CASINO PROJECT | Supplementary Information Report | Mar 2015 VOLUME A.II: PROJECT INTRODUCTION & OVERVIEW Introduction First Nations and Community Consultation A.4 Project Description A.3 Project Location A.1A Concordance Table to the Executive Committee’s Request for Supplementary Information A.2A Traditional Knowledge Bibliography A.1 A.2 A.5 Effects Assessment Methodology A.4A Tailings Management Facility Construction Material Alternatives A.4B Information on Alternative Access Road Alignments A.4C Feasibility Design of the Heap Leach Facility A.4D Report on the Feasibility Design of the Tailings Management Facility A.4F Waste Storage Area and Stockpiles Feasibility Design A.4E Results of Additional Lab Testing of Leach Ore A.4G Updated Hydrometeorology Report A.4H Cold Climate Passive Treatment Systems Literature Review A.4I Open Pit Geotechnical Design A.4L Revised Tailings Management Facility Seepage Assessment A.4M Processing Flow Sheets A.4N Scoping Level Assessment of Casino Property A.4O Advanced Metallurgical Assessment of the Casino Copper Gold Project A.4P Production of Environmental Tailings Samples for the Casino Deposit A.4Q Mine Site Borrow Materials Assessment Report A.4R Report on Laboratory Geotechnical Testing of Tailings Materials A.4J Laboratory Evaluation of the SO 2 /Air and Peroxide Process A.4K Metal Uptake in Northern Constructed Wetlands VOLUME A.II: PROJECT INTRODUCTION & OVERVIEW APPENDIX A.4M: Processing Flow Sheets
Transcript
Page 1: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

CASINO PROJECT | Supplementary Information Report | Mar 2015

Volume A.ii: Project introduction & oVerView

Volume A.iii: BioPhysicAl VAlued comPonents

Volume A.V: AdditionAl yesAA reQuirements

Volume A.iV: socio-economic VAlued comPonents

Introduction Employment and Income

Employability

Community Vitality

Community Infrastructure and Services

Economic Development and Business Sector

Cultural Continuity

Land Use and Tenure

First Nations and Community Consultation

A.4 Project Description

A.3 Project Location

A.5 Effects Assessment Methodology

A.1A Concordance Table to the Executive Committee’s Request for Supplementary Information

A.4A Tailings Management Facility Construction Material Alternatives

A.2A Traditional Knowledge Bibliography

A.4B Information on Alternative Access Road Alignments

A.4c Feasibility Design of the Heap Leach Facility

A.4d Report on the Feasibility Design of the Tailings Management Facility

A.4F Waste Storage Area and Stockpiles Feasibility Design

A.4e Results of Additional Lab Testing of Leach Ore

A.4G Updated Hydrometeorology Report

A.4h Cold Climate Passive Treatment Systems Literature Review

A.4i Open Pit Geotechnical Design

A.4l Revised Tailings Management Facility Seepage Assessment

A.4m Processing Flow Sheets

A.4n Scoping Level Assessment of Casino Property

A.4o Advanced Metallurgical Assessment of the Casino Copper Gold Project

A.4P Production of Environmental Tailings Samples for the Casino Deposit

A.4Q Mine Site Borrow Materials Assessment Report

A.4r Report on Laboratory Geotechnical Testing of Tailings Materials

A.4j Laboratory Evaluation of the SO2/Air and Peroxide Process

A.4K Metal Uptake in Northern Constructed Wetlands

Effects of the Environment on the Project

Accidents and Malfunctions

Environmental Management

Environmental Monitoring Plans

Conclusions

References

Waste and Hazardous Materials Management Plan

Spill Contingency Management Plan

Sediment and Erosion Control Management Plan

Invasive Species Management Plan

ML/ARD Management Plan

Liquid Natural Gas Management Plan

Socio-Economic Management Plan

Road Use Plan

Economic Impacts of the Casino Mine Project

Heritage Resources Assessment Areas

Heritage Sites Summary

Terrain Features

Water Quality

Air Quality

Noise

Fish and AquaticResources

Wildlife

Rare Plants and Vegetation Health

Variability Water Balance Model Report

Water Quality Predictions Report

Potential Effects of Climate Change on the Variability Water Balance

Updated Appendix B5 to Appendix 7A

2008 Environmental Studies Report: Final

Casino Mine Site Borrow Sites ML/ARD Potential

2013-2014 Groundwater Data Report

Emissions Inventory for Construction and Operations

Casino Geochemical Source Term Development: Appendix B

Extension of Numerical Groundwater Modelling to include Dip Creek Watershed

The Effect of Acid Rock Drainage on Casino Creek

Casino Kinetic Testwork 2014 Update for Ore, Waste Rock and Tailings

Preliminary Risk Assessment Metal Leaching and Acid Rock Drainage

Toxicity Testing Reports

Appendix A2 to Casino Waste Rock and Ore Geochemical Static Test As-sessment Report: Cross-Sections

Updated Fish Habitat Offsetting Plan

Wildlife Mitigation and Monitoring Plan V.1.2.

