+ All Categories
Home > Documents > PREMIER CONSULTANTS INTERNATIONAL · 2019-04-18 · Introduction “..committed to success”...

PREMIER CONSULTANTS INTERNATIONAL · 2019-04-18 · Introduction “..committed to success”...

Date post: 10-Mar-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
87
PREMIER CONSULTANTS INTERNATIONAL Abu Dhabi, UAE Contract Advisory Services Specialists MAY-2015 Office: 502, 5 th Floor, RAPCO Building, PO Box 33590, Al Falah Street, Abu Dhabi, U.A.E. Tel: + 971 2 491 2219 Fax: + 971 2 491 2218 Email: [email protected] Web: www.premierci.ae
Transcript

PREMIER CONSULTANTS

INTERNATIONAL

Abu Dhabi, UAE

Contract Advisory Services

Specialists

MAY-2015

Office: 502, 5th Floor, RAPCO Building, PO Box 33590, Al Falah Street, Abu Dhabi, U.A.E.

Tel: + 971 2 491 2219 Fax: + 971 2 491 2218

Email: [email protected]

Web: www.premierci.ae

Premier Consultants International

Contents

1. Introduction ………………………………………………………………………………………………………….. 3

2. Contracts advice and protection ……………………………………………………………………………. 4

3. Contracts administration ……………………………………………………………………………………….. 5

4. Conflict avoidance ………………………………………………………………………………………………….. 6

5. Claims preparation and defence …………………………………………………………………………….. 7

6. Dispute resolution ………………………………………………………………………………………………….. 8

7. Negotiation management, arbitration and litigation ………………………………………………. 9

8. Planning and programming ……………………………………………………………………………………. 10

9. Benefits ……………………………………………………………………………………………………………….... 11

10. Contact information ………………………………………………………………………………………………...12

Introduction

“..committed to success”

Premier Consultants International, chaired by Sulieman Nayef, has been operating for over

30 years. Our presence in the Middle East region has expanded considerably in recent years

and our client base includes some of the region’s highest profile names.

We have involvement in projects throughout the world and we intend to expand our

activities within the Middle East region.

Our resources and experience enable us to deliver best practice solutions to meet client’s

needs and to deal with the demands of the construction boom in the region.

We are able to give specialist advice on the following:

Contracts advice and protection

Contracts administration

Conflict avoidance

Claims preparation and defence

Dispute resolution

Negotiation management, arbitration and litigation

Planning and programming

We understand your needs as a contractor where contractual risks are high and there is a

need for specialist support to your project team to minimise contract risk and to enhance

contract entitlements. Our service is flexible and adaptable and we can offer dedicated

support to enhance your reputation with your clients.

3

Contracts Advice & Protection

“..committed to results”

Contracts advice is the review and analysis of contract documentation during pre and post

contract periods to provide high quality, expert advice and guidance with sound practical

and technical solutions to facilitate protection and cost effective solutions for our clients.

Our highly qualified and dynamic construction professionals are able to understand both

client’s needs and the related substantive and legal issues.

The advice provided by our senior consultants in conjunction with the contractor’s

management team includes:

Advising on optimum contract and subcontract arrangements and preparing tailor

made forms of contract and amendments to standard forms.

Review of tender or contract documents to identify obligations, liabilities and areas

of risk.

Advice and opinion on contractual matters arising throughout the contract period.

Advice on bonds, warranties, guarantees and insurances.

Identifying potential areas of conflict which will require to be addressed throughout

the contract.

Advising on sub-contracting arrangements to ensure equitable obligations, liabilities

and risks reflect the same as the main-contractors.

4

Contracts Administration

“..committed to care”

We have experience in working closely with contractors on the need for their day to day

administration of construction projects from a contractual viewpoint. Strong contract

administration is essential to ensure that any entitlement under the contract is preserved.

Our advice to the contractor on an informed basis includes:

Establishing standard forms for record keeping

Ensuring that all matters and correspondence of a contractual nature are responded

to in an appropriate manner

Interpretation of contract requirements as to notices, pro-forma letters and

schedules to ensure strict timescales for submission are complied with

Monitoring for delays and their causes to ensure that appropriate contractual action

is taken

Optimising the valuation of variations and monthly progress reporting

Optimising cash flow by the proper analysis and by prioritisation of variations

5

Conflict Avoidance

“..committed to our clients”

The key issues in conflict avoidance are:

Clear identification and allocation of obligations, liabilities and risk

Proper management of obligations and making project staff aware of the contract

procedures and obligations

Effective monitoring and recording of the construction process

Early and accurate assessment of exposure to risk

Identifying the options available and the effects of those options

Calculated decision making

Implementation of cost effective solutions

PCI are often first involved with a project after a conflict has already occurred. Our

experience, from investigating and analysing these conflicts, generally shows that the cause

often occurs in the early stages of a project either in allocation of risk, problems in design

and ensuing late assessment of variations, loss of control of program or the failure of one or

both of the parties to adhere to the contract procedures.

Issues of conflict tend to occupy extensive management time, disrupt the construction

process and cash flow and may lead to the damaging of business relationships.

Conflict avoidance should be a priority issue for all contractors from the very outset of a

project and we are able to offer advice and assist in decision making to allow effective

avoidance of conflicts.

6

Claims Preparation and Defence

“..committed to deliver”

Claims tend to arise as a result of change. Change is prevalent within the construction

industry due to many tenders being awarded before the design has been completed.

Sound and proven contract administration procedures to identify, notify and record events

resulting in delay and cost are absolutely essential. We are able to provide, through our

highly trained claims specialists, the advice, preparation, submission and subsequent

negotiation of claims, including:

Extension of time applications

Loss and expense applications including loss of overheads and profit, financing

charges and disruption costs.

Acceleration claims

Contentious valuation of variation issues and additional items

We are also able to provide:

Review of claims and advice as to their enhancement

Review of counter claims and advice on implementation for negotiation and

concession strategy

Review of counter claims and preparation of defence

7

Dispute Resolution

“..committed to resolve”

Dispute resolution is a costly business with the costs of lawyers, advocates, expert

witnesses and tribunal costs.

We can explain the procedures and options in simple terms and look at objectives of the

avenues and tentative costs involved in dispute resolution.

Our services in dispute resolution include but are not limited to:

Selection of internationally acclaimed lawyers and arbitrators

Advising on and analysing the relative merits of dispute resolution whether by

mediation, arbitration or litigation

Assisting with the preparation of documents for submission

Assisting with requests for providing further and better particulars

Assisting in mediation

8

Negotiation Management, Arbitration & Litigation

“..committed to value”

We have a successful track record in negotiation management within all aspects of the

construction process.

We provide construction professionals our experience in negotiation management and we

are able to advise our clients on the most cost effective methods in the negotiation

management process.

They are as follows:

Preparing and implementing a negotiation and concession strategy

Commercial negotiation

Negotiation and settlement of accounts

Arbitration and litigation

Expert witness and court testimony

9

Planning & Programming

“..committed to perfection”

Premier Consultants International has extensive planning experience which can be provided

to assist and support the contractor’s existing planning team.

Our services in this field include:

Assistance with preparation of the master programme

Assistance with preparation of monthly and revised programmes

Monitoring progress and identifying delay and disruptive events

Research of project documentation to indentify the actual construction process

Advise on methodology for delay recovery and acceleration

Advice on assessing the inefficiencies of labour and equipment

10

Benefits

We believe the benefits of our services include:

Total commitment

Receipt of full contractual entitlements

Increased efficiency and improved margins

Protection of your position

Flexibility

Client care and understanding

11

Contact Information

For further information please contact us:

Premier Consultants International

Office 502, 5th Floor

RAPCO Building

Al Falah Street (9th)

PO Box 33590

Abu Dhabi

United Arab Emirates

Tel: + 971 2 491 2219 (3 lines)

Fax: + 971 2 491 2218

Email: [email protected]

Web: www.premierci.com / www.premierci.ae

Check out our page on Facebook or why not visit us on LinkedIn:

www.linkedin.com/company/premier-consultants-international

12

INDEXNo. Company Name Telephone Fax P.O. Box City & Country E-mail WWW

1Abu Dhabi Maintenance & Construction Co. L.L.C. 02-6748440 02-6748445 7404 Abu Dhabi, UAE [email protected] ww.admac.ae

2 ADSO 02-6335549 02-6335573 746 Abu Dhabi, UAE [email protected] www.adco.ae

3 Ahmed Saleh Demolition (ASD)

050-6410910 02-6273636 31700 Abu Dhabi, UAE [email protected] -

4 Al Amry Group 02-5556900 02-5548842 46282 Abu Dhabi-UAE [email protected] www.alamrygroup.com

5 Al Dhafra Civil Works Projects 02-6412641 02-6412577 26253 Abu Dhabi, UAE [email protected] -

6 Al Falah Holding 02-5500903 02-5500904 126848 Abu Dhabi-UAE [email protected] www.alfalahholding.com

7 Al Firas General Contracting 02-6669600 02-6667963 4490 Abu Dhabi, UAE [email protected] www.alfiras.com

8 Al Ghafly General Contracting L.L.C.

02-5510565 02-5511208 3514 Abu Dhabi, UAE [email protected] -

9 Al Hada International 02-6329922 02-6325553 45176 Abu Dhabi, UAE [email protected] farisinternational.ae

10 Al Hamed Development Construction L.L.C. (AHDC)

02-6426633 02-6418107 4588 Abu Dhabi, UAE [email protected] www.alhamedconst.ae

11 Al Maqam Gen. Cont. & Main. Est.

02-6211218 02-6216108 7445 Abu Dhabi, UAE [email protected] www.almaqamuae.com

12 Al Massa For Gypsum Works & Decoration

02-6274100 02-6272327 46120 Abu Dhabi-UAE [email protected] www.almassadeco.com

13 Al Mezin General Contracting 02-6810456 02-6814463 705 Abu Dhabi, UAE [email protected] www.almezincontracting.com

14 Al Mureiki General Contracting 02-6770590 02-6725475 211 Abu Dhabi, UAE [email protected] www.almeraikhi.ae

15 Al Otaiba & Garg Contracting L.L.C.

02-6274936 02-6275646 43089 Abu Dhabi, UAE [email protected] -

16 Al Suwaiket 04-4298770 04-4298771 7688 Dubai - UAE [email protected] www.alsuwaiket.com

17 Alpha Engineering 02-6792931 02-6791707 43003 Abu Dhabi-UAE [email protected] -

18 Arab Korean General Contracting Co. (GENCO)

02-6440111 02-6442002 46282 Abu Dhabi, UAE [email protected] www.alamrygroup.com

19 Ascorp 02-5134444 02-5503024 5297 Abu Dhabi-UAE [email protected] www.ascorpholdings.com

20 Associated Construction & Investment Company - Ascon

02-629129 02-6349167 3532 Abu Dhabi-UAE [email protected] www.asconuae.com

21 BIWATER Abu Dhabi WLL 02-6775949 02-6720252 692 Abu Dhabi, UAE [email protected] www.delmagroup.ae

22 Cimel Abu Dhabi 02-6773963 02-6722805 2889 Abu Dhabi, UAE [email protected] www.forrestgroup.com

23 Civil Engineering & Contracting Est.

02-4456033 02-4456001 45800 Abu Dhabi, UAE [email protected] www.sadco.ae

24 Construction General Contracting House CGC

02-6267424 02-6272035 43655 Abu Dhabi-UAE [email protected] www.cgchouse.com

25 Core Alliance 02-4437754 02-4437746 70352 Abu Dhabi-UAE [email protected] www.corealliance.ae

26 Crest General Contracting 02-6268522 02-6268533 48134 Abu Dhabi, UAE [email protected]

27 Emirates Sama General Contracting Co.

02-4474555 02-4474696 5989 Abu Dhabi-UAE [email protected] -

28 Falcon Electro Mechanical Contracting FEMC

02-6818262 02-6818263 42886 Abu Dhabi-UAE [email protected] www.femc.ae

29 Ghantoot Transport General Contracting

02-6427887 02-6427225 27557 Abu Dhabi, UAE [email protected] www.ghantootgroup.com

