Project No.: DEL19-024 Date: June 14, 2019 PREPARED FOR: HLH Investments Limited Proposed Mixed Commercial and Residential Development 1674 Hyde Park Road London, Ontario Preliminary Servicing Report
Transcript
Page 1: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road

  

Project No.: DEL19-024 Date: June 14, 2019

PREPARED FOR:

HLH Investments Limited

Proposed Mixed Commercial and Residential Development

   

 

 

 

1674 Hyde Park RoadLondon, Ontario

Preliminary Servicing Report

Page 2: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road

Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road June 14, 2019

 

            

TABLE OF CONTENTS

  INTRODUCTION ............................................................................................................................... 1 

  EXISTING CONDITIONS .................................................................................................................. 1 

2.1  Site Topography/Drainage ............................................................................................................ 1 

2.2  Soil Conditions (Geotechnical) ...................................................................................................... 2 

2.3  Existing Servicing .......................................................................................................................... 2 

2.3.1  Water ..................................................................................................................................... 2 

2.3.2  Storm ..................................................................................................................................... 2 

2.3.3  Sanitary ................................................................................................................................. 3 

2.3.4  Other Services ....................................................................................................................... 3 

  REVIEW AGENCIES ........................................................................................................................ 3 

3.1  City of London ............................................................................................................................... 3 

  PROPOSED DEVELOPMENT ......................................................................................................... 3 

4.1  Proposed Grading ......................................................................................................................... 3 

4.2  Proposed Servicing ....................................................................................................................... 4 

4.2.1  Water ..................................................................................................................................... 4 

4.2.2  Storm ..................................................................................................................................... 4 

4.2.3  Sanitary ................................................................................................................................. 4 

4.3  Stormwater Management .............................................................................................................. 5 

4.3.1  Quantity Control .................................................................................................................... 5 

4.3.2  Quality Control ....................................................................................................................... 5 

4.3.3  Erosion and Sediment Control .............................................................................................. 6 

4.4  Transportation ............................................................................................................................... 6 

4.5  Noise Attenuation .......................................................................................................................... 6 

  CONCLUSIONS AND RECOMMENDATIONS ................................................................................ 6 

 

LIST OF APPENDICIES 

Appendix A – Preliminary Servicing Figures, Site Plan and City As‐built Drawings. Appendix B – Preliminary Fire Flow Calculations and Sanitary Sewer Flow Calculations, Sanitary Capacity Confirmation Email.   

Page 3: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road

Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road June 14, 2019

 

     

    Page 1 of 7    

INTRODUCTION 

Development Engineering (London) Limited (DevEng) has been retained by Wilson Diaz Architecture Inc., on behalf of HLH Investments Ltd.to prepare a preliminary servicing report in support of a zoning By‐law Amendment and Site Plan Application for the site municipally known as 1674 Hyde Park Road in London, Ontario with a current site area of approximately 0.517Ha. (before‐road widening). The ultimate site area following road widening will be 0.475Ha.   The subject site is comprised of a single municipal address known as 1674 Hyde Park Road. The current proposed concept is to develop a residential building in addition to the existing commercial building under its  current  zoning.  Review  of  the  City  of  London’s  zoning  by‐law  Z.‐1  reveals  that  the  subject  site  is currently zoned as BDC (Business District Commercial). A preliminary site plan concept prepared by Wilson Diaz Architect  Inc. as part of  the consultation pre‐application package submitted  to  the City has been included as part this report in Appendix A. The current proposed concept is to develop the site with one (1)  6  storey  residential  apartment  tower,  surface  level  parking,  road  widening  dedication  and  the retention of the existing commercial building.   This report has been prepared following pre‐consultation with the City of London in support of a zoning by‐law amendment and site plan approval of the subject development. The report describes the existing conditions of the site, outlines servicing and anticipated stormwater management (SWM) requirements, and proposes grading, servicing and SWM options whereby these requirements can be met. 

EXISTING CONDITIONS 

The existing site is bounded by two (2) municipal roads, North Routledge Park to the south and Hyde Park Road to the east as well as an existing commercial development to the north and west. The site is currently partially  developed  with  an  existing  two  (2)  storey  multi‐unit  commercial  building.  The  remaining undeveloped area of the site comprises of a combination of existing gravel and paved parking areas along with open green space.  

2.1 SITE TOPOGRAPHY/DRAINAGE 

Site elevation contour mapping was derived from a topographic survey of the subject site conducted by Development Engineering  (London)  Limited dated April 11, 2019 and Ontario Base Maps  (OBM). The geodetic elevation of the site ranges from approximately 272.5m along its eastern property line flanking Hyde Park Road to approximately 269.5 m along the western side of the property. In addition, plan and profile drawings  for nearby municipal  rights‐of‐way were provided by  the City of London. These were reviewed to provide a general understanding of the existing conditions of the subject site.  Site drainage from the existing gravel parking lot to the west of the existing buildings generally sheet flows west to an existing drainage ditch located partially on the subject site and the neighboring property to the west. Existing upstream drainage from the neighboring properties to the north is collected and outlets to the shared existing ditch along the west of the site. Drainage from the paved parking area east for the existing building is collected existing onsite via two (2) existing assumed drywells.   A 300 mm diameter private storm stub to municipal storm maintenance hole ST‐1 was installed as part of the 2018 North Routledge Park reconstruction project.  

Page 4: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road

Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road June 14, 2019

 

     

    Page 2 of 7    

2.2 SOIL CONDITIONS (GEOTECHNICAL) 

As  of  the  time  of  this  report,  a  geotechnical  investigation  has  not  been  completed.  A  geotechnical investigation will be completed as part of the detailed design and will be provided as part of the site plan application. Based on nearby geotechnical  information on the adjacent site (1600 Hyde Park Road) the soils are not anticipated to be conducive to infiltration.   

2.3 EXISTING SERVICING 

As‐built plan and profile drawings were acquired from the City of London for Hyde Park Road and North Routledge Park. Area plan and design sheet drawings have also been provided by the City indicating the design targets and discharge allocation for the subject site and down stream system capacities. Refer to Figures 1‐3 in Appendix A for a graphical representation of the existing municipal civil services available for the subject site.  

