Pre-Construction Compliance Report STEELFORCE – SSD 8900 Lot 6, Bringelly Road Business Hub Issue 02 18 September 2019
Transcript
Page 1: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

Pre-Construction

Compliance

Report

STEELFORCE – SSD 8900

Lot 6, Bringelly Road Business Hub

Issue 02 – 18 September 2019

Page 2: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 2 OF 44

Compliance Report Declaration Form

Compliance Report Declaration Form

Project Name: Steelforce Project Application Number: SSD 8900

Description of Project: The Steelforce facility comprises the detailed development of a warehouse

facility comprising of storage, dispatch and distribution of steel products. The facility will comprise

• a 10,000m2 warehouse (light industrial);

• 600m2 ancillary office space

• 48 visitor and staff car parking spaces Project Address: Lot 8, Bringelly Road Business Hub

Title of Compliance Report: Pre-construction Compliance Report Date: 19 July 2019 I declare that I have reviewed relevant evidence and prepared the contents of the attached Compliance Report and to the best of my knowledge: • the Compliance Report has been prepared in accordance with all relevant conditions of consent; • the Compliance Report has been prepared in accordance with the Compliance Reporting Post Approval Requirements; • the findings of the Compliance Report are reported truthfully, accurately and completely; • due diligence and professional judgement have been exercised in preparing the Compliance Report; and • the Compliance Report is an accurate summary of the compliance status of the development. • Under section 10.6 of the Environmental Planning and Assessment Act 1979 a person must not include false or misleading information (or provide information for inclusion in) a report of monitoring data or an audit report produced to the Minister in connection with an audit if the person knows that the information is false or misleading in a material respect. The proponent of an approved project must not fail to include information in (or provide information for inclusion in) a report of monitoring data or an audit report produced to the Minister in connection with an audit if the person knows that the information is materially relevant to the monitoring or audit. The maximum penalty is, in the case of a corporation, $1 million and for an individual, $250,000; and • The Crimes Act 1900 contains other offences relating to false and misleading information: section 307B (giving false or misleading information – maximum penalty 2 years’ imprisonment or 200 penalty units, or both). Name of Authorised Reporting Officer: Kai Schimkat

Title: Construction Manager Signature:

Company: CIP Constructions (NSW) Pty Ltd Company Address: Suite 59, 26-32 Pirrama Road, Pyrmont 2009

Page 3: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 3 OF 44

TABLE OF CONTENTS

1. EXECUTIVE SUMMARY ....................................................................................... 4

1.1 Project Name: ..................................................................................................... 4

1.2 Project Application Number: ............................................................................. 4

1.3 Site Address ....................................................................................................... 4

2. COMPLIANCE MONITORING AND REPORTING TABLE ................................... 5

3.0 NON-COMPLIANCES ................................................................................... 41

4.0 COMPLIANCE STATUS ............................................................................... 41

5.0 APPENDICES ............................................................................................... 42

Page 4: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 4 OF 44

1. EXECUTIVE SUMMARY

This Pre-Construction Compliance Report is submitted to the Department for the construction and

operations for a light industry facility for Steelforce at future Lot 8 of the Bringelly Road Business Hub.

The compliance monitoring and reporting program documents the status of the pre-construction

requirements applicable during the reporting period.

This document has been completed and implemented by CIP, we also note that Compliance reporting

continues at the nominated frequencies in accordance with the Compliance Reporting Post Approval

Requirements “CRPAR” (DPE, June 2018)

1.1 Project Name:

Steelforce

1.2 Project Application Number:

SSD 8900

1.3 Site Address

Lot 8, Bringelly Road Business Hub

1.4 Reporting type

Pre-Construction Compliance Report

1.5 Reporting Dates

This report is submitted to the Department on 19 July 2019, dates covered by this compliance report

are inclusive of 1 May 2019 to 19 July 2019 before commencement of construction.

1.6 Activities during Current Period

• All design consultants have been engaged.

• At this stage majority of trades / subcontractors have been engaged.

• CIP/CH have received necessary Construction Certificate 01 documentation for civil works, In-round services, Stormwater, Footing and Structure on 19 July 2019.

• Steelforce Environmental Management Plan has been undertaken for the Project and was approved by the Department on 11 July 2019 in accordance with condition C4 of the Steelforce consent conditions.

1.7 Key Personnel

Andrew Simpson Luke Santilli

Development Manager Project Manager

M: 0400 360 850 M: 0468 941 721

E: [email protected] E: [email protected]

Page 5: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

2. COMPLIANCE MONITORING AND REPORTING TABLE

Unique

(ID)

Compliance Requirement Development

Phase

Monitoring

Methodology

Evidence

and

Comments

Compliance

Status

PART A ADMINISTRATIVE CONDITIONS

OBLIGATION TO MINIMISE HARM TO THE ENVIRONMENT

A1 In addition to meeting the specific performance measures and criteria in this consent, all reasonable and feasible

measures must be implemented to prevent, and if prevention is not reasonable and feasible, minimise, any material

harm to the environment that may result from the construction and operation of the development, and any

rehabilitation required under this consent

At all times Construction –

daily inspections

onsite to monitor

environmental

management

practises and

procedures during

construction.

Operations –

Implement

procedures on

proper waste

disposal.

CEMP

Project

Environmental

Management

Checklist

Erosion and

Sediment Control

Plan

Waste Action

Plan.

Waste

Management

Plan

Compliant

TERMS OF CONSENT

A2 (a) The development may only be carried out:

(a) in compliance with the conditions of this consent;

At all times DA conditions are

tabulated into a

consent Matrix

that allocates

responsibility at

each phase of

development.

Independent

Environmental

Auditor to monitor

development

Consent Matrix

Checklist

Independent

Audit Report

Compliant

Page 6: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 6 OF 44

A2 (b) (b) in accordance with all written directions of the Planning Secretary; At all times DA conditions are

tabulated into a

consent Matrix

that allocates

responsibility at

each phase of

development.

Independent

Environmental

Auditor to monitor

development

Consent Matrix

Checklist

Independent

Audit Report

Compliant

A2 (c) (c) in accordance with the EIS and Response to Submissions; At all times DA conditions are

tabulated into a

consent Matrix

that allocates

responsibility at

each phase of

development.

Independent

Environment

Auditor to monitor

development

Consent Matrix

Checklist

Independent

Audit Report

Compliant

A2 (d) (d) in accordance with the Development Layout in Appendix 1; and At all times Finalised

Architectural

drawings to be in

accordance with

Appendix 1

drawings

CC from

Independent

Certifier

Compliant

A2 (e) (e) in accordance with the management and mitigation measures in Appendix 3. At all times Independent

Environmental

Auditor to monitor

development

Audit Report Compliant

A3 (a) Consistent with the requirements in this consent, the Planning Secretary may make written directions to the

Applicant in relation to:

(a) the content of any strategy, study, system, plan, program, review, audit, notification, report or correspondence

submitted under or otherwise made in relation to this consent, including those that are required to be, and have

been, approved by the Planning Secretary; and

At all times SSD 8900 DA

Consent

Copies of all

correspondence

from the

Department

Compliant

Page 7: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 7 OF 44

A3 (b) (b) the implementation of any actions or measures contained in any such document referred to in condition A3(a). At all times SSD 8900 DA

Consent

Copies of all

correspondence

from the

Department

Compliant

A4 The conditions of this consent and directions of the Planning Secretary prevail to the extent of any inconsistency,

ambiguity or conflict between them and a document listed in condition A2(c). In the event of an inconsistency,

ambiguity or conflict between any of the documents listed in condition A2(c), the most recent document prevails to

the extent of the inconsistency, ambiguity or conflict.

At all times SSD 8900 DA

Consent

Copies of all

correspondence

from the

Department

Compliant

LIMITS OF CONSENT

Lapsing

A5 This consent lapses five years after the date from which it operates, unless the development has physically

commenced on the land to which the consent applies before that date.

Construction Compliant Construction of

works

commenced

before the 5-year

threshold

Compliant

NOTIFICATION OF COMMENCEMENT

A6 (a) The date of commencement of each of the following phases of the development must be notified to the Department

in writing, at least one month before that date:

(a) construction;

Pre-Construction Department

notification date

of

commencement

of construction

Phase to be

inserted in

Steelforce

Development

programme.

Steelforce

Development

Programme

Steelforce

Construction

Notification Letter

to the

Department

Compliant

A6 (b) (b) operation; and Pre-Operation Department

notification date

of

commencement

of operation

Phase to be

inserted in

Steelforce

Development

programme.

Steelforce

Development

Programme

Steelforce Pre

Operation

Notification Letter

to the

Department

Not triggered

Page 8: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 8 OF 44

A6 (c) (c) cessation of operation Decommissioning Department

notification date

of cessation of

operations Phase

to be inserted in

Steelforce

Development

programme.

Steelforce

Development

Programme

Steelforce

Decommissioning

Notification Letter

to the

Department

Not triggered

A7 If the construction or operation of the development is to be staged, the Department must be notified in writing at

least one month before the commencement of each stage, of the date of commencement and the development to

be carried out in that stage.

All Stages Works not staged Notification letter

of non-staging of

works sent to the

Department

Compliant

EVIDENCE OF CONSULTATION

A8 (a) Where conditions of this consent require consultation with an identified party, the Applicant must:

(a) consult with the relevant party prior to submitting the subject document to the Planning Secretary for approval;

and

At all times Consult with

identified party to

identify any

potential issues

the development

may have on

them.

Email

Correspondence,

Minutes etc

Compliant

A8 (b) (i) (b) provide details of the consultation undertaken including:

(i) the outcome of that consultation, matters resolved and unresolved; and

At all times Consult with

identified party to

identify any

potential issues

the development

may have on

them.

Email

Correspondence,

Minutes etc

Compliant

A8 (b)

(ii)

(ii) details of any disagreement remaining between the party consulted and the Applicant and how the Applicant has

addressed the matters not resolved

At all times Consult with

identified party to

identify any

potential issues

the development

may have on

them.

Email

Correspondence,

Minutes etc

Compliant

Page 9: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 9 OF 44

STAGING, COMBINING AND UPDATING STRATEGIES, PLANS OR PROGRAMS

A9 (a) With the approval of the Planning Secretary, the Applicant may:

(a) prepare and submit any strategy, plan or program required by this consent on a staged basis (if a clear

description is provided as to the specific stage and scope of the development to which the strategy, plan or program

applies, the relationship of the stage to any future stages and the trigger for updating the strategy, plan or program);

At all times Required plan or

program to be

submitted to the

Department

Letter /

Correspondence

of Approval from

the Department

Not triggered

A9 (b) (b) combine any strategy, plan or program required by this consent (if a clear relationship is demonstrated between

the strategies, plans or programs that are proposed to be combined); and

At all times Required plan or

program to be

submitted to the

Department

Letter /

Correspondence

of Approval from

the Department

Not triggered

A9 (c) (c) update any strategy, plan or program required by this consent (to ensure the strategies, plans and programs

required under this consent are updated on a regular basis and incorporate additional measures or amendments to

improve the environmental performance of the development)

At all times Required plan or

program to be

submitted to the

Department

Letter /

Correspondence

of Approval from

the Department

Not triggered

A10 If the Planning Secretary agrees, a strategy, plan or program may be staged or updated without consultation being

undertaken with all parties required to be consulted in the relevant condition in this consent.