INDEX30 Helioplis Electric Company 02-6412641 02-6412577 26253 Abu Dhabi, UAE [email protected] www.heliopoliselectric.ae

31 Jarnas Electro Mechanical Est. 02-6427887 02-6427225 32635 Abu Dhabi, UAE [email protected] www.ghantootgroup.com

32 Mabani Abu Dhabi 02-6775949 02-6720252 692 Abu Dhabi, UAE [email protected] www.delmagroup.ae

33 Mabani Qatar 009744552163 009744552170 9743 Doha, Qatar [email protected] www.delmagroup.ae

34 Mammut Group 04-8011111 04-8011113 28414 Dubai - UAE [email protected] www.mammut.ae

35 Mechanical & Civil Engineering Co. (MACE)

02-6666462 02-6662616 2307 Abu Dhabi, UAE [email protected] www.macecontractors.com

36 Orient Contracting Company 02-5543311 02-5543312 348 Abu Dhabi-UAE [email protected] -

37 Pan Arabian Enterprises for Pipeline Construction

02-6344463 02-6338880 328 Abu Dhabi, UAE [email protected] -

38 Pauling Middle East Company 02-6329292 02-6352500 282 Abu Dhabi, UAE [email protected] www.farisinternational.ae

39 Rapco Civil Contracting Company

02-6813633 02-6813634 6065 Abu Dhabi, UAE [email protected] www.delmagroup.ae

40 Rashid Abdula Emran 04-2345577 - - Dubai - UAE [email protected] -

41 Roads & General Contracting Projects (RAPCO)

02-6772204 02-6764911 2315 Abu Dhabi, UAE [email protected] www.delmagroup.ae

42 Samara Electromechanical Contracting LLC

02-6745547 02-6745546 46154 Abu Dhabi-UAE [email protected] -

43 Sayed Khalaf Consultant Engineering

02-6331222 02-6313231 2884 Abu Dhabi, UAE [email protected] -

44 Seidco General Contracting Company LLC

02-6766635 02-6766061 44072 Abu Dhabi-UAE [email protected] www.seidco.net

45 Technical Architects General Contracting L.L.C

04-3419990 04-3419991 212016 Dubai, UAE [email protected] www.tagcc.ae

46 Union Pipes United 02-5500102 02-5500105 9650 Abu Dhabi-UAE [email protected] www.upi.ae

47 United Eastern Medical Services

02-6266805 02-6266897 60991 Abu Dhabi-UAE [email protected] www.uems.ae

48 Zakum Contracting 02-6344122 02-6344120 77618 Abu Dhabi-UAE [email protected] -

ADMACTel: 02 - 6748440Fax: 02 - 6748445

P.O. Box : 7404Abu Dhabi - UAE

Claim Value (AED) Preparation Date

1

CONTRACT NO. ADSS 313 – RAISING CAPACITY FOR

BAYNUNA AND MARFA PUMPING STATIONS –

WESTERN REGION – ABU DHABI

Sewerage Project

committee Abu Dhabi

Municipality Abu Dhabi

U.A.E. /

KEO 19-Jul-04 19-Jul-05 35,766,425.62 42,517,094.95 12,899,998.29 July-2011

2CONTRACT NO. ADSS 804/1- MUSSAFAH EAST

MASTER PLAN MPS 17 MUSSAFAH – ABU DHABI

Sewerage Project

committee Abu Dhabi

Municipality Abu Dhabi

U.A.E. /

ACE 23-Mar-05 12-Nov-09 13,772,255.00 15,058,272.81 4,144,684.67 July-2011

3N-01-0021 WATER PIPE LINES IN MUSSAFAH – ABU

DHABI

Abu Dhabi Water &

Electricity Authority

(ADWEA) Abu Dhabi /

TEBODIN

11-Aug.2004

Actual on PAC 29-

Aug-04

11-Aug-05 36,620,000.00 39,293,191.07 20,393,570.58 Aug-2011

4

ADWEA-A-1764 WATER DISTRIBUTION NETWORK

AT AL BATEEN, AL SAD, ABU SAMRA & AL YAHAR-AL

AIN

ADWEA / Maunsell 31-May-06 30-Sep-07 30,995,349.00 30,315,143.00 11,389,697.67 Aug-2011

5CONTRACT NO. 451 – AGRICULTURE DRAINAGE

FOR KHALIFA TOWN (A) FARMSPGD / Dorsch 30-Oct-06 29-Jan-08 16,035,170.00 26,605,907.02 5,900,589.38 Oct-2011

6

CONTRACT NO. 732

GROUND WATER LOWERING AT AL SHAWAMEKH &

SWEIHAN INTERCHANGE STORM & WATER SYSTEM

PGD / MWH 19-May-09 16-May-10 17,583,962.00 PGD / 7,279,131.28 Sep-2011

7

CONTRACT AGREEMENT NO. 62/2006-

CONSTRUCTION AND MAINTENANCE OF 200

FARMS AT AJBAN-A.D.

Abu Dhabi Municipalities&

Agriculture Dept. Abu

Dhabi Municipality

PGD 28-Mar-07 10-Nov-08 23,907,702.10

Abu Dhabi

Municipalities&

Agriculture Dept. Abu

Dhabi Municipality

4 ,954,148.61 Sep-2011

Contract Value (AED) Final Cont. Value (AED)Claim Status

S. No. Project Client Consultant Commence Date Date of Completion

ADMACTel: 02 - 6748440Fax: 02 - 6748445

P.O. Box : 7404Abu Dhabi - UAE

8

CONTRACT NO. 448

STORM WATER & SUBSOIL WATER DRAINAGE FOR

AL WATHBA PALACE, CAMEL RACE AND AL WATHBA

EQUESTRIAN CLUB

PGD / Dorsch 14-Mar-09 14-Mar-10 14,636,412.00 PGD / 6 ,887,110.43 Nov-2011

9

CONTRACT NO. G-4130

MISCELLANEOUS SEWERAGE WORKS IN ABU DHABI

AND MUSSAFAH

ADSSC / HYDER 19-Aug-05 20,000,000.00 ADSSC / 1 9,004,047.73 Dec-2011

10

CONTRACT NO. 509/4

SURFACE DRAINAGE WORKS PROJECT FOR AL-

BAHYA AND AL SADR AREAS

PGD / PIL 31-Dec-09 30-Dec-10 87,614,919.00 90,980,634.95 26,443,529.59 Sep-2011

11ADSS 142/24-26 SEWERAGE WORKS FOR SECTORS E

19/02,E 25, AND E 48

Sewerage Project

committee Abu Dhabi

Municipality Abu Dhabi

U A E

16,884,011.00 39,293,191.07 8,786,160.14 Dec-2011

313,816,205.72 284,063,434.87 97,237,361.60 0.00Total

ADSOTel: 02-6335549Fax: 02-6335573

P.O. Box : 746Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Abu Dhabi Sewerage Scheme - Contract No. 723 Al Shamkha - Phase 2

Abu Dhabi Municipalty - Al Hamed

Montgomery Watson 05-08-02

17/11/2003 Delay 231

Days11,185,122.00 6,922,566.67 5,507,381.71 Aug-02

11,185,122.00 6,922,566.67 5,507,381.71

Claim Status

Total

Commence Date

Date of Completion

Contract Value (AED)

Final Cont. Value (AED)S. No. Project Client Engineer

Ahmed Saleh Demolition (ASD)Tel: 050-6410910Fax: 02-4445484P.O. Box : 31700Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1Abu Dhabi Central Market Redevelopment Excavatin, Dewatering, Diaphragm Wall & Temporary Works Plot P-20, Sectors E1 & E2, Abu Dhabi.

Al Dar Bureau Veritas 23-11-05 22-11-06 21,060,000.00 - 7,148,734.53 Aug-07

1 Etihad Towers (Khalideyah Site Development) Arabian Construction Company (ACC) - 12-09-06 16-07-07 7,500,000.00 - 8,362,843.84 Jan-08

28,560,000.00 0.00 15,511,578.37

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

Al Amry GroupTel: 02 - 5556900Fax: 02 - 5548842P.O. Box : 46282Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Contruction of Infrastructure Works for 518 Commercial Villas and Associated Community Facilities Al Qudra Real Estate Al Salaam N/A N/A 158,879,480.00 undergoing underprocess underprocess

2 Construction of 354 Commercial Villas at Ain Al Afayda - Al Ain Al Qudra Real Estate Al Salaam N/A N/A 263,135,110.00 undergoing underprocess underprocess

422,014,590.00 0.00 0.00

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

Al Dhafra Civil Works ProjectTel: 02-6412641Fax: 02-6412577P.O. Box : 26253Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Al Reef Compound for H.H. Sheikh Tahnoon Bin Zayed Al Nahyan - Road Works. NPC - 10-01-05 Cancelled

03/03/2005 7,548,259.00 - 1,561,353.11 Mar-05

7,548,259.00 0.00 1,561,353.11

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date Date of Completion

Al Falah HoldingTel: 02 - 5500903Fax: 02 - 5500904P.O. Box : 126848Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Workers City - Metal Construction Build A lot Suwaidi Engineering 01-04-10

Terminated on

15/10/2010 5,551,668.00 - 5,361,473.05 May-12

5,551,668.00 0.00 5,361,473.05

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

Al Firas General ContractingTel: 02 - 6669600 Fax: 02 - 6667963

P.O. Box : 4490Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Residental Villas, Plot No. 41 West 17/1, Abu Dhabi

Ms. Amna Darwish Karam Al Qubaisi

Office Buildings Middle East Engineering Consultants

14/1/2007 13/3/2008 9,500,000.00 9,134,615.00 11,417,839.62 Apr/2011

2 Abu Dhabi Holding Deluxe Office Building at Plot No. c-180, E-19/2, Abu Dhabi

Abu Dhabi Holding PJSC

Gulf J-L Consulting Engineering & Firas

Engineering Consultant

24/2/2009 23/2/2010 35,698,043.00 24,975,543.00 19,558,856.65 31/3/2012

45,198,043.00 34,110,158.00 30,976,696.27Total

Contract Value (AED)

Final Cont. Value (AED)

Claim StatusS. No. Project Client Consultant Commence

DateDate of

Completion

Al Ghafly General Contracting L.L.C.Tel: 02-5510565Fax: 02-5511208P.O. Box : 3514

Abu Dhabi - UAE

Original Actual

1 Contract No. 2A, Abu Dhabi Industrial City - Musafah M41 General Industry Corporation W.S. Atkins 19-06-00 18-11-00 17-06-02 10-01-04 84,086,399.00 85,436,133.18 53,245,155.49

2 Contract Nos. 2 & 3 - 84 LCH, Bani Yase East Public Works Department

Dev. Group Architectural &

Eng.12-06-00 24-03-01 17-01-01 17-01-01 27,877,930.00 27,877,930.00 8,980,878.00

3 Construction, Completion & Maintenance of 5 0 LCH Umm Ghafa - Contract No. 2

Public Works Department

Ideal Design Eng. Consultant 10-11-97 19-12-98 09-08-00 09-10-01 38,965,700.00 42,575,636.26 21,667,109.10

4 Construction, Completion & Maintenance of 4 4 LCH Umm Ghafa - Contract No. 1

Public Works Department

Al Aali Eng. Consultant 10-11-97 15-12-98 05-08-00 30-09-01 34,289,616.00 38,618,507.46 19,336,909.90

5 Construction, Completion & Maintenance of 1 17 Pubilc Houses at Ghayathy

Abu Dhabi Municipality Dar Al Khaleej 06-07-03 10-12-03 04-04-05 30-09-05 71,120,000.00 120,027,765.38 44,385,579.05