2.3.1 Water 

There is currently a single existing 25 mm diameter PEX municipal water services to the site from Hyde Park Road. The service is currently supplied from the existing 450 mm diameter municipal watermain on Hyde Park Road.   The site is currently bounded by municipal watermains on all adjacent municipal road; an existing 300 mm diameter watermain on the south (far) side of North Routledge Park and a 450 mm distribution watermain on Hyde Park Road. There  is also an existing 900 mm municipal transmission watermain on Hyde Park Road. There will be no connections made to the existing 900 mm municipal transmission watermain on Hyde Park Road as part of this development.   There is an existing municipal fire hydrant operating on the existing 300 mm diameter watermain at the on the southwest corner of the intersection of Hyde Park Road and North Routledge Park. Refer to Figures 1‐3 in Appendix A for a graphical representation of the existing municipal watermain available to service the subject site. 

2.3.2 Storm 

Hyde Park Road and North Routledge Park have fully urban profiles. Storm drainage for each municipal right of way  is provided  via  intermittent  curbside  catchbasins  connected  to  a municipal  storm  sewer system. City Record drawings  indicate minor drainage from Hyde Park Road  is collected and conveyed through a series of existing 450 mm dia. to 675 mm dia. municipal storm sewers within Hyde Park Road with an outlet to the Hyde Park North stormwater management facility (SWMF). Minor drainage from North Routledge Park Road is collected and conveyed through a series of existing 375 mm dia. to 750 mm dia. municipal storm sewers within North Routledge Park. Based on area plans received from the City, it is unclear where collected drainage  from  the within  the North Routledge Park municipal  right of way outlets.  Per Plan #T18‐40 page 14 of 17 prepared by City of London Environmental & Engineering Services, the subject  site  has  been  allocated  to  the  existing  375 mm  diameter municipal  storm  sewer  on  North Routledge Park at a run‐off coefficient of C=0.70. A 375 mm diameter private drain connection (PDC) was installed to serve the site as part of the 2018 North Routledge Park reconstruction to existing ST‐1.  It is our understanding based on visual site conditions that the roof drains from the existing building on municipal addresses 1674 North Routledge Park outlets to grade. 

Page 5: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road

Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road June 14, 2019

 

     

    Page 3 of 7    

2.3.3 Sanitary 

A single 150 mm diameter private sanitary drain connection (PDC) to the subject site was provided as part of the 2015 Hyde Park Road reconstruction project. The existing 150 PDC is currently not in use, it is our understanding based on discussion with HLH Investment Inc. that the existing building is currently being serviced via an onsite wastewater treatment (septic) system to the west of the existing building.   Sanitary area plans and design sheets have been provided by the City of London.  Per Plan #T18‐40 page 13 of 17 prepared by City of London Environmental & Engineering Services, the subject site was included as part of area EXT1 at a max density of 100p/Ha. Based on a site area of 0.47Ha., a population of 47 people has been allocated to the existing 250 mm diameter municipal sanitary sewer on North Routledge Park from 1674 Hyde Park Road. 

2.3.4 Other Services 

Due to the location of the site in a fully developed business area, it is assumed that North Routledge Park and Hyde Park Road have available hydro, telecommunications  (Bell and Rogers) and gas services that could be utilized for the development. 

REVIEW AGENCIES 

3.1 CITY OF LONDON 

The subject site is located within the City of London.  Any future site plan applications must be submitted to and subsequently approved by the City of London.  The City will also be responsible for the approval of any building permits associated with the subject site. 

PROPOSED DEVELOPMENT 

As noted earlier, the subject site is a single municipal address locally know as 1674 Hyde Park Road. The existing commercial building will be retained as part of the development of the site. A preliminary site plan concept prepared by Wilson Diaz Architect Inc. as part of the pre‐application consultation package submitted  to  the City has been  included as part  this  report  in Appendix A. The  current  concept  is  to develop the site with a single 6 storey residential apartment tower in addition to the existing commercial building being retained. 

4.1 PROPOSED GRADING 

The proposed grading of the site will be conducted in a manner to provide, where possible, a reasonable cut/fill balance while matching into existing grades along the property boundaries.  An overland flow route should be provided such that major storm flows are not directed towards any neighboring properties but instead enter existing municipal infrastructure (a municipal right‐of‐way). No grading will be conducted in or onto the neighboring properties or easements unless otherwise approved. Detailed grading design will be completed during the site plan approval stage.  

Page 6: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road

Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road June 14, 2019

 

     

    Page 4 of 7    

4.2 PROPOSED SERVICING 

4.2.1 Water 

The proposed development will require a new 200 mm diameter water service to adequately meet both domestic and fire flow demands connected to existing municipal watermain on Hyde Park Road and/or North  Routledge  Park.  The  sizing  of  the  new  service will  be  confirmed  during  detailed  design.    It  is anticipated one or more municipal or private hydrants will be required to provide fire protection to the proposed buildings in accordance with requirements set forth in the Ontario Building Code (OBC 2012) and the Fire Underwriters Survey (FUS, 1999). It is anticipated based on the City of London pressure zone hydraulic grade  line elevation of 317.0m (Hyde Park Pumping Station and Uplands Pumping Station), a residual pressure of 55.92 psi will be attainable during fire flow conditions which is greater than the 20.0 psi minimum pressure requirement per OBC 2012, fire flow calculations been included as part this report in Appendix B. A water turnover calculation will also be provided during detailed design to verify water quality can be maintained on the proposed private water service.  The  existing  25 mm municipal water  service  from Hyde  Park  Road  to  1674 Hyde  Park  Road will  be decommissioned and capped at the main per City of London Standards.  