At all times Required plan or

program to be

submitted to the

Department

Letter /

Correspondence

of Approval from

the Department

Not triggered

A11 If approved by the Planning Secretary, updated strategies, plans or programs supersede the previous versions of

them and must be implemented in accordance with the condition that requires the strategy, plan or program.

At all times Required plan or

program to be

submitted to the

Department

Letter /

Correspondence

of Approval from

the Department

Compliant

PROTECTION OF PUBLIC INFRASTRUCTURE

A12 (a) Before the commencement of construction, the Applicant must:

(a) consult with the relevant owner and provider of services that are likely to be affected by the development to

make suitable arrangements for access to, diversion, protection and support of the affected infrastructure;

Pre-Construction Consultation with

Jemena to

identify any

potential issues

the development

may have on their

infrastructure.

Email

Correspondence

with Jemena

Compliant

A12 (b) (b) prepare a dilapidation report identifying the condition of all public infrastructure in the vicinity of the site

(including roads, gutters and footpaths); and

Pre-Construction Dilapidation

report was

undertaken of the

condition of the

BRBH and

condition of all

public

infrastructure in

BRBH

Dilapidation

Report

Compliant

Page 10: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 10 OF 44

the vicinity of the

site, pre-

construction.

A12 (c) (c) submit a copy of the dilapidation report to the Planning Secretary and Council. Pre-Construction A copy of the

Dilapidation

Report was sent

through to

Council and the

Department

Email

Correspondence

to Council and

the Department

Compliant

A13 (a) Unless the Applicant and the applicable authority agree otherwise, the Applicant must:

(a) repair, or pay the full costs associated with repairing, any public infrastructure that is damaged by carrying out

the development; and

Construction Dilapidation

report was

undertaken pre-

construction and

will also be

prepared post

construction.

Any damages

incurred by CIP

will be repaired.

Dilapidation

reports, pre and

post construction.

Not triggered

A13 (b) (b) relocate, or pay the full costs associated with relocating, any public infrastructure that needs to be relocated as a

result of the development.

Construction Dilapidation

report was

undertaken pre-

construction and

will also be

prepared post

construction.

Any relocation of

public

infrastructure as a

consequence of

the Development

will be restored /

relocated.

Dilapidation

reports, pre and

post construction.

Not triggered

Page 11: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 11 OF 44

STRUCTURAL ADEQUACY

A14 All new buildings and structures, and any alterations or additions to existing buildings and structures, that are part

of the development, must be constructed in accordance with the relevant requirements of the BCA.

Note:

- Under Part 6 of the EP&A Act, the Applicant is required to obtain construction and occupation certificates for the

proposed building works.

- Part 8 of the EP&A Regulation sets out the requirements for the certification of the development.

- Under section 21 of the Coal Mine Subsidence Compensation Act 2017, the Applicant is required to obtain the

Chief Executive of Subsidence Advisory NSW’s approval before carrying out certain development in a Mine

Subsidence District.

Construction Independent

Building Certifier

to be engaged to

certify that

buildings /

structures to be

constructed are to

relevant

requirements of

the BCA.

Construction

Certificates for

relevant stages.

Final Occupancy

Certificate

Not triggered

COMPLIANCE

A15 The Applicant must ensure that all of its employees, contractors (and their sub-contractors) are made aware of, and

are instructed to comply with, the conditions of this consent relevant to activities they carry out in respect of the

development.

At all times All employees,

contractors and

their

subcontractors

will be inducted in

respect to the

development.

SWMS

Induction

Register

Registration and

Induction Form

Compliant

OPERATION OF PLANT AND MACHINERY

A16 (a) All plant and equipment used on site, or to monitor the performance of the development, must be:

(a) maintained in a proper and efficient condition; and

Construction Plant and

Equipment

inspected daily

Plant Register Not triggered

A16 (b) (b) operated in a proper and efficient manner. Construction Plant and

Equipment

operation

inspected daily

Plant Operator

Daily Inspection

Checklist

Not triggered

EXTERNAL WALLS AND CLADDING

A17 The external walls of all buildings including additions to existing buildings must comply with the relevant

requirements of the BCA.

Post Construction External walls to

be inspected by

Architect and

Compliance

Certificate

Not triggered

Page 12: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 12 OF 44

BCA Certifier for

compliance.

A18 Before the issue of a Construction Certificate and an Occupation Certificate, the Applicant must provide the

Certifying Authority with documented evidence that the products and systems proposed for use or used in the

construction of external walls including finishes and claddings such as synthetic or aluminium composite panels

comply with the requirements of the BCA.

Before

Construction

Pre-Operation

Consultants to

design the

building systems

in accordance

with the BCA

requirements.

Design Certificate Not triggered

A19 The Applicant must provide a copy of the documentation given to the Certifying Authority to the Planning Secretary

within seven days after the Certifying Authority accepts it.

At all times Certification

checklists from

Certifying

authority to

monitor all

approved

documentation

and be sent to the

Department

Certifying

Checklists

Accepted

Documentation

Compliant

UTILITIES AND SERVICES

A20 Before the construction of any utility works associated with the development, the Applicant must obtain relevant

approvals from service providers.

Pre-Construction CIP to work with

utility service

providers to

obtain proper

approvals.

CIP to provide

utility works

approvals

Not triggered

A21 Before the commencement of operation of the development, the Applicant must obtain a Compliance Certificate for

water and sewerage infrastructure servicing of the site under section 73 of the Sydney Water Act 1994.

Pre-Operations CIP to work with

Sydney Water to

obtain proper

approvals.

CIP to provide

Compliance

Certificate for

Water and

Sewerage.

Not triggered

A22 (a) Before the issue of an Occupation Certificate for any stage of the development, the Applicant (whether or not a

constitutional corporation) is to provide evidence, satisfactory to the Certifying Authority, that arrangements have

been made for:

(a) the installation of fibre-ready facilities to all individual lots and/or premises in a real estate development project

to enable fibre to be readily connected to any premises that is being or may be constructed on those lots; and

Pre-Operations CIP to work with

Telstra / NBN to

obtain proper

approvals.

CIP to provide

approval

Not triggered

A22 (b) (b) the provision of fixed-line telecommunications infrastructure in the fibre-ready facilities to all individual lots

and/or premises in a real estate development project demonstrated through an agreement with a carrier.

Pre-Operations CIP to work with

Telstra / NBN to

obtain proper

approvals

CIP to provide

approval

Not triggered

Page 13: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 13 OF 44

A23 Before the issue of an Occupation Certificate for any stage of the development, the Applicant must demonstrate

that the carrier has confirmed in writing they are satisfied that the fibre ready facilities are fit for purpose.

Pre-Operations CIP to work with

Telstra / NBN to

obtain proper

approvals

CIP to provide

approval

Not triggered

WORKS AS EXECUTED PLANS

A24 Before the issue of the final Occupation Certificate, works-as-executed drawings signed by a registered surveyor

demonstrating that the stormwater drainage and finished ground levels have been constructed as approved, must

be submitted to the PCA.

Pre-Operations CIP to engage

registered

surveyor

CIP to provide

WAE

Not triggered

APPLICABILITY OF GUIDELINES

A25 References in the conditions of this consent to any guideline, protocol, Australian Standard or policy are to such

guidelines, protocols, Standards or policies in the form they are in as at the date of this consent.

At all times Reference so be

made to

applicable

Australian

standards

Applicable

Australian

Standards

Compliant

A26 However, consistent with the conditions of this consent and without altering any limits or criteria in this consent, the

Planning Secretary may, when issuing directions under this consent in respect of ongoing monitoring and

management obligations, require compliance with an updated or revised version of such a guideline, protocol,

Standard or policy, or a replacement of them.

At all times Reference so be

made to

applicable

Australian

standards

Reference to be

made to

Applicable

Australian

Standards as

directed by the

Department

Not triggered

ADVISORY NOTES

AN1 All licences, permits, approvals and consents as required by law must be obtained and maintained as required for

the development. No condition of this consent removes any obligation to obtain, renew or comply with such

licences, permits, approvals and consents.

At all times

All licences,

permits,

approvals and

consents required

by law to be

obtained.

Documentation of

all licences,

permits received

up to date.

Compliant

Page 14: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 14 OF 44

PART B SPECIFIC ENVIRONMENTAL CONDITIONS

TRAFFIC AND ACCESS

CONSTRUCTION TRAFFIC MANAGEMENT PLAN

B1 (a) Prior to the commencement of construction, the Applicant must prepare a Construction Traffic Management Plan

for the development to the satisfaction of the Planning Secretary. The plan must form part of the CEMP required by

condition C2 and must:

(a) be prepared by a suitably qualified and experienced person(s);

Pre-Construction CIP to engage a

qualified traffic

consultant to

prepare a CTMP

CTMP Compliant

B1 (b) (b) be prepared in consultation with RMS and Council; Pre-Construction CTMP to be

prepared in

consultation with

RMS and Council

Email

correspondence

to RMS and

Council

Compliant

B1 (c) (c) detail the measures that are to be implemented to ensure road safety and network efficiency during

construction;

Pre-Construction CTMP to detail

road safety and

network efficiency

during

construction

CTMP Compliant

B1 (d) (d) detail heavy vehicle routes, access and parking arrangements; Pre-Construction CTMP to detail

heavy vehicle

routes, access

and parking

arrangements

CTMP Compliant

B1 (e)(i) (e) include a Driver Code of Conduct to:

(i) minimise the impacts of earthworks and construction on the local and regional road network;

Pre-Construction CTMP to include

Driver code of

conduct

CTMP Compliant

B1 (e)(ii) minimise conflicts with other road users; Pre-Construction CTMP highlight

how conflict with

other road users

will be minimised

CTMP Compliant

B1 (e)(ii) minimise road traffic noise; and Pre-Construction CTMP to highlight

how road traffic

noise will be

minimised.

CTMP Compliant

B1

(e)(iv)

ensure truck drivers use specified routes Pre-Construction CTMP to highlight

how truck drivers

CTMP Compliant

Page 15: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 15 OF 44

are to use specific

routes.

B1 (f) (f) include a program to monitor the effectiveness of these measures; and Pre-Construction CTMP to include

program to

monitor

effectiveness of

these measures.

CTMP Compliant

B1 (g) (g) if necessary, detail procedures for notifying residents and the community (including local schools), of any

potential disruptions to routes

Pre-Construction CTMP to include

details on

notifying

residents/

community of any

disruptions to

routes

CTMP Compliant

B2 (a) The Applicant must:

(a) not commence construction until the Construction Traffic Management Plan required by condition B1 is

approved by the Planning Secretary; and

Pre-Construction Await Department

approval of CTMP

before

commencing

works.

CTMP approval

from the

Department

Compliant

B2 (b) (b) implement the most recent version of the Construction Traffic Management Plan approved by the Planning

Secretary for the duration of construction.

Construction Toolbox talk

implement the

new CTMP

Document

revision history to

be updated in

CEMP

Toolbox talk

meeting agenda

Toolbox meeting

attendance

register

CEMP

Not triggered

ROADWORKS AND ACCESS

B3 Prior to the commencement of operations, the Certifying Authority must ensure the vehicle crossings connecting to

Skyline Crescent and any other works in a public road are carried out in accordance with Council’s specifications

and any approval obtained under section 138 of the Roads Act 1993.

Pre-Operations Crossover

application will

require Council

Approval.

Council to inspect

crossover once

works are

complete.