6 Construction, Completion & Maintenance of 2 24 Pubilc Houses at Al Quaa Al Ain Municipality

Project Manager Hyder

Cons.17-02-03 03-02-04 02-05-05 29-05-06 143,416,000.00 147,953,390.14 80,717,743.05

7 Schools at Ghayathi & Madinat Zayed - Contract No. 195/2003

Public Works Department

International Eng. Center 01-10-01 04-04-04 28-05-05 17-02-06 51,310,000.00 50,612,513.09 44,542,089.62

8 Schools at Ghayathi & Madinat Zayed - Contract No. 285/2002

Public Works Department

National Concord 24-09-01 22-12-02 14-02-04 02/04/205 52,921,000.00 51,369,891.00 49,716,729.44

Claim Value (AED)

Contract Value (AED)

Final Cont. Value (AED)Tender Date

Date of CompletionS. No. Project Client Consultant Commence

Date

Al Ghafly General Contracting L.L.C.Tel: 02-5510565Fax: 02-5511208P.O. Box : 3514

Abu Dhabi - UAE

Original Actual

9 Schools at Al Falah - Contract No. 1 72/2003 Public Works Department

International Eng. Center 15-02-03 10-08-03 15-06-04 01-08-05 55,000,000.00 48,593,717.92 32,337,100.66

10 47 Low Cost Houses, Madinat Zayed, Al Dhafra (Contract No. 2) P.W. Tayeb

Engineering - 07-12-94 28-06-96 26-11-97 45,390,340.00 44,787,473.87 16,121,187.43

11 35 Low Cost Houses, Madinat Zayed, Al Dhafra (Contract No. 3) P.W. Tayeb

Engineering - 07-12-94 30-03-96 12-08-97 34,288,000.00 33,797,055.55 17,809,252.73

12 54 Low Cost Houses, Al Quoa, Al Ain (Contract No. 5) P.W. Tams Consultants 01-05-95 01-08-95 22-03-97 03-01-98 42,282,000.00 41,589,836.03 10,155,622.41

13 46 Low Cost Houses, Al Quoa, Al Ain ( Contract No. 3) P.W. Tams Consultants 24-07-95 09-01-96 31-07-97 10-06-98 34,997,590.00 34,241,463.56 9,352,105.64

14 46 Low Cost Houses, Al Quoa, Al Ain ( Contract No. 4) P.W. Tams Consultants 18-09-95 14-04-96 04-11-97 27-09-98 34,674,800.00 34,222,390.20 9,759,052.69

15 11 Commercial Buildings Type A Commercial Buildings Dept.

Al Khely & Al Amery - 07-10-97 06-01-99 07-06-99 42,997,900.00 42,154,803.92 6,630,289.12

16 Construction, Completion & Maintenance of 4 0 LCH (Contract No. 3) P.W. Al Aman 04-01-99 02-02-99 28-11-99 25-07-00 44,720,000.00 39,481,234.92 18,079,588.00

Project Client Consultant Tender Date Contract Value (AED)

Final Cont. Value (AED)

Claim Value (AED)S. No.

Date of CompletionCommence Date

Al Ghafly General Contracting L.L.C.Tel: 02-5510565Fax: 02-5511208P.O. Box : 3514

Abu Dhabi - UAE

Original Actual

44,492,000.00

2.3 Penalty

18 Construction, Completion & Maintenance of Meat, Fish & Vegitable Market P.W. Planners 03-08-98 23-01-99 23-10-00 01-11-01 26,984,000.00 27,287,923.75 7,704,674.15

19 Construction, Completion & Maintenance of 1 00 Pubilc Houses Contract No. 26/2002 Private Dept.

Gamada Engineerng Consultants

- 16-03-02 15-03-03 14-04-03 42,669,000.00 42,669,000.00 2,054,041.73

20 Construction, Completion & Maintenance of 7 2 Pubilc Houses Municipality Aman Eng.

Consltants - 22-06-02 13-12-03 24-03-04 34,920,000.00 35,322,419.28 4,067,486.89

21 Construction, Completion & Maintenance of 1 00 Pubilc Houses Municipality

Safeer Engineering Consultants

- 13-07-02 03-01-04 03-01-04 48,500,000.00 49,748,156.33 10,730,302.87

22 Construction, Completion & Maintenance of 2 00 Pubilc Houses Private Dept.

Int'l Engineering

Center- 21-06-03 20-06-04 22-12-04 76,000,000.00 76,000,000.00 18,752,050.29

23 Construction, Completion & Maintenance of Four Villas, Sundry Buildings in Mubazara, Al Ahin Al Ain Municipality Shankland Cox

Ltd. - 14-03-04 12-05-04 26-07-04 35,745,000.00 40,683,800.34 19,377,655.26

24 Construction, Completion & Maintenance of International Tennis Complex

Abu Dhabi Municipality

Cranke & Boake - 19-11-00 18-09-02 08-06-03 56,884,000.00 59,354,022.00 12,038,293.78

S. No. Claim Value (AED)

20,775,969.89

Contract Value (AED)

Final Cont. Value (AED)

17 Construction, Completion & Maintenance of 4 0 LCH (Contract No. 1) P.W. Al Mimar

Consultants 04-01-99 16-01-99 11-11-99 10-06-00 35,293,063.67

Project Client Consultant Tender Date Commence Date

Date of Completion

Al Ghafly General Contracting L.L.C.Tel: 02-5510565Fax: 02-5511208P.O. Box : 3514

Abu Dhabi - UAE

Original Actual

25 Construction, Completion & Maintenance of 3 Mosques (1000 Worshippers)

Abu Dhabi Municipality Dr. Maklouf 09-12-02 08-03-03 21-12-03 05-02-04 8,274,000.00 8,478,934.20 1,643,784.43

26 Construction, Completion & Maintenance of Sheikh Maktoum Villa in Green Mubazara, Al Ahin G.H.Q. G.H.Q. - 21-11-04 20-05-05 20-12-05 13,000,000.00 15,773,115.00 6,136,945.64

1,225,805,275.00 1,273,950,177.05 546,117,597.26

S. No. Project Client Consultant Tender Date Claim Value (AED)

Commence Date

Date of Completion Contract Value (AED)

Final Cont. Value (AED)

Total

Al Hada InternationalTel: 02-6329922Fax: 02-6325553P.O. Box : 45176Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Chain Link Fencing for 10 Forstation ProjectsAbu Dhabi

Municipality and Town Planning

Consulting Engineering

Group01-04-02 31/03/2003

27/10/2003 18,689,312.50 18,689,312.50 5,192,078.40 Jul-04

18,689,312.50 18,689,312.50 5,192,078.40

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

Al Hamed Development Construction L.L.C.Tel: 02-6426633Fax: 02-6418107P.O. Box : 4588

Abu Dhabi - UAE

SNI- AL HAMED CLAIMS APPRAISAL. Jan./08

S.No. Client Consultant Tender Date Commence Date

Duration (Days)

Date of Completion P.A.C. Contract Value Final Cont. Value

Estimated Claim

(Million)

1 P.W.D. 347,009,755 368,797,148.00 67

2 GHQ 499,299,153.00 484,750,051.00 59

3 ADWEA 475,685,883.00 466,568,293.00 50

4 AD Municipality 839,059,591.00 812,596,117.00 98

5 Abu Dhabi - Others 135,250,000.00 134,265,908.00 46

Abu Dhabi Total 2,296,304,382.00 2,266,977,517.00 320

SUMMARY

No. of Project

I. Abu Dhabi Projects

5

10

11

14

2

42

Al Hamed Development Construction L.L.C.Tel: 02-6426633Fax: 02-6418107P.O. Box : 4588

Abu Dhabi - UAE

SNI- AL HAMED CLAIMS APPRAISAL. Jan./08

S.No. Proj No. Project Client Consultant Tender Date Commence

DateDuration (Days)

Date of Completion P.A.C. Contract Value Final Cont. Value

Estimated Claim

(Million)

1 154 Handicapped Rehabilitation Center in Abu Dhabi P.W.D Abu Dhabi

HDP (overseas)

LTD.- 04-05-99 1001 31/12/2001 09-02-02 143,510,000 143,510,000.00 17

2 170 Al Jazeera Club P.W.D Abu Dhabi Taillibert Gulf Environment 02-04-02 05-12-02 1069 15/04/2005 - 112,304,755 140,138,079.00 11.5

3 177-1 Lulu Island Development - 300/2002 P.W.D Abu Dhabi Consico 11-09-02 08-05-02 57 10-01-02 10-10-02 35,000,000 18,715,027.00 21.5

4 177-2 Lulu Island Development - 291/2002 P.W.D Abu Dhabi Consico 11-09-02 15/08/2002 30 15/09/2002 14/10/2005 25,000,000 30,559,792.00 11

5 189 Building for Organization & Management Department P.W.D. Dar Al Khaleej - 21/06/2003 923 30/12/2005 - 31,195,000 35,874,250.00 6

347,009,755 368,797,148.00 67

1- P.W.D.

Total

Al Hamed Development Construction L.L.C.Tel: 02-6426633Fax: 02-6418107P.O. Box : 4588

Abu Dhabi - UAE

SNI- AL HAMED CLAIMS APPRAISAL. Jan./08

S.No Proj No. Project Client Consultant Tender Date Commence

DateDuration (Days)

Date of Completion P.A.C. Contract Value Final Cont. Value

Estimated Claim

(Million)

1 164 Naval Academy School - External Works

U.A.E. Armed Forces Royal Schelde 24/03/2001 372 31/03/2002 30/06/2002 25,000,000.00 25,000,000.00 3

2 172-1MW-AF-207-2001- Construction of Building in Volcano Project

U.A.E. Armed Forces

Directorate of Military Works 15/04/2002 930 31/10/2004 15/11/2003 59,649,570.00 59,649,570.00 3

3 172-2 MW-AF-125-2002- External Services to Volcano Project

U.A.E. Armed Forces

Directorate of Military Works 11-06-02 364 11-05-03 15/11/2003 45,818,835.00 45,818,835.00 4.5

4 172-3MW-AF-126-2002- Building & Security Systems to Volcano Project

U.A.E. Armed Forces

Directorate of Military Works 05-01-03 549 31/10/2004 31/10/2004 53,456,268.00 44,552,788.00 3

5 172-4MW-AF-085-2003- Additional Constructions of Burkan Project

U.A.E. Armed Forces

Directorate of Military Works 15/07/2003 365 14/05/2004 14/05/2004 15,000,000.00 15,000,000.00 2

6 173Daca 78-02-D-0008, Job Order Contract at Al Dhafra Air Base

U.A.E. Armed Forces

Kuwait Dynamics 03-07-02 1095 03-06-05 37,056,733.00 37,056,733.00 3.5

7 185-1MW-AF-131-2002-119, External Utilities at Al Dhafra Air Base

U.A.E. Armed Forces

Directorate of Military Works 06-01-03 500 10-12-04 15/02/2007 215,526,256.00 209,880,634.00 26

2- GHQ

Al Hamed Development Construction L.L.C.Tel: 02-6426633Fax: 02-6418107P.O. Box : 4588

Abu Dhabi - UAE

SNI- AL HAMED CLAIMS APPRAISAL. Jan./08

S.No Proj No. Project Client Consultant Tender Date Commence

DateDuration (Days)

Date of Completion P.A.C. Contract Value Final Cont. Value

Estimated Claim

(Million)

8 185-2 MW-AF-415-2003, External Utilities at Al Dhafra Air Base

U.A.E. Armed Forces

Directorate of Military Works 29/12/2003 243 28/08/2004 28/08/2004 8,576,256.00 8,576,256.00 3

9 185-3MW-AF-131/T-2002, External Chilled Water Pipes PH-01 & PH-02, Al Dhafra Air Base

U.A.E. Armed Forces

Directorate of Military Works 15/12/2003 212 14/07/2004 28/02/2005 12,950,000.00 16,882,447.00 6.5

