Date post: | 31-Dec-2015 |
Category: |
Documents |
Upload: | marcia-barker |
View: | 30 times |
Download: | 6 times |
M. Baldauf (DWD) 1
Precipitation verification at DWD
29th WGNE meeting, 10-13 March 2014, Melbourne
U. Damrath (DWD)
2
1000 stations; controlled data are available around 10 days after measurement.
Verification method:
Aggregation to a 1° x 1° grid: forecasts in the model grid, observations as so called superobservations in each model grid.
2
M. Baldauf (DWD) 3
We are sorry for not considering Laurie Wilson‘s
Verification proposal, due to several migrations of the
verification system during the last year:
•libdwd GRIB-API (ECMWF)
•GRIB1 GRIB2
•database requesting layer (csobank sky)
•NEC SX9 Cray XC30
M. Baldauf (DWD) 4
Winter 2012/13
Forecast day 1
low values for ETS and highvalues for FBI due to anunusual dry winter
M. Baldauf (DWD) 5
Winter 2012/13
Forecast day 2
M. Baldauf (DWD) 6
Winter 2012/13
Forecast day 3
M. Baldauf (DWD) 7
Spring 2013
Forecast day 1
M. Baldauf (DWD) 8
Spring 2013
Forecast day 2
M. Baldauf (DWD) 9
Spring 2013
Forecast day 3
M. Baldauf (DWD) 10
Summer 2013
Forecast day 1
M. Baldauf (DWD) 11
Summer 2013
Forecast day 2
M. Baldauf (DWD) 12
Summer 2013
Forecast day 3
M. Baldauf (DWD) 13
Autumn 2013
Forecast day 1
M. Baldauf (DWD) 14
Autumn 2013
Forecast day 2
M. Baldauf (DWD) 15
Autumn 2013
Forecast day 3