Moose Late Winter Habitat Suitability Report

Fish Habitat Evaluation: Instream Flow and Habitat Evaluation Procedure Study

Wildlife Baseline Report V.2

A.1

A.2

A.6

A.7

A.13 A.20

A.21

A.22

A.23

A.24

A.25

A.14

A.16

A.17

A.15

A.18

A.19

A.7A

A.22A

A.22B

A.22c

A.22d

A.22h

A.22G

A.22F

A.22e

A.7B

A.7c

A.13A

A.18A

A.18B

A.7d

A.7e

A.7K

A.7m

A.8A

A.7l

A.7n

A.7F

A.7i

A.7j

A.7G

A.7h

A.8

A.9

A.10

A.12

A.11

A.10A

A.12A

A.12c

A.10B

A.12B

Volume A.i: PREFACE

Volume A.ii: Project introduction & oVerView

Volume A.iii: BioPhysicAl VAlued comPonents

Volume A.V: AdditionAl yesAA reQuirements

Volume A.iV: socio-economic VAlued comPonents

Introduction Employment and Income

Employability

Community Vitality

Community Infrastructure and Services

Economic Development and Business Sector

Cultural Continuity

Land Use and Tenure

First Nations and Community Consultation

A.4 Project Description

A.3 Project Location

A.5 Effects Assessment Methodology

A.1A Concordance Table to the Executive Committee’s Request for Supplementary Information

A.4A Tailings Management Facility Construction Material Alternatives

A.2A Traditional Knowledge Bibliography

A.4B Information on Alternative Access Road Alignments

A.4c Feasibility Design of the Heap Leach Facility

A.4d Report on the Feasibility Design of the Tailings Management Facility

A.4F Waste Storage Area and Stockpiles Feasibility Design

A.4e Results of Additional Lab Testing of Leach Ore

A.4G Updated Hydrometeorology Report

A.4h Cold Climate Passive Treatment Systems Literature Review

A.4i Open Pit Geotechnical Design

A.4l Revised Tailings Management Facility Seepage Assessment

A.4m Processing Flow Sheets

A.4n Scoping Level Assessment of Casino Property

A.4o Advanced Metallurgical Assessment of the Casino Copper Gold Project

A.4P Production of Environmental Tailings Samples for the Casino Deposit

A.4Q Mine Site Borrow Materials Assessment Report

A.4r Report on Laboratory Geotechnical Testing of Tailings Materials

A.4j Laboratory Evaluation of the SO2/Air and Peroxide Process

A.4K Metal Uptake in Northern Constructed Wetlands

Effects of the Environment on the Project

Accidents and Malfunctions

Environmental Management

Environmental Monitoring Plans

Conclusions

References

Waste and Hazardous Materials Management Plan

Spill Contingency Management Plan

Sediment and Erosion Control Management Plan

Invasive Species Management Plan

ML/ARD Management Plan

Liquid Natural Gas Management Plan

Socio-Economic Management Plan

Road Use Plan

Economic Impacts of the Casino Mine Project

Heritage Resources Assessment Areas

Heritage Sites Summary

Terrain Features

Water Quality

Air Quality

Noise

Fish and AquaticResources

Wildlife

Rare Plants and Vegetation Health

Variability Water Balance Model Report

Water Quality Predictions Report

Potential Effects of Climate Change on the Variability Water Balance

Updated Appendix B5 to Appendix 7A

2008 Environmental Studies Report: Final

Casino Mine Site Borrow Sites ML/ARD Potential

2013-2014 Groundwater Data Report

Emissions Inventory for Construction and Operations

Casino Geochemical Source Term Development: Appendix B

Extension of Numerical Groundwater Modelling to include Dip Creek Watershed

The Effect of Acid Rock Drainage on Casino Creek

Casino Kinetic Testwork 2014 Update for Ore, Waste Rock and Tailings

Preliminary Risk Assessment Metal Leaching and Acid Rock Drainage

Toxicity Testing Reports

Appendix A2 to Casino Waste Rock and Ore Geochemical Static Test As-sessment Report: Cross-Sections

Updated Fish Habitat Offsetting Plan

Wildlife Mitigation and Monitoring Plan V.1.2.