4.2.2 Storm 

As noted earlier,  it  is our understanding based on visual site conditions  that  the  roof drains  from  the existing building on municipal addresses 1674 North Routledge Park discharge  to grade. Existing  roof leaders and surface drainage will be collected and incorporated into the overall site SWM and drainage design.  The site  is tributary to the existing 375 mm diameter municipal storm sewer on North Routledge Park.  The sizing of a new 300 mm diameter private drain connection will be confirmed during detailed design and coordinated with the Mechanical Consultant. It is anticipated SWM controls will be required to reduce the rate of runoff  in the post‐development condition as described  in Section 4.3 to meet the allocated design  flow per plan #T18‐40 page 14 of 17 prepared by City of London Environmental & Engineering Services. 

4.2.3 Sanitary 

As noted previously, it is our understanding based on discussion with HLH Investment Inc. that the existing building located at 1674 Hyde Park Road is currently being serviced via an onsite wastewater treatment (septic)  system  located  under  a  green  space  area west  of  the  existing  building.  The  existing  on‐site wastewater treatment (septic) system will need to be decommissioned and removed in accordance with all applicable Ministry guidelines.  As part of the site development, a new 200 mm diameter sanitary private drain connection is anticipated for 1674 Hyde Park Road and to be connected to the existing 250 mm diameter municipal sanitary sewer on North Routledge Park.   An area plan and design sheet prepared by City of London Environmental & Engineering Services Division, plan #T18‐40 page 13 of 17 denotes an allowable design sanitary peak flow of approximately 0.64 L/s generated by 0.475Ha. of the subject site with a design criterion of 100 people/Ha. (47 people) and a per capita rate of 230 L/person/day.    

Page 7: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road

Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road June 14, 2019

 

     

    Page 5 of 7    

It is anticipated based on current unit counts from the site plan provided by Wilson Diaz Architects Inc. that  a  post  development  sanitary  peak  flow  rate  of  1.83  L/s will  be  generated  by  a  proposed  site population  of  approximately  145  people.  The  sizing  of  the  outlet  private  drain  connection  will  be confirmed during detailed design and coordinated with the Mechanical consultant. The anticipated peak flow from the site  is anticipated to exceed the design allocation. Per an email discussion with Mustafa Almusawi dated May 31, 2019 of the City of London Development Services Division, there are no concerns with  the  additional  sanitary peak  flow  from  the  development  as  the  existing  system has  capacity  to accommodate the additional extra flows.  Detailed calculations are included in Appendix B. 

4.3 STORMWATER MANAGEMENT 

The  site  is  located  in  the Stanton Drain Subwatershed. An addendum  to  the 2002 Hyde Park EA was completed in 2018 by AECOM and notes the removal of the previously proposed Hyde Park stormwater management facility (SWMF) #4. As per figure 6.1.2 of the 2018 addendum, the subject site  is  located within subcatchment 504C, which is no longer tributary to any downstream regional SWMF. As such, the site falls under Case 3 of the City of London Permanent Private Stormwater Systems (PPS) in the City of London Design Specifications and Requirements Manual, dated October 2003, updated July 2018.   According to Per Plan #T18‐40 page 14 of 17 prepared by City of London Environmental & Engineering Services, the subject site  is tributary to the existing 375mm diameter municipal storm sewer on North Routledge Park. In accordance with the requirements outlined in the subwatershed study, Case 3 of the City of London PPS, and the pre‐consultation comments dated April 11, 2019, the following criteria are anticipated for the subject site:  

• Restrict post‐development peak  flows  from the subject site  for all storm events up  to and including the 100‐year design storm event, to the lesser of the pre‐development peak flow rates (C=0.65) or the allowable (C=0.70) runoff rates based on area plan T18‐40 page 14 of 17; and, 

• Provide ‘normal’ (level 2) water quality treatment prior to discharge from the subject site. 

4.3.1 Quantity Control 

The water quantity control requirement for the subject site can be achieved through a combination of rooftop/surface attenuation and underground storage. Based on preliminary modelling,  it  is estimated approximately 65m3 of storage is required to restrict post development peak flows from the subject site to below the pre‐development target of C=0.65. Maximum surface ponding would be limited to 0.3m in paved areas, and maximum roof ponding would be  limited to 0.15m through the use of roof scuppers. Modeling using hydraulic modeling software such as PCSWMM would need to be conducted during the detailed design stage to ensure any proposed SWM system adheres to the aforementioned criteria set forth by City of London. 

4.3.2 Quality Control 

The water quality control requirement can be achieved through the  installation of one or more oil‐grit separators on  the proposed private storm sewer system.   Oil‐grit separators are recommended  in  the MECP Stormwater Management Planning and Design Manual (March 2003) for sites less than 5.0 ha in size.   Sizing of the any proposed oil‐grit separator(s) would be conducted at the detailed design stage.  Routine maintenance is critical for oil‐grit separator unit(s) to continue to function per design. Based on site  constraints and anticipated underlying  soil  conditions, no  low  impact development measures are proposed at this time.   

Page 8: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road

Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road June 14, 2019

 

     

    Page 6 of 7    

4.3.3 Erosion and Sediment Control 

Complementary to the site servicing and grading design, erosion and sediment control (ESC) details are to be included with the Site Engineering design.  Measures will be proposed to mitigate the offsite migration of sediments by incorporation of various best management practices and control measures.  Such controls include silt fencing, straw bale barriers for inlet grate protection (CBs, and CBMHs), construction entrance mud mats, robust silt barriers in concentrated flow routes, tree preservation fencing and straw coconut erosion control blanket treatment of significant fill/cut slopes.  The control measures to be implemented on site should include:  

• Installation of silt control fencing around the site perimeter at down‐gradient locations; • Preventing  silt  or  sediment  laden  runoff  from  entering  inlets  (catchbasins  /  catchbasin 

maintenance holes) by wrapping  their  tops with  filter  fabric and  incorporating  straw bale filters (flow checks); 

• Maintaining  sediment  and  erosion  control  structures  in  good  repair  (including  periodic cleaning as required) until such time as the Engineer or City of London approves their removal; 

• Incorporation of temporary measures at site construction entrances to minimize tracking of mud and debris onto municipal road allowances; and, 

• Scheduling of critical conveyance works during forecasts of little to no precipitation.  Detailed ESC plans will be provided for review by the City of London at the site plan approval stage.

