Date post: | 30-Dec-2015 |
Category: |
Documents |
Upload: | lilian-gibbs |
View: | 213 times |
Download: | 0 times |
Precision is measurable
The use of renewable energies reveal specific
requirements for electricity meters
Precision is measurable
Meter testing / Reasons for incorrect operation
• How currents outside of the 50 Hz frequency range arise?
• Why are some electricity meters get disturbed by a frequency from 2 kHz?
• What type of meter is to be selected for which electricity consumers?
• How can ensure the correct function of the meter?
• How can you check the meter installation, easy, safty and fast?
4
Precision is measurable
How currents outside of the 50 Hz frequency range arise?
Example: switched-mode power supply
5
Circuit diagram of a switched-mode power supply
Voltage- and Currentcurve
Precision is measurable
How currents outside of the 50 Hz frequency range arise?
Example: switched-mode power supply
Fourier Transformation
6
Current profile of a switched-mode power supply 80% 150-Hz-Anteile50% 250-Hz-Anteile22% 350-Hz-Anteile
-1
-0.8
-0.6
-0.4
-0.2
0
0.2
0.4
0.6
0.8
1
0 1 2 3 4 5 6t [msec]
sin(x)0.8*sin(3*x+3.6)0.5*sin(5*x+0.6)
0.22*sin(7*x+3.8)
Fourier Transformation for I Netz:
Precision is measurable
7
household industry
photovoltaic plants photovoltaic plants
block heating station (Dachs Stirling) wind engine
Energy saving lamp Temperaturgeregelte Heizungen und Öfen
Computer, Audio- and Video devices welding machine
Dimmer elevator
Induction cooker Dynamic reactive-power compensation systems
freezer electronic frequency converter
How currents outside of the 50 Hz frequency range arise?
Examples
Precision is measurable
Why are some electricity meters get disturbed by a frequency from 2 kHz?
8
40. harmonic =
40 x 50 Hz = 2 kHz
EN 61000-2-2 und EN 50160
The frequency range from 2-9 kHz is in Europ curenntly not regulatet in the EMV Norm.
Precision is measurable
Jan. 2012 9
What type of meter is to be selected for which electricity consumers?
Production: Installation of highly accurate meters and measuring transformers in power plants
Transmission: Transfer stations between different networks
Customers: Installation of meters and measuring transformers on the consumer’s premises
Production CustomersTransmission
Precision is measurableWhat type of meter is to be selected for which electricity consumers?
The solar electricity-magazine PHOTON reported in the November 2010 edition already, that some electronic power meter are to slow …
… Some inverters are not compatible with electronic energy meters. Who is using the wrong combination of devices must be feared that his input meter shows too little income. The problem is known in professional circles for at least three years, some Operators even have blacklists....
10
Frank GreizerSMA Solar Technology AG
(Bereichsleiter Technologieentwicklung)
… be seen from any point of any failure or fault of
SMA and see the buck at the meter manufacturers
…
Karsten PetersonItron Zähler& Systemtechnik GmbH (Vertriebsleiter Deutschland)
… by the inverter generates extra power and pollution would have to actually work to avoid these …
Typ Iskra MT171 shows up to 20% less
Precision is measurable
What type of meter is selected for electricity consumer?
The VDE-project team „ Measurement reliability and stability of electricity meters and accessories“ has conducted studies on this topic.
In the laboratory of the VDE Testing and Certification Institute, 12 electronic electricity meters has been tested. It has been determined error of over 70%. (graphic left)
In the following customers are high-frequencys expected :
•Solar inverter systems
•Wind turbines
•pumping stations
•commercial operation / metal working
11
Precision is measurable
Type testing and standards norms EN 50470-X (for electronic electricity meters) will soon be expanded and standardized.
At customer site with high frequency system size it is possible to check the meter with the real system size on site with appropriate measuring instruments
More possible disturbances: DC, DC voltage, stress peaksmodulated frequency changes( Flicker)overburden of Current- and Voltagetransformer
transport damage of the meterconnection erros during the installation of the meter
12
How ensure the correct work of the meter?
Precision is measurable
On site test
• Collection of network variables
• Connection check
• Error measurement
• logging
13
ZERA stands for innovation, flexibility and sustainability
Precision is measurable
15
Thank you for your attention
Matthias Heinzen Sales Manager
ZERA GmbHHauptstrasse 392
D-53639 Koenigswinter