Moose Late Winter Habitat Suitability Report

Fish Habitat Evaluation: Instream Flow and Habitat Evaluation Procedure Study

Wildlife Baseline Report V.2

A.1

A.2

A.6

A.7

A.13 A.20

A.21

A.22

A.23

A.24

A.25

A.14

A.16

A.17

A.15

A.18

A.19

A.7A

A.22A

A.22B

A.22c

A.22d

A.22h

A.22G

A.22F

A.22e

A.7B

A.7c

A.13A

A.18A

A.18B

A.7d

A.7e

A.7K

A.7m

A.8A

A.7l

A.7n

A.7F

A.7i

A.7j

A.7G

A.7h

A.8

A.9

A.10

A.12

A.11

A.10A

A.12A

A.12c

A.10B

A.12B

Volume A.i: PREFACE

VOLUME A.II: PROJECT INTRODUCTION & OVERVIEW

APPENDIX A.4M: Processing Flow Sheets

Page 2: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

PRELIMINARY

NOT FOR CONSTRUCTION

WESTERN COPPER

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

HEAP

HEAP LEACH COPPER - MOLYBDENUM FLOTATION

SULFIDE ORE

PRIMARY

CRUSHING

PEBBLE

CRUSHING

SAG

MILL

BALL

MILL

COPPER/MOLYBDENITE

FLOTATION

TAILING

DEWATERING

TAILINGS

POND

LOADOUT

MOLYBDENITE FLOTATION

MOLYBDENITE

CLEANER

FLOTATION

BARRENPREGNANTCYCLONE

CIC

SART

COPPER PRODUCTS

TO MARKET

GYPSUM

TO

TAILINGS

REFINING

ELECTROWINNING

ELUTION

GOLD DORE

TO MARKET

PRELIMINARY

NOT FOR CONSTRUCTION

CASINO SITE

FLOW SHEET

GENERAL

OVERALL PROCESS

000-FS-001

SULFIDES

SLIMES

SANDS

MOLYBDENITE

CONCENTRATE

TO MARKET

MOLYBDENITE

CONCENTRATE

DEWATERING

COPPER

CONCENTRATE

DEWATERING

COPPER CONCENTRATE

TO MARKET

OXIDE ORE

PRIMARY

CRUSHING

SECONDARY

CRUSHING

SCREEN

Page 3: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

CASINO MINING

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

CRUSHER

PRIMARY

DISCHARGE FEEDER

FEEDER

BREAKER

ROCK

FEEDER

SAG MILL FEED CONVEYOR

BELT SCALE

MAGNET

CONVEYOR

CRUSHER

DUMP HOPPER

DISCHARGE HOPPER

CRUSHER

PRELIMINARY

NOT FOR CONSTRUCTION

BALL LOADING

SYSTEM

SAG MILL

FEEDER FEEDER

LEGEND:

METAL DETECTOR

STOCKPILE BUILDING

STOCKPILE

ROM

STOCKPILE AREA

SUMP PUMP

DUST COLLECTORDUST COLLECTOR

DUST COLLECTOR

BELT SCALE

CRUSHER AREA

OVERHEAD CRANE

CRUSHER

CRUSHER

RECLAIMRECLAIMRECLAIMRECLAIM

STOCKPILE FEED

RECLAIM TUNNEL

CASINO PROJECT

GENERAL

FLOW SHEET

000-FS-002

CRUSHING AREA

SUMP PUMP

STOCKPILE FEED

CONTROL ROOM

RECLAIM ELECTRICAL

BUILDING

CRUSHING AREA

AIR RECEIVER

CRUSHER

BUILDING

CRUSHING AREA

AIR COMPRESSOR

INSTRUMENT

AIR DRYER

ECCENTRIC

REMOVAL CARTLUBE PACKAGE

VENTILATION

FAN

MAGNET

TOTE BOX

Page 4: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

WESTERN COPPER

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

SAG MILL

CRANE

CONTROL

ROOM

LEGEND:

SAG MILL

LINER HANDLER

AIR RECEIVERAIR RECEIVER

AIR COMPRESSOR

TOTE BOX

INSTRUMENT

MAGNET

BELT SCALE

JACKING CRADLE

SAG MILL

JACKING SYSTEM

HYDRAULIC

SAG MILL

PLANT

AIR DRYER

INSTRUMENT

BALL MILL

REMOVAL TOOL

LINER BOLT

LINER HANDLER

SAG MILL

FEED PUMP

SUMP PUMP

BALL MILL

CLUSTER

SAMPLER

BALL MILL

GRINDING AREA

CYCLONE

CYCLONE

SAMPLER

PRIMARY

SECONDARY

SYSTEM

BALL LOADING

BALL MILL

PSM

SIZE MONITOR

PARTICLE

LUBE PACKAGE

BALL MILL

JACKING CRADLE

BALL MILL

LUBE PACKAGE

SAG MILL

SAG MILL

REMOVAL TOOL

LINER BOLT

BALL MILL

DETECTOR

METAL

GATE

DIVERTER

CONVEYOR

CYCLONE O/F

PSM

CHILLERS

TOOL KIT

LINER HANDLER

CYCLONE

CRANE

BALL MILL

CRANE

PRELIMINARY

NOT FOR CONSTRUCTION

CASINO SITE

FLOW SHEET

GENERAL

GRINDING & CLASSIFICATION

000-FS-003

TROMMEL

SCREEN

SAG AREA

SUMP PUMP

PEBBLE CRUSHER

AREA SUMP PUMP

PARTICLE

SIZE MONITOR

SAMPLER

FEED TANK

SECONDARY

SAMPLER

SAMPLER

FEED TANK

PRIMARY

SAMPLER

CYCLONE

CLUSTER

BOX

CYCLONE O/F

BOX

PEBBLE

CRUSHER FEEDER

PEBBLE

CRUSHER

SAG OVERSIZE

SURGE BIN

PEBBLE WASH

SCREEN

PEBBLE

CONVEYOR No. 1

MAGNET MAGNET

PEBBLE

CONVEYOR No. 2

CYCLONE

FEED SUMP

Page 5: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

CASINO MINING

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

FEED TANK

SAMPLER

SAMPLER

SECONDARY

PRELIMINARY

NOT FOR CONSTRUCTION

CASINO PROJECT

GENERAL

FLOW SHEET

Cu ROUGHER FLOTATION

000-FS-004

ROUGHER

FLOTATION CELL

PYRITE SCAVENGER

CELLS

PYRITE SCAVENGER

CELLS (FUTURE)

