1 PRE FEASIBLITY REPORT FOR BICHPURA STONE QUARRY DIPOSIT (M.L. Area: 3.80 Hect) With production capacity 62046 m3 AT Village- Bichpura, Tehsil- Barhi, District - Katni (MP) APPLICANT Shri Ravi Shankar Awasthi Village-Mohantola-Kalhara Tehsil-Vijraghvgarh, Dist.-Katni (M.P.) Mobile No. 9425160734
Transcript
Page 1: PRE FEASIBLITY REPORT FOR BICHPURA STONE QUARRY …environmentclearance.nic.in/writereaddata/District/pfr/1506201787J… · (ii) location (map showing general location, specific Location,

1

PRE FEASIBLITY

REPORT

FOR

BICHPURA

STONE QUARRY DIPOSIT

(M.L. Area: 3.80 Hect)

With production capacity 62046 m3

AT

Village- Bichpura, Tehsil- Barhi,

District - Katni (MP)

APPLICANT

Shri Ravi Shankar Awasthi

Village-Mohantola-Kalhara

Tehsil-Vijraghvgarh, Dist.-Katni (M.P.)

Mobile No. 9425160734

Page 2: PRE FEASIBLITY REPORT FOR BICHPURA STONE QUARRY …environmentclearance.nic.in/writereaddata/District/pfr/1506201787J… · (ii) location (map showing general location, specific Location,

2

PRE-FEASIBILITY REPORT

S. No. Content Page No.

1.0 Executive summary 4-5

2.0 Introduction of the project/ background information: 6-7

(i) identification of project & project proponent

(ii) brief description of nature of the project

(iii) need for the project & its importance to the country/region

(iv) demand-supply gap

(v) imports vs. Indigenous production

(vi) export possibility

(vii) domestic/export markets

(viii) employment generation (direct and indirect) due to the project

3.0 Project description: 8-12

(i) type of project including interlinked and independent Projects, if any

(ii) location (map showing general location, specific Location, and

project boundary & project site layout) With coordinates

(iii) details of alternative site considered

(iv) size or magnitude of operation

(v) project description with process details

(vi) raw material required along with estimated Quantity, likely source,

marketing area of final Products, mode of transport of raw material and

Finished product

(vii) resources optimization/ recycling and reuse envisaged In the project,

if any, should be briefly outlined

(viii) availability of water its source, energy /power Requirement and

source

(ix) quantity of waste to be generated (liquid and solid) And scheme for

their management/disposal

4.0 Site analysis: 13-16

(i) connectivity

(ii) land form, land use and land ownership

(iii) topography along with map

(iv) existing land use pattern {agriculture, non-agriculture, Forest, water

bodies (including area Under CRZ)}, shortest distances from the

periphery of the project to periphery of the forests, national park, Wild

life sanctuary, eco sensitive areas, water bodies (distance from the HFL

of the river), CRZ. In case of notified industrial area, a copy of the

gazette Notification

(v) existing infrastructure

(vi) soil classification

(vii) climatic data from secondary sources

(viii) social infrastructure available

5.0 Planning brief: 17

(i) Planning concept (type of industries, facilities, and Transportation

etc.) Town and country Planning/development authority classification

(ii) population projection

(iii) land use planning (breakup along with green belt etc.)

(iv) assessment of infrastructure demand (physical & Social)

Page 3: PRE FEASIBLITY REPORT FOR BICHPURA STONE QUARRY …environmentclearance.nic.in/writereaddata/District/pfr/1506201787J… · (ii) location (map showing general location, specific Location,

3

(v) amenities/facilities

6.0 Proposed infrastructure: 18-19

(i) industrial area (processing area)

(ii) residential area (non processing area)

(iii) green belt development

(iv) social infrastructure

(v) connectivity

(vi) drinking water management (source & supply of Water)

(vii) sewerage system

(viii) industrial waste management

(ix) solid waste management

(x) power requirement & supply/source

7.0 Rehabilitation and resettlement (R & R) plan: 20

(i) policy to be adopted (central/state)in respect of the Project affected

persons including home oustees, land Oustees and landless laborers

(brief outline to be

Given)

8.0 Project schedule & cost estimates: 20

(i) likely date of start of construction and likely date Of completion (time

schedule for the project to be Given)

(ii) estimated project cost along with analysis in terms of Economic

viability of the project

9.0 Analysis of proposal: 20

(i) financial and social benefits with special emphasis on The benefit to

the local people including tribal Population if any

LIST OF TABLES

Figure No. Name of Figures Page No.