10 203External Works at Sheikh Zayed Military Housing Complex, Shahama

U.A.E. Armed Forces

Directorate of Military Works 30/09/1994 1055 20/08/1997 39,215,235.00 39,215,235.00 4.5

512,249,153.00 501,632,498.00 59Total

Al Hamed Development Construction L.L.C.Tel: 02-6426633Fax: 02-6418107P.O. Box : 4588

Abu Dhabi - UAE

SNI- AL HAMED CLAIMS APPRAISAL. Jan./08

S.No Proj No. Project Client Consultant Tender Date Commence

DateDuration (Days)

Date of Completion P.A.C. Contract Value Final Cont. Value

Estimated Claim

(Million)

1 199

Connecting Sir Baniyas Island to Abu Dhabi 33KV Network in Western Region - Contract No. G 1288T

ADWEA / Transelektro Swed Power 01-07-04 338 12-10-04 9,967,305 10,224,221.00 2

2 606 Water Supply to Raha Beach - Contract D-01-0053 ADWEA Ital Consult 04-01-01 14/04/2001 439 27/06/2002 04-07-03 12,300,000.00 12,290,041.00 6

3 607

Water Supply Sch. To New Houses & Improv. Of Water Dist. Network in Madinat Zayed & Bainuna. Contract D-00-0208

ADWEA Ital Consult 05-12-01 05-12-01 1128 13/06/2004 15/06/2004 33,384,509.00 34,579,149.00 3.5

4 608Bidda Khalifa Water Transmission Line. Cont. No. D-01-0135

ADWEA Tebodin 07-08-01 18/07/2001 304 18/05/2002 12-03-02 24,369,054.00 19,675,310.00 6.5

5 610Water Supply to Grain Al Ayesh & Haramiya Island, Contract G-1042

ADWEA Ital Consult 05-12-02 07-07-02 1185 10-04-05 16/01/2006 79,648,986.00 76,465,274.00 4.5

6 611Water Supply to Abu Al Abyad Island & Al Dhabiya, Contract G-1043

ADWEA Ital Consult 19/05/2002 07-08-02 964 26/02/2005 26/06/2005 64,819,319.00 69,635,971.00 5

7 612Construction D.I. Pipeline from Ajban PS to Al Maha Forest, Contract # N/1917

ADWEA Montgomery Watson 16/02/2003 03-02-03 900 18/08/2005 12-05-05 9,891,272.00 9,014,648.00 2

3- ADWEA

Al Hamed Development Construction L.L.C.Tel: 02-6426633Fax: 02-6418107P.O. Box : 4588

Abu Dhabi - UAE

SNI- AL HAMED CLAIMS APPRAISAL. Jan./08

S.No Proj No. Project Client Consultant Tender Date Commence

DateDuration (Days)

Date of Completion P.A.C. Contract Value Final Cont. Value

Estimated Claim

(Million)

8 613Water Supply for Al Ajban Army Camp & Zayed Military City Contract # D-3877

ADWEA Maunsell Consultancy 14/03/2004 13/06/2004 365 13/06/2005 19/11/2005 13,777,777.00 13,777,777.00 3.5

9 701 Upgrade Electrical Systems in Palaces & Hospitals ADWEA Mott

Mcdermot 02-08-00 911 08-07-02 183,578,784.00 176,957,025.00 9

10 702-1 Additional Reservoirs at Unit I, II & III/Lot 1 ADWEA Montgomery

Watson 14/04/2002 30/06/2002 811 18/09/2004 21,542,996.00 21,542,996.00 3.5

11 702-2 Additional Reservoirs at Unit I, II & III/Lot 2 ADWEA Montgomery

Watson 14/04/2002 19/06/2002 547 18/12/2003 22,405,881.00 22,405,881.00 4.5

475,685,883 466,568,293.00 50Total

Al Hamed Development Construction L.L.C.Tel: 02-6426633Fax: 02-6418107P.O. Box : 4588

Abu Dhabi - UAE

SNI- AL HAMED CLAIMS APPRAISAL. Jan./08

S.No Proj No. Project Client Consultant Tender Date Commence

DateDuration (Days)

Date of Completion P.A.C. Contract Value Final Cont. Value

Estimated Claim

(Million)

1 165 Khalifa Park in Greater Abu Dhabi City, Abu Dhabi AD Municipality Shankland

Cox 07-01-01 1034 30/04/2004 16/01/2005 231,021,129.00 231,021,129.00 26

2 182 Relocation of Market & Harbour in Abu Dhabi AD Municipality GIBB Middle

East 28/01/2002 28/10/2002 942 27/05/2005 12-11-05 201,895,056.00 175,516,752.00 17

3 198 Multi Storey Car Parking at Sector - E6, Contract No. 986 AD Municipality De Leuw

Cather Int'l 12-07-03 805 19/02/2006 Running 74,941,018.00 74,941,018.00 5.5

4 201Abu Dhabi Sewerage Scheme - Contract No. 131/5, Abu Dhabi

AD Municipality John Taylor & Sons 31/08/1995 452 25/11/1996 30,555,810.00 30,555,810.00 3

5 202Abu Dhabi Sewerage Scheme - Contract No. 142/12, Abu Dhabi

AD Municipality John Taylor & Sons 18/11/1995 365 17/11/1996 11,011,499.00 11,011,499.00 2

6 209

Miscellaneous Sewerage Works in Musaffah - Phase II, Contract No. 142/15, Abu Dhabi

AD Municipality John Taylor & Sons 06-01-99 457 31/08/2000 21,746,626.00 21,746,626.00 4.5

7 210Musaffah Sewerage Scheme - Southern Sector, Contract No. 147, Abu Dhabi

AD Municipality John Taylor & Sons 06-01-99 458 09-01-00 30,969,544.00 30,969,544.00 5

4- Abu Dhabi Municipality

Al Hamed Development Construction L.L.C.Tel: 02-6426633Fax: 02-6418107P.O. Box : 4588

Abu Dhabi - UAE

SNI- AL HAMED CLAIMS APPRAISAL. Jan./08

S.No Proj No. Project Client Consultant Tender Date Commence

DateDuration (Days)

Date of Completion P.A.C. Contract Value Final Cont. Value

Estimated Claim

(Million)

8 211 Al Khatim Sewerage Project, Contract No. 411, Abu Dhabi AD Municipality Dortsch

Consultants 20/09/1999 452 15/12/2000 29,500,000.00 29,500,000.00 4.5

9 213Al Mafraq Sewerage Project, Contract No. 148/10, Abu Dhabi

AD Municipality Hyder Consulting 06-06-00 869 23/10/2002 31/10/2001 24,734,567.00 24,734,567.00 3

10 217ADSS Contract No. 722, Sewerage of Al Shamkha, Phase 2

AD Municipality Montgomery Watson 05-07-02 15/07/2002 469 27/10/2003 27/03/2003 16,675,186.00 16,675,186.00 2.5

11 218ADSS Contract No. 723, Sewerage of Al Shamkha, Phase 2

AD Municipality Montgomery Watson 05-07-02 09-01-02 452 27/11/2003 27/11/2003 17,978,080.00 17,361,703.00 2

12 221ADSS Contract No. 714/2, Trunk Sewerage of Falah & Al Shamkha

AD Municipality Montgomery Watson 28/05/2002 23/09/2002 475 01-11-04 01-11-04 18,031,076.00 18,562,283.00 2

13 224

Sewerage & Surface Water Works In Abu Dhabi & Musaffah- Phase 20 (ADSS No. 142/26)

AD Municipality Hyder Consulting 02-10-04 08-10-04 719 30/07/2006 30,000,000.00 30,000,000.00 4

14 1006The Redevelopment of Mohd Bin Zayed Stadium at Al Jazira Club in Abu Dhabi

AD MunicipalityDewan

Architects & Engineers

22/08/2005 358 15/08/2006 100,000,000.00 100,000,000.00 17

839,059,591.00 812,596,117.00 98Total

Al Hamed Development Construction L.L.C.Tel: 02-6426633Fax: 02-6418107P.O. Box : 4588

Abu Dhabi - UAE

SNI- AL HAMED CLAIMS APPRAISAL. Jan./08

S.No Proj No. Project Client Consultant Tender Date Commence

DateDuration (Days)

Date of Completion P.A.C. Contract Value Final Cont. Value

Estimated Claim

(Million)

1 168 New Hangar Facility at Abu Dhabi International Airport GAMCO Halcrow

International 10-03-01 12-06-01 514 05-04-03 10-04-05 36,000,000.00 35,538,286.00 26

2 178Habshan Residential Complex - Expansion Contract # 175210/C1

ADNOC - GASCO Hill International 20/05/2002 24/08/2002 1011 31/05/2005 09-03-06 99,250,000.00 98,727,622.00 20

135,250,000.00 134,265,908.00 46Total

5- Abu Dhabi Others

Al Hamed Development Construction L.L.C.Tel: 02-6426633Fax: 02-6418107P.O. Box : 4588

Abu Dhabi - UAE

SNI- AL HAMED CLAIMS APPRAISAL. Jan./08

S.No. Proj No. Project Client Consultant Tender Date Commence

DateDuration (Days)

Date of Completion P.A.C. Contract Value Final Cont. Value

Estimate Claim

(Million)

1 212Jumeirah & Al Safa Sewerage & Drainage Project - Phase 9, Dubai

Dubai Municipality K & A Joint with M.E. 20/03/1999 453 15/06/2000 23,216,000.00 23,216,000.00 2

2 222DM Contract # DS-114, Al Nahda & Al Qusais Sewerage & Drainage

Dubai Municipality

Dr. Ahmed Al Warith

Consulting Engineers

20/07/2002 15/11/2003 668 13/09/2005 25,777,777.00 21,286,711.00 3

3 227 DS 131 Al Barsha 2 Sewerge and Drainage Dubai Municipality Al Thurath

Engineering 10-10-04 03-05-05 730 03-05-07 103,999,979.00 103,999,979.00 8

4 330 Dubai Municipality Nursery at WDubai Municipality Al Burg Engineering 05-09-05 549 11-09-06 Terminated 52,598,039.00 52,598,039.00 6

205,591,795 201,100,729.00 19Total

6- DM

Al Hamed Development Construction L.L.C.Tel: 02-6426633Fax: 02-6418107P.O. Box : 4588

Abu Dhabi - UAE

SNI- AL HAMED CLAIMS APPRAISAL. Jan./08

S.No. Proj No. Project Client Consultant Tender Date Commence

DateDuration (Days)

Date of Completion P.A.C. Contract Value Final Cont. Value

Estimate Claim

(Million)

1 315Dubai Int'l Airport - Extension to VIP Pavolion, Cont. No. AX-180

Dubai Civil Aviation

Rice Perry Ellis 26/08/2002 10-12-02 323 31/08/2003 deleted 19,250,000 1,916,101.00 2.5

2 320Dubai Int'l Airport Expansion-II, AX-237 Executive Jet Hangar

Govt. fo Dubai - DCA R M J M 24/02/2004 06-01-04 629 20/02/2006 48,000,000.00 48,222,000.00 5

3 321 Dubai Int'l Airport Expansion-II, AX-183 VIP 2 Terminal

Govt. fo Dubai - DCA R M J M 14/03/2004 06-01-04 517 31/10/2005 30,000,000.00 30,577,995.00 4.5

4 327Dubai Int'l Airport Expansion-II, AX-176 Ground Service Equipment Complex

Govt. fo Dubai - DCA R M J M 07-05-04 16/10/2004 395 15/11/2005 16,000,000.00 16,332,194.00 3

5 328 Dubai Int'l Airport Expansion-II, AX-083 New Fire Station

Govt. fo Dubai - DCA R M J M 07-05-04 16/10/2004 425 15/12/2005 19,000,000.00 19,035,326.00 2.5

132,250,000 116,083,616.00 17.5Total

7- DCA

Al Hamed Development Construction L.L.C.Tel: 02-6426633Fax: 02-6418107P.O. Box : 4588