PYRITE SCAVENGER

CELLS

ROUGHER

FLOTATION CELL

ROUGHER AREA

SUMP PUMP

PRIMARY

SAMPLER

ROUGHER AREA

SUMP PUMP

ROUGHER

CONCENTRATE

SAMPLER

COPPER 1st CLEANER

DISTRIBUTOR

COPPER 1st

CLEANER CELLS

CLEANER AREA

SUMP PUMP

COPPER 1st

CLEANER CELLS

PRIMARY

SAMPLER

SECONDARY

SAMPLER

SAMPLER

FEED TANK

ROUGHER

CONCENTRATE

SAMPLER

ROUGHER

CONCENTRATE

SUMP

ROUGHER

CONCENTRATE PUMP

Cu 1st CLEANER

TAILING SAMPLER

Cu 1st CLEANER

TAILING SAMPLER

PYRITE SCAVENGER

CELLS (FUTURE)

Page 6: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

WESTERN COPPER

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

AIR DRYER

AIR COMPRESSOR

AIR RECEIVER

INSTRUMENT

LEGEND:

AIR RECEIVER

INSTRUMENT

BLOWER

PRELIMINARY

NOT FOR CONSTRUCTION

CASINO SITE

FLOW SHEET

GENERAL

Cu CLEANER FLOTATION

000-FS-005

COPPER COLUMN

TAILS SUMP

COPPER COLUMN

TAILING PUMP

COPPER 3rd

CLEANER FEED PUMP

COPPER 3rd CLEANER

FEED SUMP

BLOWER

(COLUMN CELLS)

COPPER 3rd

CLEANER

COLUMN CELLS

COPPER CLEANER

AREA SUMP PUMP

COPPER 3rd

CLEANER

DISTRIBUTOR

REGRIND

CYCLONE

FEED PUMP

REGRIND MILL

REGRIND CYCLONE

FEED SUMP

REGRIND AREA

SUMP PUMP

COPPER REGRIND

CYCLONE CLUSTER

BRIDGE CRANE

COPPER 2nd CLEANER

FLOTATION CELLS

COPPER 2nd CLEANER

TAILING SUMP

COPPER 2nd

CLEANER TAILING PUMP

Page 7: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

CASINO MINING

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

TAILING

THICKENER AREA

SUMP PUMP

TAILING

THICKENER

RECIRCULATE

PUMPS

TAILING

THICKENER

OVERFLOW

SUMP PUMP

SEEPAGE PUMPS

D8 DOZER

PRELIMINARY

NOT FOR CONSTRUCTION

CASINO PROJECT

GENERAL

FLOW SHEET

TAILING DEWATERING

000-FS-006

TAILING

THICKENER

OVERFLOW

PUMPS

TAILING

THICKENERS

TAILING RECLAIM

BARGE PUMP

PYRITE THICKENER

AREA SUMP PUMP

PYRITE

THICKENER

UNDERFLOW

PUMPS

PYRITE

THICKENER

TAILING CYCLONE

CLUSTER

TAILING CYCLONE

FEED SUMP

RECLAIM

WATER BARGE

TAILING CYCLONE

PLANT HEAD

WATER TANK

TAILING CYCLONE

OVERFLOW PUMP

(FUTURE)

TAILING CYCLONE

OVERFLOW SUMP

TAILING CYCLONE

UNDERFLOW PUMP

(FUTURE)

TAILING CYCLONE

UNDERFLOW SUMP

WATER

BUFFER TANK

SEAL WATER

TANK SEAL WATER PUMP

(FUTURE)

SEAL WATER

FILTER

Page 8: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

WESTERN COPPER

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

CuMo CONCENTRATE

THICKENER

AREA SUMP PUMP

CuMo

CONCENTRATE

THICKENER

UNDERFLOW

PUMP

CuMo

CONCENTRATE

THICKENER

CuMo CONCENTRATE

THICKENER

OVERFLOW SUMP

LEGEND:

PRELIMINARY

NOT FOR CONSTRUCTION

CASINO SITE

FLOW SHEET

GENERAL

Mo ROUGHER FLOTATION

000-FS-007

CuMo

CONCENTRATE

OVERFLOW PUMP

MOLY

REGRIND

MILL

MOLY 1st

CLEANER TAILS

SAMPLER

MOLY ROUGHER

TAILS SAMPLER

MOLY 1st

CLEANER

FLOTATION CELLS

MOLY 1st CLEANER

CONCENTRATE

SAMPLER

MOLY ROUGHER

CONCENTRATE

SAMPLER

MULTI-STREAM

ANALYZER

MOLY ROUGHER

FLOTATION CELLS

MOLY 1st CLEANER

FEED PUMP

MOLY ROUGHER

CONDITIONING

TANK No. 1

AGITATOR

MOLY ROUGHER

CONDITIONING

TANK No. 2

AGITATOR

MOLY REGRIND

SUMP

MOLY REGRIND

PUMP

MOLY ROUGHER

AREA SUMP PUMP

Page 9: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

LEGEND:

