Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report 1 | Page PRE-FEASIBILITY REPORT 1. Executive Summary M/s. Jayasree Industries proposed to conduct Black Granite quarrying operations in Compartment No. 233 & 234 of Santhapeta R.F., Chittoor (West) Division, Chittoor Mandal & District over an extent of 4.90Ha and applied for diversion of 4.90 Ha forest land. After following the due process, the Ministry of Environment, Forests & Climate Change, Regional Office, Chennai, Government of India has issued Stage-I approval to the above precise area. Accordingly, Environment, Forest, Science & Technology (Section-II) Department, Government of Andhra Pradesh has issued Stage-II approval to the above precise area for 10 years period or for a period co-terminus with the period of mining lease proposed to be granted. Accordingly, an application was filed to Department of Mines and Geology for grant of Quarry lease for Black Granite in the above said area. Director of Mines and Geology, Ibrahimpatnam, Government of Andhra Pradesh vide Notice No. 18270/R5-1/2017, Dt. 23.08.2017 in principle decided to grant quarry lease for 20 years period for the above precise area subject to submission of Forest Clearance for remaining period of 10 years after expiry of the 1 st 10 years period and subject to submission of Approved Mining Plan, Environmental Clearance, Consent for Establishment. The mining plan was approved by Deputy Director of Mines and Geology, Kadapa vide letter no. 3704/MP-CTR/2017, Dt. 07.10.2017. Now, the proposal is submitting for environmental clearance to be obtain from District Level Environment Impact Assessment Authority under B 2 category as per EIA notification, 2006 and S. O. 141 (E) Dt. 15.01.2016 as the lease area is <5ha and there is no Inter State Boundary, National Park, Wildlife Sanctuary and Critically Polluted area within 5 kms radius from the proposed lease area boundary and also there are no other quarry leases within 500m from the proposed lease boundary. It is proposed to extract Black Granite maximum production of 6602 m 3 annually by semi mechanized opencast mining by developing benches of 6m height with 1.5m bench width from top of the hillock with shallow drilling and blasting. Capital cost proposed for quarrying is Rs. 40.0 Lakhs.
Transcript
Page 1: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/... · Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report 2 | Page 2. Introduction of

Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report

1 | P a g e

PRE-FEASIBILITY REPORT

1. Executive Summary

M/s. Jayasree Industries proposed to conduct Black Granite quarrying operations in

Compartment No. 233 & 234 of Santhapeta R.F., Chittoor (West) Division, Chittoor Mandal &

District over an extent of 4.90Ha and applied for diversion of 4.90 Ha forest land. After

following the due process, the Ministry of Environment, Forests & Climate Change, Regional

Office, Chennai, Government of India has issued Stage-I approval to the above precise area.

Accordingly, Environment, Forest, Science & Technology (Section-II) Department,

Government of Andhra Pradesh has issued Stage-II approval to the above precise area for

10 years period or for a period co-terminus with the period of mining lease proposed to be

granted. Accordingly, an application was filed to Department of Mines and Geology for grant

of Quarry lease for Black Granite in the above said area.

Director of Mines and Geology, Ibrahimpatnam, Government of Andhra Pradesh vide

Notice No. 18270/R5-1/2017, Dt. 23.08.2017 in principle decided to grant quarry lease for 20

years period for the above precise area subject to submission of Forest Clearance for

remaining period of 10 years after expiry of the 1st 10 years period and subject to submission

of Approved Mining Plan, Environmental Clearance, Consent for Establishment. The mining

plan was approved by Deputy Director of Mines and Geology, Kadapa vide letter no.

3704/MP-CTR/2017, Dt. 07.10.2017.

Now, the proposal is submitting for environmental clearance to be obtain from District

Level Environment Impact Assessment Authority under B2 category as per EIA notification,

2006 and S. O. 141 (E) Dt. 15.01.2016 as the lease area is <5ha and there is no Inter State

Boundary, National Park, Wildlife Sanctuary and Critically Polluted area within 5 kms radius

from the proposed lease area boundary and also there are no other quarry leases within

500m from the proposed lease boundary.

It is proposed to extract Black Granite maximum production of 6602 m3 annually by semi

mechanized opencast mining by developing benches of 6m height with 1.5m bench width

from top of the hillock with shallow drilling and blasting. Capital cost proposed for quarrying is

Rs. 40.0 Lakhs.