1 Location Map 9

2 Environmental Setting Map 15

Page 4: PRE FEASIBLITY REPORT FOR BICHPURA STONE QUARRY …environmentclearance.nic.in/writereaddata/District/pfr/1506201787J… · (ii) location (map showing general location, specific Location,

4

PRE-FEASIBILITY REPORT

1.0 EXECUTIVE SUMMARY:

Table – 1

BRIEF OF THE PROJECT

S. No. Particulars Details

A. Nature of the Project Bichpura Stone quarry Diposit

B. Size of the Project:

1 Mining Lease area 3.80Hect.

2. Proposed Production capacity 62046 m3

C. Location Details:

3. Village Bichpura

4. Tehsil Barhi

5. District Katni

6. State Madhya Pradesh

7. Lease area Coordinates

N- 23°52'35.9"to N-230 52’40.9” E-800 50’ 51’3.1” to E- 800 51’ 16.5”

8. Toposheet No. 64 A/13

D. Cost Details:

9 Total Project Cost Rs. 40 Laces /-

10. Cost of Environment Protection Measures Capital Cost: Rs. 40 Lacs /-

Recurring Cost: Rs.4.0 Lac per Annum

E. Requirement of the project:

11. Water Requirement 6 KLD

Source: Mine pit water and Water will be

purchased from nearby

Villages panchayat

12. Power Requirement Electricity will not be required as

workings will be in day shift only.

13. Man power Requirement 30 persons Source- Mining plan

Page 5: PRE FEASIBLITY REPORT FOR BICHPURA STONE QUARRY …environmentclearance.nic.in/writereaddata/District/pfr/1506201787J… · (ii) location (map showing general location, specific Location,

5

ENVIRONMENTAL MANAGEMENT PLAN:

S. No. Particulars Details

1 Air Quality

Management

Drilling will be done with water injection system & dust

collector.

Control Blasting will be carried out.

Water sprinkling will be done during loading points / haul roads

etc.

Haul road will be kept wide & compact.

Personal protective equipments will be provided to the workers

working in high dust area.

Regular maintenance of machinery and vehicles will be carried

out to control dust emission during transportation.

Green Belt will be developed around the lease boundary, haul

roads and plantation will be done on undisturbed area, reclaimed

area & mine office etc.

2 Water Quality

Mana

No waste water will be generated during mining operation

Septic tanks and soak pits will be provided for the disposal of

domestic effluents generated from mine office.

Garland drains will be provided at the toe of dumps to prevent the

entry of rainwater into the mining pit.

Rainwater falling in the mining pit will be collected in lower

benches & will be used for dust suppression & green belt.

Regular monitoring of ground water quality will be carried out.

3 Noise Quality

Management

Drilling will be carried out with the drills having sharp drill bits

for noise reduction.

Control Blasting will be carried out.

Earmuffs/earplugs will be provided to all operators and

employees working near the machinery.

Adequate silencers with AC cabins will be provided in Heavy

Earth Moving Machines.

Proper maintenance, oiling and greasing of machines at regular

intervals will be done to reduce generation of noise.

Green Belt will be developed around the lease boundary, haul

roads and plantation will be done on undisturbed area, reclaimed

area & mine office etc.

Periodical monitoring will be done.

4 Solid Waste

Management

Top soil will be separately stacked & simultaneously used for

plantation purpose.

OB generated will be temporary stacked in eastern side of non

mineralized area which will be backfilled in excavated area &

rehabilitated by plantation at the conceptual stage.

5 Plantation Green Belt will be developed around the lease boundary, haul

roads and plantation will be done on undisturbed area, reclaimed

area, nearby workshop & mine office etc.

Local species will be planted after consultation with local forest

officer and as per CPCB guidelines

Page 6: PRE FEASIBLITY REPORT FOR BICHPURA STONE QUARRY …environmentclearance.nic.in/writereaddata/District/pfr/1506201787J… · (ii) location (map showing general location, specific Location,

6

2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION:

(i) Identification of project and project proponent:

The Bichpura metal stone Quarry Village - Bichpura, Tehsil- Barhi , District- Katni

(M.P.) of Shri Ravi Shankar Awasthi

Project Proponent

Shri Ravi Shankar Awasthi

Vill.Bichpura ,Tehsil –Barhi, Dist-Katni (MP)

Mobile No. 9425160734

(ii) Brief description of nature of the project:

The Bichpura metal stone Quarry (deposit) Lease has been in favour of Shri Ravi

Shankar Awasthi vide Order no. 2414/Khanij/60/U.P./ dated 25/06/2016 from the

date of Agreement.

