Premises Services - Statutory Maintenance and Inspection Guide Maintenance Element Type of system Action Required Frequency Inspection By Type of Inspection Records & Follow- up Actions Required Relevant Legislation Asbestos Asbestos Resurveying Annually UKAS accredited company for testing and inspection Asbestos management survey, update asbestos log book Record all findings in the service report .Agree all follow up actions with Client Control of asbestos regulations 2012. Asbestos Asbestos Management plan Annually Review. Annually Trained Person Asbestos management plan, risk register and action plan Record all findings in the service report .Agree all follow up actions with Client Control of asbestos regulations 2012 Asbestos Asbestos removal or remedial works Removal of asbestos containing materials. Where management survey recommends action, or as part of a demolition or refurbishment Survey. HSE licensed contractor, preferably holding a 3 year license Licensed contractor, 14 day notification may be required Record all findings in the service report .Agree all follow up actions with Client Control of asbestos regulations 2102 Building Refurb Demolition Survey Prior to any demolition /intrusive works taking place Prior to any refurbishment works taking place UKAS accredited company Demolition refurbishment survey for areas where intrusive work is planned. Record all findings in the service report .Agree all follow up actions with Client Control of asbestos regulations 2012 Page 1 of 25 Version 1-12.01.2017
Transcript
Page 1: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Asbestos Asbestos Resurveying Annually

UKAS

accredited

company for

testing and

inspection

Asbestos

management survey,

update asbestos log

book

Record all findings in the

service report .Agree all

follow up actions with

Client

Control of asbestos

regulations 2012.

AsbestosAsbestos

Management planAnnually Review. Annually Trained Person

Asbestos

management plan,

risk register and

action plan

Record all findings in the

service report .Agree all

follow up actions with

Client

Control of asbestos

regulations 2012

AsbestosAsbestos removal

or remedial works

Removal of

asbestos

containing

materials.

Where

management

survey

recommends

action, or as part

of a demolition

or refurbishment

Survey.

HSE licensed

contractor,

preferably

holding a 3 year

license

Licensed contractor,

14 day notification

may be required

Record all findings in the

service report .Agree all

follow up actions with

Client

Control of asbestos

regulations 2102

BuildingRefurb Demolition

Survey

Prior to any

demolition

/intrusive works

taking place

Prior to any

refurbishment

works taking

place

UKAS

accredited

company

Demolition

refurbishment

survey for areas

where intrusive work

is planned.

Record all findings in the

service report .Agree all

follow up actions with

Client

Control of asbestos

regulations 2012

Page 1 of 25 Version 1-12.01.2017

Page 2: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Electrical /Building Automated Doors Routine servicing 6 Monthly

NICEIC/ECA

registered

contractor or

approved

equivalent

Thorough service

according to

manufacturer`s

recommendations,

check automatic

motion sensors,

check that in the

event of power

failure the doors

must revert back to

manual control

Record all findings in the

service report .Agree all

follow up actions with

Client

BS7036 1996 Parts 1,

2 and 3. Electricity at

work regulations

1998. BS7671 IEE

Wiring regulations.

Electrical /Building Car Park Barriers Routine Servicing 6 Monthly Competent

person

Through service and

inspection in line

with manufacture's

recommendations.

Record all findings in the

service report .Agree all

follow up actions with

Client

Electricity at work act

1998. IEE Wiring

regulations.

Electrical /Building Passenger Lifts

Systematic and

thorough

examination.

Every 2 months

depending on risk

assessment.

Normally every 6

months.

Competent

person

A thorough

examination of the

lift safety and its

associated

equipment, doors,

interlocks, worm and

other gearing,

governors,

suspension ropes

and chains.

Record data.

Health and safety at

work act 1974.  The

lifting operations and

lifting equipment

regulations 1998

(LOLER) BS5655 Part

10.

Page 2 of 25 Version 1-12.01.2017

Page 3: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Building/Electrical-

UPS Systems

Uninterruptable

power supplyService of system

yearly or 6

monthly

depending on

size of

installation

NICEIC/ECA

registered

contractor.