Page 2: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/... · Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report 2 | Page 2. Introduction of

Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report

2 | P a g e

2. Introduction of the Project / Background Information:

i) Identification of Project and project Proponent

Granite is a very hard crystalline, igneous or metamorphic rock primarily composed of

feldspar, quartz and lesser amounts of dark minerals. India has vast resources of granite with

about 200 varieties of different colours and textures such as black, grey, Colour, multi

coloured, etc. These varieties are used to produce monuments, building slabs, titles, surface

plates etc. However, popular varieties are mainly found in South India.

M/s. Jayasree Industries is having no. of granite leases in the district and operating the

leases without having any violations in terms of Forest Act, EP Act and MMDR Act. Now it is

proposed to extract black granite from the proposed area after obtaining statutory

clearances. For this reason, Forest Clearance was already obtained. The proprietor Sri A.M.

Vinodh is a 34 years older and Post Graduate holder with almost 10 years of experience in

this field and the other members of his family members are also in the same business from

past 15 years.

The proposed quarry lease area is located at 0.9 km SE of Mailagundlapalle hamlet which is

on Tirupathi to Kanipakam road. The quarry lease area falls in Survey of India Toposheet no.

57O/3 at the intersection of 13° 16’ 05.794” North latitude and 79° 04’ 44.555” East longitude.

The area is an elevated mound mostly covered by rock boulders, these boulders are irregular

in shapes and vary in size and shape. They may rise gently as continuously hills, presenting

a rugged topography.

ii) Brief description of nature of the project

The black granite is exposed as a boulder rock in the center portion with gentle slopes and

boulders are covering on top portion. The lease area is mostly consisting lot of big dolerite

boulders on surface along the trend of North west to South east. The quarrying operations

will be carried out by semi mechanized opencast method with shallow drilling and blasting for

breaking the black granite, using jackhammer drilling and wedge cutting. The excavation and

loading into tippers will be done with excavator.

iii) Need for the project and its importance to the country and or region

Granite has been extensively used as a dimension stone and as flooring tiles in public and

commercial buildings and monuments. With increasing amounts of acid rain in parts of the

world, granite has begun to supplant marble as a monument material, since it is much more

durable. Engineers have traditionally used polished granite surfaces to establish a plane of

reference, since they are relatively impervious and inflexible.

Page 3: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/... · Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report 2 | Page 2. Introduction of

Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report

3 | P a g e

iv) Demand - Supply Gap

The project is envisaged to meet the demand supply gap in both domestic market and export

market, as granite demand is increasing day by day. It is proposed to produce 6,602 m3 per

annum of granite to meet their present required quantum of black granite for domestic and

international market. The total mineable reserves of granite are estimated by using cross

section method with 20% recovery is 282,371 m3 and the production proposed per year is

6,602 m3. Hence the life of the quarry with the proposed production is 43 years

approximately.

Reserves Estimated Category Section Influence

Distance (m) Section

Area (m²) Volume

(m³) Reserves

@20% (m³) Rock Wastage@

80% (m³) (A) (B) (A*B) (A*B)0.2 (A*B)0.8 Proved A-A’ 100 1868 186800 37360 149440

B-B’ 227 3312 751824 150365 601459 C-C' 180 6016 1082880 216576 866304

2021504 404301 1617203 Probable A-A’ 100 374 37400 7480 29920

B-B’ 227 163 37001 7400 29601 C-C' 180 192 34560 6912 27648

108961 21792 87169 Possible A-A’ 100 374 37400 7480 29920

B-B’ 227 163 37001 7400 29601 C-C' 180 192 34560 6912 27648

108961 21792 87169 Total 2239426 447885 1791541

After Buffer Zone 1945209 389042 1556167 After Bench Slope Deduction 1411857 282371 1129486

Mineable reserves and life of the mine Description Quantity Proved Reserves 447885 m3 Reserves blocked under 7.5m buffer zone 58843 m3 Reserves blocked under bench slopes 106670 m3 Net Reserves available 282371 m3 Annual Production proposed 4764 m3 Life of the mine 59 years Max. production per year 6602 m3 Life of the mine 42.76 years

v) Imports Vs. Indigenous Production

The mine is being operated to meet the increased demand of Granite in the national and

international market. This is not for import substitution.

vi) Export possibility

The finished products shall be exported to the domestic and international market through the

exporters depends upon the quality and demand.