Final Council

Approval

Not triggered

Page 16: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 16 OF 44

B4 The Applicant must ensure any new buildings, structures, or improvements integral to the use of the site are

erected clear of the land reserved for road widening under the RMS Road Widening Order for DP 225208 under

Section 25 of the Roads Act 1993, published in Folio 2660 of the Government Gazette 105, dated 20 August 1965.

Construction Consultant to

survey the site

upon completion

of Steelforce

Site Survey Not triggered

PARKING

B5 The Applicant must provide sufficient parking facilities on-site, including for heavy vehicles and for site personnel, to

ensure that traffic associated with the development does not utilise public and residential streets or public parking

facilities.

At all times Allocate sufficient

parking facilities

during

construction.

Development in

accordance with

approved number

of car parks and

allocated truck

parking area/

hardstand

Architectural

Plans

CTMP

Not triggered

OPERATING CONDITIONS

B6 (a) The Applicant must ensure:

(a) internal roads, driveways and parking (including grades, turn paths, sight distance requirements, aisle widths,

aisle lengths and parking bay dimensions) associated with the development are constructed and maintained in

accordance with the latest version of AS 2890.1:2004 Parking facilities Off-street car parking (Standards Australia,

2004) and AS 2890.2:2002 Parking facilities Off-street commercial vehicle facilities (Standards Australia, 2002);

Construction Architectural

drawings of

roads, driveways

and parking to be

in accordance

with the latest

version of AS

2890.1:2004

Certification from

Architect

Not triggered

B6 (b) (b) the swept path of the longest vehicle entering and exiting the site, as well as manoeuvrability through the site, is

in accordance with the relevant AUSTROADS guidelines noting the limitations established in B6 (j) and (k) below;

At all times Architectural

swept path

drawings to be in

accordance with

the latest version

of AS

2890.1:2004

Certification from

Architect

Not triggered

B6 (c) (c) all vehicles enter and exit the site in a forward direction noting the limitations established in B6 (j) and (k) below; At all times Trucks to enter

via the western

boundary and exit

via the eastern

boundary.

Architectural

drawings

Not triggered

Page 17: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 17 OF 44

Allocate sufficient

truck turning

space for when

only western

boundary can be

used.

B6 (d) (d) the development does not result in any vehicles queuing on the public road network; At all times Allocate sufficient

Truck parking and

Truck entry and

exit points

Allocate sufficient

Car parking and

Car entry and exit

points

Architectural

Drawings

Traffic Impact

Assessment

Not triggered

B6 (e) (e) heavy vehicles and bins associated with the development are not parked on local roads or footpaths in the

vicinity of the site;

At all times Designated truck

parking area and

Waste disposal

area to nominated

on drawings.

Architectural

drawings

Not triggered

B6 (f) (f) all vehicles are wholly contained on site before being required to stop At all times Site Compound /

Carpark will be

included in

CTMP.

CTMP Not triggered

B6 (g) (g) all loading and unloading of materials is carried out on-site noting the limitations established in B6 (k); At all times Trucks to be

nominated

unloading area on

arrival onsite

depending on

materials to be

delivered

Nominated Area Not triggered

B6 (h) (h) all trucks entering or leaving the site with loads have their loads covered or otherwise secured and do not track

dirt onto the public road network;

At all times Ensure trucks

entering and

exiting site has

been fully loaded

before entering /

exiting site

Truck shakers to

be used at entry

and exit point

Truck Importing

and Exporting

Register

Not triggered

Page 18: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 18 OF 44

during

construction

B6 (i) (i) the proposed turning areas in the car park are kept clear of any obstacles, including parked cars, at all times. At all times Designated

Parking areas to

be clearly marked

in car park to

distinguish from

turning areas

Architectural

Plans

Not triggered

B6 (j) (j) there shall be no access via the eastern side of the building by heavy vehicles between the hours of 10:00pm

and 7:00am

At all times Driver Code of

Conduct and

Induction Training

Driver Code of

Conduct.

Not triggered

B6 (k) (k) all roller doors/shutters on the eastern elevation of the building shall be closed between the hours of 10:00pm and 7:00am

At all times Driver Code of

Conduct and

Induction Training

Driver Code of

Conduct.

Not triggered

B6 (l) (l) externally there shall be no loading or unloading activities on the eastern side of the building between 10:00pm

and 7:00am

At all times Driver Code of

Conduct and

Induction Training

Driver Code of

Conduct.

Not triggered

WORK PLACE TRAVEL PLAN

B7 (a) Prior to the commencement of operation of any part of the development, the Applicant must prepare a Work Place

Travel Plan to the satisfaction of the Planning Secretary. The Work Place Travel Plan must:

(a) be prepared in consultation with TfNSW;

Pre-Operations TfNSW to be

consulted for the

Workplace Travel

Plan

Workplace travel

plan to be to

satisfaction of

Department

Steelforce

Workplace Travel

Plan

Not triggered

B7 (b) (b) outline facilities and measures to promote public transport usage, such as car share schemes and employee

incentives; and

Pre-Operations Bicycle racks,

showers, lockers

etc to be outlined

in Workplace

Travel Plan

Steelforce

Workplace Travel

Plan

Architectural

Drawings

Not triggered

B7 (c) (c) describe pedestrian and bicycle linkages and end of trip facilities available on-site. Pre-Operations Steelforce

Workplace Travel

Plan to describe

end of trip

Steelforce

Workplace Travel

Plan

Not triggered

Page 19: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 19 OF 44

facilities etc

available onsite.

B8 The Applicant must implement the most recent version of the Work Place Travel Plan approved by the Planning

Secretary for the duration of the development.

Pre-Operations Most recent Work

Place Travel Plan

to be

implemented

Steelforce

Workplace Travel

Plan

Not triggered

BICYCLE PARKING

B9 Bicycle parking spaces are to be provided in accordance with the rates provided in the Cycling Aspects of

Austroads Guides (2017) and designed in accordance with the latest version of AS 2890.3: 2015 Bicycle parking

facilities (Standards Australia, 2015).

Pre-Construction Architect to

design bicycle

parking spaces in

accordance with

the rates provided

in the Cycling

Aspects of

Austroads Guides

(2017) and

designed in

accordance with

the latest version

of AS 2890.3:

2015 Bicycle

parking facilities

(Standards

Australia, 2015).

Certification from

Architect

Compliant

NOISE

HOURS OF WORK

B10 The Applicant must comply with the hours detailed in Table 1, unless otherwise agreed in writing by the Planning Secretary.

Construction Hours of work will be Included as

part of the subcontract agreement

and Site Safety

Management

Plan.

Site Safety Management

Plan

Not triggered

Page 20: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 20 OF 44

B11 (a) Works outside of the hours identified in condition B11 may be undertaken in the following circumstances:

(a) works that are inaudible at the nearest sensitive receivers; Construction Works inaudible

to sensitive

receivers can be

undertaken

outside the hours

in table 1

Site Safety

Management

Plan

Not triggered

B11 (b) for the delivery of materials required outside these hours by the NSW Police Force or other authorities for safety reasons; or

Construction Delivery of

materials by

authorities can be

undertaken for

safety reasons

can be

undertaken

outside of hours

in table 1

Site Safety

Management

Plan

Not triggered

B11 (c) where it is required in an emergency to avoid the loss of lives, property or to prevent environmental harm. Construction Emergency

situations to be

actioned outside

of hours in table 1

Site Safety

Management

Plan

Not triggered

CONSTRUCTION NOISE LIMITS

B12 The development must be constructed to achieve the construction noise management levels detailed in the Interim Construction Noise Guideline (DECC, 2009) (as may be updated or replaced from time to time).

Construction Comply with EPA guidelines for

Construction.

Noise and Vibration

Action Plan

Not triggered

DRIVER CODE OF CONDUCT

B13 (a) Prior to the commencement of construction, the Applicant must prepare a Driver Code of Conduct and induction training for the operation of the development to minimise road traffic noise. The Driver Code of Conduct and

induction training should include:

(a) measures to ensure heavy vehicles only use the western access between 10 pm and 7 am Monday to Saturday;

At all times Driver Code of

Conduct and

Induction Training

to be updated for

all stages of the

Development.

Driver Code of

Conduct for

Construction and

Operations.

Compliant

B13 (b) (b) measures to minimise noise from the airbrakes of heavy vehicles during the operation of the development between 10 pm and 7 am Monday to Saturday; and

Operations Drover Code of

Conduct to

mitigate noise

from airbrakes

between 10pm &

7am.

Driver Code of

Conduct

Compliant

Page 21: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 21 OF 44

B13 (c) The matters in Condition B6 above At all times Driver Code of Conduct to

mitigate noise from airbrakes between 10pm &

7am.

Driver Code of

Conduct

Compliant

B14 The applicant must implement the most recent version of the Driver Code of Conduct for the life of the development.

At all times Most recent

Driver Code of

Conduct to be

implemented

Driver Code of

Conduct

Compliant

VIBRATION

VIBRATION CRITERIA

B15 (a) Vibration caused by construction at any residence or structure outside the site must be limited to: (a) for structural damage, the latest version of DIN 4150-3 (1992-02) Structural vibration - Effects of vibration on structures (German Institute for Standardisation, 1999); and

Construction Vibration during

Construction to

comply with

Structural

Vibration

Standards

Noise and

Vibration Action

Plan

Not triggered

B15 (b) for human exposure, the acceptable vibration values set out in the Environmental Noise Management Assessing

Vibration: a technical guideline (DEC, 2006) (as may be updated or replaced from time to time). Construction Vibration during

Construction to

comply with

Environmental

Noise

Management

Assessing

Vibration

standards,

Noise and

Vibration Action

Plan

Not triggered

B16 Vibratory compactors must not be used closer than 30 metres from residential buildings unless vibration monitoring confirms compliance with the vibration criteria specified in condition B16.

Construction Vibration

compactors must

not be closer than

30m from

residential

buildings.

Noise and

Vibration Action

Plan

Not triggered

SOILS, WATER QUALITY AND HYDROLOGY

IMPORTED SOILS

Page 22: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 22 OF 44

B17 (a) The Applicant must:

(a) ensure that only VENM, ENM, or other material approved in writing by EPA is brought onto the site;

At all times Soil to be tested

by accredited

environmental

scientist

Soil report to be

submitted

Contaminated

Soil Action Plan

Not triggered

B17 (b) (b) keep accurate records of the volume and type of fill to be used; and At all times Records of

volume and use

to be kept

Import material

register

Not triggered

B17 (c) (c) make these records available to the Department upon request At all times Records to be up

to date

Import Material

Register

Soil Report

Not triggered

EROSION AND SEDIMENT CONTROL

B18 Prior to the commencement of any construction or other surface disturbance the Applicant must install and maintain

suitable erosion and sediment control measures on-site, in accordance with the relevant requirements of the

Managing Urban Stormwater: Soils and Construction - Volume 1: Blue Book (Landcom, 2004) guideline and the

Erosion and Sediment Control Plan included in the CEMP required by condition C2.

Pre-Construction Erosion and

Sediment Control

basin sizing

based in

recommendation

of ‘Soils and

Construction,

Managing the

Blue Book’

Erosion and

Sediment Control

Drawings

Not triggered

DISCHARGE LIMITS

B19 The development must comply with section 120 of the POEO Act, which prohibits the pollution of waters. At all times Disposal of

polluted water in

accordance with

statutory

requirements (if

any).