(iii) Need for the project and its importance to the country:

With respect to the importance of the project to the nation, it can be well said that in a

developing nation like India, cement is essential for infrastructural development.

Thus, keeping in mind this requirement, mining of Stone boulder is essential for the

nation`s growth.

Shri Ravi Shankar Awasthi has proposed stone Quarry project in order to meet the

requirement of Metal Stone for the construction railway track and building

construction projects of nearby district.

(iv) Demand supply gap:

Shri Ravi Shankar Awasthi has proposed Stone quarry will meet the

requirement/demand of Stone boulder for the construction of railway track. and

building construction projects of nearby district.

(v) Imports vs. Indigenous production:

As the stone availability from indigenous sources, the import of the same is not

required.

Page 7: PRE FEASIBLITY REPORT FOR BICHPURA STONE QUARRY …environmentclearance.nic.in/writereaddata/District/pfr/1506201787J… · (ii) location (map showing general location, specific Location,

7

(vi) Export possibility

There is no export possibility as these minerals are quite cheap and locally available

in abundance.

(vii) Domestic / Export Markets:

These Metal Stone boulders have only domestic /govt. department market as such will

be consumed accordingly.

(viii) Employment Generation (Direct and Indirect) due to the project:

Direct and indirect employment will be generated due to the project. Unskilled / semi

Skilled manpower can be sourced from the local area and skilled manpower will be

sourced from outside. At present about 30 manpower including technical, supervisory

staff, wage board employees, officers and staff will be engaged in the mining

activities.

3.0 PROJECT DESCRIPTION:

(i) Type of Project including interlinked and interdependent projects if any:

Bichpura Stone quarry Diposit(M.L Area:3.80ha.) with production capacity 62046

m3 at Village- Bichpura, Tehsil- Barhi, District- Katni, (M.P.) of Shri Ravi Shankar

Awasthi

Interlinked Project:

There is no interlinked or interdependent project based on mineral produced. Stone

boulder after sorting and sizing will be sold directly to railways and in open market.

(ii) Location (map showing general location, specific location, and project boundary

& project site layout) with coordinates.

Page 8: PRE FEASIBLITY REPORT FOR BICHPURA STONE QUARRY …environmentclearance.nic.in/writereaddata/District/pfr/1506201787J… · (ii) location (map showing general location, specific Location,

8

LOCATION MAP

Page 9: PRE FEASIBLITY REPORT FOR BICHPURA STONE QUARRY …environmentclearance.nic.in/writereaddata/District/pfr/1506201787J… · (ii) location (map showing general location, specific Location,

9

(iii) Details of alternative site consideration and basis of selecting the proposed site

particularly the environmental considerations gone Sound are highlighted.

As this is a site specific mining project and the site has been selected as metal stone is

available in this area & lease has been sanctioned by collector Jabalpur in the name of

Shri Ravi Shankar Awasthi vide their 2414/Khanij/60/U.P./ dated 25/06/2016 . over an

area of 3.80Hect. of 10 years. from due date. Therefore no alternative site has been

selected.

(iv) Size or magnitude of operation:

Bichpura Stone quarry Diposit(M.L Area: 3.80ha.) with production capacity 62046

m3 at Village- Bichpura, Tehsil- Barhi, District- Katni, M.P. of Shri Ravi Shankar

Awasthi

(v) Project description with process details (a schematic diagram/flow chart

showing the project layout, components of the project etc. Should be given)

Table – 2

SALIENT FEATURES OF PROJECT

S. No. Particulars Details

1. Plot/Survey/Khasra No. Khasra No: 1036/3, 1039/3, 1039/5, 1039/6, 1039/7

Khasra map along with khasra panchshala is enclosed

as Annexure – I

2. Village Bichpura

3. Tehsil Barhi

4. District Katni

5. State Madhya Pradesh

6. Lease area coordinates N- 23052’32.6” to N-23

0 52’40.9”

E-800 50’ 51’3.1” to E- 80

0 51’ 16.5”