Abu Dhabi - UAE

SNI- AL HAMED CLAIMS APPRAISAL. Jan./08

S.No. Proj No. Project Client Consultant Tender Date Commence

DateDuration (Days)

Date of Completion P.A.C. Contract Value Final Cont. Value

Estimate Claim

(Million)

1 317 The Palm Jumeirah - Signature Homes (234 Villas) NAKHEEL Schuster

Pechtold 08-10-03 11-01-03 893 04-12-06 278,422,052.00 316,428,950.00 40

2 319 Shoreline Apartments - Package 4 NAKHEEL

ACE - Associated Consulting Engineers

30/11/2003 23/02/2004 812 15/05/2006 237,420,864.00 252,319,378.00 37

515,842,916.00 568,748,328.00 77Total

8- NAKHEEL

Al Hamed Development Construction L.L.C.Tel: 02-6426633Fax: 02-6418107P.O. Box : 4588

Abu Dhabi - UAE

SNI- AL HAMED CLAIMS APPRAISAL. Jan./08

S.No. Proj No. Project Client Consultant Tender Date Commence

DateDuration (Days)

Date of Completion P.A.C. Contract Value Final Cont. Value

Estimate Claim

(Million)

1 324 Lake Terrace on Plot D2, Dubai Damac Properties W. S. Atkins 05-09-04 17/08/2004 593 04-02-06 146,820,000.00 146,820,000.00 22

2 329 Lake view Tower on Plot No. B2 - Jumeirah Lake Towers Damac Properties Al Gurg 24/01/2005 06-01-05 942 30/12/2007 152,000,000.00 151,548,461.00 17

298,820,000.00 298,368,461.00 39Total

9- DAMAC PROPERTIES

Al Hamed Development Construction L.L.C.Tel: 02-6426633Fax: 02-6418107P.O. Box : 4588

Abu Dhabi - UAE

SNI- AL HAMED CLAIMS APPRAISAL. Jan./08

S.No. Proj No. Project Client Consultant Tender Date Commence

DateDuration (Days)

Date of Completion P.A.C. Contract Value Final Cont. Value

Estimate Claim

(Million)

1 316Uptown Mirdif Development Cont. Pack. B & D - Main Works

Union Properties Khatib & Alami 08-12-03 15/10/2003 778 12-01-05 25/02/2007 252,800,000.00 224,918,160.00 20

2 325 Uptown Mirdif Development Cont. Pack. A Union Properties Khatib & Alami 26/07/2004 11-09-04 395 12-09-05 70,000,000.00 76,332,546.00 12

322,800,000.00 301,250,706.00 32Total

10- UNION PROPERTIES

Al Hamed Development Construction L.L.C.Tel: 02-6426633Fax: 02-6418107P.O. Box : 4588

Abu Dhabi - UAE

SNI- AL HAMED CLAIMS APPRAISAL. Jan./08

S.No. Proj No. Project Client Consultant Tender Date Commence

DateDuration (Days)

Date of Completion P.A.C. Contract Value Final Cont. Value

Estimate Claim

(Million)

1 318Burj Dubai Residence Development - East Frame Structures

NASA MULTIPLEX 22/02/2004 282 30/11/2004 22,400,000.00 22,400,000.00 5

2 332 Sajwani Villa Hussain Al Sajwani

National Engineering

Bureau15/05/2005 488 15/09/2006 28,246,281.00 29,580,156.00 8

50,646,281.00 51,980,156.00 13

11- DUBAI - OTHERS

Total

Al Maqam Gen. Cont. Maint. Est.Tel: 02 - 6211218Fax: 02 - 6427225P.O. Box : 27557Abu Dhabi - UAE

Claim Value (AED) Prepration Date

1 Said Khalfan Al Ghaith Bulding Said Khalfan Al GhaithConin

Incorporated Consultants

13-05-06 06-12-10 34,200,000.00 37,500,000.00 4,383,700.45 October 2006

2 Mosque for link International Properties at Plot P-2, Sector W-1, Abu Dhabi

Link International Properties(LIP)

EWAN Architectural &

Engineering Consultancy

28-11-11 27/11/2012 5,388,000.00 -- 969,361.96 June-2012

39,588,000.00 37,500,000.00 5,353,062.41Total

Contract Value (AED)

Final Cont. Value (AED)

Claim StatusS. No. Project Client Consultant Commence

DateDate of

Completion

Al Massa For Gypsum Works DecorationTel: 02 - 6274100Fax: 02 - 6272327P.O. Box : 46120Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Al Mafraq Hospital Package II - Drywall and Ceiling Works (Basement and Podium Building) (SEHA)

Habtoor Leighton & Murray & Roberts JV Allen & Shariff 19-02-12 04-11-13 28,600,000.00 - 4,789,264.00 Juyl-13

28,600,000.00 0.00 4,789,264.00

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Project Manager Commence Date

Date of Completion

AL MEZIN GENERAL CONTRACTINGTel: 02 - 68 10 456 Fax: 02 - 68 14 463

P.O. Box : 705Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1

COMMERCIAL BUILDING – EAST 25, PLOT 35, ABU DHABI MR. HUMAID & KHAMEES OBAID THANI MATAR AL RUMAITHI

Abu Dhabi Islamic Bank – Burooj Properties

Sayed Khallaf Consultants Engineers

16/04/2009 51,365,385.00 Un-defined 5,711,691.00 Apr-10

51,365,385.00 - 5,711,691.00

Final Cont. Value (AED)

Claim Status

Total

Commence Date

Date of Completion

Contract Value (AED)S. No. Project Client Engineer

Al Mureiki General ContractingTel: 02-6770590Fax: 02-6725475

P.O. Box : 211Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 New General Hospital at Al Rahba, Abu Dhabi - Claim v. Wehco / Sensaire J.V. PWD

Belgian Arab Consultant

Bureau

Without Delay

31/05/1999 30/03/2001 54,980,900.00 54,131,263.59 10,593,129.00 Dec-04

54,980,900.00 54,131,263.59 10,593,129.00

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

Al Otaiba And Garg Contracting L.L.C.Tel: 02-6274936Fax: 02-6275646P.O. Box : 43089Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1Contract No. A-2025 - Civil Works for 11 KV Prefabricated Sub-stations and Associated Works in Al Ain

AADC AADC 05-10-04 09/05/2005 09/07/2005 7,604,327.00 7,606,512.20 645,970.26 Jan-06

7,604,327.00 7,606,512.20 645,970.26

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

Al Suwaiket Trading ContracingTel: 04 - 4298770Fax: 04 - 4298771

P.O. Box : 7688Dubai - UAE

Claim Value (SAR)

Preparation Date

1Sipchem's Product & Application Development Center (PADC) in Al - Khobar - KSA, Engineering Services, SAP Contract No. 7600000047

Saudi Int'l Pertochemical Co.

(Sipchem)Sipchem 31-07-11

Terminated on

22/05/2012 74,700,000.00 79,764,461.00 65,921,573.59 Sep-13

2

Al Khobar Lakes Development, Infrastructure Package No. 3B Infrastructure Works (Deep & Shallow Services) for Village 1 and Rough Grading Works for Villages 2 & 3

EMAAR MIDDLE EAST 24-01-09 80,201,627.00

154,901,627.00 79,764,461.00 65,921,573.59

Contract Value (SAR)

Final Cont. Value (SAR)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

Alpha EnggineeringTel: 02 - 6792931Fax: 02 - 6791707P.O. Box : 43003Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

2 RELIGIOUS GUIDING CENTER FOR SHEIKHA SALAMA BINT BUTTI, SECTOR W46/01

EMIRATE OF ABU DHABIWORKS

DEPARTMENT

Winner Consulting Engineers

28-03-04 27-12-05 9,241,463.00 9,010,640.57 6,565,188.27 May-10

1 BUILDING LICENSING SECTION

ABU DHABIMUNICIPALITIES &

AGRICULTURE DEPARTMENT

Al – Ramahi Engineering Consultants

12-03-05 15-11-06 6,348,369.00 8,332,014.00 5,649,617.94 Juyl-2010

3 Commercial Building of Mr. Salem Ahmad Al Guss ADCP ADCE 22-02-09 27-10-11 24,038,462.00 24,341,852.00 3,000,000.00 2012

39,628,294.00 41,684,506.57 15,214,806.21

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

Arab Korean General Contracting Co. (GENCO)Tel: 02-6440111Fax: 02-6442002P.O. Box : 46282Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 (30) LCH in Shuaiba Al Ain Works DepartmentEmirates Engineer Bearure

05-07-03

29/04/2004 04/01/2007

Except House No.

16

30,777,000.00 33,854,700.00 65,126,508.17 Feb-07

2 Roads & Parkings around some Mosques - Phase 4 Al Ain Municipality Gozi & Partner 19-04-04 19/10/2005 19/10/2006 12,000,000.00 - 8,108,507.01 Feb-07

3 Minor Roads & Parking in Al Ain Al Ain Municipality Arab Beaure 20-04-04 19/04/2006 19/12/2006 10,000,000.00 - 4,557,092.20 Feb-07

52,777,000.00 33,854,700.00 77,792,107.38

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

Ascorp HoldingTel: 02 - 5134444Fax: 02 - 5503024

P.O. Box : 5297Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Hameem Workers City Plot H1C2 ADCB Al Dhabi Engineering 29-06-08 29-08-10 429,613,333.00 429,613,333.00 under progress under progress

429,613,333.00 429,613,333.00 0.00

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

Associated Constructions Investments Co. LLC (ASCON)Tel: 02 - 6329129Fax: 02 - 6349167

P.O. Box : 3532Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Supply & Construction for Miscellaneous Civil Works at Asab - Contract No: 6978.01/ EC 10696

Abu Dhabi Company for Onshore Oil

Operations (ADCO)

Area Engineering Manager

SAS / QW09-05-10 17-04-13 87,755,940.00 - 18,586,875.24 June-2013

87,755,940.00 0.00 18,586,875.24

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Employer Representaive

Commence Date

Date of Completion

Biwater Abu Dhabi W.L.L.Tel: 02-6775949Fax: 02-6720252

P.O. Box : 692Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Mafraq Sewage Treatment Works Extensions - Contract No. 512 S.P.C. Engineering

Science Inc. 19-09-93 31-10-97 377,966,860.03 416,445,178.46 78,712,593.55 Aug-05

377,966,860.03 416,445,178.46 78,712,593.55

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

Cimel Abu DhabiTel: 02-6773963Fax: 02-6722805P.O. Box : 2889

Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Supply and Installation of 33KV Network and 33/11KV Sub-Stations in Mirfa Area ADWEA Ewbank Preece 12-03-95 07/09/1996

05/08/1997 72,487,737.00 70,875,695.29 62,225,692.89 Aug-04

72,487,737.00 70,875,695.29 62,225,692.89

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

Civil Engineering Contracting Est.Tel: 02 - 4456033Fax: 02 - 4456001P.O. Box : 45800Abu Dhabi - UAE

Claim Value (AED)Prepration

Date

1CONTRACT No. – WEA/VWD – 562/98, WATER

DISTRIBUTION PROJECT AT DALMA ISLAND – PHASE V

Abu dhabi Water and

Electricity

Hyder Consulting

Middle06-06-98 30/7/1999 15,989,305.00 17,249,548.00 21,783,293.98 Jan-2006

2CONTRACT No. – R-00-0237 WATER DISTRIBUTION

PROJECT AT DALMA ISLAND – PHASE V

Abu dhabi Water and

Electricity

Hyder Consulting

Middle10-03-00 13/1/2004 1,176,555.00 1,176,555.00 1,377,140.89 Jan-2006

17,165,860.00 18,426,103.00 23,160,434.87Total

Contract Value (AED)Final Cont. Value

(AED)

Claim Status

S. No. Project Client ConsultantCommence

Date

Date of

Completion

Construction General Contracting House (CGC)Tel: 02 - 6267424Fax: 02 - 6272035P.O. Box : 43655Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