Page 4: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/... · Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report 2 | Page 2. Introduction of

Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report

4 | P a g e

vii) Domestic/export Markets:

The project is expected to have 80% domestic sales and 20% export sales through

exporters. The area is surrounded by hillocks comprising valuable export quality granite.

viii) Employment Generation (Direct and Indirect) due to the project:

The Manpower requirement is around 22 no’s including Mines Manager/Foreman

competency certificate, Supervisor and other Staff. The Mine shall provide indirect

employment for 20 people. The working hours at the mines will be 8 hours/day for 250

days/year.

Employment Generation S. No. Designation No's

1 Foreman 1 2 Supervisor 1 3 Excavator and Tipper operator 2 4 Helpers 6 5 Drill Operators 6 6 Compressor Operators 2 7 Unskilled labour 4

Total 22

3. Project Description

ix) Type of Project including interlinked and interdependent projects, if any:

The project is for quarrying of minerals i.e. Black granite quarry and it is an individual project.

The quarrying operations will carried out by opencast method with the help of machineries

like Wire-Saw cutter, excavators, tippers and jackhammer drills. The proposed area is

surrounded by hillocks within the Santhapeta reserved forest except north side as the lease

area is proposed in NW side of the RF.

Page 5: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/... · Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report 2 | Page 2. Introduction of

Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report

5 | P a g e

x) Location (map showing general location, specific location, and project boundary & project site layout with coordinates).

It is a mining/quarrying project and the proposed land is in Forest area, no alternative sites

examined. The site is geographically located between North Latitude 13° 16’ 05.794” and

East Longitude 79° 04’ 44.555”. The project site and 25% of its 10kms buffer zone falls in the

Survey of India Toposheet No. 57 O/3 and the remaining buffer zone area falls in Toposheet

no. 57 K/16, 17 & 57 O/4. The Lease area is an elevated mount located in Santhapeta

reserved forest area. The rock that is likely to be mined is exposed at ground level as

boulders. The area is devoid of any forest or tree cover. It comprises shrubs only. There are

no national parks, wildlife sanctuaries and critically polluted areas are observed in 10km

radius from the quarry lease area. Location map of the mine lease area is presented in figure

1. Lease boundary map is presented in figure 2.

xi) Details of alternate sites considered and the basis of selecting the proposed site, particularly the environmental considerations gone into should be highlighted.

No alternative sites considered, the proposal is mining/quarrying project consists of granite

rock boulders and it is site specific. However it is very far from the human habitation and

worship places but it is a forest. Also there are no water bodies or channels passing through

the lease area.

Page 6: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/... · Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report 2 | Page 2. Introduction of

Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report

6 | P a g e

Figure - 1 Location Map of the mine lease area

Page 7: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/... · Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report 2 | Page 2. Introduction of

Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report

7 | P a g e

Figure - 2 Lease boundary map of the mine

Page 8: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/... · Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report 2 | Page 2. Introduction of

Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report

8 | P a g e

xii) Size or magnitude of operation:

It is proposed to produce black granite average production of 4,764 m3/annum by semi

mechanized opencast method quarrying and or the maximum production of 6,602 m3/annum

by semi mechanized opencast method.

Production Plan for five years Year Working area

m2 Bench height

Volume m3 R.F. Production m3 Granite Waste

1st year 3912 6 23472 0.2 4694 18778 23472 4694 18778

2nd year 3433 6 20598 0.2 4120 16478 20598 4120 16478

3rd year 2972 6 17832 0.2 3566 14266 2530 6 15180 0.2 3036 12144

33012 6602 26410 4th year 2109 6 12654 0.2 2531 10123

1721 6 10326 0.2 2065 8261 22980 4596 18384

5th year 1367 6 8202 0.2 1640 6562 1046 6 6276 0.2 1255 5021 760 6 4560 0.2 912 3648

19038 3808 15230 Total five years 119100 23820 95280

xiii) Project description with process details (a schematic diagram/flow chart showing the project layout, components of the project etc. should be given)

