Preliminary design of the SSLB (“S” for SLHC). sLHC upgrade meeting. SLB – Functional Description. Overall synchronization of the ECAL and HCAL trigger primitives. Transmission of the Trigger Primitives to the Calorimeter Regional Trigger. SLB – Functional Description. - PowerPoint PPT Presentation
12
José C. Da Silva CMS Upgrade Workshop, FNAL, October 28, 2009 Preliminary design of the SSLB (“S” for SLHC) sLHC upgrade meeting
Transcript
Page 1: Preliminary design of the  SSLB (“S” for SLHC)

José C. Da SilvaCMS Upgrade Workshop, FNAL, October 28, 2009

Preliminary design of the SSLB(“S” for SLHC)

sLHC upgrade meeting

Page 2: Preliminary design of the  SSLB (“S” for SLHC)

José C. Da SilvaCMS Upgrade Workshop, FNAL, October 28, 2009

SLB – Functional Description

• Overall synchronization of the ECAL and HCAL trigger primitives.

• Transmission of the Trigger Primitives to the Calorimeter Regional Trigger.

Page 3: Preliminary design of the  SSLB (“S” for SLHC)

José C. Da SilvaCMS Upgrade Workshop, FNAL, October 28, 2009

SLB – Functional Description

• Receives 9 bit data @ 40 MHz / TT

• Each SLB houses 8 TT

• Align Trigger Data using the LHC Orbit bunch structure to determine the BX position using internal histograms

• FIFO stage to compensate fiber length differences, deserialisers lock delays and to guarantee the alignment of data sent to the RT from both ECAL and HCAL.

• 2 TT data merging + Hamming code prior to send it over the high speed link

• 4 High speed links (1.2Gb/s each)

Page 4: Preliminary design of the  SSLB (“S” for SLHC)

José C. Da SilvaCMS Upgrade Workshop, FNAL, October 28, 2009

SSLB details

• Maintain same connectivity and form factor

• Replace cables by optical links

• Latency budget increases in most cases when using FPGAs

• High speed link, 850/1310 nm, commercial package

• PCB for both ECAL/HCAL and RCT (duplex)

• FPGA Transceivers, deeper FIFO and Full Orbit histogram per

channel

• Stratix II or IV (GX) or Virtex 4 or 5 (6 arriving)

• SSLB (TX and RX)

Page 5: Preliminary design of the  SSLB (“S” for SLHC)

José C. Da SilvaCMS Upgrade Workshop, FNAL, October 28, 2009

SSLB TPG side

90% JTAG Coverage

4 x 9 BITS BUS40.08 MHz

4 x 9 BITS BUS40.08 MHz

VITESSEctrl interface

TTC_rx CLK

Main Board Interface

HIGH SPEED

MERGER

PMC connectors

SYNC-S

SYNC

4 x 8 Bit BUS120.24 MHz Clock

RX_BCO

120.24 MHz Clock, 15 ps jitter

RX_CLK

PMC connectors

SYNC

mux

SYNC

SYNC

SLB-SController(Embedded )

EDC

EDC

SYNC-S

SYNC

SYNC

mux

SYNC

SYNC

mux

EDC

EDC

CLOCK Multiplier

mux

TTC BUS

Local_BUS

JTAG

4.8GB/sOptical Transceiver

Page 6: Preliminary design of the  SSLB (“S” for SLHC)

José C. Da SilvaCMS Upgrade Workshop, FNAL, October 28, 2009

SSLB RCT side

90% JTAG Coverage

ctrl interface

ALIGN DATA

BLOCK

PMC connectors

PMC connectors

DE MUX

Controller(Embedded )

CLOCK Multiplier

4.8GB/sOptical Transceiver

RCT interface

Page 7: Preliminary design of the  SSLB (“S” for SLHC)

José C. Da SilvaCMS Upgrade Workshop, FNAL, October 28, 2009

SSLB PCB Preview

Page 8: Preliminary design of the  SSLB (“S” for SLHC)

José C. Da SilvaCMS Upgrade Workshop, FNAL, October 28, 2009

SSLB borders

RCTReceiver

Card

EE-TCC: EB-TCC:

EE EB borders

SLBAB

SLBCD

Hydra Cable2x(2x1.2Gb)

RCTReceiver

Card

EE-TCC: EB-TCC:

EE EB

SLBABCD

SLBABCD

Normal Cable4x1.2Gb

RCTReceiver

Card

Page 9: Preliminary design of the  SSLB (“S” for SLHC)

José C. Da SilvaCMS Upgrade Workshop, FNAL, October 28, 2009

SSLB PCB Preview

Page 10: Preliminary design of the  SSLB (“S” for SLHC)

José C. Da SilvaCMS Upgrade Workshop, FNAL, October 28, 2009

RCT

Calorimeter Trigger Evolution

RCT

GCT:Sources

GCT:Main GT/GMT

GCT/uTCA

ETCC:TPGs

HTR:TPGs

Cu

FO

RCT

GCT:Sources

GT/GMT

GCT/uTCA

uTCA-HTR:TPGs

SSLBRCT/

uTCA

GCT/uTCA

GT/GMT

ETCC:TPGs

uTCA-HTR:TPGs

SSLB

Step 1 (2009) Step 2(2010-2011)

RCT/uTCA

ETCC:TPGs

uTCA-HTR:TPGs

SSLB

Step 3 (>2011) Step 4 (>2012)

SSLBSSLB

GCT:Sources

GT/GMT

GCT/uTCA

SLBSLBSLB

SLB SLB

ETCC:TPGs

SLB

Matrix& AuxCards

Page 11: Preliminary design of the  SSLB (“S” for SLHC)

José C. Da SilvaCMS Upgrade Workshop, FNAL, October 28, 2009

RCT

Calorimeter Trigger Evolution II

RCT

GCT:Sources

GCT:Main GT/GMT

GCT/uTCA

ETCC:TPGs

HTR:TPGs

Cu

FO

RCT

GCT:Sources

GT/GMT

GCT/uTCA

uTCA-HTR:TPGs

SSLBRCT/

uTCA

GCT/uTCA

GT/GMT

ETCC:TPGs

uTCA-HTR:TPGs

SSLB

Step 1 (2009) Step 2(2010-2011)

RCT/uTCA

ETCC:TPGs

SSLB

Step 3 (>2011) Step 4 (>2012)

SSLBSSLB

GCT:Sources

GT/GMT

GCT/uTCA

SLBSLBSLB

SLB SLB

ETCC:TPGs

SLB

Matrix& AuxCards

uTCA-HTR:TPGs

Page 12: Preliminary design of the  SSLB (“S” for SLHC)

José C. Da SilvaCMS Upgrade Workshop, FNAL, October 28, 2009

Conclusions

• Use a single design for the new SLB , with Optical Transceivers

• Both connectors footprints

• Maintain modularity for compatibility with existing design

• LIP will take the responsibility of this design


Recommended