Full system test,

check batteries

voltage currents,

load current and

bypass switches

Record all findings in the

service report. Agree all

follow up actions with

Client

Electricity at Work Act

1998. BS EN62040-

2:2006

Building/Intruder

AlarmIntruder Alarm

Monitoring and

inspection6 Monthly

Competent

person or

contractor.

Carryout full

monitoring and

inspection testing

according to

manufacturers

recommendations.

Record Results in log

book. Undertake

remedial action where

required.

Electricity at Work Act

1998, IEE Wiring

Regulations BS 7671.

Building/Lightning

Conductors

Lightning

Conductors

Check for damage

and deterioration. 11 Monthly

Competent

person

Inspection for

damage and

deterioration.

Electrical Inspect,

test and record the

continuity of

conductors; Bonds,

joints and the earth

resistance.

Record all findings in the

service report. Agree all

follow up actions with

Client

Section 32 of

BS6651`Protection of

structures against

lightning'.

Page 3 of 25 Version 1-12.01.2017

Page 4: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Building/Pottery

KilnsPottery Kilns

Annual Inspection -

Caution some

Kilns are known to

contain asbestos,

refer to register

AnnuallyNICEIC

contractor

Carry out full

inspection as per

manufacturer`s

instructions.

Record date of test and

name of tester. Record

must show actual

measured test values of

earth continuity and

insulation resistance.

Electricity at Work Act

1998, BS7671 IEE

Wiring regulations,

Provision and use of

power equipment

regulations 1998

(PUWER)

Building/Rain Water

HarvestingGround Level Type System Service Annually

Competent

personOperational

Check and clean all filters,

regular clean and check

gutters and filters. If

required chlorinate

storage tank.

Chlorination to be done

with Calcium

hypochlorite. Check

operation of pumps

BS8515:2009

Building Solar Physical inspection

Annually or

following

extreme weather

events

Competent

personVisual

Order repair  by an

 approved contractorFire/ electrical safety.

Page 4 of 25 Version 1-12.01.2017

Page 5: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Solar PV Roof Mounted System metering

and monitoringContinuous

Remote IT link

to

Orsis/Competen

t person.

Monitoring and data

collection

Oris web based can be

downloaded by

interested bodies and

disseminated as required.

Any faults or disruption

prompt an order for

repair by an approved

contractor

To comply with

Ofgem if it is  a

registered system.

Page 5 of 25 Version 1-12.01.2017

Page 6: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Electrical Automated Doors Routine servicing 6 Monthly

NICEIC/ECA

registered

contractor or

approved

equivalent

Thorough service

according to

manufacturer`s

recommendations,

check automatic

motion sensors,

check that in the

event of power

failure the doors

must revert back to

manual control

Record all findings in the

service report .Agree all

follow up actions with

Client

BS7036 1996 Parts 1,

2 and 3. Electricity at

Work Act 1998.

BS7671 IEE Wiring

regulations.

Electrical Car Park Barriers Routine Servicing 6 Monthly Competent

person

Through service and

inspection in line

with manufacture's

recommendations.

Record all findings in the

service report .Agree all

follow up actions with

Client

Electricity at Work Act

1998. IEE Wiring

regulations.

Electrical CCTVInspection and

testingAnnually.

Trained

technician

Full inspection and

testing. Written

records including

date of test, next

test date, defects

found and record of

repairs.

Written records

including date of test,

next test date, defects

found and record of

repairs.

Electricity at Work Act

1998 IEE Wiring

regulations BS7671.

Page 6 of 25 Version 1 08.12.2016

Page 7: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Electrical

Combined

inspection and

testing

Undertake

combined

inspection and

testing of portable

appliances

Varies according

to type of

equipment and

environment -

see

http://www.hse.

gov.uk/pubns/bo

oks/hsg107.htm

NICEIC/ECA

registered

contractor or

approved

equivalent

Combined test and

inspection.

Document records of

items tested and

place stickers on

items. Log any faults

identified and take

remedial action.

Document records of

items tested and place

stickers on items. Log any

faults identified and take

remedial action.

Electricity at Work Act

1998.

PUWER

ElectricalElectrical Portable

Appliances Visual inspection

6 Monthly , or

before use if

used

infrequently.

Competent

person

Carry out visual

inspection if

individual has

enough training and

knowledge.