The quarrying operations will be carried out by opencast method with the help of machineries

like Wire-Saw cutter, excavators, tippers, compressors and jackhammer drills. Two

excavators will be used to remove the waste material, consisting of small float boulders &

defect material from working face. Two tippers of 15 Tons will be deployed to shift the waste

and secondary blocks from working face to stockyard/ dump yard. To cut the sheet rock in to

primary blocks, wire saw machine will be used and to cut primary blocks into secondary

blocks, jackhammers will be used. For loading the dressed & marketable granite blocks in to

trucks, the excavator will be used. Jackhammer drilling and blasting is used occasionally in

waste rock removal and for development of free-face.

xiv) Raw material required along with estimated quantity likely source, marketing area of final product/s, mode of transport of raw material and finished product

No raw material is required, project is for quarrying of granite. The extracted granite is

mainly sold in domestic market in Andhra Pradesh or surrounding states or for export

(contingent on the quality).

Page 9: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/... · Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report 2 | Page 2. Introduction of

Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report

9 | P a g e

xv) Resource optimization/recycling and reuse envisaged in the project, if any, should be briefly outlined.

Waste material, under size blocks or defected material or shape less blocks generated from

the quarrying shall be dumped in the non mineral zone dump yard on NW side over an area

of 4,200 m2 to a height of 12m with 45° slope angle. A retaining wall will be constructed

around the dump for preventing the slanting of boulders. About 80% of the production or

approximately 95,280 m3 of material is going to be generated as solid (granite) waste in five

years plan period. This material can be utilized to fill the pits after quarry operations are over.

When the dumps reach their optimum height suitable greenery will be grown on these dumps

to stabilize them.

xvi) Availability of water its source, energy/power requirement and source should be given

Water Requirement:

Water requirement is mainly for drinking purpose, domestic purpose, green belt maintaining

and for sprinkling on Mine haulage roads the water shall be drawn from nearby village

through tankers. The domestic waste water shall be sent to septic tank followed by soak pit.

Rainwater Catch Pond of 50 KL capacity will be developed to collect the storm water for

reuse. This will ensure that the rainwater is effectively used and minimizes the drawl of

ground water resources. The required water shall be drawn from the local villages through

tankers.

Water requirement S. No Water Usage Quantity KLD

1 For wet drilling operation 1.3 2 For water sprinkling on mine haulage roads 4.4 3 Domestic 1.0 4 Green Belt 2.0 Total 8.7

Ground water and Surface Water:

The groundwater level in this area is at 50m BGL and the maximum depth proposed for

quarrying is 45m BGL from top of the hill which is about 130m height from the ground level.

There are no surface water structures within the proposed lease area.

Electricity:

Power facility is there in nearest villages and Mailagundlapalle village hamlet is located at a

distance of 0.9km from the QL area in NW direction. The power line is there up to lease area.

Page 10: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/... · Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report 2 | Page 2. Introduction of

Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report

10 | P a g e

xvii) Quantity of wastes to be generated (liquid and solid) and scheme for their Management/disposal

About 80% of the production or approximately 95,280m3 of material is going to be generated

as solid (granite) waste in five years plan period. Waste material, under size blocks or

defected material or shape less blocks generated from the quarrying shall be dumped in the

dump yard on NW side over an area of 4,200 m2 to a height of 12m. The waste material will

be used for reclamation of the worked-out pits after completion of quarry workings and or will

be used for creation of bunds and local construction purposes.

4. Site Analysis

4.1 Plant Location

The proposed lease area of 4.90ha is located in Compartment no. 233 & 234 of Santhapeta

R.F., Chittoor (West) Division, Chittoor Mandal & District. The proposed lease area falls in

the Survey of India topo sheet no. 57O/3 between the co-ordinates of North Latitude 13° 16’

05.794” and East Longitude 79° 04’ 44.555”. The nearest village hamlet is Mailagundlapalle

located at a distance of 0.9km from the proposed lease area in Northwest (NW) direction.

Tirupathi – Kanipakam road is at 0.6 km in NW and Chittoor – Kanipakam road is at 1.3 km in

SW. Chittoor town is at 5.7km in SSE direction. The nearest railway stations are Muttirevula

RS (SC railway) at 3.6 km in ENE and Chittoor RS at 5.7km in SSE directions respectively.