7. Toposheet No. 64 A/13

B. Lease Area Details:

(i) Mining Lease Area 3.80hect. Source: Mining plan

Page 10: PRE FEASIBLITY REPORT FOR BICHPURA STONE QUARRY …environmentclearance.nic.in/writereaddata/District/pfr/1506201787J… · (ii) location (map showing general location, specific Location,

10

METHOD OF MINING:

Mining will be carried out by opencast- semi mechanized method added by deploying

required equipments and machinery for excavation, drilling, blasting, loading and

transportation. All operations of mining will be done by heavy earth moving machineries for

excavation, loading & transport. Various mining activities such drilling, blasting, loading and

transportation will be so conducted as to ensure maximum mineral conservation and

minimum environmental degradation.

Sequence of Mining:

I. Top soil and OB removal:

Top soil is not present in the area soil will be import for plantation.

II. Drilling:

Drilling will be carried out with the help of sharp drill bits for noise reduction.

Drilling will be done with water injection system & dust collector.

III. Blasting:

Control Blasting will be carried out.

IV. Loading:

Stone Boulder from quarries will be loaded by loader /poclain ..

V. Transportation:

Excavated stone boulder will be transported to construction unit by hired trucks and

dumpers.

(vi) Raw material required along with estimated quantity, likely source, marketing

area of final products, mode of transport of raw material and finished product:

This is a stone boulder Mining project, thus no raw material is required.

Metal stone boulder produce from the lease area will be used in construction works.

The stone boulder is brought to the stacking site by trucks and mechanically loaded .

Excavated stone boulder will be transported to construction sites by hired trucks and

dumpers.

(vii) Resources optimization/ recycling and reuse envisaged in the project, if any,

should be briefly outlined:

No waste water will be generated during mining operation

Page 11: PRE FEASIBLITY REPORT FOR BICHPURA STONE QUARRY …environmentclearance.nic.in/writereaddata/District/pfr/1506201787J… · (ii) location (map showing general location, specific Location,

11

Domestic waste water generated from mine office will be disposed in soak pits via

septic tank

Top soil will be stacked separately if encountered and will be simultaneously used in

plantation.

Waste overburden will be used in Road construction.

(viii) Availability of water its source, energy /power requirement and source:

A. Water Requirement:

Total Water requirement for the mining project will be 6 KLD which will be

purchased from nearby village panchayat sources.

B. Fuel & Power Requirement:

The electric power is not used for the process of mining. Only HSD Fuel is required

for operating excavator/loaders, dumpers & pumps etc.

(ix) Quantity of waste to be generated (liquid and solid) and scheme for their

management/disposal:

Occasional soil is present in the area soil will be import for plantation.

No waste water will be generated during mining operation.

Domestic wastewater generated from mines office will be disposed off in soak pit via

septic tank.

Page 12: PRE FEASIBLITY REPORT FOR BICHPURA STONE QUARRY …environmentclearance.nic.in/writereaddata/District/pfr/1506201787J… · (ii) location (map showing general location, specific Location,

12

4.0 SITE ANALYSIS

(i) Connectivity:

The Q.L. area is located at a distance of 57 km. West of Katni Approach from Katni to quarry area is

as follows. Distance from Katni to village Bichpura is 57 km. west of Katni. Form Village-Bichpura

to Barhi is 5 Km and from Barhi to quarry area distance is 8.0 km. approachable by Barhi to Katni

metal road.

Nearest PWD rest house is located at a distance of 47 km. In Barhi which is located towards

Northeast of the Q.L. area. The area falls under jurisdiction of police Barhi located at a distance of 5

km. South of the Q.L. area. Nearest railway station is Katni located at a distance of 47 km. North of

Q.L. area. Schooling facility, medical facility, post office and telegram facility are available in village

Barhi located at a distance of 5 km. North of the quarry area.

.

(ii) Land form, land use and land ownership:

Total Mining lease area is 3.80 hatc which Govt. land

(iii) Topography:

Topographically the lease area is having radial but gentle slope towards west

direction. Highest elevation of the applied area is 408 m above MSL, located along

the southwestern and lowest elevation is 407 m.situated on Northeastern part of the

area. Difference between highest and lowest elevation of the area is about 1m.