2 Maintenance Works at Abu Dhabi ADM -Agreement

Date 07/07/2008

Terminated on

09/11/2008 Undefined Undefined 48,304,385.85 Feb-09

1 Commercial Building of Dr. Al Mazroi Dr. Hamdan Al Mazroi Consolidated Consultants (CC) 18-07-08

Terminated on

26/04/2009 155,289,000.00 - 39,998,111.96 May-2011

155,289,000.00 0.00 88,302,497.81

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

Core AllianceTel: 02 - 4437745Fax: 02 - 4437746P.O. Box : 70352Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Construction Management of Al Wathba Compound W100 Musanada 12-06-08 17-08-11

2 Construction Management of Al Shamkha South Compound SS100 Musanada 12-06-08 17-08-11

51,898,550.00 51,898,550.00 10,615,068.77Total

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

51,898,550.00 51,898,550.00 10,615,068.77 Dec-2012

S. No. Project Client Consultant Commence Date

Date of Completion

CREST GENERAL CONTRACTINGTel: 02 - 626 85 22 Fax: 02 - 626 85 33

P.O. Box : 48134Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1ACADEMIC BUILDING FOR AL JAZIRA SPORTS AND CULTURAL CENTER

ABU DHABI SPORTS

COUNCILQP International

Hanover Consulting Engineers

02-01-09 43,785,506.00 Un-defined 350,999.50 Apr-10

43,785,506.00 - 350,999.50

Final Cont. Value (AED)

Claim Status

Total

Project Manager Consultant Commence Date

Date of Completion

Contract Value (AED)S. No. Project Client

Emirates Sama General Contracting Co.Tel: 02 - 4474555Fax: 02 - 4474696

P.O. Box : 5989Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Contract # 204H.H. Sheikh Mansour Bin Zayed Engineering

Office

H.H. Sheikh Mansour Bin

Zayed Engineering

20-05-13Terminated

on 07/11/2013

2,470,000.00 -

2 Contract # 205H.H. Sheikh Mansour Bin Zayed Engineering

Office

H.H. Sheikh Mansour Bin

Zayed Engineering

19-07-13Terminated

on 07/11/2013

6,292,530.00 -

8,762,530.00 0.00 1,800,587.62

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

1,800,587.62 Dec-13

S. No. Project Client Consultant Commence Date

Date of Completion

Falcon Electro Mechanical Contracting (FEMC)Tel: 02 - 6818262Fax: 02 - 6818263P.O. Box : 42886Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Project (EPC-6) ED Zublin AG - 07-06-10 - 115,000,000.00 Undergoing V.O. Claims 36,085,679.23 Several Dates

115,000,000.00 - 36,085,679.23

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

GHANTOOT TRANSPORT GENERALCONTRACTING EST.

Tel: 02 - 642 78 87 Fax: 02 - 642 72 25

P.O. Box : 27557Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1NUJOOM ISLANDS DEVELOPMENT EARTH WORKS – PHASE 2 IN SHARJAH Al Hanoo holding

Company

Maunsell Consultancy

Services LTD

Halcrow International

Partners13/05/2006 11-08-08 103,420,000.00 48,743,128.99 58,207,518.68 Feb-10

2NUJOOM ISLANDS DEVELOPMENT ROCK WORKS IN SHARJAH Al Hanoo holding

Company

Maunsell Consultancy

Services LTD

Halcrow International

Partners07-08-06 27/12/2009 99,232,400.00 72,564,710.74 54,777,668.06 Feb-10

202,652,400.00 121,307,839.73 112,985,186.74

Claim Status

Total

Commence Date

Date of Completion

Contract Value (AED)

Final Cont. Value (AED)S. No. Project Client Engineer Designer

Heliopolis Electric Co.

Tel: 02 - 6412641 Fax: 02 - 6412577P.O. Box : 26253Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Contract No. WED/PD/INST - 673 - Umm Al Nar - Al Shahama Road Lighting Project W.E.D W.E.D 25-05-91 08/11/1991

09/01/1993 13,334,487.05 13,932,063.86 11,059,640.70 Jun-04

2 Contract No. WED/PD/AD-AA/S-INST - 815 - Supply and Installation of 11KV Overhead Lines in Al Ain W.E.D W.E.D 24-05-95 23/11/1996

23/05/1997 8,067,501.33 9,053,287.72 866,848.98 Jun-04

3Contract No. WED/PD/AD-AA/S-INST/C- 853 - Reinforcement of 33KV Network in Abu Dhabi and Al Ain Areas

W.E.D W.E.D 17-01-96 15/07/1997 16/05/1998 55,853,150.82 65,251,147.99 9,937,693.47 Jun-04

4Contract No. WED/PD/AD/S-INST/C- 866 - Supply and Installation 104km of 33KV XLPE Cables, Pilot Cables and Related Works at Mossafah Area

W.E.D W.E.D 25-12-95 24/04/1998 23/10/1998 39,272,859.99 44,202,226.78 4,879,191.43 Jun-04

5Contract No. D-99-0128 - Supply and Installation of 11KV Cables for the Reinforcement of Distribution Network at Various Locations

A.D.W.E.A. A.D.W.E.A. 25-01-00 12/09/2000 15/03/2001 4,958,922.14 4,669,282.80 1,994,521.26 Jun-04

6 Contract No. A-99-54 - Supply and Installation of 11KV OHLS for Bida Faris Farms, Al Ain A.D.W.E.A. A.D.W.E.A. 15-11-99 14/05/2001

14/03/2002 30,850,694.16 29,358,919.46 7,188,983.90 Jun-04

7 Contract A-00-0019 - 33KV Underground Cables in Abu Dhabi and Al Ain - Lot 2B A.D.W.E.A. A.D.W.E.A. 01-02-00 31/08/2001

27/08/2001 7,632,118.91 6,598,552.25 1,020,880.45 Jun-04

8 Contract No. D-99-129 - Transfer of Loads to Shahama Primary and Mafraq Primary Substations A.D.W.E.A. A.D.W.E.A. 01-04-00 30/06/2001

30/04/2002 18,704,671.16 18,045,079.30 5,936,121.46 Jun-04

S. No. Project Client Consultant Commence Date

Date of Completion

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Heliopolis Electric Co.

Tel: 02 - 6412641 Fax: 02 - 6412577P.O. Box : 26253Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

9 Contract No. A-00-0132 - Installation of New Connection for LV Cables in Al Ain (220-250KM) A.D.W.E.A. A.D.W.E.A. 22-10-02 21/04/2002

21/08/2002 4,725,598.25 5,670,713.00 185,773.00 Jun-04

183,400,003.81 196,781,273.16 43,069,654.65Total

S. No. Project Client Consultant Commence Date

Date of Completion

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

JARNAS ELECTRO MECHANICAL EST.Tel: 02 - 642 78 87 Fax: 02 - 642 72 25

P.O. Box : 32635Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 BLOOD BANK IN ABU DHABI (MEP WORKS) Works Department Arab Union Cont.

James Cubitt & Partners

James Cubitt & Partners 06-12-02 30/06/2007 2,375,000.00 Un-defined 3,928,039.64 Mar-10

2 BLOOD BANK IN AL AIN (MEP WORKS) Works Department Arab Union Cont.

James Cubitt & Partners

James Cubitt & Partners 06-12-02 30/06/2007 2,375,000.00 Un-defined 4,381,962.36 Mar-10

4,750,000.00 - 8,310,002.00

Claim Status

Total

Consultant Commence Date

Date of Completion

Contract Value (AED)

Final Cont. Value (AED)S. No. Project Client Engineer

Mabani Abu DhabiTel: 02 - 6775949 Fax: 02 - 6720252

P.O. Box : 692Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Rehabilitation of External Service Gallery, Stage 2, Zayed Sports City

Abu Dhabi Town Planning Dept.

Bureau Veritas 18-12-99 17/06/1999

30/04/2003 16,132,942.00 15,628,939.00 10,110,273.51 Oct-04

2 Water Supply to Sheikh Khalifa Farm, Seih Al Sadeera Forest and Other Adjacent Areas

Abu Dhabi Water and Electricity Authority Tebodin 21-02-02 20/05/2003

20/10/2004 34,901,885.37 34,901,885.37 25,439,623.89 Oct-04

3 Water Supply to Sheikh Khalifa Farm, Seih Al Sadeera Forest and Other Adjacent

Abu Dhabi Water and Electricity Authority Tebodin 21-02-02 20/05/2003

20/10/2004 34,901,885.37 12 Months 5 Months Oct-04

4 Contract No. 509/07 - Lowering of Ground Water Table in Al Ajban and Al Semeih

Abu Dhabi Town Planning Dept. Parsons 04-09-04 02/03/2005

05/06/2005 9,483,386.02 180 Days 95 Days Feb-05

5 Contract No. 147/12-Surface Water Drainage Works for Interchanges at Airport / Al Ain / Mussafah Roads

Abu Dhabi Municipality - SPC Hyder 16-10-04 12/07/2005

12/10/2005 15,937,554.28 270 Days 92 Days Feb-05

6 Contract No. DS149/3 - Jebel Ali Irrigation Main Line 3 Dubai MunicipalityMontgomery

Watson Harza

05-10-02 16/02/2004 10/01/2005 38,553,392.00 500 Days 328 Days Feb-05

7 Contract No. 118/1 - Al Barsha Sewerage and Drainage - Phase 1 Dubai Municipality khatib and

Alami 06-07-02 06/03/2004 06/03/2005 59,940,350.00 610 Days 366 Days Mar-05

8 Rehabilitation of External Service Gallery, Stage 2 Zayed Sports City

Abu Dhabi Town Planning Dept.

Bureau Veritas 18-12-99 17/06/1999

30/04/2003 16,132,942.00 547 Days 683 Days Mar-05

S. No. Project Client Consultant Commence Date

Date of Completion

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Mabani Abu DhabiTel: 02 - 6775949 Fax: 02 - 6720252

P.O. Box : 692Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

9Contract No. 502/13 Urgent Miscellaneous Surface drainage works for Low Areas in Al Samha, Al Semeih, Al Taweela and Al Shahama

Abu Dhabi Municipality - SPC Parsons 19-06-04 13/06/2005

17/07/2005 18,900,000.00 360 Days 34 Days Mar-05

51,034,827.37 50,530,824.37 35,549,897.40Total

S. No. Project Client Consultant Commence Date

Date of Completion

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Mabani QatarTel: +9744552163Fax: +9744552170

P.O. Box : 9743Doha - Qatar

1 Ras Laffan Water Pipelines - Contract No. GTC/37/2001Qatar General

Electricity and Water Company

Qatar General Electricity and

Water Company21-07-02

20/07/2004 31/12/2004 31/05/2005

254,800,000.00 730 Days 164Days 151 Days Mar-05

254,800,000.00

Contract Value (QR)

Original Duration

Extension of Time

Claim Preparation

Date

Total

S. No. Project Client Consultant Commence Date

Date of Completion

Mammut GroupTel: 04-8011111Fax: 04-8011113P.O. Box : 28414

Dubai - UAE

Claim Value (AED)

Preparation Date

1 2B+G+M+3+R - Al Wahda Mall 2, Plot No. P7d, Sector East 19, Abu Dhabi Ali & Sons Khatib & Alami 17-09-09 28-04-11 83,500,000.00 85,865,973.56 50,464,452.66 Jan-12

2 Waterfront - Madinat Al Arab Badrah Development Manara District Stage - 1 Nakheel Woods Bagot 19-11-07 30-06-10 508,700,000.00 329,641,120.95 127,234,797.50

592,200,000.00 415,507,094.51 177,699,250.16

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

Mechanical And Civil Engineering Co. LTD - MACETel: 02-6666462Fax: 02-6662616P.O. Box : 2307