Aspects and

Impacts Register

Not triggered

STORMWATER MANAGEMENT SYSTEM

B20 (a) Prior to the commencement of operation, the Applicant must design, install and operate a stormwater management

system for the development. The system must:

(a) be designed by a suitably qualified and experienced person(s);

Pre-Operations Civil Engineer to

design

stormwater

management

system in

accordance with

standards

Stormwater

Design

certification

Not triggered

Page 23: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 23 OF 44

B20 (b) (b) be generally in accordance with the conceptual design in the EIS; Pre-Operations Final design of

the Stormwater

System Design to

be reviewed for

compliance with

the concept

design in EIS

EIS and final

Stormwater

system design

drawings

Not triggered

B20 (c) (c) be in accordance with applicable Australian Standards; Pre-Operations Advise consultant

to design

Stormwater

Management

design to

necessary

standards

Stormwater

Design

certification

Not triggered

B20 (d) (d) ensure that water discharged from the site comply with Council’s water quality standards prior to being

discharged downstream into Bedwell Park Wetland;

Pre-Operations Advise consultant

to design water

discharge design

to necessary

standards

Stormwater

Design

Certification

Not triggered

B20 (e) (e) provide water quality treatment works designed using MUSIC modelling software and verify the performance of

the water quality treatment works using Council’s MUSIC-link; and

Pre-Operations Music Modelling

software

Stormwater

Design

Certification

Not triggered

B20 (f) (f) ensure that the system capacity has been designed in accordance with Australian Rainfall and Runoff

(Engineers Australia, 2016) and Managing Urban Stormwater: Council Handbook (EPA, 1997) guidelines.

Pre-Operations Design system

capacity in

accordance with

Australian Rainfall

and Runoff

(Engineers

Australia, 2016)

and Managing

Urban

Stormwater:

Council

Handbook (EPA,

1997) guidelines

Stormwater

Design

Certification

Not triggered

B21 The Stormwater Management System must be installed before the issue of any Occupation Certificate and must be

maintained by the Applicant for the duration of the development. All stormwater works within public road reserves

must be constructed before dedication to Council.

Pre-Operations Install Stormwater

Management

System before

OC

Compliance

Certificate

Not triggered

Page 24: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 24 OF 44

FIRE PROTECTION AND MANAGEMENT

ASSET PROTECTION ZONES

B22 At the commencement of construction, and in perpetuity, the Applicant must manage the property as an Inner

Protection Area as outlined in Section 4.1.3 and Appendix 5 of Planning for Bushfire Protection 2006 and the NSW

Rural Fire Services’ publication ‘Standards for asset protection zones’.

Construction No tree or tree

canopy is to occur

within 2 m of the

future building

rooflines;

The presence of

a few shrubs or

trees in the APZ

is acceptable

provided they:

- Are well spread

out and do not

form a continuous

canopy;

- Are not species

that retain dead

material or

deposit excessive

quantities of

ground fuel in a

short period or in

a danger period;

and

- Are located far

enough away

from the building

so that they will

not ignite future

buildings by direct

flame contact or

radiant heat

emission.

-Any landscaping

or plantings

should preferably

be local endemic

mesic species or

Steelforce

Bushfire

Protection

Assessment

Not triggered

Page 25: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 25 OF 44

other low

flammability

species;

- A minimal

ground fuel is to

be maintained to

include less than

4 tonnes per

hectare of fine

fuel (fine fuel

means ANY dead

or living

vegetation of <6

mm in diameter

e.g. twigs less

than a pencil in

thickness. 4 t/ha

is equivalent to a

1 cm thick layer of

leaf litter); and

- Any structures

storing

combustible

materials must be

sealed to prevent

entry of burning

debris.

DESIGN AND CONSTRUCTION

B23 (a) The Applicant must ensure the building and building elements in the development comply with the ‘National

Standard Steel Framed Construction in Bushfire Areas – 2014’ as appropriate or the specified bushfire attack levels

(BAL) under Australian Standard AS3959-2009 ‘Construction of buildings in bush fire-prone areas’. The Applicant

must also ensure:

(a) internal access roads comply with section 4.2.7 of Planning for Bushfire Protection 2006; and

At all times - Weepholes,

vents and

openable portions

of windows be

screened against

the entry of

embers with steel

mesh with

maximum

aperture of 2 mm;

- Weather strips

or similar

Certification from

Fire Engineer

Not triggered

Page 26: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 26 OF 44

measure to

external doors to

prevent the entry

of embers

through gaps

greater than 3

mm;

- Nylon brush

seals or similar

measure around

roller doors to

prevent the entry

of embers

through gaps

greater than 3

mm.

- vehicular access

to the site is

available from

skyline crescent

with separate

entry and exit

points provided

for cars and

trucks.

B23 (b) (b) the provision of water, electricity and gas complies with section 4.1.3 of Planning for Bushfire Protection 2006. At all times Make provision

for adequate

water for

protection of

building during

bushfire.

Easy identification

of electricity and

gas not to

contribute to a

bushfire.

Certification from

Fire Engineer

Not triggered

Page 27: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 27 OF 44

BUSHFIRE EMERGENCY MANAGEMENT

B24 Prior to the commencement of operation, the Applicant must prepare a Bush Fire Emergency Management and

Evacuation Plan which is consistent with NSW Rural Fire Services’ publication Development Planning – A Guide to

Developing a Bush Fire Emergency Management and Evacuation Plan.

Pre-Operations Consultant to

develop a

bushfire

Emergency

Management and

Evacuation Plan

Bushfire

Emergency

Management and

Evacuation Plan

Not triggered

AIR QUALITY

DUST MINIMISATION

B25 The Applicant must take all reasonable steps to minimise dust generated during all works authorised by this

consent.

Construction Prepare

mitigation

measures to

minimise dust

generation during

works.

Air Quality Action

Plan

Not triggered

B26 (a) During construction, the Applicant must ensure that:

(a) exposed surfaces and stockpiles are suppressed by regular watering;

Construction Prepare

mitigation

measures to

address exposed

surfaces and

stockpiles

Air Quality Action

Plan

Not triggered

B26 (b) (b) all trucks entering or leaving the site with loads have their loads covered; Construction Prepare

mitigation

measures to

avoid trucks

onsite with

uncovered loads

Air Quality Action

Plan

Not triggered

B26 (c) (c) trucks associated with the development do not track dirt onto the public road network; Construction Truck shakers to

be used at entry

and exit point

during

construction

Erosion and

Sediment Control

Details

Not triggered

B26 (d) (d) public roads used by these trucks are kept clean; and Construction Truck shakers to

be used at entry

and exit point

during

construction

Erosion and

Sediment Control

Details

Not triggered

Page 28: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 28 OF 44

B26 (e) (e) land stabilisation works are carried out progressively on site to minimise exposed surfaces. Construction Water Cart

Crushed Rock

Capping

Water Cart Plant

Day docket

Crushed Rock

Capping delivery

docket

Not triggered

AIR QUALITY DISCHARGES

B27 The Applicant must install and operate equipment in line with best practice. Construction Minimise diesel

pollutant impacts

on surrounding

land uses by:

-Turning off diesel

combustion

engines on

construction

equipment not in

active use and on

dump trucks that

are idling while

waiting to load or

unload material;

and

-Ensuring

vehicles are well

maintained.

Air Quality Action

Plan

Air Quality Impact

Statement

Plant Operator

Daily Inspection

Checklist

Not triggered

ODOUR MANAGEMENT

B28 The Applicant must ensure the development does not cause or permit the emission of any offensive odour (as

defined in the POEO Act).

Construction Ensure there is

no burning of

waste material on

site.

Air Quality Action

Plan

Complaints

Register

Air Quality Impact

Assessment

Not triggered

Page 29: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 29 OF 44

HAZARDS AND RISKS

B29 The Applicant must ensure that the quantities of dangerous goods stored within the development or transported to and from the development will remain below the screening threshold quantities listed in the Department’s Applying

SEPP 33 guideline (January 2011) at all times.

At all times Construction –

DG’s container

during

construction

Receipt of hire

Photos

DG’s report

Not triggered

B30 (a) The Applicant must store and handle all chemicals, fuels and oils within the development in accordance with:

(a) the requirements of all relevant Australian Standards; and At all times Spill containment

procedures

Minimise the

volume of

chemicals, oil and

fuels stored

onsite

Hazards and Risk

Action Plan

DG’s report

Not triggered

B30 (b) (b) the NSW EPA’s Storing and Handling of Liquids: Environmental Protection – Participants Handbook if the

chemicals are liquids. At all times Spill containment

procedures Minimise the

volume of chemicals, oil and fuels

stored onsite

Hazards and Risk

Action Plan

Not triggered

B31 In the event of an inconsistency between the requirements listed from B30(a) to B30(b) above, the most stringent

requirement shall prevail to the extent of the inconsistency.

At all times SEPP 33 and

NSW EPA

guidelines must

be adhered to.

Hazards and Risk

Action Plan

DG’s report

Not triggered

WASTE MANAGEMENT

PESTS VERMIN AND NOXIOUS WEED MANAGEMENT

B32 (a) The Applicant must: (a) implement suitable measures to manage pests, vermin and declared noxious weeds on the site; and

At all times Measures to be

put in place to

manage pests,

vermin and

noxious weeds.

Waste Action Plan

Not triggered

B32 (b) (b) inspect the site on a regular basis to ensure that these measures are working effectively, and that pests, vermin or noxious weeds are not present on site in sufficient numbers to pose an environmental hazard or cause the loss

of amenity in the surrounding area. Note: For the purposes of this condition, noxious weeds are those species subject to an order declared under the

Noxious Weed Act 1993.

At all times Daily Site Inspections to

identify environmental hazards

Any weed removal (if

Environmental Management

Checklist Aspects and

Impacts Register

Not triggered

Page 30: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 30 OF 44

necessary) is to be undertaken in

accordance with Council’s Noxious and

Environmental Weeds Policy and using appropriate

pesticides and herbicides handling

procedures.

Flora and Fauna

Action

Plan

WASTE STORAGE

B33 Waste must be secured and maintained within designated waste storage areas at all times and must not leave the site onto neighbouring public or private properties.

At all times Designated waste

storage area

provided during

construction and

operations.

Waste

Management

Plan

Waste Action

Plan

Not triggered

STATUTORY REQUIREMENTS

B34 All waste materials removed from the site must only be directed to a waste management facility or premises lawfully

permitted to accept the materials.

At all times All waste to be

properly disposed

of.

Waste Action

Plan

Waste

Management

Plan

Not triggered

B35 The Applicant must assess and classify all liquid and non-liquid wastes to be taken off site in accordance with the

latest version of EPA's Waste Classification Guidelines Part 1: Classifying Waste (EPA, 2014) and dispose of all

wastes to a facility that may lawfully accept the waste.

At all times Waste Action

Plan

Waste

Management

Plan.

Monitor liquid

waste disposal.

Waste disposal

receipts

Not triggered

B36 Waste generated outside the site must not be received at the site for storage, treatment, processing, reprocessing,

or disposal.

At all times Waste

containers/skips

must not be

located on a

public road or

road related area

(footpath, nature

strip, shoulder,

road reserve,

public car park,

Waste Action

Plan

Not triggered

Page 31: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 31 OF 44

etc.) to avoid out

of site use.

B37 The Applicant must retain all sampling and waste classification data for the life of the development in accordance

with the requirements of EPA.

At all times Waste dockets to

be provided and

kept on site for

construction

waste

Waste disposal /

sampling receipts

to be retained

Not triggered

B38 The collection of waste generated during operation of the development must be undertaken between 7am to 10pm

Monday to Friday.