4.4 TRANSPORTATION 

The proposed site plan concept includes two (2) driveway connections, one existing joint connection point from Hyde Park Road and an additional proposed connection point to North Routledge Park aligned with the  proposed  entrance  to  1600 Hyde  Park  Road  as  per  pre‐consultation  comments  provided  by  the Transportation  Division. Other  details  concerning  access  arrangement will  be made  during  site  plan approval.  

4.5 NOISE ATTENUATION 

Hyde Park Road is classified as an arterial roadway in the City of London and as such properties adjacent to  them are  subject  to  significant  road noise.   A noise  study will be  required  to be completed during detailed design and submitted to the City of London in support of site plan approval.  

CONCLUSIONS AND RECOMMENDATIONS 

Based on the preceding information, the following conclusions can be made with regards to servicing of the site at 1674 North Routledge Park in London, Ontario: 

• There are existing municipal watermain, storm sewers and sanitary sewers available to service potential  development  of  the  subject  site  and  will  require  connections  to  existing infrastructure on North Routledge Park and Hyde Park Road; 

• Any potential development of the subject site will require detailed drawing submissions to the City of London; 

• It has been noted per an email discussion with Mustafa Almusawi dated May 31, 2019 of the City of London Development Services Division, that there are no concerns with the additional sanitary peak flow from the development as the existing system has capacity to accommodate the additional extra flows and no capacity concerns are anticipated within the impacted sewer segments as a result of the proposed development; 

Page 9: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road

Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road June 14, 2019

 

     

    Page 7 of 7    

• The subject site can be serviced for storm by constructing a new connection to the existing 375 mm municipal storm sewer on North Routledge Park;  

• On‐site  SWM  will  be  required  to  support  development  of  the  subject  site.    The  SWM requirements are anticipated as follows: o Restrict post‐development peak flows from the subject site for all storm events up to and 

including the 100‐year design storm event to the lesser of the pre‐development peak flow rates or the allowable runoff rates based on area plan T18‐40 page 14 of 17; and, 

o Provide ‘normal’ (level 2) water quality treatment prior to discharge from the subject site. • A detailed noise study will be required to verify impacts of vehicular traffic on Hyde Park Road 

on the subject site, to be submitted in support of Site Plan Approval. It is recommended that: • The City of London accepts this report in support of the proposed development and confirms 

that servicing strategy therein; • This report be utilized to inform the detailed engineering designed of the subject site.  

If you have any questions or concerns, please contact the undersigned.   DEVELOPMENT ENGINEERING (LONDON) LIMITED               Shawn Duncan, C.E.T            Laurence Murray, P. Eng. Senior Designer             Senior Project Engineer

Page 10: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road

 

 

APPENDIX A  

PRELIMINARY SERVICING FIGURES, SITE PLAN DRAWING AND CITY AS‐BUILT DRAWINGS 

Page 11: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road

12 CARS

EXISTING BUILDING

16 CARS

4 CARS

4 CARS

18 CARS

11 CARS

12 CARS

PRIVATE OUTDOORAMENITY AREA

6 STOREYAPARTMENT BUILDING

LOAD

ING

ROUT

E

R=12 m

2 STOREY

GARBAGEROOM

Existing House

CONCEPT PLAN

1828

1674 HYDE PARK ROAD

A-010

CONCEPT PARKINGPLAN

S.Y.