Abu Dhabi - UAE

1 Contract No. 190/4 SPC Parsons 21-08-96 10-08-98 19-02-99 17-02-99 79,077,885.00 87,748,934.24 5,911,915.29 Nov-05

2 Contract No. 190/8 SPC Parsons 05-12-99 27-05-01 10-09-01 23-05-01 32,943,560.00 33,744,451.96 4,544,317.56 Nov-05

3 Contract No. 142/20 SPC Hyder 18-06-02 06-06-04 30-04-05 23-04-05 30,000,000.00 30,557,898.42 5,515,176.68 Mar-06

4 Contract No. 159/6 SPC Dorsch 10-11-03 02-05-05 - Not Issued 10,308,171.35 10,292,546.65 1,243,808.71 Mar-06

5 Contract No. 186/3 SPC Hyder 15-12-03 08-12-04 - - 25,644,828.00 In Progress 22,783,066.63 Apr-06

6 Contract No. 185/4 SPC Hyder 21-04-01 12-10-02 17-03-03 17-03-03 15,479,270.94 18,501,386.78 1,571,603.27 Dec-05

7 Contract No. 515/3 SPC Parsons 23-02-99 17-02-00 17-02-01 17-02-01 19,857,957.00 23,176,859.41 5,771,227.67 Dec-05

8 Contract No. 147/9 SPC Hyder 18-09-04 15-01-05 - Not Issued 7,559,323.25 5,750,000.00 5,546,312.58 Dec-05

S. No. Project Client Consultant Commence Date

Completion Date PreparedContract Value

(AED)Final Cont. Value

(AED)Claim Value

(AED)

Extended Completion

DateDate of PAC

Mechanical And Civil Engineering Co. LTD - MACETel: 02-6666462Fax: 02-6662616P.O. Box : 2307

Abu Dhabi - UAE

9 Contract No. 148/5 SPC Hyder 04-07-96 25-12-97 27-06-98 30-04-99 42,000,000.00 50,247,612.11 6,001,801.79 Dec-05

10 Contract No. 148/12 SPC Hyder 02-11-02 30-04-03 24-07-03 24-07-03 7,700,000.00 7,817,299.84 2,712,196.59 Dec-05

11 Contract No. 514/1B SPC Parsons 30-11-98 24-11-99 04-03-01 04-03-01 25,084,797.00 27,368,632.00 12,305,905.46 Jan-06

12 Contract No. 148/3 SPC Hyder 02-01-95 24-06-96 22-09-96 22-09-96 28,577,777.00 34,436,645.55 3,700,360.60 Jan-06

13 Contract No. 190/5 SPC Parsons 21-06-99 11-12-00 11-12-00 41,239,850.00 43,301,842.50 4,364,431.30 Feb-06

365,473,419.54 372,944,109.46 81,972,124.13Total

S. No. Project Client Consultant Commence Date

Completion Date PreparedContract Value

(AED)Final Cont. Value

(AED)Claim Value

(AED)

Extended Completion

DateDate of PAC

Orient Contracting Company (OCC)Tel: 02 - 5543311Fax: 02 - 5543312

P.O. Box : 348Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1

Abu Dhabi Sewage SchemeConstruction of 60 KM Pipe Swers & HouseConnection of 100-300mm with Manholes,associated Civil Workss, 1No. Lifting

Sewerage ProjectCommittee,Abu Dhabi Municipality

Oct - 1981 Jan - 1984 40,800,000.00 40,800,000.00

2

Construction of 5 Kilometer of GRP Sewerlines of1800mm ti 2300mm diameter and 40km of VC pipeSewer lines of 100mm to 300 mm diameter pipes with associated Manhoies and Ancilliary works

Sewerage ProjectsCommitteeEmirates of Abu Dhabi

May - 1977 Dec - 1981 84,332,635.00

3

Construction of 93km of GRP sewer lines 800mm to 1300mm diameter with associated valve chambers and appurtnances, 0.5km of submarine channel crossing three pumping stations (Ps1,Ps5 And PS6

Sewerage ProjectsCommitteeEmirates of Abu Dhabi

01-02-77 01-09-81 199,992,200.00

4

Water supply & Distrubtion at Sir Baniyas Island Construction of One & Two Million GalionWelded Steel Water Storage Tanks,Pumping Station with Submersible Pumps,

Water & ElectricityDepartment (WED)Emirates of Abu Dhabi

May - 1977 01-02-78 25,056,000.00

5

H.Q. Dhafrah Brigade Camp - SuweihanConstruction of Complete Military CampComprising, Site Levelling, roads, water supplyand distirbution, electrical supply and

UAE Armed Forces-GHQ Engineering CorpnADDF

01-08-79 01-08-81 93,717,711.00

6

Air Defence Camp - SuweihanConstruction of Complete Military Camp comprising, Site leveling, roads, water supplyand distibution, electrical supply and

UAE Armed Forces-GHQ Engineering CorpnADDF

01-11-79 01-04-82 49,500,000.00

40,800,000.00 493,398,546.00 0.00

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

Pan Arabian Enterprises For Pipeline ConstructionTel: 02 - 6344463 Fax: 02 - 6338880

P.O. Box : 328Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Contract No. WE-23 - Upgrading Pumping Stations including Electro Mechanical Works ADWEA D. Balfour 08-09-96 07-03-99 29,012,298.00 28,497,292.78 3,761,975.87 Oct-05

2 Contract No. WED/VWD 554/97 - Water Spply System from Madinat Zayed to Mezeirah ADWEA DSS Engineers

Inc. 05-04-97 04-04-99 123,600,000.00 127,806,234.39 17,457,211.41 Jun-05

3 Contract No. 566/98 - 800mm Pipeline Project frm Mezeirah to Western Liwa ADWEA DSS Engineers

Inc. 01-10-98 31-12-00 83,788,723.00 90,858,123.90 18,882,183.31 Jun-05

4 Contract No. ADWEA/VWD-565-98 - Water Supply Scheme for New Houses at Shahama (Al Bahya) ADWEA ITALCONSULT 21-10-98 30-09-00 38,301,432.30 32,829,686.50 7,601,770.73 Sep-05

5 Contract No. 514/1A - Irrigation Facilities from Mafraq STW

Abu Dhabi Municipality

Engg. Science Inc. 30-11-98 12-11-00 15,927,381.00 19,358,601.93 3,647,050.29 Jul-05

6 Contract No. 307 - Baaya - Sila and Ghuwaifat Sewerage Systems

Abu Dhabi Municipality

KEO International 02-09-00 31-12-02 58,142,281.00 57,708,930.83 20,797,570.55

May 2005 Updated

Octover 2005

7 Contract No. G 1039 - Water Supply to Al Hail Island and Abu Dhabi International Airport ADWEA ITALCONSULT 12-02-02 11-02-03 11,553,729.00 11,553,995.00 6,556,023.99 Aug-05

Contract Value (AED)

Final Cont. Value (AED)

Claim StatusDate of CompletionS. No. Project Client Consultant Commence

Date

Pan Arabian Enterprises For Pipeline ConstructionTel: 02 - 6344463 Fax: 02 - 6338880

P.O. Box : 328Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

8 Contract No. 411/6 - Miscellaneous Sewerage and Irrigation Works at Al Khatm

Abu Dhabi Municipality

DORSCH Consultats 17-02-02 18-11-03 12,117,425.00 8,200,000.00 2,744,583.20 Jul-05

9 Contract No. 308 - Liwa Sewerage System Abu Dhabi Municipality

KEO International 13-05-02 01-05-04 53,937,030.00 5,666,948.69 17,230,546.16

May 2005 Updated

Octover 2005

10 Contract No. G 1100 - Water Pipeline - From Shuwaihat to Sila ADWEA ITALCONSULT 19-11-02 18-05-04 190,737,190.00 - 29,254,701.55 Aug-05

617,117,489.30 382,479,814.02 127,933,617.06

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

Pauling Middle East Co. L.L.C.Tel: 02 - 6329292 Fax: 02 - 6352500

P.O. Box : 282Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Road from Nahil / Qarn Bint Sa'd to Al Hili Emiraes of Abu Dhabi Works Department Hyder 26-05-01 25/01/2003

23/10/2004 79,528,586.00 95,263,281.96 58,980,745.93 Jul-05

2 Contract for 120 No. Low Cost Houses at Shamkha Plot No. (331-43)+(331-44)

Abu Dhabi Municipality and Town

Planning

Al Maktab Al Asri 15-06-03 05-12-04 58,200,000.00 58,200,000.00 10,841,614.13 Oct-04

3 Contract No. MW-OU-013-2003 Asphalt Works for Internal Roads at Al Nahyan Camp. UAE Armed Forces UAE Armed

Forces 18-04-04 17-12-04 3,800,000.00 3,800,000.00 1,808,647.17 Jun-05

4 JUMEIRAH PARK VILLAS – PACKAGE 2 & 2A Nakheel PJSCDar Al Handasah

(Shair and Partners)

12-02-08 09-03-14 1,178,125,000.00 1,192,490,375.92 378,318,195.33 Apr-15

1,319,653,586.00 1,349,753,657.88 449,949,202.56Total

Contract Value (AED)

Final Cont. Value (AED)

Claim StatusS. No. Project Client Consultant Commence

DateDate of

Completion

Rapco Civil Contracting Co.Tel: 02 - 6813633 Fax: 02 - 6813634

P.O. Box : 6065Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Contract No. 515/96 - Demolition and Re-construction of Mna Zayed Filling Station Abu Dhabi ADNOC ADNOC 21-09-97 09/05/1988

09/08/1999 1,495,704.00 1,495,704.00 2,304,318.26 Mar-05

1,495,704.00 1,495,704.00 2,304,318.26

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

Rashid Abdula EmranTel: 04 - 2345577

Dubai - UAE

Claim Value (AED)

Preparation Date

1 Rashid Abdulla Emran Hospital Rashid Abdulla Emran Beijing Emirates Co.MAZAYA

CONSULTING ENGINEERS

18-11-07Terminated on 31-12-

2012 56,000,000.00 63,477,163.00 13,477,126.73 Sep-14

56,000,000.00 63,477,163.00 13,477,126.73

Date of Completion

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Contractor Consultant Commence Date

Roads And General Contracting Projects (RAPCO)Tel: 02 - 6772204 Fax: 02 - 6764911

P.O. Box : 2315Abu Dhabi - UAE

Claim Value (AED)

Simple Interest (8%) to 30/04/05

1 Up-grading of Abu Dhabi - Al Ain Express Way - Contract No. 1 Abu Dhabi P.W.D. Ital Consult 05-01-93 20-08-96 258,390,656.34 248,065,826.55 100,566,056.96 779,003,963.85

2 Construction of Internal Roads for New Low Cost House at Shawamekh City - Cont. # 6 Abu Dhabi P.W.D. Frederic R.

Harris Inc. 01-09-01 19-02-03 70,000,000.00 56,444,293.65 59,643,850.53 493,047,115.96

3 Development of Old & New Sanaya & Const. of Bridge Across Wadi Al Ain Municipality Freeman Fox

International 20-04-91 16-07-95 107,274,160.29 161,405,680.45 38,490,133.73 294,769,043.87

4TRIP Contract # 17/17A Improvement of Intersections & Widening of Roads (Cost. & Main. Of King Khalid Bin Abdel Aziz/Manhal St.)

Abu Dhabi Municipality

De Leuw Cather Int'l 24-09-88 31-12-91 92,057,534.90 103,748,931.64 33,580,129.70 247,650,236.53

5 The New Road Tarif - Madinat Zayed Liwa - Contract No. 2B

Abu Dhabi Works Dept.

Ove Arup & Partners 03-10-00 29-12-02 77,669,874.97 69,346,824.74 31,713,256.18 261,796,839.62

6 Trip Contract # 35 Tourist Club (South) Abu Dhabi Municipality

De Leuw Cather Int'l 19-06-93 30-06-97 107,870,381.43 107,857,705.56 26,906,732.80 210,276,485.42

7 Improvement and Reinforcement of Existing Roads at M. Zayed - Cont. # 2

Abu Dhabi Works Dept.

