Preparation of Feasibility cum Masterplan for Development of Turf Club in Punjab
PRE- BID CONFERENCE
Date 15.06.2012
Background
Department of Animal Husbandry is administrative department of project.
Punjab Infrastructure Development Board (PIDB), a nodal agency set by Government of Punjab.
IL&FS IDC -as Project Development Advisor The area allocated for the project is around 250 acre in
Ludhiana District, Punjab. The facility is expected to include Turf Club & other national
and international level equestrian activities as well, viz. club house complex, horse riding club for children, etc.
The Project also envisages various related support infrastructure like five star hotel and Amusement park and other Leisure activities, etc .
Pre Bid Conference
Institutional Structure
Pre Bid Conference
G.O.PG.O.P
PIDBPIDB ANIMAL HUSBANDRY
ANIMAL HUSBANDRY
IL&FS IDC
IL&FS IDC
NODAL AGENCY FOR DEVELOPING THE PROJECT
ON PPP
ADMINISTRATIVE DEPARTMENT FOR
DEVELOPMENT OF THE PROJECT
PROJECT DEVELOPMENT ADVISOR
DEPARTMENTS INVOLVEDDEPARTMENTS INVOLVED
› Department of Home Affair & Justice.
› Department of Excise and Taxation
Selection Process
TWO STAGE PROCESS
TECHNICAL EVALUATIO
N
FINANCIAL EVALUATIO
N
SELECTED BIDDER
Only those Applicants whose Technical Proposals score 70 marks or more out of 100 shall qualify.
QUALITY- COST BASED SELECTION- 70:30
Pre Bid Conference
Eligibility Criteria
TECHNICAL CRITERIAOver the past 15 (Fifteen) years preceding the PDD, undertaken a minimum of [2 (two)] Eligible Assignments.
FINANCIAL CRITERIAThe Applicant shall have received a minimum average annual income of [Rs. 7 (seven)] crore per annum from professional fees during the last 3 (three) financial years i.e. till March 2011 preceding the Proposal Due Date.
Pre Bid Conference
Eligible Assignments
Turf Club The Turf Club should have been registered in the turf
authority/federation of respective countries. Masterplan and Conceptual Design of the following Components:- Race Tracks with minimum length of 1200 of meters Grand Stand with minimum capacity of 3000 spectators Stables for 500 Horses Betting Arena]; or
Pre Bid Conference
Eligible Assignments
[Upgradation of Turf Club Project Cost of Upgradation should be more than 200 crores
which will include Upgradation or redevelopment of the following components:-
Redevelopment of racecourse which involves extension and widening of the existing tracks.
Masterplan and Conceptual Design of the following Components:-
Redevelopment of Grand Stand with minimum capacity of 3000 spectators.
Redevelopment of Stables for 500 Horses. Redevelopment of Betting Arena]; or
Pre Bid Conference
Eligible Assignments- Cont… Equestrian Sports Centre Masterplan and conceptual design of equestrian Sports Complex of
International Level. Design of Grand Stand with minimum capacity of 3000 spectators. Design of stable for 250 horses. Design of show jumping arena
Pre Bid Conference
Proposal Requirement
Pre Bid Conference
Method of Selection : Quality and Cost Based Selection (QCBS) Quality Cost Ratio : 70 : 30 Bid Security: INR 2 Lakh. Proposal Validity Period : 90 days Proposal shall be submitted in English Language Format of Technical Proposal : Full Technical Proposal
Evaluation Criteria
Pre Bid Conference
Parameters Max. Weight
Relevant Experience of the Applicant 25
Approach and Methodology 5
Relevant Experience of Key Personnel 70
Senior Architect-cum-Team Leader 20
Project Manager 15
IT Expert 15
Equine Sports Expert 10
Equine Veterinary Specialist 10
Total Maximum Score 100
Minimum Technical Score required to pass : 70%
Financial Score
Formula for Financial Score
Sf = 100 * Fm/FSf : Financial Score
Fm : Lowest Price
F : Price Proposal Under Consideration
Weights given to Technical and Financial Proposals are
T = 70% and
P = 30% Combined and final evaluation 3.4.1 Proposals will finally be ranked according to their combined
technical (ST) and financial (SF) scores as follows: S = ST x TW + SF x FW Where S is the combined score, and TW and FW are weights assigned to Technical
Proposal and Financial Proposal that shall be 0.70 and 0.30 respectively
Pre Bid Conference
Issue of RFP Documents
Submission of Technical & Financial Proposal
Selection of Preferred Bidder and Issue of Notice of Award
Pre –Bid Meeting 15th June 2012
15th June 2012
25th May 2012
25th May 2012
Release of NIT
Opening of Technical Proposals 9th July 2012 9th July 2012
Opening of Financial Proposals of Technically Qualified Bidders
Team Mobilization/Commencement of Work
9th July 2012 9th July 2012
July 2012 July 2012
July 2012 July 2012
25th May 2012
25th May 2012
July 2012 July 2012
Bidding Process
Pre Bid Conference
Objective
The objective of the consultancy is to provide technical assistance to GoP in the development of a world class Turf club with all the facilities of international standards.