Log any faults identified

and take remedial action.

Remove failed items from

service

Electricity at Work Act

1998

ElectricalElectrical Stage

Lighting

Inspection and

testing of portable

dimmer racks with

no fixed cabling,

plugs, sockets and

flexible leads.

Every 3 months

and after every

alteration. Or

before use if

equipment if

used

infrequently.

Competent

person

Inspection and

testing of all stage

lighting

Document records, log

faults. Take remedial

action.

Electricity at Work Act

1998

Page 7 of 25 Version 1 08.12.2016

Page 8: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

ElectricalEmergency lighting-

Fick Test

Carry out function

test of emergency

lighting units by

performing a "Flick

Test" which

consists of the

momentary

operational test of

each emergency

fitting, usually

from a local fish

key.

Monthly.Competent

person.Visual & functional

Record results in log

book. Arrange for any

failed fittings to be

repaired.

Electricity at Work Act

1998.

BS 5266-1 2016.

BS EN 50172:2004

BS 5266-8:2004.

Electrical Emergency lighting

Full rated duration

discharge test of

each fitting.

Perform battery

maintenance if

applicable

Annual

NICEIC/ECA

registered

contractor or

approved

equivalent

Performance

Certification to BS5266

and update log book.

Repair any failed units.

Electricity at Work Act

1998.

BS 5266-1 2016.

BS EN 50172:2004

BS 5266-8:2004

Electrical

Fire detection and

alarm systems

(general).

Verification of

system statusDaily

Nominated

person

Check of Fire Panel

for any displayed

faults

Record all findings in the

service report .Agree all

follow up actions with

Client

BS5839 1:2013

Page 8 of 25 Version 1 08.12.2016

Page 9: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Electrical

Fire detection and

alarm systems

(general).

Testing of

sounders and call

points

Weekly.Nominated

person.

Activation of manual

call point to confirm

system operation of

indicating

equipment. Call

points are to be

tested on a

rotational basis.

Record details of device

tested in log book.BS5839 1:2013

Electrical

Fire detection and

alarm systems

(general).

Inspection and test

of entire system

Yearly - This can

be split down to

multiple visits per

year.

Qualified Fire

Alarm Engineer

Function test of all

devices on system

and analysis of

previous false

activations along

with other

requirements of

clause 45 of BS5839

Inspection and test

certificate BS5839 1:2013

ElectricalFire Risk

Assessment

Visual inspection

and

recommendations.

Yearly. Responsible

person

A visual survey

carried out by a

responsible person

and implement fire

management plan

Record all findings in the

service report .Agree all

follow up actions with

Client

The Regulatory

Reform (fire safety)

2005, PAS 79 2012

Page 9 of 25 Version 1 08.12.2016

Page 10: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Electrical Fixed electrical

installation

Testing of all fixed

wiring and

distribution

boards.

Is determined in

accordance with

BS7671 guidance

note 3 and the

testing engineer.

NICEIC/ECA

registered

contractor or

approved

equivalent with

operative

qualified in

testing &

inspecting.

Electrical Installation

Condition Report -

Formally known as

Periodic Inspection

Report.

Testing of complete

installation. Compiling

records, date of test,

date of next test, defects

found and record of

repairs to rectify defects

Electricity at Work Act

1998, BS7671 IEE

Wiring Regulations.

Catering Equipment

Gas appliances,

electrical

appliances,

pressure cookers

Maintenance and

repair

Annually

Inspection By:

Gas Safe

contractor/

NICEIC.

Gas Safe

contractor/

NICEIC

Carryout

maintenance in

accordance with

manufacturer`s

guidelines. Keep

records of service

and repair and date

of next visit

Record all findings in the

service report .Agree all

follow up actions with

Client

Gas Safe regulations

Provision and use of

work equipment

regulations

1998(PUWER)

Page 10 of 25 Version 1 08.12.2016

Page 11: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Electrical GeneratorsMonitoring and

Load testingMonthly Competent Visual

Test the generator load.

Running the generator

for short periods off load

is detrimental to the

engine.

The main purpose of the

load test though is

obviously to prove that

the generator will pick

up and sustain the

intended load. Load tests

are I appreciate

disruptive, however they

are critical to ensure

confidence in system.