(iv) Existing land use pattern (agriculture, non-agriculture, forest, water bodies

(including area under CRZ)), shortest distances from the periphery of the

project to periphery of the forests, national park, wild life sanctuary, eco

sensitive areas, water bodies (distance from the HFL of the river), CRZ:

Total Mining lease area is 3.80 hact which is Government waste land

Page 13: PRE FEASIBLITY REPORT FOR BICHPURA STONE QUARRY …environmentclearance.nic.in/writereaddata/District/pfr/1506201787J… · (ii) location (map showing general location, specific Location,

13

Table: 3

Environmental Settings of the Area

S. No. Particulars Details

1. Nearest Railway Station The nearest railway station is Katni at 57km distance.

2. Nearest Village Bichpura is situated at 3 km east of the lease area.

3. Nearest City Barhi (5km)

4. National Highway/State

Highway/PWD road

Barhi –Katni PWD road is present at 3.0 km distance

from lease area

5. Nearest Airport The nearest Airport is Jabalpur at 150 km distance.

6. Ecological Sensitive

Areas

No Ecological Sensitive Areas (National Park,

Wild Life Sanctuary, Biosphere Reserves,

Wildlife corridors, Tiger/Elephant Reserves,

Protected Forests etc.) within 10 km radius of

the mine site

Page 14: PRE FEASIBLITY REPORT FOR BICHPURA STONE QUARRY …environmentclearance.nic.in/writereaddata/District/pfr/1506201787J… · (ii) location (map showing general location, specific Location,

14

KEY PLAN

Page 15: PRE FEASIBLITY REPORT FOR BICHPURA STONE QUARRY …environmentclearance.nic.in/writereaddata/District/pfr/1506201787J… · (ii) location (map showing general location, specific Location,

15

(v) Existing Infrastructure:

The Q.L. area is located at a distance of 57 km. West of Katni

Approach from Katni to quarry area is as follows. Distance from Katni to village

Bichpura is 57 km. west of Katni. Form Village-Bichpura to Barhi is 5 Km and from

Barhi to quarry area distance is 8.0 km. approachable by Barhi to Katni metal

road.Nearest PWD rest house is located at a distance of 47 km. in Barhi which is

located towards Northeast of the Q.L. area. The area falls under jurisdiction of police

Barhi located at a distance of 5 km. South of the Q.L. area. Nearest railway station is

Katni located at a distance of 47 km. North of Q.L. area. Schooling facility, medical

facility, post office and telegram facility are available in village Barhi located at a

distance of 5 km. North of the quarry area.

(vi) Soil Classification:

Soil is Basaltic it supports Cultivation.

(vii) Climatic data from secondary sources:

The area experiences sub- tropical with an annual average rainfall of 1200 mm.

climatic conditions. The temperature reaches up to 46°C during summer whereas

during winter it goes down to 4°C.

The wind generally blows in NE direction from November to February, The area

experience a pleasant weather, summer starts from March to June and monsoon sets

by end of June up to September.

Relative humidity varies between 18% to 80%.

(viii) Social Infrastructure Available:

The site is well connected with social infrastructure facilities like medical, post office,

schools, police stations etc. and as such, no constraints are envisaged in this aspect as

the Tehsil and District headquarter is near to the site.

Page 16: PRE FEASIBLITY REPORT FOR BICHPURA STONE QUARRY …environmentclearance.nic.in/writereaddata/District/pfr/1506201787J… · (ii) location (map showing general location, specific Location,

16

5.0 PLANNING BRIEF:

(i) Planning concept (type of industries, facilities, and Transportation etc.) Town

and country planning/development Authority classification:

The Q.L. area is located at a distance of 57 km. West of Katni Approach from

Katni to quarry area is as follows. Distance from Katni to village Bichpura is 57 km.

west of Katni. Form Village-Bichpura to Barhi is 5 Km and from Barhi to quarry area

distance is 8.0 km. approachable by Barhi to Katni metal road.Nearest PWD rest

house is located at a distance of 47 km. in Barhi which is located towards Northeast of

the Q.L. area. The area falls under jurisdiction of police Barhi located at a distance of

5 km. South of the Q.L. area. Nearest railway station is Katni located at a distance of

47 km. North of Q.L. area. Schooling facility, medical facility, post office and

telegram facility are available in village Barhi located at a distance of 5 km. North of

the quarry area.

(ii) Population Projection:

There will be insignificant increase in population due to the project, Manpower

required will be engaged from nearby areas. No significant influx of people is

anticipated in the area.

(iii) Land use planning (breakup along with green belt etc.):

Total Mining lease area is 3.80ha which is Private waste land.