S.D.AS NOTED

06/13/2019

1 CONCEPT PARKING PLANSCALE = 1:500

AutoCAD SHX Text
EXISTING COMMERCIAL BUILDING MUN. No. 1674
AutoCAD SHX Text
Ex. Bottom of Ditch
AutoCAD SHX Text
Ex. Top of Ditch
AutoCAD SHX Text
Ex. Bottom of Ditch
AutoCAD SHX Text
EX. 1.524 CONC. S/W
AutoCAD SHX Text
(OPSD 600.060)
AutoCAD SHX Text
NORTH ROUTLEDGE PARK
AutoCAD SHX Text
CONC. CURB AND GUTTER
AutoCAD SHX Text
EX. CONC. S/W
AutoCAD SHX Text
HYDE PARK RD
AutoCAD SHX Text
NEW CONC. S/W
AutoCAD SHX Text
NEW CONC. S/W
AutoCAD SHX Text
BIKE LANE
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
CURB
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
ON STREET PARKING
AutoCAD SHX Text
NEW CONC. S/W
AutoCAD SHX Text
NEW CONC. S/W
AutoCAD SHX Text
NEW CONC. S/W
AutoCAD SHX Text
NEW CONC. S/W
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
NEW CONC. S/W
AutoCAD SHX Text
HPS
AutoCAD SHX Text
HPS
AutoCAD SHX Text
NEW CONC. S/W
AutoCAD SHX Text
SECONDARY ENTRANCE
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
(OPSD 600.060)
AutoCAD SHX Text
NORTH ROUTLEDGE PARK
AutoCAD SHX Text
CONC. CURB AND GUTTER
AutoCAD SHX Text
NEW CONC. SIDEWALK
AutoCAD SHX Text
C/L ROAD ALLOWANCE
AutoCAD SHX Text
NORTH ROUTLEDGE PARK
AutoCAD SHX Text
ON STREET PARKING
AutoCAD SHX Text
FIRE ROUTE
AutoCAD SHX Text
PROPOSED
AutoCAD SHX Text
REQUIRED
AutoCAD SHX Text
A
AutoCAD SHX Text
ITEM
AutoCAD SHX Text
1674 HYDE PARK ROAD
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
8.0
AutoCAD SHX Text
3.0m MAX
AutoCAD SHX Text
LOT FRONTAGE
AutoCAD SHX Text
FRONT YARD SETBACK
AutoCAD SHX Text
8
AutoCAD SHX Text
BUILDING HEIGHT
AutoCAD SHX Text
47.9 m
AutoCAD SHX Text
3
AutoCAD SHX Text
N/A
AutoCAD SHX Text
LOT AREA
AutoCAD SHX Text
6
AutoCAD SHX Text
EXTERIOR SIDE SETBACK (S)
AutoCAD SHX Text
7
AutoCAD SHX Text
0.517 ha*
AutoCAD SHX Text
0.00 ha
AutoCAD SHX Text
LOT DEPTH
AutoCAD SHX Text
101.2 m
AutoCAD SHX Text
5.5 m**
AutoCAD SHX Text
0.0 m
AutoCAD SHX Text
0.0 m
AutoCAD SHX Text
INTERIOR SIDE SETBACK (N)
AutoCAD SHX Text
0.0 m
AutoCAD SHX Text
5.4 m
AutoCAD SHX Text
REAR YARD SETBACK
AutoCAD SHX Text
0.0 m
AutoCAD SHX Text
40.9 m
AutoCAD SHX Text
12.0 m
AutoCAD SHX Text
18 mm***
AutoCAD SHX Text
9
AutoCAD SHX Text
LOT COVERAGE
AutoCAD SHX Text
70%
AutoCAD SHX Text
10
AutoCAD SHX Text
TOTAL GFA
AutoCAD SHX Text
N/A
AutoCAD SHX Text
5.358 m²
AutoCAD SHX Text
11
AutoCAD SHX Text
LANDSCAPED AREA
AutoCAD SHX Text
12
AutoCAD SHX Text
COMM. GFA
AutoCAD SHX Text
464 m²
AutoCAD SHX Text
13
AutoCAD SHX Text
RESIDENTAL UNITS
AutoCAD SHX Text
30%
AutoCAD SHX Text
N/A
AutoCAD SHX Text
22%
AutoCAD SHX Text
N/A
AutoCAD SHX Text
46
AutoCAD SHX Text
N/A
AutoCAD SHX Text
14
AutoCAD SHX Text
DENSITY
AutoCAD SHX Text
150 UPH
AutoCAD SHX Text
15
AutoCAD SHX Text
COMMERCIAL PARKING (1/30)
AutoCAD SHX Text
16
AutoCAD SHX Text
18
AutoCAD SHX Text
16
AutoCAD SHX Text
113 UPH
AutoCAD SHX Text
RESIDENTIAL PARKING (1/1.25)
AutoCAD SHX Text
58
AutoCAD SHX Text
58
AutoCAD SHX Text
18
AutoCAD SHX Text
TOTAL PARKING
AutoCAD SHX Text
79
AutoCAD SHX Text
* PRE-ROAD WIDENING. LOT AREA POST WIDENING IS 0.48ha
AutoCAD SHX Text
** EXISTING
AutoCAD SHX Text
*** REQUIRES SITE-SPECIFIC REGULATION
AutoCAD SHX Text
17
AutoCAD SHX Text
HANDICAP PARKING (4%)
AutoCAD SHX Text
3
AutoCAD SHX Text
77
AutoCAD SHX Text
3
AutoCAD SHX Text
No.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
MM/DD/YYYY
AutoCAD SHX Text
PROJECT TITLE:
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
DATE PLOTTED:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
PROJECT No.
AutoCAD SHX Text
DRAWING No.
AutoCAD SHX Text
CONSTRUCTION NORTH
AutoCAD SHX Text
TRUE NORTH
AutoCAD SHX Text
ARCHITECTS SEAL
Page 12: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road

PROPOSEDWATERMAINCONNECTION

1674 HYDE PARK

DEVELOPMENT

DEL19-024

1.0

Figure Number

SD

JUNE 12, 2019

London Office

41 Adelaide St. N., Unit 71

(519) 672-8310

Paris Office

31 Mechanic St., Unit 301

(519) 442-1441

450 PVC WM

450 PVC WM

900 CONC. WM

900 CONC. WM

EX.

HYD

EX.

HYD

600 C

ON

C. W

M

30

0 P

VC

W

M

EX.

HYD

EX.