BS7909 : 2008 Code

of Practice for

temporary electrical

systems

• BS7671:2008

• AMPS: The

Association for

manufacturers power

generation

equipment and their

supplies

• AM8 : 1992 Private

and Standby

generation of

electricity

Page 11 of 25 Version 1 08.12.2016

Page 12: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Electrical GeneratorMaintenance and

repair12monthly Competent

Service Test and

repair

Record all findings in the

service report .Agree all

follow up actions with

Client

BS7909 : 2008 Code

of Practice for

temporary electrical

systems

• BS7671:2008

• AMPS: The

Association for

manufacturers power

generation

equipment and their

supplies

• AM8 : 1992 Private

and Standby

generation of

electricity

Electrical Intruder AlarmMonitoring and

inspection6 Monthly

Competent

person or

contractor.

Carry out full

monitoring and

inspection testing

according to

manufacturers

recommendation.

Record Results in log

book. Undertake

remedial action where

required.

• BS7671:2008

Page 12 of 25 Version 1 08.12.2016

Page 13: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Kitchen VentilationKitchen ventilation

systems

System inspection

and installationYearly

Accredited

companyOperational

Record all findings in the

service report .Agree all

follow up actions with

Client

• AMPS: The

Association for

manufacturers power

generation

equipment and their

supplies

ElectricalLightening

Conductors

Check for damage

and deterioration. 11 Monthly

Competent

person

Inspection for

damage and

deterioration.

Electrical Inspect,

test and record the

continuity of

conductors; Bonds,

joints and the earth

resistance.

Record all findings in the

service report .Agree all

follow up actions with

Client

• AM8 : 1992 Private

and Standby

generation of

electricity

ElectricalLPHW Fan

Convector HeatersService.

Frequency:

Annually

Competent

person or

NICEIC/ECA

registered

contractor

Visual and electrical

inspection.

Clean filters check

thermostats and load

current to motor.

Ensure all inspection

panels are locked and

secure.

BS EN 16430-3 2014.

  

Page 13 of 25 Version 1 08.12.2016

Page 14: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

ElectricalOff peak storage

heaters. Service. Yearly: Inspection

NICEIC/ECA

registered

contractor

Visual and electrical

inspection.

Record all findings in the

service report .Agree all

follow up actions with

Client

Full operational,

carryout inspection of

elements, As test.

Relevant Legislation:

CP 1018:1971 IEE

Wiring regulations.

Electrical Passenger Lifts.

Systematic and

thorough

examination.

Every 2 months

depending on risk

assessment.

Normally every 6

months.

Competent

person

A thorough

examination of the

lift safety and its

associated

equipment, doors,

interlocks, worm and

other gearing,

governors,

suspension ropes

and chains.

Record data.Follow up

remedial works with

Client .

Health and safety at

work act 1974. The

lifting operations and

lifting equipment

regulations 1998

(LOLER) BS5655 Part

10.

Electrical Pottery Kilns

Annual Inspection -

Caution some

Kilns are known to

contain asbestos,

refer to register

AnnuallyNICEIC

contractor

Carry out full

inspection as per

manufacturer`s

instructions.

Record date of test and

name of tester. Record

must show actual

measured test values of

earth continuity and

insulation resistance.

Electricity at Work Act

1998, BS7671 IEE

Wiring regulations,

Provision and use of

power equipment

regulations 1998

(PUWER)

Page 14 of 25 Version 1 08.12.2016

Page 15: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Solar PV Roof Mounted System metering

and monitoringContinuous

Remote IT link

to

Orsis/Competen

t person.

Monitoring and data collection

Oris web based can be

downloaded by

interested bodies and

disseminated as required.

Any faults or disruption

prompt an order for

repair by an approved

contractor

To comply with

Ofgem if it is  a

registered system.

Swimming Pool Swimming Pools

Testing dosing

equipment and

pool water

Dosing

equipment, 6

monthly, water

testing, daily

Trained person Operational

Record all findings in the

service report .Agree all

follow up actions with

Client

BS EN 16582-1, 16713-

1, 16713-2, 16582-3.