NH-18 (Kurnool-Kadapa-Chittoor-Chennai) is passing through the study area at 4.0 Km in

East direction. The proposed area is located within the Santhapeta R.F., Other RF areas are

Vaviltota Reserve Forest at 3.2km in North direction, Putalapattu RF at 7.2Km in NE direction,

Chaseskonda RF at 6.9km in SE direction & Reddigunta RF at 7.7km in SSE direction.

Goddu Vanka (West – East) is at 1.0km in North, Ponnai Dry River (North – SE) is at 6.3km

in East, Goddu vanka joins into Ponnai Dry River is at 5.9km in ENE direction. There are no

interstate borders, national parks, wildlife sanctuaries and critically polluted areas observed in

10km radius of the proposed mine lease area.

Geo coordinates of the proposed lease area Datum: WGS - 84, Units: Degree Minutes Seconds (dd mm ss.s)

S. No. Latitude (N) Longitude (E) S. No. Latitude (N) Longitude (E) 1 13 16 19.801 79 04 37.963 22 13 16 06.618 79 05 02.738 2 13 16 17.908 79 04 40.768 23 13 16 04.422 79 05 05.183 3 13 16 14.822 79 04 44.677 24 13 16 01.618 79 05 07.814 4 13 16 12.814 79 04 45.304 25 13 16 01.470 79 05 08.387 5 13 16 11.176 79 04 46.207 26 13 16 00.426 79 05 08.891 6 13 16 09.070 79 04 47.255 27 13 16 00.894 79 05 05.719 7 13 16 06.265 79 04 48.907 28 13 16 02.766 79 05 04.607 8 13 16 05.898 79 04 50.243 29 13 16 03.414 79 05 02.951 9 13 16 05.102 79 04 51.071 30 13 16 03.594 79 05 01.662

10 13 16 04.458 79 04 52.550 31 13 16 03.630 79 05 00.647 11 13 16 02.662 79 04 55.430 32 13 16 01.758 79 04 58.739

Page 11: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/... · Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report 2 | Page 2. Introduction of

Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report

11 | P a g e

12 13 16 02.082 79 04 56.975 33 13 16 01.074 79 04 57.943 13 13 16 02.266 79 04 57.839 34 13 16 01.870 79 04 55.434 14 13 16 03.882 79 04 59.495 35 13 16 03.306 79 04 52.478 15 13 16 04.746 79 04 59.642 36 13 16 03.810 79 04 51.215 16 13 16 05.466 79 04 59.671 37 13 16 04.246 79 04 49.206 17 13 16 06.082 79 04 59.822 38 13 16 04.894 79 04 48.259 18 13 16 07.126 79 04 58.343 39 13 16 06.006 79 04 46.034 19 13 16 07.838 79 04 56.795 40 13 16 05.794 79 04 44.555 20 13 16 09.102 79 04 58.199 41 13 16 06.827 79 04 44.958 21 13 16 07.914 79 05 01.835 42 13 16 07.086 79 04 47.622

5. Planning Brief

It is a green field proposed quarry located in forest land which is proposed to extract black

granite from the lease area. Now it is envisaged to be put into production or quarrying by

January 2018 and the production shall be initiated thereon. It is proposed to produce black

granite maximum production of 6,602 m3/annum by semi mechanized opencast method.

About 95,280 m3 of waste material will generate during the plan period and this waste will be

dumped in an area of 4200 m2 to a height of 12m in NW side of the proposed lease area.

Approach road within lease area, Retaining wall, Safety bunds and fencing will be provided

within 0.023ha. About 0.269ha area proposed for stock yard.

6. Proposed Infrastructure

The applied area is located at 0.9km towards SE of Mailagundlapalle Village hamlet. Pukka

road is available up to the village hamlet from the Chittoor town and Kutcha road is available

up to the quarry area from the village hamlet and it will be repaired regularly to mitigate the

dust generated due to transportation. The black granite will be transported through tippers of

15 Ton capacity and about 5 truck trips will be required per day. Regular water sprinkling on

haul roads will be done with water tanker provided with sprinkler arrangement to suppress

the air borne dust generated during transportation. It is proposed to provide the following

infrastructures within the proposed lease area.