HYD

HYDE PARK ROAD

NO

RT

H R

OU

TLE

DG

E

PA

RK

GA

IN

SB

OR

OU

GH

R

OA

D

900 CONC. WM

450 PVC WM

AutoCAD SHX Text
EX. MUN. #1603
AutoCAD SHX Text
EX. MUN. #1607
AutoCAD SHX Text
EX. MUN. #1617
AutoCAD SHX Text
EX. MUN. #1635
AutoCAD SHX Text
EX. MUN. #1645
AutoCAD SHX Text
EX. MUN. #1695
AutoCAD SHX Text
EX. MUN. #1073
AutoCAD SHX Text
EX. MUN. #1079
AutoCAD SHX Text
EX. MUN. #1083
AutoCAD SHX Text
EX. MUN. #1087
AutoCAD SHX Text
EX. MUN. #1093
AutoCAD SHX Text
EX. MUN. #1099
AutoCAD SHX Text
EX. MUN. #1103
AutoCAD SHX Text
EX. MUN. #1107
AutoCAD SHX Text
EX. MUN. #1113
AutoCAD SHX Text
EX. MUN. #1119
AutoCAD SHX Text
EX. MUN. #1131
AutoCAD SHX Text
EX. MUN. #1141
AutoCAD SHX Text
EX. MUN. #1584
AutoCAD SHX Text
EX. MUN. #1570
AutoCAD SHX Text
EX. MUN. #1560
AutoCAD SHX Text
EX. MUN. #1540
AutoCAD SHX Text
EX. MUN. #1520
AutoCAD SHX Text
EX. MUN. #1147
AutoCAD SHX Text
EX. MUN. #1565
AutoCAD SHX Text
EX. MUN. #1535
AutoCAD SHX Text
EX. MUN. #1551
AutoCAD SHX Text
EX. MUN. #1615
AutoCAD SHX Text
EX. MUN. #1385
AutoCAD SHX Text
EX. MUN. #1674
AutoCAD SHX Text
EX. MUN. #1656
AutoCAD SHX Text
EX. MUN. #1490
AutoCAD SHX Text
EX. MUN. #1700
AutoCAD SHX Text
EX. MUN. #1712
AutoCAD SHX Text
EX. MUN. #1724
AutoCAD SHX Text
EX. MUN. #1600
AutoCAD SHX Text
PROJECT Nº
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
(London) Limited
AutoCAD SHX Text
CONSULTING CIVIL ENGINEERS ONSULTING CIVIL ENGINEERS NSULTING CIVIL ENGINEERS SULTING CIVIL ENGINEERS ULTING CIVIL ENGINEERS LTING CIVIL ENGINEERS TING CIVIL ENGINEERS ING CIVIL ENGINEERS NG CIVIL ENGINEERS G CIVIL ENGINEERS CIVIL ENGINEERS CIVIL ENGINEERS IVIL ENGINEERS VIL ENGINEERS IL ENGINEERS L ENGINEERS ENGINEERS ENGINEERS NGINEERS GINEERS INEERS NEERS EERS ERS RS S
AutoCAD SHX Text
EX. AIR RELEASE CHAMBER
AutoCAD SHX Text
EX. WATER VALVE CHAMBER
AutoCAD SHX Text
EX. LINE VALVE CHAMBER
AutoCAD SHX Text
SITE
AutoCAD SHX Text
PROP. 200 WATER SERVICE
AutoCAD SHX Text
DENOTES EXISTING WATERMAIN
AutoCAD SHX Text
DENOTES PROPOSED WATERMAIN
AutoCAD SHX Text
DENOTES EXISTING FIRE HYDRANT
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
DENOTES PROPOSED SITE BOUNDARY
AutoCAD SHX Text
EX. WS
AutoCAD SHX Text
DENOTES EXISTING MUNICIPAL ADDRESS
AutoCAD SHX Text
EX. WS
AutoCAD SHX Text
EX. MUN. #1147
AutoCAD SHX Text
EX. 25mm WS
AutoCAD SHX Text
EX. 50mm WS
Page 13: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road

PROPOSEDSTORM SEWERCONNECTION

1674 HYDE PARK

DEVELOPMENT

DEL19-024

2.0

Figure Number

SD

JUNE 13, 2019

London Office

41 Adelaide St. N., Unit 71

(519) 672-8310

Paris Office

31 Mechanic St., Unit 301

(519) 442-1441

EX

. 3

75

Ø S

TM

HYDE PARK ROAD

NO

RT

H R

OU

TLE

DG

E P

AR

K

GA

IN

SB

OR

OU

GH

R

OA

D

EX

. 6

75

Ø S

TM

EX. 750Ø STM

E

X

.

7

5

0

Ø

S

T

M

EX

. 7

50

Ø S

TM

EX

. 7

50

Ø S

TM

E

X

. 6

0

0

Ø

S

T

M

EX.

ST-1

EX.

ST-3

EX.

ST-4

EX.

ST-5

EX.

ST-6

EX.

ST-7

EX.

ST-8

EX.

ST-2

EX.

8S662

EX.

8S661

EX.

8S660

EX.

8S273

E

X

. 1950Ø

S

TM

EX. 450Ø

STM

EX.

8S364

EX

. 600Ø

ST

M

EX. 675Ø STM

STM.

INSP.

MH

OGS

EX. 825Ø STM

EX. 825Ø STM

EX.

8S663

EX.

8S664

EX.

DICB

EX.

DICB11

EX.

DICB10

EX. 300

STUB

PROP.

300Ø

STM

AutoCAD SHX Text
EX. MUN. #1603
AutoCAD SHX Text
EX. MUN. #1607
AutoCAD SHX Text
EX. MUN. #1617
AutoCAD SHX Text
EX. MUN. #1635
AutoCAD SHX Text
EX. MUN. #1645
AutoCAD SHX Text
EX. MUN. #1695
AutoCAD SHX Text
EX. MUN. #1073
AutoCAD SHX Text
EX. MUN. #1079
AutoCAD SHX Text
EX. MUN. #1083
AutoCAD SHX Text
EX. MUN. #1087
AutoCAD SHX Text
EX. MUN. #1093
AutoCAD SHX Text
EX. MUN. #1099
AutoCAD SHX Text
EX. MUN. #1103
AutoCAD SHX Text
EX. MUN. #1107
AutoCAD SHX Text
EX. MUN. #1113
AutoCAD SHX Text
EX. MUN. #1119
AutoCAD SHX Text
EX. MUN. #1131
AutoCAD SHX Text
EX. MUN. #1141
AutoCAD SHX Text
EX. MUN. #1584
AutoCAD SHX Text
EX. MUN. #1570
AutoCAD SHX Text
EX. MUN. #1560
AutoCAD SHX Text
EX. MUN. #1540
AutoCAD SHX Text
EX. MUN. #1520
AutoCAD SHX Text
EX. MUN. #1147
AutoCAD SHX Text
EX. MUN. #1565
AutoCAD SHX Text
EX. MUN. #1535
AutoCAD SHX Text
EX. MUN. #1551
AutoCAD SHX Text
EX. MUN. #1615
AutoCAD SHX Text
EX. MUN. #1385
AutoCAD SHX Text
EX. MUN. #1674
AutoCAD SHX Text
EX. MUN. #1656
AutoCAD SHX Text
EX. MUN. #1490
AutoCAD SHX Text
EX. MUN. #1700
AutoCAD SHX Text
EX. MUN. #1712
AutoCAD SHX Text
EX. MUN. #1724
AutoCAD SHX Text
EX. MUN. #1600
AutoCAD SHX Text
PROJECT Nº
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
(London) Limited
AutoCAD SHX Text
CONSULTING CIVIL ENGINEERS ONSULTING CIVIL ENGINEERS NSULTING CIVIL ENGINEERS SULTING CIVIL ENGINEERS ULTING CIVIL ENGINEERS LTING CIVIL ENGINEERS TING CIVIL ENGINEERS ING CIVIL ENGINEERS NG CIVIL ENGINEERS G CIVIL ENGINEERS CIVIL ENGINEERS CIVIL ENGINEERS IVIL ENGINEERS VIL ENGINEERS IL ENGINEERS L ENGINEERS ENGINEERS ENGINEERS NGINEERS GINEERS INEERS NEERS EERS ERS RS S
AutoCAD SHX Text
SITE
AutoCAD SHX Text
DENOTES EXISTING STORM SEWER
AutoCAD SHX Text
DENOTES PROPOSED STORM SEWER
AutoCAD SHX Text
DENOTES EXISTING MAINTENANCE HOLE
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
DENOTES PROPOSED SITE BOUNDARY
AutoCAD SHX Text
DENOTES EXISTING MUNICIPAL ADDRESS
AutoCAD SHX Text
EX. MUN. #1565
AutoCAD SHX Text
DENOTES PROPOSED MAINTENANCE HOLE
Page 14: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road