PWTAG 2009

Electrical

Temporary

electrical

installations i.e.

events

Installations of up

to 6.5Kw. Larger

installations need

professional

installation.

Frequency: Before

first use

dependent on

length of

installation further

inspections will be

required

Before first use

dependent on

length of

installation

further

inspections will

be required

NICEIC/ECA

registered

contractor or

approved

equivalent

Installation and

commissioning

certificates including

earth leakage test

records.

Record all findings in the

service report .Agree all

follow up actions with

Client

BS7909- Code of

Practice for

temporary electrical

systems for

entertainment and

related purposes. HSE

Guidance Note GS50.

Refer also to local

authority licencing

conditions.

Page 15 of 25 Version 1 08.12.2016

Page 16: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Electrical-UPS

Systems

Uninterruptable

power supplyService of system

yearly or 6

monthly

depending on

size of

installation

NICEIC/ECA

registered

contractor.

Full system test,

check batteries

voltage currents,

load current and

bypass switches

Record all findings in the

service report. Agree all

follow up actions with

Client

Electricity at work act

1998. BS EN62040-

2:2006

Solar PV Physical Physical inspection

Annually or

following

extreme weather

events

Competent

personVisual

Order repair by an

approved contractor

No current legislation

to maintain

Page 16 of 25 Version 1 08.12.2016

Page 17: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Air Conditioning

Air conditioning

and ventilation

(fans, filters and

motors)

Maintain systems

according to

manufacturer`s

guidance.

6 Monthly or

annually

Registered

company

Full inspection and

service following

manufacturer`s

guidelines. Units and

systems may require

an energy inspection

under the Energy

Performance of

Buildings Regulations

Record all findings in the

service report .Agree all

follow up actions with

Client

BS EN 378,

Refrigeration systems

safety and

environmental

requirements, BS5720

BS5925 Building

regulations 1991

TM44

Air Conditioning Air Conditioning

Inspections

System inspection

and certification

greater than 12KW

cooling load.

Inspection every

5 Years.

Accredited

person. Statutory.

Record all findings in the

service report .Agree all

follow up actions with

Client

Energy performance

of buildings

(certificates and

inspections)

regulations 2007,

CIBSE TM44

Air Conditioning Refrigerant gasses

Follow fixed

schedule of

inspections for

leaks.

Follow guidance

in F-Gas

regulations

REFCOM

certified

company,

competent

person.

Statutory.

Update F Gas Register

(note this can be held by

the maintenance

provider)

F-Gas regulations No

842/2006

Page 17 of 25 Version 1-08.12.2016

Page 18: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Catering Equipment

Gas appliances,

electrical

appliances,

pressure cookers

Maintenance and

repair

Annually

Inspection By:

Gas Safe

contractor/

NICEIC.

Gas Safe

contractor/

NICEIC

Carryout

maintenance in

accordance with

manufacturer`s

guidelines. Keep

records of service

and repair and date

of next visit

Record all findings in the

service report .Agree all

follow up actions with

Client

Gas Safe regulations

Provision and use of

work equipment

regulations

1998(PUWER)

Fire Suppression and

Fire Prevention

Non automatic fire

protection

systems, dry (or

wet) risers and

hydrants:

Visual, inspection

and hydraulic test.

Visual-weekly,

Inspection-6

monthly,

Hydraulic test-12

monthly

Weekly-user, 6

monthly-

Competent

person, 12

monthly-

accredited

company

User-Statutory

Record all findings in the

service report .Agree all

follow up actions with

Client

BS EN 671. BS

9990:2006 and

BS5306-1:2006.

BS588-12 and

Building Regulations.

FIA, LPC or similar

accreditation

Fire Suppression and

Fire Prevention

Automatic

sprinkler

protection

systems, Wet

system (wet/dry),

Dry system, Pre-

engaged and Fire

Pumps

Automatic

sprinkler

protection

equipment-

Depends on type

and purpose

Automatic

sprinkler

protection

systems-Weekly.

Wet systems-3

monthly. Dry

systems-6

monthly. Pre-

engaged 12

monthly

Automatic

sprinkler

protection-

Trained person.

Dry system-

competent

person. Pre-

engaged

accredited

company.

