Electrical Schedules:

a. Revised Electrical Panel Schedule P2.

END OF PR-04

Nora Brooks Attachments: Drawings

Larson Incitti Architects Mechanical: Sheets M0.1, M3.1, M7.1 and M8.1 Electrical: Sheets E2.1, E3.1, E5.1 and E5.2