PROPOSEDSANITARY

SEWERCONNECTION

1674 HYDE PARK

DEVELOPMENT

DEL19-024

3.0

Figure Number

SD

JUNE 24, 2019

London Office

41 Adelaide St. N., Unit 71

(519) 672-8310

Paris Office

31 Mechanic St., Unit 301

(519) 442-1441

HYDE PARK ROAD

NO

RT

H R

OU

TLE

DG

E P

AR

K

GA

IN

SB

OR

OU

GH

R

OA

D

EX. 200Ø SAN

EX

. 2

50

Ø S

AN

EX

. 2

50

Ø S

AN

EX

. 2

50

Ø S

AN

EX. 250Ø SAN

E

X

.

2

5

0

Ø

S

A

N

EX

. 2

50

Ø S

AN

E

X

. 2

5

0

Ø

S

A

N

EX

. 3

00

Ø S

AN

EX

. 3

00

Ø S

AN

E

X

. 8

2

5

Ø

S

A

N

E

X

. 8

2

5

Ø

S

A

N

E

X

. 8

2

5

Ø

S

A

N

SA-2

EX

. 2

50

Ø

SA

N

SA-1

SA-3

SA-4SA-5

SA-6

SA-8

SA-9

SA-10

EX

. 2

50

Ø S

AN

SA-7

EX.

HP34

HP131

HP132

HP450

EX. 200Ø SAN

EX

. 150Ø

PD

C

EX

. 150Ø

PD

C

E

X

.

2

0

0

Ø

S

A

N

PROP. SAN.

INSP. MH

PROP.

200Ø SAN.

EX. 200Ø SAN

HP451

HP452

EX

. 1

50

Ø

PD

C

AutoCAD SHX Text
EX. MUN. #1603
AutoCAD SHX Text
EX. MUN. #1607
AutoCAD SHX Text
EX. MUN. #1617
AutoCAD SHX Text
EX. MUN. #1635
AutoCAD SHX Text
EX. MUN. #1645
AutoCAD SHX Text
EX. MUN. #1695
AutoCAD SHX Text
EX. MUN. #1073
AutoCAD SHX Text
EX. MUN. #1079
AutoCAD SHX Text
EX. MUN. #1083
AutoCAD SHX Text
EX. MUN. #1087
AutoCAD SHX Text
EX. MUN. #1093
AutoCAD SHX Text
EX. MUN. #1099
AutoCAD SHX Text
EX. MUN. #1103
AutoCAD SHX Text
EX. MUN. #1107
AutoCAD SHX Text
EX. MUN. #1113
AutoCAD SHX Text
EX. MUN. #1119
AutoCAD SHX Text
EX. MUN. #1131
AutoCAD SHX Text
EX. MUN. #1141
AutoCAD SHX Text
EX. MUN. #1584
AutoCAD SHX Text
EX. MUN. #1570
AutoCAD SHX Text
EX. MUN. #1560
AutoCAD SHX Text
EX. MUN. #1540
AutoCAD SHX Text
EX. MUN. #1520
AutoCAD SHX Text
EX. MUN. #1147
AutoCAD SHX Text
EX. MUN. #1565
AutoCAD SHX Text
EX. MUN. #1535
AutoCAD SHX Text
EX. MUN. #1551
AutoCAD SHX Text
EX. MUN. #1615
AutoCAD SHX Text
EX. MUN. #1385
AutoCAD SHX Text
EX. MUN. #1674
AutoCAD SHX Text
EX. MUN. #1656
AutoCAD SHX Text
EX. MUN. #1490
AutoCAD SHX Text
EX. MUN. #1700
AutoCAD SHX Text
EX. MUN. #1712
AutoCAD SHX Text
EX. MUN. #1724
AutoCAD SHX Text
EX. MUN. #1600
AutoCAD SHX Text
PROJECT Nº
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
(London) Limited
AutoCAD SHX Text
CONSULTING CIVIL ENGINEERS ONSULTING CIVIL ENGINEERS NSULTING CIVIL ENGINEERS SULTING CIVIL ENGINEERS ULTING CIVIL ENGINEERS LTING CIVIL ENGINEERS TING CIVIL ENGINEERS ING CIVIL ENGINEERS NG CIVIL ENGINEERS G CIVIL ENGINEERS CIVIL ENGINEERS CIVIL ENGINEERS IVIL ENGINEERS VIL ENGINEERS IL ENGINEERS L ENGINEERS ENGINEERS ENGINEERS NGINEERS GINEERS INEERS NEERS EERS ERS RS S
AutoCAD SHX Text
SITE
AutoCAD SHX Text
DENOTES EXISTING SANITARY SEWER
AutoCAD SHX Text
DENOTES PROPOSED SANITARY SEWER
AutoCAD SHX Text
DENOTES EXISTING MAINTENANCE HOLE
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
DENOTES PROPOSED SITE BOUNDARY
AutoCAD SHX Text
DENOTES EXISTING MUNICIPAL ADDRESS
AutoCAD SHX Text
EX. MUN. #1565
AutoCAD SHX Text
DENOTES PROPOSED MAINTENANCE HOLE
Page 15: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road
sduncan
Rectangle
sduncan
Text Box
SITE
Page 16: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road
sduncan
Rectangle
sduncan
Text Box
SITE
Page 17: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road
sduncan
Rectangle
sduncan
Text Box
SITE
Page 18: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road
sduncan
Rectangle
sduncan
Text Box
SITE
Page 19: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road
sduncan
Rectangle
Page 20: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road
sduncan
Rectangle
Page 21: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road

 

 

APPENDIX B  

PRELIMINARY FIRE FLOW CALCULATIONS, SANITARY SEWAGE FLOW CALCULATIONS AND  SANITARY CAPACITY CONFIRMATION EMAIL. 