Automatic sprinkler-

operational. Wet

systems-

Operational. Dry

systems statutory.

Pre-engaged-

Statutory.

Record all findings in the

service report .Agree all

follow up actions with

Client

BS12845 2004

Automatic sprinkler

systems, LPCB

certificate of

conformity, BS9251

sprinkler systems for

residential and

domestic occupancies

(cop), FIA, LPC or

similar

Page 18 of 25 Version 1-08.12.2016

Page 19: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Fire Suppression and

Fire Prevention

Fire detection and

alarm systems

(general).

Verification of

system statusDaily

Nominated

person

Check of Fire Panel

for any displayed

faults

Record all findings in the

service report .Agree all

follow up actions with

Client

BS5839 1:2013

Fire Suppression and

Fire Prevention

Fire detection and

alarm systems

(general).

Testing of

sounders and call

points

Weekly.Competent

person

Activation of manual

call point to confirm

system operation of

indicating

equipment. Call

points are to be

tested on a

rotational basis.

Record details of device

tested in log book.BS5839 1:2013

Fire Suppression and

Fire Prevention

Fire detection and

alarm systems

(general).

Inspection and test

of entire system

Yearly - This can

be split down to

multiple visits per

year.

Qualified Fire

Alarm Engineer

Function test of all

devices on system

and analysis of

previous false

activations along

with other

requirements of

clause 45 of BS5839

Inspection and test

certificate BS5839 1:2013

Page 19 of 25 Version 1-08.12.2016

Page 20: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Fire Suppression and

Fire Prevention Fire Extinguishers.

Inspection &

dischargeAnnually.

Competent

person. Statutory.

Record all findings in the

service report .Agree all

follow up actions with

Client

BS9999:2008 codes of

practice for fire safety

in the design,

management and use

of buildings.

Fire Suppression and

Fire Prevention Fire hose reels.

Visual inspection,

function test

Inspection

monthly, test

yearly

User/trained

person.Risk assessment

Record all findings in the

service report .Agree all

follow up actions with

Client

BS EN 694:2001, BS

EN 671-3:2009 Fixed

firefighting system

Fire Suppression and

Fire Prevention

Fire protection

extinguishing

systems,

communication

rooms and server

rooms CO2 and

inert gas systems

Visual, Training,

Panel Test, Inspect

and Test and

Enclosure

integrity.

Visual-weekly.

Training-monthly.

Panel test-3

monthly. Inspect

and test-6

monthly.

Enclosure

integrity-12

monthly

Weekly-user.

Inspect and Test-

competent

person.

Enclosure

Integrity

accredited

Company.

User- Non statutory.

Accredited company

Record all findings in the

service report .Agree all

follow up actions with

Client

BS EN 671. Guide for

the selection of

installed systems and

other fire equipment.

FIA or other fire FGAS

certification body for

H.C.F.C`s

Gas Systems Gas system testingInstallation testing

and certification3 yearly

Gas Safe

certified

company.

Pressure test of gas

pipework

Record all findings in the

service report .Agree all

follow up actions with

Client

IGE-UP1A, Gas Safe

Page 20 of 25 Version 1-08.12.2016

Page 21: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

HeatingBoiler Inspections

and Service

Minimise and

control

environmental

impact.

Oil 6 Monthly,

Gas 6 monthly.

Gas Safe/ Oftec

certified

company,

competent

person

Operational.

Record all findings in the

service report .Agree all

follow up actions with

Client

ISO14001:2004

Environmental

management

systems. Gas Safe

card with certification

for appliances.

BS5544-2009 flueing

and ventilation of

rated input not

exceeding 70KW.

BS6172-2009

Specification for

installation and

maintenance of gas

fired catering

appliances. BS6644-

2011 Specification for

the installation and

maintenance of gas

fired hot water

boilers of rated inputs

between 70Kw and

1.8MW. BS6986-2011

Specification for

installation of gas

fired overhead

radiant heaters for

industrial and

Page 21 of 25 Version 1-08.12.2016

Page 22: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Kitchen VentilationKitchen ventilation

systems

System inspection

and installationYearly

Accredited

companyOperational

Record all findings in the

service report. Agree all

follow up actions with

Client

BS EN 203-1 2005

DW172

MechanicalDust and Fume

Extraction

Regular

maintenance

At least 14

monthstrained person

Regular maintenance

and servicing in line

with manufacturers

guidelines. Written

records of inspection

including

identification

number of

system/fume

cupboard, date of

test, type and

results. Must be kept

for 5 years.