(iv) Assessment of infrastructure demand (physical & social):

The applicant has assessed the demand of infrastructure (Physical & Social) in nearby

Area of the mine site and same will be developed under social responsibilities

programs.

(v) Amenities / Facilities:

The applicant will develop the Amenities/Facilities in the nearby area of the proposed

mine site as per requirement of local people of the nearby area under social

responsibilities program.

Page 17: PRE FEASIBLITY REPORT FOR BICHPURA STONE QUARRY …environmentclearance.nic.in/writereaddata/District/pfr/1506201787J… · (ii) location (map showing general location, specific Location,

17

6.0 PROPOSED INFRASTRUCTURE:

(i) Industrial Area (Processing Area):

Quarry lease area is 3.80ha and required infrastructure stone boulder mining activities

will be provided.

(ii) Residential Area (Non Processing Area):

This is not required as mine workers will come from nearby villages.

(iii) Green Belt Development:

Green Belt will be developed around the lease boundary, haul roads and plantation

will be done on undisturbed area, reclaimed area & mine office etc .Local species will

be planted after consultation with local forest officer and as per CPCB guidelines.

(iv) Social Infrastructure:

Proposed mining project will result in growth of the surrounding areas by increased

direct and indirect employment including ancillary development and supporting

infrastructure.

(v) Connectivity (traffic and transportation road/rail/metro/water Ways etc):

The Q.L. area is located at a distance of 57 km. West of Katni Approach from

Katni to quarry area is as follows. Distance from Katni to village Bichpura is 57 km.

west of Katni. Form Village-Bichpura to Barhi is 5 Km and from Barhi to quarry area

distance is 8.0 km. approachable by Barhi to Katni metal road.Nearest PWD rest

house is located at a distance of 47 km. in Barhi which is located towards Northeast of

the Q.L. area. The area falls under jurisdiction of police Barhi located at a distance of

5 km. South of the Q.L. area. Nearest railway station is Katni located at a distance of

47 km. North of Q.L. area. Schooling facility, medical facility, post office and

telegram facility are available in village Barhi located at a distance of 5 km. North of

the quarry area.

.

Page 18: PRE FEASIBLITY REPORT FOR BICHPURA STONE QUARRY …environmentclearance.nic.in/writereaddata/District/pfr/1506201787J… · (ii) location (map showing general location, specific Location,

18

(vi) Drinking Water Management (Source & Supply of Water):

6 KLD water will be required for this mining project which will be sourced from

nearby villages.

(vii) Sewerage System:

The waste water generated from mine and utilities will be disposed in soak pit via

septic tank.

(viii) Industrial Waste Management:

There will be no workshop so no waste water will be generated.

(ix) Solid Waste Management:

No soil generation during proposed mining.

No waste water will be generated during mining operation.

Domestic wastewater generated from mines office will be disposed off in soak pit via

septic tank.

(x) Power Requirement & Supply/Source:

Power will not be required as workings will be in day shift only.

Page 19: PRE FEASIBLITY REPORT FOR BICHPURA STONE QUARRY …environmentclearance.nic.in/writereaddata/District/pfr/1506201787J… · (ii) location (map showing general location, specific Location,

19

7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN:

(i) Policy to be adopted (central/state)in respect of the project affected persons

including home out sees, land out sees and Landless labourers:

Total Quarry lease area is 3.80ha which is Private waste land.

8.0 PROJECT SCHEDULE & COST ESTIMATES:

(i) Likely date of start of construction and likely date of completion (time schedule

for the project to be given):

The quarry will start after obtaining Environmental Clearance from SEIAA, MP.

(ii) Estimated project cost along with analysis in terms of economic viability of the

project:

Total cost of the Project is: Rs. 40Lacs/-

Cost for Environment Protection for the Proposed Project:

Capital cost –Rs40 Lacs /-

Recurring cost- Rs 4 Lacs per Annum

9.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATION):

(i) Financial and social benefits with special emphasis on the benefit to the local

people including tribal population if any:

Stone boulder mining project will result in growth of the surrounding areas by

increasing direct and indirect employment opportunities in the region including

ancillary development and supporting infrastructure. Special emphasis on Financial

and Social benefits will be given to the local people including tribal population, if

any, in the area. Development of social amenities will be in the form of medical

facilities, education to underprivileged and creation of self help groups.

No major adverse effect on environment is envisaged as the required mitigation

measures are inbuilt in the project.