  

 

Page 22: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road

6/14/2019 1 of 1

Date: June 12, 2019By: Shawn Duncan Checked: Laurence Murray, P.Eng.

Hydraulic Grade Line (Low Level System) = 317.00 m

Elevation of FFE= 272.25 m

Static Pressure at Building before losses= 63.65 PSI

CALCULATE FIRE FLOW DEMAND:

Total flow required for fire protection =

Sprinkler Demand + Hose Stream Demand = 1000+ 250 = 1250.0 usgpm = 1,040.84 igpm

Maximum Day Peak Demand = 174.0 usgpm = 144.89 igpm

Total Flow Required = 1424.00 usgpm = 1,185.73 igpm

CHECK PRESSURE CONSTRAINT:

The watermain should be sized so that the minimum pressure reached during fire flows is 20 psi.

We need to account for pressure losses in the system. The equivalent length method is used below.

Equivalent Length (m)

90.0 m

L/D= 60 D= 200 mm 12.0 m

L/D= 6 D= 200 mm 1.2 m

Total Equivalent Length of pipe and fittings = 103.2 m

Calculate the frictional head loss in the equivalent length of pipe using the Hazen-Williams Formula:

f = 0.2083 (100/C)1.85 x Q1.852/di4.8655 where f is in m of water/100 m of pipe, C is unitless, Q is in usgpm, di is in inches

C = constant for inside roughness of pipe 110

Q = flow in usgpm = 1424.0 usgpm

di = inside diameter of pipe = 200 mm

f = friction head in m of water per 100 m of pipe = 5.2719 m water / 100 m of pipe

Total head loss = 5.2719 x 103.2/100 = 5.44064 m

Pressure drop in equivalent length of pipe = 5.44 m = -7.73 psi

55.92 psi

CHECK VELOCITY CONSTRAINT:

The watermain should be sized so that the maximum velocity shall not exceed 2.4m/s during fire flows (City of London specification)

V = Q/A         A = pi (D/2)2 Q = 1424.0 usgpm = 0.08984044 cu.m/s

D = 300 mm

A = 0.0707 sq.m

V = 1.27 m/s

Velocity during fire flow is less than 2.4 m/s, therefore the velocity constraint is met.

CHECK STATIC PRESSURE AT THE PROPOSED MIXED RESIDENTIAL AND COMMERCIAL DEVELOPMENT BASED ON CITY PRESSURE ZONE HGL

As outlined in NFPA 13 - Installation of Sprinkler Systems, a hose stream demand is to be considered for fire fighting as well. We will assume an ordinary hazard occupancy for the residential appartment (to be conservative). Ordinary Hazard occupancy requires a hose stream demand of 250 usgpm.

FIRE FLOW WATERMAIN CALCULATIONS - SPRINKLERED BUILDINGDEL19-024 - 1674 HYDE PARK ROAD, LONDON, ONTARIO

A new sprinkler system will be installed throughout the proposed residential appartment buildings. The project mechanical engineers have not provided a sprinkler demand at the time of this calculation. A conservative demand of 1000 usgpm has been used in lieu of actual demands for the purpose of this calculation

Length of 200 dia water service to proposed building addition=

300x300x200 Tee (flow through branch)

Check velocity in 300mm municipal watermain:

200 Gate Valve (fully open)

(C=110 for a 200 dia pipe as per City of London Standards)

Residual pressure at proposed school addition finished floor =

190415 - DEL19-024 - Fire Protection Calcs - SPRINKLERED.xlsx

Page 23: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road

Date: June 12, 2019By: Shawn Duncan Checked: Laurence Murray, P.Eng.

145 0.475 230 1.1 0.10 1.781 0.048 1.83* Assumed population of Ex. Commercial Building per OBC - 8.2.1.3. Sewage System Design Flows - Shopping = 5 L / 1m2 Floor Area

Building Name BLDG Area (m2) L / m2 Total Litres Building Name Units Pop/Unit Total PopulationEx. Commercial Building 597 5 2,983.00 Prop. Apartment Building 55 2.4 132

Total Litres 2,983.00 Total Pop. 132Per Capita Flow 230

Pop. Equiv. 13

PEAK SANITARY CALCULATIONS DEL19-024 - 1674 HYDE PARK ROAD, LONDON, ONTARIO

PopulationPer Capita Flow 

(L/s)

Uncertain 

Development Factor

Infiltration Flow 

(L/s/Ha)Sewage (L/s)Area (Ha)

Infiltration 

(L/s)Total (L/s)

Page 24: Preliminary Servicing Report - London, Ontario · Preliminary Servicing Report Job No.: DEL19-024 Proposed Mixed use Commercial and Residential Development – 1674 Hyde Park Road

1

Shawn Duncan

From: Almusawi, Mustafa <[email protected]>Sent: Friday, May 31, 2019 1:14 PMTo: Shawn DuncanSubject: 1674 Hyde Park Road

Hi Shawn, As discussed, there is capacity for the proposed 6-storey, 50 unit apartment building even though these are commercial lands and the proposed development was never contemplated. It is noted that the proposed apartment building takes more capacity than the area plan allows but the system has the room to accommodate the extra flows. Best Regards,

Mustafa Almusawi Senior Technologist Development Services City of London

300 Dufferin Ave., London ON N6A 4L9 P: 519.661.CITY (2489) x 8409 | Fax: 519.661.3501 [email protected] | www.london.ca   