PRELIMINARY

NOT FOR CONSTRUCTION

CASINO SITE

FLOW SHEET

GENERAL

Mo CLEANER FLOTATION

000-FS-008

MOLY CLEANER AREA

SUMP PUMP

MOLY 2nd CLEANER

TAILS PUMP

MOLY 2nd CLEANER

TAILS SUMP

MOLY 3rd CLEANER

FEED SUMP

MOLY FINAL CLEANER

CONCENTRATE SAMPLER

MOLY 3rd

CLEANER COLUMN

CELL

MOLY 3rd CLEANER

FEED PUMP

MOLY 2nd CLEANER

FEED SUMP

MOLY 2nd

CLEANER COLUMN

CELL

MOLY 2nd CLEANER

FEED PUMP

MOLY 4th

CLEANER COLUMN

CELL

MOLY 3rd CLEANER

CONCENTRATE SUMP

MOLY 4th CLEANER

FEED PUMPS

WESTERN COPPER

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

Page 10: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

WESTERN COPPER

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

CONVEYOR

BELT SCALE

LEGEND:

SUMP PUMP

PRELIMINARY

NOT FOR CONSTRUCTION

CASINO SITE

FLOW SHEET

GENERAL

000-FS-009

FILTER AREA

SUMP PUMP

COPPER

THICKENER

OVERFLOW PUMP

COPPER

THICKENER OVERFLOW

PUMP SUMP

FILTRATE PUMP

FILTER BUILDING

CRANE

MOLY

SEPARATION

TAILING

SAMPLER

COPPER

CONCENTRATE

THICKENER

COPPER

THICKENER

UNDERFLOW PUMP

COPPER

THICKENER AREA

SUMP PUMP

Cu CONCENTRATE

CONCENTRATE AREA

MOLY

SEPARATION

TAILING

SAMPLE TANK

DISTRIBUTOR

COPPER FILTER

FEED TANK

FILTRATE TANK

COPPER FILTER

FEED PUMP

COPPER

CONCENTRATE

FILTER

PRESSURE

FILTRATION AIR

COMPRESSOR

PRESSURE

FILTRATION

AIR RECEIVER

Page 11: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

WESTERN COPPER

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

LEGEND:

FILTER FEED TANK

FORKLIFT

AGITATOR

MOLY FILTER

FAN

MOLY FILTER

PACKAGING SYSTEM

PRELIMINARY

NOT FOR CONSTRUCTION

CASINO SITE

FLOW SHEET

GENERAL

000-FS-010

FILTRATE

PUMP

MOLY

CONCENTRATE

DRYER

OIL

HEATER

CLEANUP

PUMP

MOLYBDENITE

CONCENTRATE BIN

ROTARY

VALVE

MOLY DUST

COLLECTOR

PLATFORM

SCALE AND

PRINTER

FEEED PUMP

MOLY

FILTRATE

TANK

PRESSURE

FILTRATION AIR

COMPRESSOR

PRESSURE

FILTRATION

AIR RECEIVER

BIN ACTIVATOR

Mo SCREW

CONVEYOR

Page 12: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

WESTERN COPPER

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

MOLY COLLECTOR (No. 2 DIESEL FUEL) SYSTEMMIBC (FROTHER) SYSTEM

LIME SYSTEM

LEGEND:

SCREW CONVEYOR

OVERHEAD CRANE

PRELIMINARY

NOT FOR CONSTRUCTION

CASINO SITE

FLOW SHEET

GENERAL

REAGENTS SHEET 1

000-FS-011

LIME AREA

SUMP PUMP

MILK OF LIME

TANK

MILK OF LIME

TANK AGITATOR

M.O.L. DISTRIBUTION

PUMP

GENERAL

REAGENT AREA

SUMP PUMP

MIBC

DISTRIBUTION

PUMP

MIBC

STORAGE TANK

DISTRIBUTION

PUMP

DISTRIBUTION

TANK

LIME VERTICAL

MILL

XANTHATE SYSTEM (PAX 350)

DISTRIBUTION TANK

AGITATOR

XANTHATE

TRANSFER PUMP

XANTHATE MIX

TANK

NITROGEN PACKAGE 800-RE-003

XANTHATE

DISTRIBUTION PUMP

XANTHATE

AGITATOR

VENDOR PACKAGE

METERING

PUMPS

METERING

PUMPS

SCREW CONVEYOR

FRONT END LOADER

TOTES

Page 13: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

WESTERN COPPER

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

LEGEND:

PROMOTER No. 1 (AEROPHINE 3418A) SYSTEM

FLOCCULANT SYSTEM

SODIUM HYDROSULFIDE (NaHS)

MIX TANK AGITATOR

MIX TANK

PROMOTER No. 2 (AERO FLOAT 208) SYSTEM

AGITATOR

AGITATOR

PRELIMINARY

NOT FOR CONSTRUCTION

CASINO SITE

FLOW SHEET

GENERAL

REAGENTS SHEET 2

000-FS-012

DISTRIBUTION

PUMP

PROMOTER

MIX TANK

PROMOTER

DISTRIBUTION

PUMP

DISTRIBUTION

PUMP

DISTRIBUTION

TANK

TRANSFER

PUMP

METERING

PUMPS

METERING

PUMPS

METERING

PUMPS

STORAGE TANK

IN-LINE MIXER

TOTES

TOTES

Page 14: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

WESTERN COPPER

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

LEGEND:

PRELIMINARY

NOT FOR CONSTRUCTION

CASINO SITE

FLOW SHEET

GENERAL

PROCESS WATER

000-FS-013

PROCESS WATER

POND

RECLAIM WATER

SUMP

Page 15: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

CASINO MINING

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

LEGEND:

PRELIMINARY

NOT FOR CONSTRUCTION

CASINO PROJECT

GENERAL

FLOW SHEET

PROCESS WATER

000-FS-013

PROCESS

WATER POND

RECLAIM

BOOSTER PUMP

RECLAIM

BOOSTER TANK

RECLAIM

BOOSTER TANK

RECLAIM

BOOSTER PUMP

Page 16: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

CASINO MINING

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

LEGEND:

PRELIMINARY

NOT FOR CONSTRUCTION

CASINO PROJECT

GENERAL

FLOW SHEET

FRESH WATER

000-FS-014

FRESH/FIRE

WATER POND

HIGH PRESSURE

GLAND SEAL

WATER PUMP

GLAND SEAL

WATER TANK

GLAND SEAL

WATER PUMP

MINE WATER

TANK

POTABLE WATER

TANK

CHLORINATOR

PACKAGE

WITH FILTER

FRESH WATER

INTAKE PUMPS

FRESH WATER

BOOSTER PUMPS

FRESH WATER

BOOSTER TANK

FRESH WATER

BOOSTER PUMPS

FRESH WATER

BOOSTER TANK

FRESH WATER

BOOSTER PUMPS

FRESH WATER

BOOSTER TANK

FRESH WATER

BOOSTER PUMPS

FRESH WATER

BOOSTER TANK

FRESH WATER

INTAKE TANK

Page 17: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

WESTERN COPPER

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

CASINO SITE

FLOW SHEET

GENERAL

PYRITE LEACH / CIL

000-FS-015

PRELIMINARY

NOT FOR CONSTRUCTION

Page 18: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

CASINO MINING

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

PRELIMINARY

NOT FOR CONSTRUCTION

LEGEND:

CASINO PROJECT

OXIDE CIRCUIT

FLOW SHEET

050-FS-001

BIN VIBRATOR

LIME BIN

METAL

DETECTOR

SECONDARY

SCREEN FEED

CONVEYOR

BELT SCALE

PRIMARY

CRUSHER

SECONDARY

SCREEN

FINE ORE

TRANSFER

CONVEYOR

SECONDARY

CRUSHER

MAGNET

DUST

COLLECTOR

FAN

SECONDARY

CRUSHER

FEED BIN

MINE TRUCK

ROM STOCKPILE

PRIMARY

CRUSHER

APRON FEEDER

ROCK

BREAKER

BELT SCALE

SECONDARY

CRUSHER

BELT FEEDER

OXIDE CRUSHING

BUILDING

SCREW CONVEYOR

ROCK BOX

ROTARY VALVE

MOBILE CRANE

OXIDE CRUSHING

AIR RECEIVER

SECONDARY SCREEN

DISCHARGE CONVEYOR

ECCENTRIC

REMOVAL CART

Page 19: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

CASINO MINING

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

CASINO PROJECT

OXIDE CIRCUIT

FLOW SHEET

OVERLAND CONVEYANCE

050-FS-002

INTERMEDIATE

TRANSFER

CONVEYOR

OVERLAND

TRANSFER

CONVEYOR

LEGEND:

OVERLAND

TRANSFER

CONVEYOR

OVERLAND

TRANSFER

CONVEYOR

OVERLAND

TRANSFER

CONVEYOR

OVERLAND

TRANSFER

CONVEYOR

OVERLAND

TRANSFER

CONVEYOR

OVERLAND

TRANSFER

CONVEYOR

OVERLAND

TRANSFER

CONVEYOR

OVERLAND

TRANSFER

CONVEYOR

OVERLAND

TRANSFER

CONVEYOR

OVERLAND

TRANSFER

CONVEYOR

OVERLAND

TRANSFER

CONVEYOR

OVERLAND

TRANSFER

CONVEYOR

PRELIMINARY

NOT FOR CONSTRUCTION

Page 20: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

CASINO MINING

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

PRELIMINARY

NOT FOR CONSTRUCTION

LEGEND:

CASINO PROJECT

OXIDE CIRCUIT

FLOW SHEET

HEAP LEACH

050-FS-003

EVENTS POND

EVENTS POND PUMP

HEAP LEACH PAD

OVERFLOW DITCH

PUMP CASING

DRIP LINE CART

CRAWLER DOZER

PREGNANT

SOLUTION PUMP

LEAK DETECTION

PUMP

EMERGENCY SHOWER

EYEWASH

LEACH PILE

STACKING

CONVEYOR

TELESCOPING

STACKER FEED

CONVEYOR

Page 21: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

CASINO MINING

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

PRELIMINARY

NOT FOR CONSTRUCTION

CASINO PROJECT

OXIDE CIRCUIT

FLOW SHEET

GOLD ADSORPTION

050-FS-004

BARREN

SOLUTION FILTER

BARREN

SOLUTION

SAMPLER

BARREN

SOLUTION TANK

BARREN

SOLUTION

PUMP, VFD

LEGEND:

PREGNANT LEACH

SOLUTION SAMPLER

CARBON

SAFETY SCREEN

CARBON

SIZING SCREEN

CARBON

SIZING SCREEN

BARREN

COLUMN

SAMPLER

SART FEED

PUMP

ADR FEED

PUMP

PREGNANT SOLUTION

DISTRIBUTION TANK

TRASH SCREEN

CARBON

ADSORPTION

AREA PUMP

ADSORPTION COLUMNCARBON TRANSFER PUMP

ADSORPTION COLUMNCARBON TRANSFER PUMP

Page 22: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

CASINO MINING

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

PRELIMINARY

NOT FOR CONSTRUCTION

LEGEND:

CASINO PROJECT

OXIDE CIRCUIT

FLOW SHEET

CARBON WASH / STRIP

050-FS-005

SAFETY STN SHOWER &

EYEWASH/ACID AREA

BARREN STRIP

SOLUTION PUMP

KILN FEED

DEWATERING SCREEN

CARBON

DISTRIBUTOR TANK

STRIP

COLUMN No. 2

STRIP

COLUMN No. 1

CARBON STRIP

TRANSFER PUMP

ACID WASH

VENT FAN

ACID WASH

COLUMN

CONC. ACID AREA

SUMP PUMPDILUTE ACID TANK

ACID WASH CARBON

TRANSFER PUMP

ACID WASH

PUMP

BARREN STRIP

SOLUTION TANK

STRIP SOLUTION

HEATER NO. 2

STRIP

SOLUTION

HEATER NO.1

RECOVERY

HEAT EXCHANGER

E/W BARREN

RETURN TANK

BARREN

RETURN PUMP

STRIP AREA

SUMP PUMP

CARBON FINES

PUMP

CARBON FINES

FILTER

REGENERATION

AREA SPILLAGE PUMP

CARBON FINES

TANK

CARBON FINES

AGITATOR

TRIM HEAT

EXCHANGER

SAFETY STN

CARBON STRIP AREA

Page 23: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

CASINO MINING

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

PRELIMINARY

NOT FOR CONSTRUCTION

LEGEND:

CASINO PROJECT

OXIDE CIRCUIT

FLOW SHEET

050-FS-006

CARBON SUPERSACS

HANDLING HOIST

HANDLING CART

SLAG JAW

CRUSHER

E/W SLUDGE FILTER

PRESS

BULLION

FURNACE HOIST

E/W SLUDGE,

DIAPHRAGM PUMP

CARBON QUENCH

TANK

CATHODE HANDLING

HOIST

CARBON

REGENERATION KILN

KILN EXHAUST

FAN

ACTIVATED

CARBON

STORAGE TANK

BULLION

FURNACE

EW CELL

EXHAUST FAN

ELECTROWINNING CELLS

e/w RECTIFIER

SAFETY STN SHOWER &

EYEWASH/SMELT AREA

E/W WASH/SLUDGE TANK

E/W AREA SUMP

PUMP

CARBON

TRANSFER PUMP

(ACTIVE)

BULLION FURNACE

VENT FAN

BAGHOUSE DUST

COLLECTOR

CARBON

ATTRITION TANK

CARBON ATTRITION

AGITATOR

KILN SCREW

FEEDER

HIGH PRESSURE

SPRAYER

VAULT DOOR

SLAG POT

SLAG MOLD SETFLUX MIXER

TO ATMOS.

SLAG ROLL

CRUSHER

DORE

BALANCE

SLAG PRILL

SCREEN

PLATFORM

SCALE

CARBON

TRANSFER PUMP

TANK KILN

FEED

Page 24: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

CASINO MINING

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

PRELIMINARY

NOT FOR CONSTRUCTION

LEGEND:

CASINO PROJECT

OXIDE CIRCUIT

FLOW SHEET

SART PROCESS

050-FS-007

2

SART FEED

FILTER

NaHS IN-LINE

MIXER

SULFURIC ACID

IN-LINE MIXER

AGITATOR

PRECIPITATION

REACTOR

2

Cu S UNDERFLOW

RECIRCULATION PUMP

2

Cu S UNDERFLOW

ADVANCE PUMP

NEUTRALIZATION

FEED TANK

AGITATOR

Cu S UNDERFLOW

NEUTRALIZATION

TANK

AGITATOR

Cu S HOLDING

TANK

2

NEUTRALIZATION

FEED PUMP

GYPSUM

SLURRY PUMP

TREATED

SOLUTION PUMP

AGITATOR

NEUTRALIZATION

REACTOR No. 1

AGITATOR

NEUTRALIZATION

REACTOR No. 2

GYPSUM UNDERFLOW

RECIRCULATION PUMP

GYPSUM UNDERFLOW

ADVANCE PUMP

GYPSUM

THICKENERCu S THICKENER

TREATED

SOLUTION TANK

AGITATOR

GYPSUM

HOLDING TANK

Cu S FILTER

CAKE CONVEYOR

Cu S FILTER

PRESS

DRYER

FEED BIN

DRIED Cu S

STORAGE BIN

Cu S DRYER

DISAGGREGATOR

BRIDGE CRANE

BAG ROLLING

CONVEYOR

2

2

2

2

2

Cu S HOLDING

TANK PUMP

2

TREATED

SOLUTION FILTER

PLANT AIR

RECEIVER

PLANT AIR

COMPRESSOR

INSTRUMENT

AIR RECEIVER

EYEWASH /

SAFETY SHOWER

INSTRUMENT

AIR DRYER

Page 25: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

CASINO MINING

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

PRELIMINARY

NOT FOR CONSTRUCTION

LEGEND:

