+ All Categories
Home > Documents > Prebid Clarification 23-9-10

Prebid Clarification 23-9-10

Date post: 09-Apr-2018
Category:
Upload: dxindrarajan
View: 218 times
Download: 0 times
Share this document with a friend

of 10

Transcript
  • 8/7/2019 Prebid Clarification 23-9-10

    1/10

  • 8/7/2019 Prebid Clarification 23-9-10

    2/10

  • 8/7/2019 Prebid Clarification 23-9-10

    3/10

  • 8/7/2019 Prebid Clarification 23-9-10

    4/10

  • 8/7/2019 Prebid Clarification 23-9-10

    5/10

    EXURE 1 (COMMERCIA

    S.

    N.o

    Clause

    No.

    Page

    No.

    Query raised by the bidderRRECL Comments/ Clarifications

    within 30 days of date of completion for an amount equivalent to 10% of the Supply and

    Erection and Commissioning contracts valid up to expiry of the warranty period from

    commissioning.

    29 4.7.2 25 2. Performance Bond within 30 days of date of expiry of the warranty period in the form of

    Bank Guarantee from Scheduled or Nationalized bank for an amount equivalent to 10% of

    the annual O & M charges initially valid for one year to be renewed every year for quoted O

    & M period.

    Considered.

    Performance Bond within 30 days

    of date of expiry of the warranty

    period in the form of Bank

    Guarantee from Scheduled orNationalized bank for an amount

    equivalent to 5% of the annual O

    & M charges initially valid for one

    year to be renewed every year for

    quoted O & M period. This is in

    line with our previous RfP.

    30 4.7.3 25 We request that the above BGs should have well defined objectively oriented breach of

    term / clause for invocation instead of subjective dissatisfaction. Please confirm.

    No need to change.

    31 4.37.2

    to

    4.37.9

    4.84

    4.85

    9.1.23

    34

    55

    56

    88

    While considering the short commissioning schedule available with the successful bidder,

    we request you to kindly waive off these clauses.

    Not accepted

    32 4.37.1

    0

    34 Any test such as mentioned in the clause would be conducted only after completion of the

    stabilization period only, hence requested to be excluded from the completion period.

    Please confirm.

    The continuous generation of electricity out of wind farm can not be achieved due to

    unpredictable nature of wind. Please eliminate this requirement.

    No need to change.

    33 4.38.1 35 We request RRECL to consider the payment through electronic mode. Considered. Accepted being fast

    payment mode.

    34 4.44 37 In the event of damage due to force Majeure reason, the O & M operator would be paid Not accepted

  • 8/7/2019 Prebid Clarification 23-9-10

    6/10

  • 8/7/2019 Prebid Clarification 23-9-10

    7/10

    EXURE 1 (COMMERCIA

    S.

    N.o

    Clause

    No.

    Page

    No.

    Query raised by the bidderRRECL Comments/ Clarifications

    mentioned in the tender for Machinery Break Down insurance.

    For all other risks bidders should be allowed to bear risk and liabilities without taking

    insurance policy.

    No endorsable policy document or proof of payment of premium would be required by

    RREC from successful bidder.

    43 5.7 64 In the event us being successful bidder, please note that major chunk of supplies would be

    interstate supplies from locations outside the Rajasthan to site in the state of Rajasthan onwhich deduction of the Income Tax (IT) TDS and Works Contract Tax (WCT) TDS would

    not be applicable.

    Also since the arrangement of land, and Power Evacuation does not form part of works

    contract, neither WCT TDS, nor IT TDS would be deductible on these items.

    Please confirm.

    No need to change

    44 5.8 64 We propose following payment terms for the tender:

    1. RREC will release 10% interest free advance within 7 days of submission of BankGuarantee of equivalent amount without any deduction from running account bills.

    2. 60% against receipt of Material at site on pro- rata basis.3. 30% on synchronization of individual WTGs with grid.

    Not accept.

    45 5.9 64 All payments would be released within 10 days of their becoming due, failing which an

    interest @ 18% per annum with monthly rest would be accrued and considered for

    adjustment against any shortfall claim.

    Not accepted.

    46 5.10.2 64 Considering the WTG model available in the market are field proven, we propose to

    conduct mechanical run test for 48 Hours after stabilization period of 60 days from the date

    of commissioning of WTG. We request to kindly amend the clause accordingly.

    Not accepted.

    47 5.11 65 We request to kindly amend the clause to following terms in line with the industry practice

    and as widely accepted by various Central PSU/ Government departments :

    The rate for the Penalty is requested to be amended to % per week of delay or part

    thereof, subject to a maximum of 5% of the value, of the un commissioned value of the

    WEGs.

    Not accepted.

  • 8/7/2019 Prebid Clarification 23-9-10

    8/10

    EXURE 1 (COMMERCIA

    S.

    N.o

    Clause

    No.

    Page

    No.

    Query raised by the bidderRRECL Comments/ Clarifications

    48 5.12.1 65 We propose that the equipment would be warranted for 12 Months from the date of

    commissioning.

    The period is requested to be reduced from the required 24 months period to 12 months,

    due to the fact that most of our parts and components are warranted for 12 (Twelve) months

    only.