Land use pattern of the lease area S. No Purpose Proposed (Ha)

1 Proposed working pit 0.3912 2 Waste dumping 0.42 3 Road -- 4 Infrastructure (Office, rest room, shelter, toilet etc.) 0.0225 5 Stock yard 0.269 6 Plantation 0.1875 7 Safety zone 1.3725 8 Outside road area 0.33 9 Vacant/Non used 1.91 Total 4.90

Page 12: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/... · Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report 2 | Page 2. Introduction of

Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report

12 | P a g e

6.2 Utilities

It is proposed to undertake semi-mechanized opencast method quarrying operations, the

following machinery will be deployed.

S. No. Machinery No's Power 1 Tata Hitachi 350 Excavator 2 246 KW 2 Water Pump 1 5 KW 3 Generator 1 125 KV 4 Leyland Tipper 2 100 HP 5 Atlas Compressor 2 116 KV 6 Jack Hammer 6 -- 7 Wiresaw Machine 2 60 HP

6.3 Waste management

Liquid Effluents

There is no effluent generation from the mine operations. The effluent generated from the

domestic source is 0.7KLD will be sent to septic tank followed by soak pit. Rainwater

accumulated in the working pits during rainy days will be pumped out to natural drains or rain

water collection pond to be used for water sprinkling purpose on haul roads, plantation

development and etc.

Air Pollution

The granite quarrying does not involve dust formations. The dust anticipated at drilling place

will be suppressed by putting cloth around the hole. Dust suppression systems (water

spraying) will be adopted at Faces/sites before and after blasting, Faces/sites while loading;

and Use of sharp drill bits for drilling holes and drills with water flushing systems (wet drilling)

to reduce dust generation. Regular water spraying on haulage roads during transportation of

granite and covering of loaded trucks through tarpaulin. Plantation will be developed to

control dust emission.

Year Name of Plant species

No. of Plants Area Spacing

Area Covered In Sq. Mt.

1st Year Native species 60 2.5x2.5 mts. 50 x 7.5; 375 2nd Year Native species 60 2.5x2.5 mts. 50 x 7.5; 375 3rd Year Native species 60 2.5x2.5 mts. 50 x 7.5; 375 4th Year Native species 60 2.5x2.5 mts. 50 x 7.5; 375 5th Year Native species 60 2.5x2.5 mts. 50 x 7.5; 375 Total 300 1875 m2

Page 13: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/... · Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report 2 | Page 2. Introduction of

Jayasree Industries - Black Granite – 4.90 Ha Pre-Feasibility Report

13 | P a g e

Solid waste

About 80% of the production or approximately 95,280m3 of material is going to be generated

as solid (granite) waste in five years scheme period. Waste material, under size blocks or

defected material or shape less blocks generated from the quarrying shall be dumped in the

dump yard on NW side over an area of 4,200 m2 to a height of 12m. The waste material will

be used for reclamation of the worked out pits after completion of quarry workings and will be

used for creation of bunds and local construction purposes. Retaining wall will be provided to

arrest the loose material split from the slope of the dump.

7. Rehabilitation and Resettlement (R&R) Plan

NA. It is a proposed project located within the Reserve Forest area and there are no

settlements and structures are located within the lease area. The area does not have any

wild animals. It is an elevated mound of Forest Land with rock boulders.

8. Project Schedule & Cost Estimates

i) Likely date of start of construction and likely date of completion (Time schedule for the project to be given)

It is a proposed quarry which is planned to start quarrying operations from the year

2018. The clearances procedure is initiated as per the target and will open the quarry

only after obtaining all statutory clearances.

ii) Estimated project cost along with analysis in terms of economic viability of the project

The estimated cost of the project is approximately Rs. 40 Lakhs.

S. No. Purpose Cost (Rs) 1 Excavator 375000 2 Compressor 44000 3 Wire saw generator 52000 4 Supervisor salary 15000 5 Labors salary 150000 6 Blasting material & Jack hammer 30000 7 Office Cost 50000 8 Tippers 50000 9 Safety Equipment 25000

10 Tanker 40000 11 EMP cost 719187 12 Backfilling 100000 13 Consultant charges/Miscellaneous 350000

Total 2000186.667

Capital cost of the project = Project initial cost x 2 months = 20.0 Lakhs x 2 = 40.0 Lakhs.