Operations

Notify all site

workers on waste

collection times

Waste Action

Plan

Not triggered

VISUAL AMENITY

LANDSCAPING

B39 (a) Prior to the commencement of operation, the Applicant must prepare a Landscape Management Plan to manage

the revegetation and landscaping works on-site. The plan must:

(a) detail the species to be planted on-site;

Pre-Operations Landscape

Architect to

prepare

Landscape

Management

Plan

Landscape

Management

Plan

Not triggered

B39 (b) (b) include landscape buffer planting within Bedwell Park riparian corridor comprising a mixture of native ground

covers, grasses, shrubs and mature trees that would complement the existing vegetation in the riparian corridor;

Pre-Operations Landscape buffer

planting in

Bedwell Park in

accordance with

Landscape

Architectural

Drawings

Landscape

Architectural

Drawings

Photos

Not triggered

B39 (c) (c ) Include landscape screening on the eastern side of the development between R01 and the development, in

particular the 1st and 2nd access points to the warehouse in consultation with the owners of R01.

Pre-Operations Landscape buffer

planting in

Bedwell Park in

accordance with

Landscape

Architectural

Drawings and

R01.

Landscape

Architectural

Drawings

Photos

Not triggered

B39 (d) (d) include a diversity of native trees, shrubs and groundcover species from the local native vegetation community Pre-Operations Landscape

planting in

accordance with

Landscape

Landscape

Management

Plan

Not triggered

Page 32: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 32 OF 44

Architectural

Drawings

B39 (e) (e) describe the monitoring and maintenance measures to manage revegetation and landscaping works; Pre-Operations Management

Plan to monitor and maintain revegetation and

landscaping works

Bushfire

Protection

Assessment

Not triggered

B39 (f) (f) detail how the landscaping on-site will comply with the principles of Appendix 5 of Planning for Bushfire

Protection 2006; and

Pre-Operations - Any landscaping

or plantings

should preferably

be local endemic

mesic species or

other low

flammability

species;

-No tree or tree

canopy is to occur

within 2 m of the

future building

rooflines

Bushfire

Protection

Assessment

Not triggered

B39 (g) (g) be consistent with the Applicant’s Management and Mitigation Measures at Appendix 3. Pre-Operations -No tree or tree

canopy is to occur within 2 m of the

future building rooflines;

-Any landscaping or plantings should preferably

be local endemic mesic species or other low

flammability species;

Bushfire

Protection

Assessment

Not triggered

B40 (a) The Applicant must:

(a) not commence operation until the Landscape Management Plan is approved by the Planning Secretary.

Pre-Operations Undertake

Landscape

Management

Plan prior to

operations

Landscape

Management

Plan

Not triggered

Page 33: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 33 OF 44

B40 (b) (b) must implement the most recent version of the Landscape Management Plan approved by the Planning

Secretary; and

Pre-Operations Approved

Landscape

Management

Plan to be

implemented

Landscape

Management

Plan

Not triggered

B40 (c) (c) maintain the landscaping and vegetation on the site in accordance with the approved Landscape Management

Plan required by condition B44 for the life of the development.

Pre-Operations Maintain

Landscape and

vegetation in

accordance to

Landscape

Management

Plan

Landscape

Management

Plan

Not triggered

LIGHTING

B41 (a) The Applicant must ensure the lighting associated with the development:

(a) complies with the latest version of AS 4282-1997 - Control of the obtrusive effects of outdoor lighting (Standards

Australia, 1997); and

Construction Electrician to

install lighting with

the required

control system to

meet AS 4282-

1997

Electrical

Certification

Not triggered

B41 (b) (b) is mounted, screened and directed in such a manner that it does not create a nuisance to surrounding

properties or the public road network.

Post-

Construction

Electrician to

provide visual

inspection for

associated

lighting

Lux meter results

to be provided

Not triggered

SIGNAGE AND FENCING

B42 All signage and fencing must be erected in accordance with the development plans included in the EIS.

Note: This condition does not apply to temporary construction and safety related signage and fencing.

Construction Architect to

provide signage

plan

Signage Plan Not triggered

COMMUNITY ENGAGEMENT

B43 The Applicant must consult with the community regularly throughout the development, including consultation with

the nearby sensitive receivers identified on Figure 8 in Appendix 2, relevant regulatory authorities, Registered Aboriginal Parties and other interested stakeholders.

At all times CIP to regularly

consult with

community

regularly

BRBH Website

1800 hotline

Not triggered

Page 34: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 34 OF 44

throughout the

development.

Monthly letterbox

flyer updates

PART C ENVIRONMENTAL MANAGEMENT, REPORTING AND AUDITING

ENVIRONMENTAL MANAGEMENT

MANAGEMENT PLAN REQUIREMENT

C1 (a) Management plans required under this consent must be prepared in accordance with relevant guidelines, and include:

(a) detailed baseline data;

At all times Management

Plans to include

baseline data

CEMP &

Appendices

Compliant

C1 (b) (b) details of:

(i) the relevant statutory requirements (including any relevant approval, licence or lease conditions);

(ii) any relevant limits or performance measures and criteria; and

(iii) the specific performance indicators that are proposed to be used to judge the performance of, or guide the

implementation of, the development or any management measures;

At all times Management

Plans to include

relevant statutory

requirements

CEMP &

Appendices

Compliant

C1 (c) (c) a description of the measures to be implemented to comply with the relevant statutory requirements, limits, or

performance measures and criteria;

At all times Management

Plans to include

measures to

implement

relevant statutory

requirements

CEMP &

Appendices

Compliant

C1 (d) (d) a program to monitor and report on the:

(i) impacts and environmental performance of the development; and

(ii) effectiveness of the management measures set out pursuant to paragraph (c) above;

At all times Management

Plans to include

monitor impacts

an enviro

performance of

the development.

CEMP &

Appendices

Compliant

C1 (e) (e) a contingency plan to manage any unpredicted impacts and their consequences and to ensure that ongoing

impacts reduce to levels below relevant impact assessment criteria as quickly as possible;

At all times Management

Plans to include

contingency plan

CEMP &

Appendices

Compliant

C1 (f) (f) a program to investigate and implement ways to improve the environmental performance of the development

over time.

At all times Management

Plans to include

program to

improve

environmental

performance

CEMP &

Appendices

Compliant

Page 35: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 35 OF 44

C1 (g) (g) a protocol for managing and reporting any:

(i) incident and any non-compliance (specifically including any exceedance of the impact assessment criteria and

performance criteria);

(ii) complaint;

(iii) failure to comply with statutory requirements; and

At all times Management

Plans to include

protocol to

management

complaints,

incidents, non-

compliances

CEMP &

Appendices

Compliant

C1 (h) (h) a protocol for periodic review of the plan.

Note: the Planning Secretary may waive some of these requirements if they are unnecessary or unwarranted for

particular management plans

At all times Management

Plans to include

protocol for

periodic review

CEMP &

Appendices

Compliant

CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN

C2 The Applicant must prepare a Construction Environmental Management Plan (CEMP) in accordance with the

requirements of condition C1 and to the satisfaction of the Planning Secretary.

Pre-Construction Review CEMP for

compliance with

C1

CEMP Compliant

C3 (a) As part of the CEMP required under Condition C2 of this consent, the Applicant must include the following:

(a) Construction Traffic Management Plan (see Condition B1);

Pre-Construction CTMP to be

included as part

of CEMP

CEMP Compliant

C3 (b) (b) Erosion and Sediment Control Plan (see Condition B19); Pre-Construction Erosion and

Sediment Control

to be included as

part of CEMP

CEMP Compliant

C3 (c) (c) Community Consultation and Complaints Handling. Pre-Construction Community

Consultation and

Complaints

handling to be

included as part

of CEMP

CEMP Compliant

C4 (a) The Applicant must:

(a) not commence construction of the development until the CEMP is approved by the Planning Secretary; and

Pre-Construction CEMP approval

to be obtained

prior to

commencing

works

Approval Letter

from the

Department

Compliant

Page 36: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 36 OF 44

C4 (b) (b) carry out the construction of the development in accordance with the CEMP approved by the Planning Secretary

and as revised and approved by the Planning Secretary from time to time.

Pre-Construction Construction in

accordance with

CEMP

CEMP Compliant

REVISION OF STRATEGIES, PLANS AND PROGRAMS

C5 (a) Within three months of:

(a) the submission of a Compliance Report under condition C12;

At all times Compliance

reports to be

reviewed

quarterly

Revised

Strategies, Plans

and Programs

Compliant

C5 (b) (b) the submission of an incident report under condition C7; At all times Incident reports to

be reviewed

quarterly

Revised

Strategies, Plans

and Programs

Not triggered

C5 (c) (c) the submission of an Independent Audit under condition C15; At all times Independent

reports to be

reviewed

quarterly

Revised

Strategies, Plans

and Programs

Not triggered

C5 (d) (d) the approval of any modification of the conditions of this consent; or At all times Approved

modifications to

Consent to be

reviewed

quarterly

Revised

Strategies, Plans

and Programs

Compliant

C5 (e) (e) the issue of a direction of the Planning Secretary under condition A2(b) which requires a review, the strategies,

plans and programs required under this consent must be reviewed.

At all times Directions from

the Department to

be reviewed

quarterly

Revised

Strategies, Plans

and Programs

Compliant

C6 If necessary to either improve the environmental performance of the development, cater for a modification or

comply with a direction, the strategies, plans and programs required under this consent must be revised, to the

satisfaction of the Planning Secretary. Where revisions are required, the revised document must be submitted to

The Planning Secretary for approval within six weeks of the review.

Note: This is to ensure strategies, plans and programs are updated on a regular basis and to incorporate any

recommended measures to improve the environmental performance of the development.

At all times Reviewed

documentation to

be reviewed

quarterly

Revised

Strategies, Plans

and Programs

Compliant

REPORTING AND AUDITING

INCIDENT NOTIFICATION, REPORTING AND RESPONSE

C7 The Department must be notified in writing to [email protected] immediately after the Applicant

becomes aware of an incident. The notification must identify the development (including the development

application number and the name of the development if it has one) and set out the location and nature of the

Construction Immediate

incident

notification to the

CEMP Not triggered

Page 37: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 37 OF 44

incident. Subsequent notification requirements must be given and reports submitted in accordance with the

requirements set out in Appendix 4.

department to be

included in

CEMP.

NON-COMPLIANCE NOTIFICATION

C8 The Department must be notified in writing to [email protected] within seven days after the

Applicant becomes aware of any non-compliance

At all times Notification in

writing to the

department and

timing to be

included in CEMP

CEMP Not triggered

C9 A non-compliance notification must identify the development and the application number for it, set out the condition

of consent that the development is non-compliant with, the way in which it does not comply and the reasons for the

non-compliance (if known) and what actions have been, or will be, undertaken to address the non-compliance.

At all times Non- Compliance

Notification to the

department to be

included in CEMP

CEMP

Not triggered

C10 A non-compliance which has been notified as an incident does not need to also be notified as a non-compliance. At all times Non-compliances

notified as

incidents do not

need to be

notified as non

compliances

Notices of

Noncompliance /

Incidents

Not triggered

COMPLIANCE REPORTING

C11 No later than 6 weeks before the date notified for the commencement of construction, a Compliance Monitoring and

Reporting Program prepared in accordance with the Compliance Reporting Post Approval Requirements

(Department 2018) must be submitted to the Department.