Record all findings in the

service report. Agree all

follow up actions with

Client

COSHH 2002, BS EN

14175-2 2003.

Mechanical Pressure VesselsThrough

examinationAnnually

Insurance

Company

Carry out Thorough

examination of

pressure vessels and

keep records of

examination

Record all findings in the

service report .Agree all

follow up actions with

Client

The pressure systems

regulations 2000.

Page 22 of 25 Version 1-08.12.2016

Page 23: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Rain Water

HarvestingGround Level Type System Service Annually

Competent

personOperational

Check and clean all filters

,Regular clean and check

gutters and filters. If

required chlorinate

storage tank.

Chlorination to be done

with Calcium

hypochlorite. Check

operation of pumps

BS8515:2009

Water

Thermostatic

mixing valves on

water outlets and

showers.

Service and safety

check

6 Monthly and

annually.

Trained staff

and registered

contractor

Carryout inspection

to determine if any

deterioration has

occurred to the

thermostatic mixing

valve (6 monthly)

Maintenance of all

thermostatic mixing

valves (annually).

Record all findings in the

service report .Agree all

follow up actions with

Client

Provision and use of

work equipment

regulations 1998

(PUWER)

WaterWater hygiene risk

assessment.

Carryout risk

assessment

Every 2 year or

where there is

significant

change to the

system or use of

building

Registered

assessor should

have

experience.

Water hygiene risk

assessment carried

out and reviewed

Record all findings in the

service report .Agree all

follow up actions with

Client

The control of

legionella bacteria in

water systems

BS8580

Page 23 of 25 Version 1-08.12.2016

Page 24: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Water

Water hygiene

testing and

precautions

Carryout various

duties as listed

Ranging from

weekly to

annually.

Trained staff

and registered

contractor

Flush through little

used outlets

(weekly)

Temperature testing

of hot and cold

stored water

systems (monthly)

Descaling shower

heads (Quarterly)

Supply temperature

check (6 monthly)

Sampling and

chlorination of

system and regular

routine maintenance

(annually)

Record all findings in the

service report .Agree all

follow up actions with

Client

The control of

legionella bacteria in

water systems ACOP

L8

Boiler

Above Ground Oil

Storage

Installations.

Bund (water/leaks Weekly User. Operational/visual

Record all findings in the

service report .Agree all

follow up actions with

Client

Control of pollution

(Oil Storage England)

Regulations 2001.

Section J of the

Building Regulations

Page 24 of 25 Version 1-08.12.2016

Page 25: Premises Services - Statutory Maintenance and Inspection …inspiretolearn.shropshire.gov.uk/media/1095/statutory...Electrical Electrical Portable Appliances Visual inspection 6 Monthly

Premises Services - Statutory Maintenance and Inspection Guide

Maintenance

Element

Type of

system

Action

Required Frequency

Inspection

By

Type of

Inspection

Records & Follow-

up Actions

Required

Relevant

Legislation

Gas Systems Gas appliances

Maintained in

accordance with

manufacturers

recommendations.

Annually.

Inspection By:

Gas Safe

registered

company

Carryout service of

appliances records of

service and repair

are to be kept

including date and

date of next visit.

Service

documentation

should also record

the gas safe

registration of the

engineer carrying

out the service.

Record all findings in the

service report .Agree all

follow up actions with

Client

Gas safety regulations

1998 L56 Safety in the

installation and use of

gas systems and

appliances

HeatingGround source

heat pumps

General

maintenance and

service.

AnnuallyCompetent

person.

Carryout

maintenance all as

per manufacturer`s

instructions, records

to be kept of site

visits and any faults

or remedial works.

Record all findings in the

service report. Agree all

follow up actions with

Client

Building and

engineering services

association SFG/20

(standard

maintenance

specification)

Page 25 of 25 Version 1-08.12.2016