Pre Bid Conference
Scope of Work- Cont…
Assessment and analysis of existing site: Selection of Site- The consultant will undertake a site suitability study for
the two sites available near Ludhiana. Assessment of land at the selected site and possibility for future
expansion Assessment of land requirement and land acquisition requirement if any Assessment of Infrastructure facility like water supply, sewerage,
drainage facility Identification of external infrastructure development Consultant shall list all the clearances required for the project Consultant shall also assess the potential of proposed site for commercial
development and identify and propose the type and size of commercial activities possible site
Pre Bid Conference
Scope of Work
Prepare the conceptual plan and design for the entire turf club.
Standardizing - laying specifications as per their respective international & national federations for turf club support infrastructure & facilities.
Planning & standardizing entire operation/activity of racing in accordance to the guidelines of international horse racing federation.
Pre Bid Conference
Scope of Work- Cont… Providing technical inputs as per international/national guidelines, as
& when required for designing facilities, equestrian sports, betting law, breeding & veterinary hospital till the award of final work order or signing of final agreement with the concessioner.
Assistance in preparation of tender documents/concession agreement and bid evaluation.
Conceptual design and specifications for water treatment plant, water reservoirs, water features, surface contouring of water features, irrigation and drainage.
Environmental impact assessment of the project and detailing measures required for mitigating adverse impacts if any.
Pre Bid Conference
Scope of Work- Cont…
Preliminary Design and Conceptual Masterplan: The consultant shall carry out preliminary design and prepare
alternative concept plan for Turf Club. Identification and listing of essential and desirable components in term of infrastructure, support infrastructure, amenities, etc and recommended components for the proposed project.
Outline design for Turf Club and components, their sizing, configuration and preliminary design structure. The design shall be in conformation with applicable norms, standards, guidelines.
Pre Bid Conference
Scope of Work- Cont…
Master Plan shall include: Prevalent building regulation and developmental guidelines. This may
include ground coverage, setbacks, maximum permissible built-up area, permissible building height, use of basement etc.
Site layout with plot boundary, setbacks and other applicable development control guidelines
Spatial arrangement of components including utilities and support infrastructure and sizing of components
Area statement for each proposed components Parking arrangement Circulation plan
Pre Bid Conference
Scope of Work- Cont…
Cost Estimations: The consultant shall undertake cost estimate as per applicable
Schedule of Rate for each and every component of the proposed facilities.
The consultant shall provide in detail a schedule of fixed and variable operating and maintenance cost of the facility at various stages of utilization These costs shall be used by GoP for estimation of landed project cost and all financial analysis and calculation.
Pre Bid Conference
Proposed Team Structure
Sr.
No
Team Member Educational Qualification Experience of Eligible Projects
1 Team Leader B. Arch with more than 10 years of
experience
He should have worked in atleast two of the eligible
projects mentioned in clause 3.1.4 out of which one should
have been in the capacity of a team leader.
2 Project Manager B. Arch with more than 7 years of
experience
He should have worked as an architect in atleast one of the
eligible projects mentioned in clause 3.1.4.
3 IT Expert B.E/B.Tech in Computer/I.T Engineering
with more than 7 years of experience
He should have led the IT Team in atleast one of the eligible
projects mentioned in clause 3.1.4. or should have been
involved in designing the software which facilitates betting
in Casinos or related projects.
4 Equestrian Sports
Expert
Graduate with more than 7 years of
Experience
He should have worked as an Equestrian Sports Expert in
atleast one of the eligible projects mentioned in clause
3.1.4.
5 Equine Veterinary
Specialist
P.G in Veterinary Science with more than
7 years of experience
He should have been involved as an Equine Veterinary
Specialist in atleast one of the eligible projects mentioned in
Clause 3.1.4.
Pre Bid Conference
Time Schedules and deliverables
Pre Bid Conference
Sr. No.
Activity/Report Time(in days from date of signing of consultancy agreement)
Payment as a % of Total Fee
1 Inception ReportAction Plan and Methodology
7 days 5
2 Interim Report I Shall include the final site suitable for the Turf Club. It would also include the Concept plan including layout plans for Race Tracks, Grand Stand, Veterinary Hospital, and Stables for horses. The consultant shall also prepare a draft Master Plan for different amenities like amusement park, multiplex, hotel, residential, commercial etc feasible near the Turf Club.
30 Days 25
3 Interim Report IIBased on the suggestions received from the Client on Inception Report, the Consultant shall submit Interim Report which would include:
a) Preliminary Planning for the Turf Club and the Internal Infrastructure; and
b) The Revised Master Plan for the different Amenities feasible near the Turf Club.
75 days 30
4 Final ReportThe final report would include:
a) The preliminary design of the Turf Club and the Internal Infrastructure.
b) Final Master Plan for the different Amenities and the Proposal for Key Attraction
120 days 40
Sites In Punjab- Ladhowal and Mattewara
Pre Bid Conference
LadhowalMattewara
Ludhiana
Location of Site- Mattewara
Pre Bid Conference
Location of Site- Mattewara
Location of Site- Ladhowal
Pre Bid Conference
THANK YOU