Pre-Construction Methodology and

evidence to be

provided on how

to comply with

Consent

Conditions

Compliance

Reporting

Program

Compliant

C12 Compliance Reports of the project must be carried out in accordance with the Compliance Reporting Post Approval

Requirements (Department 2018).

At all times Compliance

reports to be

undertaken on the

project

Construction

Compliance

Report

Operation

Compliance

Report

Decommissioning

Compliance

Report

Not triggered

Page 38: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 38 OF 44

C13 The Applicant must make each Compliance Report publicly available no later than 60 days after submitting it to the

Department and notify the Department in writing at least 7 days before this is done.

At all times Compliance

reports must be

publicly available

via the BRBH

website.

Department

notified in writing

BRBH Website

Notification to the

Department

Not triggered

INDEPENDENT AUDIT

C14 No later than 4 weeks before the date notified for the commencement of construction, an Independent Audit

Program prepared in accordance with the Independent Audit Post Approval Requirements (Department 2018) must

be submitted to the Department.

Pre-Construction Independent

Auditor to

undertake

Independent

Audit Program for

SSD 8900

Independent

Audit Program

Compliant

C15 (a) Independent Audits of the development must be carried out in accordance with:

(a) the Independent Audit Program submitted to the Department under condition C14 of this consent; and

At all times Independent

audits to be

carried out in

accordance with

Independent

Audit Program

Independent

Audit

Compliant

C15 (b) (b) the requirements for an Independent Audit Methodology and Independent Audit Report in the Independent Audit

Post Approval Requirements (Department 2018).

At all times Independent

audits to be

carried out in

accordance Audit

Approval

Requirement

Independent

Audit

Compliant

C16 (a) In accordance with the specific requirements in the Independent Audit Post Approval Requirements (Department

2018), the Applicant must:

(a) review and respond to each Independent Audit Report prepared under condition C15 of this consent;

At all times CIP to review and

respond to each

Audit Report

prepared under

C15

Independent

Audit

Compliant

C16 (b) (b) submit the response to the Department; and At all times Audit response

submitted to the

Department

Independent

Audit

Compliant

Page 39: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 39 OF 44

C16 (c) (c) make each Independent Audit Report and response to it publicly available no later than 60 days after

submission to the Department and notify the Department in writing at least 7 days before this is done.

At all times Independent

Report to be

uploaded on

BRBH website

BRBH website Compliant

MONITORING AND ENVIRONMENTAL AUDITS

C17 Any condition of this consent that requires the carrying out of monitoring or an environmental audit, whether directly or by way of a plan, strategy or program, is taken to be a condition requiring monitoring or an environmental audit under Division 9.4 of Part 9 of the EP&A Act.

This includes conditions in respect of incident notification, reporting and response, non-compliance notification, compliance reporting and independent auditing.

Note: For the purposes of this condition, as set out in the EP&A Act, “monitoring” is monitoring of the development to provide data on compliance with the consent or on the environmental impact of the development, and an

“environmental audit” is a periodic or particular documented evaluation of the development to provide information on compliance with the consent or the environmental management or impact of the development.

At all times Monitoring and

Environmental

Audits to be

undertaken as per

DA Consent

Independent

Auditor

Compliant

ACCESS AND INFORMATION

C18 (a)

(i)

At least 48 hours before the commencement of construction until the completion of all works under this consent, the Applicant must:

(a) make the following information and documents (as they are obtained or approved) publicly available on its website:

the documents referred to in condition A2 of this consent;

At all times Terms of Consent

Documentation to

be uploaded on

website

BRBH Website Compliant

C18 (a)

(ii)

all current statutory approvals for the development;

At all times Statutory

documentation to

be uploaded on

website

BRBH Website Compliant

C18 (a)

(iii)

all approved strategies, plans and programs required under the conditions of this consent;

At all times Plans, strategies,

programs to be

uploaded on

website

BRBH Website Compliant

C18 (a)

(iv)

regular reporting on the environmental performance of the development in accordance with the reporting requirements in any plans or programs approved under the conditions of this consent;

At all times Regular

Environmental

performance of

development to

be uploaded on

website

BRBH Website Compliant

Page 40: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 40 OF 44

C18 (a)

(v)

a comprehensive summary of the monitoring results of the development, reported in accordance with the specifications in any conditions of this consent, or any approved plans and programs;

At all times Monitoring results

to be uploaded on

website

BRBH Website Compliant

C18 (a)

(vi)

a summary of the current stage and progress of the development;

At all times Summary od

current stage of

Development to

be uploaded on

website

BRBH Website Compliant

C18 (a)

(vii)

contact details to enquire about the development or to make a complaint; At all times Enquiry contact

number and email

to be placed on

website

BRBH Website Compliant

C18 (a)

(viii)

a complaint register updated monthly;

At all times Complaints

register to be

uploaded monthly

on website

BRBH Website Not triggered

C18 (a)

(ix)

the Compliance Report of the development At all times Compliance

Reports of

Development to

be uploaded on

website

BRBH Website Not triggered

C18 (a)

(x)

audit reports prepared as part of any Independent Audit of the development and the Applicant’s response to the recommendations in any audit report;

At all times Audit report and

CIP’s response to

recommendations

to be uploaded on

website

BRBH Website Not triggered

C18 (a)

(xi)

any other matter required by the Planning Secretary; and

At all times Requirements

made by the

Department to be

uploaded on

website

BRBH Website Not triggered

C18 (b) keep such information up to date, to the satisfaction of the Planning Secretary. At all times All information on

website to be kept

up to date

BRBH Website Not triggered

Page 41: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

3.0 NON-COMPLIANCES

Please be advised that no non- compliances were identified during this reporting period.

4.0 COMPLIANCE STATUS

4.1 Previous Report Actions

Please be advised that there are no previous Compliance Report actions to be addressed in this

report.

4.2 Incidents

Please be advised that there are no incidents to be reported during this compliance report.

4.3 Complaints

Please be advised that there are no complaints received during this reporting period

Page 42: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 42 OF 44

5.0 APPENDICES

Page 43: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 43 OF 44

Appendix A - BRBH Subdivision Plan

Page 44: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this
Page 45: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

GLOBAL STANDARDS, LOCAL EXPERTISE>CA-SD-009>3.0>11/18

PAGE 44 OF 44

Appendix B – Steelforce Site Plan

Page 46: Pre-Construction Compliance Report€¦ · Pre-Construction Compliance Report 1.5 Reporting Dates This report is submitted to the Department on 19 July 2019, dates covered by this

19

DIS. CAR SPACE WITHSHARED AREA

INSERTED KERB RAMP

PROPOSED INDUSTRIAL DEVELOPMENTfor

STEELFORCEat

BRINGELLY BUSINESS HUB, LOT 10 of DP2910, SKYLINEROAD, HORNINGSEA PARK, NSW.

G

OVERALL SITEPLAN

OVERALL SITE PLAN

WAREHOUSE

CARPARK

HARDSTAND

HARDSTAND

OFFICE

DEVELOPMENT SUMMARY

9,999.5 sqm

TOTAL BUILDING AREA 10,601.5 sqm

HEAVY DUTY PAVEMENT (H)

LIGHT DUTY PAVEMENT (L)

CARPARKING PROVIDED 36 spaces

602 sqm

EFFICIENCY 47.19 %

AWNING (15m) 1,983 sqm

SITE AREA 22,467 sqm

WAREHOUSE

OFFICE (2 LEVELS)

