20
Pre-Excavation Rock Evaluation 1) Goal - Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock mass-governed by the underground stress state and the geomechanical and fluid-flow properties of the rock mass. b) based on those measurements, model the excavation & the necessary rock wall and roof supports + internal mounting connections
Transcript
Page 1: Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.

Pre-Excavation Rock Evaluation1) Goal- Excavate the largest possible safe

and stable detector chamber

2) Procedure• a) measure characteristics of the rock

mass-governed by the underground stress state and the geomechanical and fluid-flow properties of the rock mass.

• b) based on those measurements, model the excavation & the necessary rock wall and roof supports + internal mounting connections

Page 2: Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.

Rock Characterization1) Obtain samples of the rock by coring

2) Evaluate the cores - compressive strength, joints, invasive materials

3) Utilize the core holes to:

a) examine & test the rock surface of the holes,

b) explore the region of rock between core holes-

c) Set up long term stress and motion sensors

Page 3: Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.

What is Already Known?• The Yates member of the Poorman formation

appears very strong and has minimal joints. It was not extensively explored because it does not contain gold.

• This is the section of rock that houses the Davis cavity (chlorine solar neutrino detector)– stable for over 40 years.

• 2001 preliminary study conclusions & recommendations

Page 4: Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.

2001 Excavation Study• One location, known as site 3, looked particularly attractive. It was

in the Yates member of the Poorman formation on the 4850 ft level and adjacent to the existing chlorine solar neutrino detector. Unfortunately, at that time it was not possible to obtain rock cores from the interior of the rock formations and only surface rocks were collected. Based on these an evaluation of large excavations was carried out. At that time, in 2001, we set the baseline excavation as a 50-meter diameter by 50-meter high vertical cylinder. The RQD (Rock Quality Designation) of site 3 was initially evaluated as 100 and then downgraded to 85 to adjust for the possibility that there are unknown joints in that rock. The unconfined compressive strength of that rock sample was 186 MPa.

• As a comparison, the Kamioka Mine rock at the location of the Super Kamiokande excavation (40-meter diameter by 40 meter high cylinder with an additional 18 meter high domed roof) has a

• RQD = 84 and unconfined compressive strength of 149 MPa (Nakagawa et al., 1997; Yamatomi et al., 1999).

Page 5: Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.
Page 6: Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.
Page 7: Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.
Page 8: Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.
Page 9: Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.
Page 10: Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.
Page 11: Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.
Page 12: Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.

Boltable, Gasketed, Reinforced Concrete Segments

Page 13: Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.

Cable Bolt Lengths – from Barton

Page 14: Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.

2009 Proposal & Plan Penn, Wisconsin, Stanford, Clemson

1) Drill core holes, extract oriented cores – measure unconstrained rock strength-LBL

2) View inside of core holes with a televiewer

3) Examine each hole & structure between holes with an acoustic array – reflection & transmission

4) Measure constrained rock strength by hydro-fracture

5) Install fiber optic sensors to monitor changes in stress & movement – before, during & after excavation

Page 15: Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.

U.S.G.S.Example ofcomparison of Optical, acoustic and thermal televiewer outputs – West Virginia water system

Page 16: Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.

Televiewer Specifications

• Diameter: 50mm

• Length: 1.51m including natural-gamma option

• Radial Resolution: 720 pixels/360°

• maximum vertical Resolution: 1mm

• Sensor type: CCD 768x494 elements

• Orientation: Any

• Lighting: Internal ‘white’ LEDs; • external for diameters up to 300mm (12in). External lighthead for larger

diameters available.

Page 17: Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.

3D Virtual Core Display3D Virtual Core Display

Page 18: Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.

Cased Hole InspectionCased Hole Inspection

Page 19: Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.
Page 20: Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.