PRE-PROPOSAL MEETING
FOR
RUNWAY 4-22 OVERLAY ANDTAXIWAYS REHABILITATION
RONALD REAGAN WASHINGTON NATIONAL AIRPORT
MAY 25, 2016
Project Overview
2
Project Areas Multiple Taxiways Runway 4-22
Overlay/Rehabilitate Bituminous Pavement 3” Bituminous Overlay 8” Partial Depth Repairs 30” Full Depth Repairs 32” Full Depth Repair Temporary and Permanent Electrical Work
Limited Work Hours
3
Project Work Areas
Proposer’s Qualifications
4
Updated – See Refer to RFP Section IX, Attachment 06 Paragraph 01 for Minimum Qualification Requirements
Contractor Haul and Storage
5
+
6
Project Phasing Project divided into 10 phases with multiple sub-phases
7
8
Project Schedule (cont’d)
Typical Phase Detail - Nights
9
Typical Phase Detail – Days (No Work)
10
Phasing Details
11
Phasing Details
12
RT9
Typical Sections
13
3”
30”
8”
Typical Section – Txy J
14
32”
Other Work Items Pavement Markings
Taxiway/Runway Centerline and Edge Stripes Surface Painted Signs Temporary Markings on Milled or Interim
Surface Reflective Markers
Taxiway Centerline and Roadway Provided by MWAA
Temporary/Permanent Electrical Lighting Edge Lights, Signage
15
Other Work Items Drainage Structure Top Replacement
16
Work Under Other Contracts Ongoing Airfield Maintenance Projects
17
Questions