Date post: | 01-Apr-2015 |
Category: |
Documents |
Upload: | keagan-cowser |
View: | 213 times |
Download: | 0 times |
Preparatory work on JI in Bulgaria
Preparatory work on JI in Bulgaria
Milya Dimitrova
Ministry of Environment and Water, Bulgaria
UNFCCC Technical Workshop on Joint Implementation9 - 10 March 2006, Bonn, Germany
Content
• Bulgarian Policy on JI
• Approved Projects
• Planned Activities
• EUETS and JI
• JISC Key Role
• Challenges
Bulgarian policy on JI
• Kyoto Protocol Ratification• National Environmental Strategy• Second NAPCC, 2005 – 2008• JI Sector in MoEW (DFP for JI)• National Procedures • 7 Memoranda of Understanding
13 projects approved
Approved projects
Project type / ERs
17%10% 9%
24%
10%30%
Energy Efficiency Renewables Biomass
Cogeneration Gasification N2O
Approved projects
Buyer / ERs
37%
14%
31%
18%
Netherlands Austria Denmark PCF
Planned activities
• Continuing the Cooperation on JI
• Meeting the Eligibility Requirements
• Moving to JI Track 1 Procedures
Continuing the Cooperation on JI
• 21 Endorsed Project Ideas
• MoUs under negotiations – Finland, Spain, Italy, Germany, France
• Set aside in NAP
Meeting the eligibility
• AAUs Calculation
• National System for the estimation of anthropogenic GHG emissions
• National Registry
• Annual Inventory
• AAUs Supplementary Information
Moving to JI Track 1
• Developing National Guidelines
• Developing Standardised baselines
• Accrediting Local Validators
• Developing Additionality Test
EUETS and JI
• EUETS limits the scope of JI
– Direct Double Counting - cancel allowances from concrete installations
– Indirect Double Counting - deduct allowances from electricity sector
• Set aside in NAP
• Potential for projects outside of the Scheme and non CO2 projects
JISC Key Role
• Accreditation of Independent Entities
• Criteria for Baseline Setting and Monitoring
• Decisions on “Early Movers”
“Early movers”
• Revalidation?
– PDD Format– Baseline and Monitoring Plan– Methodology – Accreditation of Independent Entities
The challenges …
• JISC Decisions
• NAP Negotiation and Approval
• Meeting Eligibility Requirements
• Moving to JI Track 1 Procedures
Milya DimitrovaJoint Implementation Sector
Climate Change Policy DepartmentMinistry of Environment and Water
phone: +359 2 940 61 10e-mail: [email protected]
www.moew.government.bg