CASINO PROJECT

OXIDE CIRCUIT

FLOW SHEET

REAGENTS SHEET 1

050-FS-008

NaOH MAKEUP SYSTEM

CYANIDE MAKEUP SYSTEM

AIR SYSTEM

LIME SYSTEM

CAUSTIC TRANSFER PUMP

AIR RECEIVER

AIR COMPRESSOR

HCI SUPPLY

NaHS SYSTEM

(SPARE)

CYANIDE MIX TANK

CYANIDE

DISTRIBUTION PUMP

CYANIDE AREA

SUMP PUMP

CYANIDE STORAGE

TANK

CYANIDE SOLUTION

TRANSFER PUMP

BIN VENT

BIN VENT

CAUSTIC

STORAGE TANK

CAUSTIC SOLUTION

DISTRIBUTION PUMP

HCL ACID

METERING PUMP

REAGENTS

HOIST

CYANIDE AREA

SAFETY STATION

NaHS UNLOADING

PUMP

NaHS STORAGE

TANK

NaHS DISTRIBUTION

PUMP

NaHS AREA

SUMP PUMP

NaOH STORAGE

TANK

NaOH DISTRIBUTION

PUMP

NaOH AREA

SUMP PUMP

NaOH DISTRIBUTION

PUMP - SCRUBBER

BRIDGE CRANE

LIME AREA

SUMP PUMP

LIME

DISTRIBUTION

PUMP

LIME STORAGE

& SLAKING

PACKAGE

LIME

TRANSFER

PUMP

LIME SLURRY TANK

LIME GRIT SCREW

CONVEYOR

LIME GRIT

REMOVAL SCREEN

SLAKER FEEDER

LIME SLAKER

LIME SILO

LIME SILO VENT

AGITATOR

LIME DIST. TANK

AGITATOR

AGITATOR

CAUSTIC MIX TANK

AGITATOR

Page 26: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

CASINO MINING

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

PRELIMINARY

NOT FOR CONSTRUCTION

LEGEND:

CASINO PROJECT

OXIDE CIRCUIT

FLOW SHEET

050-FS-009

NOTE:

MINE YARD FRESH/FIRE WATER

FRESH/FIRE WATER

SEWAGE/WASTE WATER

MINE YARD

FRESH/FIRE WATER

IMMERSION HEATER

ADR FIRE WATER

DISTRIBUTION PUMP

MINE YARD

FRESH WATER

DISTRIBUTION

PUMP

MINE YARD

FRESH WATER

TRANSFER PUMP

ADR FIRE WATER

RECIRCULATION PUMP

ADR FRESH/

FIRE WATER

TANK

FRESH/FIRE WATER TANK

IMMERSION HEATER

LAB. SUMP

WASTE WATER PUMP

MINE YARD

FRESH/FIRE

WATER TANK

Page 27: PREFACE APPENDIX A.4M: Processing Flow Sheets · PDF fileProcedure Study Wildlife Baseline Report V.2 A.1 A.2 A.6 A.7 A.13 A.20 A.22 A.23 A.24 ... LINER BOLT LINER HANDLER SAG MILL

CASINO MINING

CORPORATION

CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S

TITLE DWG. NO.R E F E R E N C E S

TITLE NO. CLIENTNO.R E V I S I O N S

DATEBY APP'D CLIENTR E V I S I O N S

DESCRIPTION BY APP'D DATE

CLIENT APPR.

PROJECT MGR

CHECKED BY

DRAWN BY

DESIGNED BY

SCALE: DATE

DATEREV NO.

DWG NO.PROJECT NO. M3-PN 120001

DO NOT SCALE 11x17 DRAWINGS

ARCHITECTURE

ENGINEERING

CONSTRUCTION MANAGEMENT

PRELIMINARY

NOT FOR CONSTRUCTION

LEGEND:

CASINO PROJECT

OXIDE CIRCUIT

FLOW SHEET

REAGENTS SHEET 2

050-FS-010

FLOCCULANT SYSTEM

VENDOR PACKAGE

ANTI-SCALANT SUPPLY & DISTRIBUTION

SULFURIC ACID SYSTEM

FLOCCULANT

FEED SYSTEM

FLOCCULANT

MIX TANK

AGITATOR

FLOCCULANT

MIX TANK

FLOCCULANT

TRANSFER

PUMP

FLOCCULANT

DAY TANK

FLOCCULANT

DISTRIBUTION

PUMP

ANTISCALANT

METERING PUMP

ANTISCALANT

TANK

SULFURIC ACID

UNLOADING PUMP

SULFURIC ACID

STORAGE TANK

SULFURIC ACID

DISTRIBUTION

PUMP

SULFURIC

ACID AREA

SUMP PUMP

ANTISCALANT

METERING PUMP

ANTISCALANT

ISOTANK

SCRUBBER

PACKAGE -

SART PLANT

SCRUBBER - SART PLANT


Recommended