Frederic R. Harris Inc. 12-09-00 30-09-03 74,498,005.00 68,498,446.51 24,924,766.89 207,259,338.31

8 Abu Dhabi Trip Contract # 23 Saeed Bin Tahnoun the First Street

Abu Dhabi Municipality

De Leuw Cather Int'l 26-09-92 15-06-95 82,382,636.89 76,464,529.02 24,195,907.88 185,135,154.87

Contract Value (AED)

Final Cont. Value (AED)

Claim StatusS. No. Project Client Consultant Commence

DateDate of

Completion

Roads And General Contracting Projects (RAPCO)Tel: 02 - 6772204 Fax: 02 - 6764911

P.O. Box : 2315Abu Dhabi - UAE

Claim Value (AED)

Simple Interest (8%) to 30/04/05

9 Rehabilitation and Replacement of Old Water Mains Outside Abu Dhabi Island - Cont. No. N-00-0302 ADWEA Penspen Int'l Ltd. 19-05-01 31-07-04 51,419,892.10 51,419,892.10 19,622,381.66 164,479,641.47

10 Construction & Paving Ghantoot Roads Abu Dhabi P.W.D. Freeman Fox International 11-07-90 25-08-91 53,328,269.00 51,005,288.23 17,591,917.49 129,245,166.96

11 H. H. Sh. Sultan Bin Khalifa Al Nahyan - Palace Road Works Trip Contract # W-28

Abu Dhabi Municipality

De Leuw Cather Int'l 11-01-97 30-11-99 10,176,178.45 13,437,854.81 15,504,747.76 124,170,515.81

12 Two Bridges on Al Ain - Dubai Road (Al Oha & Masheeq Area) Al Ain Municipality Ital Consult 10-03-90 02-11-91 25,780,538.50 27,466,240.19 13,343,242.46 98,232,585.42

13 Construction of Internal Roads for New Low Cost House at Shawamekh City - Cont. # 3 Abu Dhabi P.W.D. Frederic R.

Harris Inc. 18-08-98 08-04-00 81,787,915.95 89,988,847.76 10,075,638.18 80,978,318.12

14 Construction of New Truck Road from Al Faya to She Sheib - Contract No. 3 Abu Dhabi P.W.D. Render Palmer &

Tritton 27-12-99 25-08-01 68,034,252.57 67,730,115.60 9,718,023.19 79,177,660.50

15 Construction of 2nd Carriageway & Rehabilitation of Sweihan - Al Saad Road (Stage-1) Abu Dhabi P.W.D. Diwi Consult 06-01-98 05-07-99 67,698,546.50 54,836,803.24 8,152,832.41 65,027,884.76

16 Construction of 2nd Carriageway & Rehabilitation of Sweihan - Al Saad Road (Stage-2) Abu Dhabi P.W.D. Diwi Consult 06-01-98 05-07-99 65,706,458.00 52,119,404.35 8,059,877.64 64,286,467.33

Contract Value (AED)

Final Cont. Value (AED)

Claim StatusS. No. Project Client Consultant Commence

DateDate of

Completion

Roads And General Contracting Projects (RAPCO)Tel: 02 - 6772204 Fax: 02 - 6764911

P.O. Box : 2315Abu Dhabi - UAE

Claim Value (AED)

Simple Interest (8%) to 30/04/05

17 Roads in Al Ain City - Stage - 12 Al Ain Municipality Ital Consult 01-08-90 30-04-92 34,479,645.70 32,667,708.99 7,970,894.98 58,995,978.65

18 Repair / Resurfacing Roads in Al Ain City Al Ain Municipality Ital Consult 23-06-90 06-04-92 14,554,011.25 14,552,616.02 7,771,553.46 57,479,686.91

19 New Service Roads & Parking in Govt. Complex in Al Ain Al Ain Municipality Asie Etudes Stup

Int'l 23-10-88 19-05-90 17,408,441.50 24,525,055.31 7,176,899.03 51,999,287.94

20 Sector Roads - E30, E31, E34/01, E34/02, E35, E26, E28, E29 and E39 - Contract 950

Abu Dhabi Municipality Gibb Ltd. 02-11-96 01-02-00 61,465,750.91 71,264,044.01 6,978,408.07 55,983,275.00

21 Samha Interchange Abu Dhabi P.W.D. Ital Consult 01-08-90 15-01-92 16,390,210.70 20,993,848.98 4,521,663.34 33,361,699.29

22 Construction of Internal Roads & Svcs. for the New Housing Sectors at East of Shawamkh City - Cont. # 3

Abu Dhabi Works Dept. Hyder Consul 02-04-01 30-06-02 31,418,616.14 37,508,025.22 3,745,307.45 30,768,572.90

23 Roads & Parking at Jabel Al Nagfa & other Areas of Al Ain Town Centre Al Ain Municipality Shankland Cox

Ltd. 01-08-92 28-02-94 10,846,890.00 11,040,064.26 3,520,683.86 26,574,314.69

24 Roads & Parking in : Sheikh Mubarak Palace - Al Ain Al Ain Municipality Freeman Fox International 20-04-85 03-04-86 7,972,303.50 7,958,568.00 3,458,590.40 23,916,389.51

S. No. Project Client Consultant Commence Date

Date of Completion

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Roads And General Contracting Projects (RAPCO)Tel: 02 - 6772204 Fax: 02 - 6764911

P.O. Box : 2315Abu Dhabi - UAE

Claim Value (AED)

Simple Interest (8%) to 30/04/05

25 Tarif - Jabal Dhanna Road Second Carriageway Rehabilitation Abu Dhabi P.W.D. Consult Ltd. 16-09-96 15-03-98 53,851,528.87 49,498,759.54 2,613,363.95 20,571,255.43

26 Repairing & Resurfacing Roads in Al Gimi & Al Quatara, Al Ain, Stage -3 Al Ain Municipality Ital Consult 25-09-85 24-11-86 21,090,000.00 21,361,662.00 2,132,454.13 14,855,902.36

27 Internal Roads for (80) Low Cost Houses at Al Shawamekh City Contract No. 2 Abu Dhabi P.W.D. Fedric R. Harris

Inc. 20-04-98 19-04-99 26,332,178.19 22,352,249.35 2,127,783.08 -

28 Sulaymat Interchange & Wadi Al Tuwayah - Al Ain Abu Dhabi P.W.D. Ital Consult 14-08-88 06-03-90 47,286,283.79 50,285,588.24 1,263,327.76 9,132,786.74

29 Service Roads to Palaces & University Farm - Al Ain Al Ain Municipality Freeman Fox International 01-06-85 18-12-85 3,977,350.00 3,991,516.45 1,187,501.29 8,184,063.68

30 Roads & Parking in : H. H. Sheikh Zayed - Al Maqam Palace and H. H. Sheikh Khalifa Palace Al Ain Municipality Ital Consult 04-01-88 03-12-88 11,471,245.60 14,258,258.77 210,007.27 1,497,092.92

31 Eastern Ring Road (North Contract No. 77 Abu Dhabi Municipality

De Leuw Cather Int'l 11-10-90 31-05-94 86,607,919.44 126,010,604.01 32,088,265.79 -

1,739,227,676.48 1,808,105,253.55 528,856,199.32 3,877,856,724.82

Date of Completion

Contract Value (AED)

Final Cont. Value (AED)

Claim StatusS. No. Project Client Consultant Commence

Date

Total

Samara Electromechanical ContractingTel: 02 - 6745547Fax: 02 - 6745546P.O. Box : 46154Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 MEP Works - Research & Security Center, Abu Dhabi Abu Dhabi Police Shahin 28-12-09 27-12-10 15,000,000.00 16,450,000.00 1,052,150.00 May-11

15,000,000.00 16,450,000.00 1,052,150.00

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

Sayed Khalaf Consultant EngineeringTel: 02 - 6331222Fax: 02 - 6313231

P.O. Box : 2884Abu Dhabi - UAE

Claim Value (AED) Prepration Date

1DEVELOPMENT OF BUILDINGS AND EXPANSION

OF HIGHER TECHNICAL CLOLLEGE CLASSROOMS / AL AIN

Department of Municipalities and

Agriculture Works & Abu Dhabi General

25/1/2005 33,845,000.00 2.4 % or 812,280.00 522,281.57 May/2011

2 SMALL PROJECTS & MAINTENANCE FOR ABU DHABI & SUBURBS – GROUP B

Department of Municipalities and

Agriculture Works & Abu Dhabi General

05-02-05 -- -- 1,502,886.19 Jan/2012

3 Administration & Training Staff Accomodation at aldhfra club in AL MARFA cITY

Department of Municipalities and

Agriculture Works & Abu Dhabi General

21/1/2010 8,300,000.00 3.2 % or 265,000.00 1,489,142.95 Mar/2011

4 600 Worshippers Mosque at New Al Shahama \ defense houses

Department of Municipalities and

Agriculture Works & Abu Dhabi General

25/6/2008 10,000,000.00 3.6 % or 360,000.00 1,317,773.26 Mar/2012

52,145,000.00 4,832,083.97Total

Initial Project Cost (AED)

Agreement Amount (AED)

Claim StatusS. No. Project Client Consultancy Service

Agreement Date

Seidco General Contracting CompanyTel: 02 - 6766635Fax: 02 - 6766061P.O. Box : 44072Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Dubai Metal & Commodities Center (DMCC) Nakheel Shankland Cox Ltd 19-04-07 18-07-08 66,928,000.00 84,217,995.12 44,737,930.44 Jul-11

2New TRANSCO Head Quarters Building in Abu DhabiContract No. N-5127

Abu Dhabi Transmission & Dispatch Co. (Transco)

Shankland Cox Ltd 19-04-07 18-07-08 66,928,000.00 84,217,995.12 44,737,930.44 Jul-11

66,928,000.00 84,217,995.12 44,737,930.44

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

Technical Architects General Contracting LLCTel: 02 - 3419990 Fax: 02 - 3419991P.O. Box : 212016

Dubai - UAE

Claim Value (AED)

Preparation Date

1 Contract No. 18-020-06 - Design & Construction of Employer's Offices - O1 (Design & Build Contract0 Nakheel

ACE - Dynamic Engineering Consultant

01-04-07 28-01-08 10,434,799.00 - 32,478,579.21 Jan-08

2 Mogle - 3 NakheelEngineering Consultants

Group (ECG)12-02-08

Terminated on

19/01/2009 950,350,435.57 - 77,850,319.00 Aug-10

960,785,234.57 0.00 110,328,898.21

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

Union Pipes UnitedTel: 02 - 5500102Fax: 02 - 5500105

P.O. Box : 9650Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Carbon Black & Delayed Cocker Samsung Engineering Co. Ltd Samsung 14-07-12 undergoing 155,400,000.00 - under process under process

155,400,000.00 0.00 0.00

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion

United Eastern Medical ServicesTel: 02 - 6266805Fax: 02 - 6266897P.O. Box : 60991Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Danat Al Emarat Hospital of United Eastern Medical Services

TERNA S.A. ENGINEERING

Engineering Consultant Group 01-02-11 undergoing 440,000,000.00 - undergoing undergoing

440,000,000.00 0.00 0.00

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Contractor Consultant Commence Date

Date of Completion

Zakum ContractingTel: 02 - 6344122Fax: 02 - 6344120P.O. Box : 77618Abu Dhabi - UAE

Claim Value (AED)

Preparation Date

1 Open MRI For Spine Surgery Center - Abu Dhabi Open MRI For Spine Surgery Center - Dubai

Emirates Engineering Consultancy

28-11-11 01-05-12 2,022,454.20 - 1,906,583.18 Mar-13

2,022,454.20 0.00 1,906,583.18

Contract Value (AED)

Final Cont. Value (AED)

Claim Status

Total

S. No. Project Client Consultant Commence Date

Date of Completion


Recommended