1,064.5 sqm8,274.8 sqm

AWNING (3m) 100.8 sqm

FUTURE CARPARKING 12 spaces

AutoCAD SHX Text
SCALE 1 : 100
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
BOLLARD SHALL BE MIN. 150 & 1300MMIN HEIGHT & POSSESS A SURFACE 30% LUMINANCE CONTRAST AS PER AS2890.1
AutoCAD SHX Text
INTERNATIONAL SYMBOL FOR ACCESS AS PER AS1428.1; AS2890.6
AutoCAD SHX Text
LINEMARKING OF DEDICATED SPACE TO BE ALTERNATIVE COLOUR (BLUE OR YELLOW) TO THE GENERAL PARKING BAYS AS PER AS2890.5
AutoCAD SHX Text
BOL
AutoCAD SHX Text
150MM HIGH KERB TYPICAL
AutoCAD SHX Text
SCALE 1 : 100
AutoCAD SHX Text
AS PER AS1428.1
AutoCAD SHX Text
1:8 MAX.
AutoCAD SHX Text
RAMP UP
AutoCAD SHX Text
CLEAR LANDINGS TO BE MAINTAINED,
AutoCAD SHX Text
KERB LINE
AutoCAD SHX Text
MIN.
AutoCAD SHX Text
MAX.
AutoCAD SHX Text
TACTILE INDICATORS
AutoCAD SHX Text
PARKING ACCESSIBLE
AutoCAD SHX Text
2500w X 5500l
AutoCAD SHX Text
2500w X 5500l OR AS INDICATED ON SITE PLAN
AutoCAD SHX Text
PARKING STANDARD
AutoCAD SHX Text
LINE MARKING
AutoCAD SHX Text
CAR PARKING AREAS WILL BE LINEMARKED IN ACCORDANCE WITH SITE PLAN AND TO THE ENTIRE SATISFACTION OF THE LOCAL AUTHORITY. LINE MARKING TO BE DULUX ROADMASTER CR WHITE.
AutoCAD SHX Text
CROSSOVERS AS INDICATED ON SITE PLAN CONSTRUCTED IN ACCORDANCE WITH LOCAL COUNCIL REQUIREMEMTS.
AutoCAD SHX Text
CROSSOVERS
AutoCAD SHX Text
LIGHT DUTY CONCRETE PAVEMENTS TO DESIGNATED CAR PARKING AREAS, WITH THE NUMBER OF CAR SPACES IN ACCORDANCE WITH THE LAYOUT, AS INDICATED ON SITE PLAN AND WITHIN THE LIMITATIONS OF MAIN ROAD'S AUTHORITIES GUIDELINES, INCLUDING ALL THE REQUIRED DISABLED CAR SPACES. ALL PAVING TO BE LAID TO CORRECT GRADIENTS AND SHALL INCLUDE PERIMETER KERB AND CHANNEL CONNECTED TO STORMWATER DRAINAGE SYSTEM.
AutoCAD SHX Text
CAR PARKING
AutoCAD SHX Text
TRUCK MANOEUVRING PAVEMENT
AutoCAD SHX Text
REINFORCED HEAVY DUTY CONCRETE PAVING TO STRICTURAL AND CIVIL ENGINEER'S DESIGN TO SUIT TRUCK OPERATIONS AND ALL RELEVANT AUSTRALIAN STANDARDS ALL CONCRETE PAVING TO BE LAID TO THE CORRECT GRADIENTS INCLUDING A 150mm HIGH PERIMETER KERB AND CHANNEL CONNECTED TO THE STORMWATER DRAINAGE SYSTEM.
AutoCAD SHX Text
GATES
AutoCAD SHX Text
FENCING
AutoCAD SHX Text
TYPE 1 - 1800 HIGH PERIMETER FENCE WITH BLACK PVC COATED CHAIN WIRE ON PAINTED BLACK POSTS WITH TOP & BOTTOM RAILS & WITH 3 ROWS OF BARBED WIRE TO AN OVERALL HEIGHT OF 2100MM INSTALLED TO SITE BOUNDARIES AND AS INDICATED ON SITE PLAN. TYPE 2 - 2100 HIGH METAL PICKET TYPE FENCING TO STREET FRONTAGE - BLACK
AutoCAD SHX Text
EXCAVATION
AutoCAD SHX Text
LANDSCAPING
AutoCAD SHX Text
REFER TO LANDSCAPE DRAWING AUTOMATIC IRRIGATION SYSTEM INSTALLED TO MAINTAIN LANDSCAPED AREAS.
AutoCAD SHX Text
PREPARATION -
AutoCAD SHX Text
ALL EXCAVATION, SUPPLY AND COMPACTION OF FILLING MATERIAL TO LEVEL 1 SUPERVISION AND THE PREPARATION NESSESSARY TO ENSURE THE SITE IS CUT AND FILLED TO THE CORRECT GRADIENT TO ACHEIVE A FFL ABOVE Q100 FLOOD LEVEL AS PER COUNCIL REQUIREMENTS. ALL EXCESS SPOIL INCLUDING IMPORTED AND SITE DERIVED MATERIALS SHALL BE REMOVED FROM SITE ON COMPLETION OF THE SPECIFIED WORKS. ALLOWANCE MADE FOR 3% CEMENT GROUND STABILISATION FOR FUTURE EXPANSION TO AREA INDICATED ON PLANS.
AutoCAD SHX Text
SITE
AutoCAD SHX Text
PROVIDE ACCESSIBLE COMPLYING TRANSITITION RAMPS AS PER AS1428 & CIVIL ENG'S DWG'S FOR DETAILS
AutoCAD SHX Text
DIS
AutoCAD SHX Text
ACCESSIBLE PARKING SIGN WITH INTERNATIONAL SYMBOL AS REQUIRED TO AS1428.1; A.S.2890.6 & SPEC D3.5 (BCA)
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
PROVIDE SHARED SPACE AS PER AS2890.6
AutoCAD SHX Text
ENTRY/EXIT POINT AS INDICATED ON SITE PLAN, AUTOMATIC PALISADE TYPE SWING GATES TO MATCH ADJACENT FENCING.
AutoCAD SHX Text
DS
AutoCAD SHX Text
ACCESSIBLE PARKING SIGN & POLE WITH INTERNATIONAL SYMBOL AS REQUIRED TO A.S. 1428.1; A.S.2890.6
AutoCAD SHX Text
LIGHTING
AutoCAD SHX Text
EXTERNAL LIGHTING TO BE PROVIDED TO EXTERNAL HARDSTAND & CARPARK AREAS AND TO PERIMETER OF WAREHOUSE AS PER AUST. STANDARDS AND LOCAL AUTHORITY REQUIREMENTS.
AutoCAD SHX Text
STAFF OUTDOOR AREA
AutoCAD SHX Text
A STAFF OUTDOOR AREA SHALL BE PROVIDED AND WILL COMPRISE OF: -WEATHERPROOF DOUBLE GPO & LIGHTING WEATHERPROOF DOUBLE GPO & LIGHTING -1 NO. BIB TAP1 NO. BIB TAP
AutoCAD SHX Text
PROVIDE ENCLOSURE ADJACENT THE WAREHOUSE AS INDICATED. -FULL WIDTH GATES FOR ACCESS. FULL WIDTH GATES FOR ACCESS. -1.8M HIGH POWDERCOAT SLAT FENCING, 1.8M HIGH POWDERCOAT SLAT FENCING, STRATCO EZI-SLAT OF SIMILAR. BLACK
AutoCAD SHX Text
WASTE AREA
AutoCAD SHX Text
PEDESTRIAN PAVEMENTS
AutoCAD SHX Text
TO OUTDOOR AREAS AND ENTRY PAVING LIGHT DUTY CONCRETE PAVING WILL BE PROVIDED, LAID OVER PREPARED SUB-GRADE TO CORRECT GRADIENTS.
AutoCAD SHX Text
TO BE DESIGNED IN ACCORDANCE WITH LOCAL AUTHORITIES REQUIREMENTS AND DISCHARGING TO THE NOMINATED LEGAL POINT OF DISCHARGE FOR THE DEVELOPMENT. FOR FULL DETAILS REFER TO CIVIL ENG'S DWG'S.
AutoCAD SHX Text
STORM WATER
AutoCAD SHX Text
GUARDRAIL G2
AutoCAD SHX Text
RHINO-STOP TYPE 1 WITH HANDRAIL EXTENSION TO 1M OR SIMILAR
AutoCAD SHX Text
GUARDRAIL G1
AutoCAD SHX Text
RHINO-STOP TRUCK GUARD TYPE 1 OR SIMILAR
AutoCAD SHX Text
BIKE RACK
AutoCAD SHX Text
MINIMUM 10 BIKE CAPACITY 'CORA' OR SIMILAR BIKE RACK SYSTEMS INSTALLED TO MANUF'S INSTRUCTIONS OVER PEDESTRIAN PAVING SLAB AS INDICATED ON SITE PLAN.
AutoCAD SHX Text
WS
AutoCAD SHX Text
WHEEL STOP AS SELECTED IN ACCORDANCE WITH AS2890.1, 1650L x 150W x 90H
AutoCAD SHX Text
DP
AutoCAD SHX Text
DOWN PIPE
AutoCAD SHX Text
COL
AutoCAD SHX Text
STEEL COLUMN, REFER STRUCT. ENG FOR FULL DETAILS
AutoCAD SHX Text
SITE LEGEND
AutoCAD SHX Text
BOL
AutoCAD SHX Text
1200MM HIGH, 219MM DIA. GALV. STEEL PIPE, PAINTED & FILLED WITH CONCRETE. PAINT FINISH SAFETY YELLOW WITH KNOCK ON CAPS
AutoCAD SHX Text
K+C
AutoCAD SHX Text
KERB & CHANNEL TO CIVIL ENG'S DETAILS
AutoCAD SHX Text
ROK
AutoCAD SHX Text
ROLL OVER KERB TO CIVIL ENG'S DETAILS
AutoCAD SHX Text
HOSE REEL FITTED AND INSTALLED IN ACCORDANCE WITH AS 1221 AND AS 2441 AND TO THE SATISFACTION OF THE CHIEF FIRE OFFICE AND BUILDING SURVEYOR.
AutoCAD SHX Text
FHY
AutoCAD SHX Text
PROVIDE EXTINGUISHERS IN ACCORDANCE WITH AS 2444
AutoCAD SHX Text
**
AutoCAD SHX Text
THE ENTIRE SYSTEM OF FIRE SERVICES SHALL BE TO THE SATISFACTION OF THE CHIEF FIRE OFFICER, FIRE SERVICES ENGINEER, BUILDING SURVEYOR INCLUDING BUT NOT LIMITED TO THE PROVISION OF BOOSTERS, FIRE MAIN, VALVES ETC.
AutoCAD SHX Text
FIRE SERVICE LEGEND
AutoCAD SHX Text
HYDRANT FITTED AND INSTALLED IN ACCORDANCE WITH RELEVANT PROVISIONS OF BCA, AS1221 AND AS 2441, CHIEF FIRE OFFICER AND BUILDING SURVEYOR. FOR FULL DETAILS REFER TO FIRE SERVICE DRAWINGS.
AutoCAD SHX Text
FHR
AutoCAD SHX Text
FIRE EXTINGUISHER, REFER FIRE SERVICE ENG. FOR FULL DETAILS
AutoCAD SHX Text
EXT
AutoCAD SHX Text
FIRE INDICATOR PANEL, REFER FIRE SERVICE ENG. FOR FULL DETAILS
AutoCAD SHX Text
FIP
AutoCAD SHX Text
**
AutoCAD SHX Text
EXTERNAL HYDRANTS ADJACENT TO DADO PANELS TO BE POSITIONED NOT LESS THAN 2M FROM ANY OPENING. PROVIDE BOLLARD PROTECTION AS REQUIRED.
AutoCAD SHX Text
PAVEMENT LEGEND
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DOWN PIPE WITH PROTECTION
AutoCAD SHX Text
H1HEAVY DUTY REINFORCED CONC. PAVEMENT TO HEAVY DUTY REINFORCED CONC. PAVEMENT TO CIVIL ENG'S DETAILS
AutoCAD SHX Text
LIGHT DUTY REINFORCED BITUMOUS CONC. PAVEMENT TO CIVIL ENG'S DETAILS
AutoCAD SHX Text
PEDESTRIAN PAVEMENT TO CIVIL ENG'S DETAILS
AutoCAD SHX Text
- 2 off. INTERNALLY & EXTERNALLY AT RSD'S (ON GRADE WAREHOUSE)
AutoCAD SHX Text
- 2 off. TRAFFICABLE CORNERS - EGRESS DOORS AS INDICATED - ELECTRICAL SWITCHBOARDS - ACCESS DOORS FROM WH TO OFFICES
AutoCAD SHX Text
LANDSCAPE AS PER LANDSCAPE ARCHITECTS DETAILS
AutoCAD SHX Text
GP
AutoCAD SHX Text
GRATED PIT, REFER CIVIL ENG'S DWG'S FOR FULL DETAILS
AutoCAD SHX Text
JP
AutoCAD SHX Text
JUNCTION PIT, REFER CIVIL ENG'S DWG'S FOR FULL DETAILS
AutoCAD SHX Text
SEP
AutoCAD SHX Text
SIDE ENTRY PIT, REFER CIVIL ENG'S DWG'S FOR FULL DETAILS
AutoCAD SHX Text
AND AS INDICATED ON DWG A100
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
14
AutoCAD SHX Text
15
AutoCAD SHX Text
16
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
14
AutoCAD SHX Text
15
AutoCAD SHX Text
16
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
ND
AutoCAD SHX Text
JH