    This clause will be modified for

    warrantee period for 12 months,

    49 5.12.2

    5.13 c)

    65

    66

    We propose that the clause should be amended to require minimum annual average machine

    availability of 95% to be evaluated only after the completion of stabilization period of 60

    days, while looking to the practical aspects of Wind farm Operations and Maintenance andindustry practices followed with PSU tenders.

    Not accepted.

    50 5.13

    a) to e)

    8.18

    65

    78

    Performance Power Curve Guarantee.

    We agree for Performance test to be conducted only after the requisite stabilization period

    of WTG viz 45 days after commissioning.

    The Tender calls for unconditional Power Curve Generation Guarantee (PCGG) where

    shortfall would be levied in excess of the actual revenue loss are not in line with theprevailing practices in the industry.

    Hence, we agree to offer that the machine performance would be verified against the

    Certified Power Curve by carrying out a one time test for 1-2 months in the first year of

    operation as per the Procedure being submitted herewith only. Please note that the same is

    successfully undertaken in other government tenders under C-WET guidance/ supervision.

    Once the Power Curve is proved only Guarantee of Machine availability would be

    applicable.

    The loss of estimated Generation due to grid unavailability, Load Shedding, mandatory O &

    M and force Majeure reasons etc in proportion to the actual wind speeds would be reduced

    from total estimated generation to be considered while evaluating shortfall.

    Hence, the permanent wind mast and all allied accessories and soft wares asked in tender

    are requested to be deleted from the scope of the tender.

    Not accepted.

    51 5.13.2 67 We agree to offer that the machine performance would be verified against the Certified

    Power Curve by carrying out a one time test for 1-2 Months in the first year of operation as

    Not accepted.

  • 8/7/2019 Prebid Clarification 23-9-10

    9/10

    EXURE 1 (COMMERCIA

    S.

    N.o

    Clause

    No.

    Page

    No.

    Query raised by the bidderRRECL Comments/ Clarifications

    per the Procedure being submitted herewith only. Once the Power Curve is proved only

    Guarantee of Machine availability would be applicable.

    52 5.13.1

    5

    68 Wind Data may also be allowed to be authenticated by any qualified 3rd

    party agency other

    than C WET. Please confirm.

    Not accepted.

    53 6.3.1 69 The Power evacuation system is owned by Discoms at times, hence the responsibility of

    maintaining it lies with them. Hence this is requested to be eliminated from the Battery

    limits.

    Not accepted.

    54 7.1 &7.2

    75 As per present state practice, we can offer the sites within 25 km radius of certified C-WET/Bidder mast. Please confirm your acceptance to the above criterion for the bid.

    Not accepted.

    55 7.2 75 Water Resources.

    While considering the fact that Jaisalmer/Jodhpur/Badmer falls under desert area the

    permanent water supply arrangement through a bore well is practically not possible. We

    request to amend the clause considering the practical difficulties.

    Not accepted.

    56 8.7 76 Instead of costly dedicated facility we propose suitable arrangements would be made at

    available facility on shared facility basis. Please confirm acceptance.

    Not accepted.

    57 8.8 76 Availability of vehicles for O&M staff and for every day inspection by RREC as perrequirement may be ensured, failing which RREC shall have full right for alternate

    arrangement at the risk & cost of contractor.

    Bidders shall design suitable power evacuation system to inject power from wind farm at

    any nearest 33 kV/132 kV/220kV/400kV GSS through dedicated line, bay extension and

    protection equipment work at RVPN/DISCOM Grid Sub Station if required, then the

    expenses shall be borne by the contractor.

    The existing clause is modifiedfor educated line

    58 8.9

    8.19

    77

    78

    We request to delete the Furnished Office cum Store room along with facilities asked in the

    tender, Security Room as the dedicated rooms are not required.

    All the roads required for transportation of Man and Material would be of earthen type as

    per the Bidders standard practice to be offered on shared facility basis.

    Not accepted.

    59 8.22

    8.30

    8.35

    78

    79

    80

    No dedicated inventory of spares for the project is required to be maintained as the same

    would be available at nearest common pool. Please amend the clause accordingly.

    Not accepted.

  • 8/7/2019 Prebid Clarification 23-9-10

    10/10

    EXURE 1 (COMMERCIA

    S.

    N.o

    Clause

    No.

    Page

    No.

    Query raised by the bidderRRECL Comments/ Clarifications

    60 8.33.3 80 The insurance covers mentioned in the clause for Operation & Maintenance period is

    proposed to be kept in owners scope as post commissioning the owner would be in-charge

    of the windfarms.

    Not accepted.

    61 9.1.4 83 Exclusive facility of CMCS is not required considering the size of the project. However,

    CMCS facility would be provided as shared facility through Bidders existing facilities as

    done successfully with other customer. Please confirm.

    Not accepted.

    62 Appen

    dix ENote

    No. 13

    146 The annual lease rent if any, and such charges beyond commissioning viz. annual CEIG

    inspection charges would be borne by RRECL. Please confirm.

    Not accepted.

    63 3.4.1 10 The validity period of the Bid i.e.180 days is required beyond the desired completion period

    of 28 Feb 2011. Hence we request you to reduce the validity period of the bid to be 60 days

    from the date of bid submission.

    This clause will modify for

    validity period from 180 days to

    90 days.

    64 Annex

    ure-C

    149 In Annexure-C, the amount appearing in last column will be calculated only if generation

    column is inserted.

    The existing Annexure-C is

    substituted accordingly.