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DRWG. No.
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PLOT SCALE
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DOCUMENTATION
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
MAY 2019
AutoCAD SHX Text
1 : 1
AutoCAD SHX Text
SHEET. No.
AutoCAD SHX Text
AS SHOWN @ A0
AutoCAD SHX Text
JH
AutoCAD SHX Text
PROJECT :
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
CLIENT:
AutoCAD SHX Text
TO THE ATTENTION OF THE ARCHITECT.
AutoCAD SHX Text
DIMENSIONS ON SITE. DISCREPENCIES TO BE BROUGHT
AutoCAD SHX Text
SCALE. BUILDER SHALL CHECK AND VERIFY ALL
AutoCAD SHX Text
WRITTEN DIMENSIONS TO TAKE PRECEDENCE OVER
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
No.
AutoCAD SHX Text
REVISIONS:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
No.
AutoCAD SHX Text
19615
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
No.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
No.
AutoCAD SHX Text
A.C.N. 070 432 932
AutoCAD SHX Text
AutoCAD SHX Text
Tel: 9696 5822
AutoCAD SHX Text
37 Bevan Street, Albert Park, 3206
AutoCAD SHX Text
NICHOLAS & ALEXANDER ARCHITECTS
AutoCAD SHX Text
ARCHITECTS DOCUMENTATION
AutoCAD SHX Text
A010
AutoCAD SHX Text
P1
AutoCAD SHX Text
08.05.2019
AutoCAD SHX Text
PRELIM ISSUE
AutoCAD SHX Text
REFER CIVIL ENGINEERS DRAWINGS FOR FULL DETAILS OF STORMWATER SYSTEM
AutoCAD SHX Text
SCALE 1 : 250
AutoCAD SHX Text
** DIMENSIONS TO INSIDE FACE OF KERBS
AutoCAD SHX Text
SPRINKLER TANK 10.5m 7.1m H
AutoCAD SHX Text
PUMP RM
AutoCAD SHX Text
sump
AutoCAD SHX Text
WASTE ENCLOSURE 3.0m x 3.5m
AutoCAD SHX Text
FUTURE PARKING 12 TOTAL
AutoCAD SHX Text
AWNING 1
AutoCAD SHX Text
AWNING 2
AutoCAD SHX Text
AWNING 3
AutoCAD SHX Text
AWNING 4
AutoCAD SHX Text
FFL: 59.00
AutoCAD SHX Text
10,000 SQM
AutoCAD SHX Text
HEAVY DUTY CONCRETE PAVEMENT. REFER CIVIL ENG'S DWG'S FOR FULL DETAILS.
AutoCAD SHX Text
HEAVY DUTY CONCRETE PAVEMENT. REFER CIVIL ENG'S DWG'S FOR FULL DETAILS.
AutoCAD SHX Text
CARPARK ENTRY/EXIT
AutoCAD SHX Text
TRUCK ENTRY/EXIT
AutoCAD SHX Text
TRUCK ENTRY/EXIT
AutoCAD SHX Text
RWT
AutoCAD SHX Text
25Kl
AutoCAD SHX Text
3.5m
AutoCAD SHX Text
RETAINING WALL
AutoCAD SHX Text
RETAINING WALL
AutoCAD SHX Text
RETAINING WALL
AutoCAD SHX Text
RETAINING WALL
AutoCAD SHX Text
FFL: 59.00
AutoCAD SHX Text
RAMP UP
AutoCAD SHX Text
RAMP UP
AutoCAD SHX Text
RAMP UP
AutoCAD SHX Text
OUTDOOR AREA
AutoCAD SHX Text
P2
AutoCAD SHX Text
11.05.2019
AutoCAD SHX Text
DESIGN DEVELOPMENT
AutoCAD SHX Text
P3
AutoCAD SHX Text
17.05.2019
AutoCAD SHX Text
OFFICE AND WAREHOUSE PLAN REVISED
AutoCAD SHX Text
P4
AutoCAD SHX Text
14.06.2019
AutoCAD SHX Text
SUB-STATION RELOCATED, HYDRANTS/HOSE REELS
AutoCAD SHX Text
PROPOSED SUB-STATION EASEMENT 2.75m x 5.5m
AutoCAD SHX Text
FENCE TYPE 2
AutoCAD SHX Text
REFER CIVIL DWG'S FOR FULL SETOUT AND DETAILS OF ALL RETAINING WALLS
AutoCAD SHX Text
CROSSOVER TO AUTHORITY REQUIREMENTS
AutoCAD SHX Text
CROSSOVER TO AUTHORITY REQUIREMENTS
AutoCAD SHX Text
CROSSOVER TO AUTHORITY REQUIREMENTS
AutoCAD SHX Text
FENCE TYPE 2
AutoCAD SHX Text
FENCE TYPE 2
AutoCAD SHX Text
BOL
AutoCAD SHX Text
FHY
AutoCAD SHX Text
FHR
AutoCAD SHX Text
BOL
AutoCAD SHX Text
FHR
AutoCAD SHX Text
FHR
AutoCAD SHX Text
FHR
AutoCAD SHX Text
FHR
AutoCAD SHX Text
FHR
AutoCAD SHX Text
FHR
AutoCAD SHX Text
FHR
AutoCAD SHX Text
FHR
AutoCAD SHX Text
FHY
AutoCAD SHX Text
FHY
AutoCAD SHX Text
FHY
AutoCAD SHX Text
FHY
AutoCAD SHX Text
FHY
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
INDICATED
AutoCAD SHX Text
CNR OF SITE BOUNDARY
AutoCAD SHX Text
FENCE TYPE 1
AutoCAD SHX Text
FENCE TYPE 1
AutoCAD SHX Text
FENCE TYPE 1
AutoCAD SHX Text
FENCE TYPE 1
AutoCAD SHX Text
FENCE TYPE 1
AutoCAD SHX Text
FENCE TYPE 1
AutoCAD SHX Text
FENCE TYPE 1
AutoCAD SHX Text
EX.RETAINING WALLRETAINING WALL
AutoCAD SHX Text
EX.RETAINING WALLRETAINING WALL
AutoCAD SHX Text
EX.RETAINING WALLRETAINING WALL
AutoCAD SHX Text
FENCE TYPE 2
AutoCAD SHX Text
FENCE TYPE 2
AutoCAD SHX Text
FENCE TYPE 2
AutoCAD SHX Text
BIKE RACKS
AutoCAD SHX Text
PROVIDE 2NO. 5 CAPACITY BIKE RACKS, CORA 4506 OR SIMILAR
AutoCAD SHX Text
CONC. PAVEMENT TO CIVIL DETAILS
AutoCAD SHX Text
BITUMINOUS CONCRETE REFER CIVIL ENG'S DWG'S FOR FULL DETAILS. LINEMARKING TO THE ENTIRE SATISFACTION OF THE LOCAL AUTHORITY 36 TOTAL
AutoCAD SHX Text
RWT
AutoCAD SHX Text
25Kl
AutoCAD SHX Text
3.5m
AutoCAD SHX Text
TURNING BAY
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP
AutoCAD SHX Text
DP
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP+P
AutoCAD SHX Text
DP
AutoCAD SHX Text
P5
AutoCAD SHX Text
03.07.2019
AutoCAD SHX Text
DP'S INDICATED, NOTES ADDED, RWT'S REVISED
AutoCAD SHX Text
GUARDRAIL (G2)
AutoCAD SHX Text
GUARDRAIL (G2)
AutoCAD SHX Text
GUARDRAIL (G2)
AutoCAD SHX Text
FENCE TYPE 2
AutoCAD SHX Text
FENCE TYPE 2
AutoCAD SHX Text
FENCE TYPE 2
AutoCAD SHX Text
GATES SCHEDULE
AutoCAD SHX Text
GATE CONTRACTOR/MANUFACTURER TO CHECK AND VERIFY ALL DIMENSIONS ON SITE PRIOR TO ANY FABRICATION
AutoCAD SHX Text
GATE 1
AutoCAD SHX Text
2 NO. 2100MM HIGH AUTO SWING GATE TO SUIT 9000MM WIDE DRIVEWAY. POWDERCOAT FINISH - PALLISADE OR SIMILAR TO SUIT ADJACENT FENCING
AutoCAD SHX Text
GATE 2
AutoCAD SHX Text
GATE 3
AutoCAD SHX Text
GATE 1
AutoCAD SHX Text
GATE 2
AutoCAD SHX Text
GATE 3
AutoCAD SHX Text
2 NO. 2100MM HIGH AUTO SWING GATE TO SUIT 6000MM WIDE DRIVEWAY. POWDERCOAT FINISH - PALLISADE OR SIMILAR TO SUIT ADJACENT FENCING
AutoCAD SHX Text
2 NO. 2100MM HIGH AUTO SWING GATE TO SUIT 7000MM WIDE DRIVEWAY. POWDERCOAT FINISH - PALLISADE OR SIMILAR TO SUIT ADJACENT FENCING
AutoCAD SHX Text
CNR OF SITE BOUNDARY
AutoCAD SHX Text
CNR OF SITE BOUNDARY
AutoCAD SHX Text
CNR OF SITE BOUNDARY
AutoCAD SHX Text
CNR OF SITE BOUNDARY
AutoCAD SHX Text
CNR OF SITE BOUNDARY
AutoCAD SHX Text
BOL
AutoCAD SHX Text
DS
AutoCAD SHX Text
DIS
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
A
AutoCAD SHX Text
10.07.2019
AutoCAD SHX Text
FOR CC1 APPROVAL
AutoCAD SHX Text
FHY, RSD RELOCATED, CIVIL PITS ETC INDICATED
AutoCAD SHX Text
JP
AutoCAD SHX Text
JP
AutoCAD SHX Text
JP
AutoCAD SHX Text
JP
AutoCAD SHX Text
JP
AutoCAD SHX Text
JP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GRATED TRENCH
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
SW TREATMENT, REFER CIVILE ENG'S DWG'S
AutoCAD SHX Text
ON SITE DETENTION TANK AS PER CIVIL ENG'S DETAILS. REFER CIVIL ENG FOR ALL SETOUT REQUIREMENTS
AutoCAD SHX Text
B
AutoCAD SHX Text
17.07.2019
AutoCAD SHX Text
BOOSTER DELETED
AutoCAD SHX Text
AREAS CALCULATED TO EXTERNAL FACE OF CONCRETE PANELS / DADO'S & CENTRELINES OF DIVIDING WALLS
AutoCAD SHX Text
C
AutoCAD SHX Text
19.07.2019
AutoCAD SHX Text
AREAS SCHEDULE ADDED
AutoCAD SHX Text
NEW CONSTRUCTION SHALL COMPLY WITH SECTIONS 3 & 5 (BAL 12.5) AUSTRALIAN STANDARD AS3959-2009 'CONSTRUCTION OF BUILDINGS IN BUSH FIRE-PRONE AREAS' OR NASH STANDARD (1.7.14 UPDATED) 'NATIONAL STANDARD STEEEL FRAMED CONSTRUCTION IN BUSH FIRE AREAS - 2014' AS APPROPRIATE & SECTION A3.7 ADDENDUM APPENDIX 3 OF 'PLANNING FOR BUSH FIRE PROTECTION 2006'
AutoCAD SHX Text
RURAL FIRE - COMPLIANCE WITH FIRE PROTECTION & MANAGEMENT
AutoCAD SHX Text
ENSURE THE FOLLOWING EMBER PROTECTION MEASURES ARE INCLUDED WITHIN THE DESIGN AND CONSTRUCTION OF BUILDINGS WHICH WILL BE WITHIN 100M OF THE BUSH FIRE HAZARD: -WEEPHOLES, VENTS AND OPENABLE PORTIONS OF WEEPHOLES, VENTS AND OPENABLE PORTIONS OF WINDOWS BE SCREENED AGAINST THE ENTRY OF EMBERS WITH STEEL MESH WITH MAXIMUM APERTURE OF 2 MM; -WEATHER STRIPS OR SIMILAR MEASURE TO EXTERNAL WEATHER STRIPS OR SIMILAR MEASURE TO EXTERNAL DOORS TO PREVENT THE ENTRY OF EMBERS THROUGH GAPS GREATER THAN 3 MM; -NYLON BRUSH SEALS OR SIMILAR MEASURE AROUND NYLON BRUSH SEALS OR SIMILAR MEASURE AROUND ROLLER DOORS TO PREVENT THE ENTRY OF EMBERS THROUGH GAPS GREATER THAN 3 MM.
AutoCAD SHX Text
HYDRANT BOOSTER ASSEMBLY TO HYD. ENG'S DETAILS & AUTHORITY REQUIREMENTS
AutoCAD SHX Text
MSB
AutoCAD SHX Text
D
AutoCAD SHX Text
05.08.2019
AutoCAD SHX Text
NOTES ADDED, SITE ADJUSTMENTS
AutoCAD SHX Text
E
AutoCAD SHX Text
06.08.2019
AutoCAD SHX Text
OSD SETOUT ADDED
AutoCAD SHX Text
F
AutoCAD SHX Text
13.08.2019
AutoCAD SHX Text
OSD SETOUT REVISED
AutoCAD SHX Text
G
AutoCAD SHX Text
11.09.2019
AutoCAD SHX Text
IFC

Recommended