King Fahad Cardio. Surgery & Disease center Project Group.1 Prepared By Supervisor : Prof.Naif bin Humaid mahmoud Abdullrhman Bin Mohammed ALMannaa Abdullah ALQhtani Yazed ALarafj Emad Shieraz Faisal ALolyani Meshari ALOabied
Transcript

 King Fahad Cardio. Surgery & Disease 

center Project 

Group.1 Prepared By

Supervisor: Prof.Naif bin Humaid mahmoud Abdullrhman Bin

Mohammed ALMannaa Abdullah ALQhtani

Yazed ALarafj Emad Shieraz

Faisal ALolyani Meshari ALOabied

 

Project Introduction  The work comprises of detailed shop drawing design

of civil, structural, building works, electrical, plumbing and mechanical installation work, site work and all other works for the construction, completion of the King Fahad Cardio- Surgery and Disease Center Building. This is a seven (7) storey building a total floor area of 70.000 m2, one (1) of which is basement.

The project duration is 720 calendar days from the site handover date confirmed with a signed acceptance by ABV Rock Group Ltd., Project Manager.

Project HighlightsClient : King Saud University, Ministry for Higher

EducationDesign Consultant : Zuhair Fayez PartnershipShop Drawing : ABV Rock Group

LimitedContractor : ABV Rock Group LimitedContract Type : Lump sum contractProject Area : 70.000 M2 [Building/Floor

Area]Project Start Date : 27th December 2009Project Finish Date: 29 April 2012 (After Receiving an

Extension Time)

Progress Achievements :Partial Site hand over from 27th December

acceptedExcavation in hand-over area of the building

mostly completedStructural work with foundation started, into

the fifth floor.Masonry works started in basement, ground

and 1st floor

Project Progress Overview

DIV DETALLS REMARKS

1 General Requirements

Soil Investigation

- Soil Testing/Boreholes

- Cavity Probing

- Cavity Injection

Done

Done

Not required

2 Site Work & General Excavation Started and on-going in handed over area

3 Cast-In-Place Concrete Work on-going up to roof floor

4 Masonry Startedin basement, Ground floor and 1st floor

5 Metal Works

6 Wood & Plastic

7 Thermal & Moisture Protection Work on-going

8 Doors & Windows

9 Finishes

10 Specialties

14 Conveying System

15 Mechanical Works – sub- Structure Drainage system work in progress

Plumbing and fire protection started up to 2nd floor

16 Electrical Works Grounding work under progress

Electrical first fix started up to 5th floor

BUILDING INFORMATION SHEET

Abdullah ALQhtani    description   quantity unit cost total cost اليتجاوز لعمق بالموقع متر 7حفر

حفر     الطبيعية االرض منسوب من 105300m3 35 3685500     excavate over site to form basement notللبدرومexceeding 7m deep الموقع خارج quantity daily prod of crew crew make up man hours total 1170000 13 90000نقل

man hours total crew hours avg wage rate 105300 100 1forman - labor3 per unit 11232 3744 12.5       0.106       labor subtotal rate per hour equip subtotal   total cost     140400 6×700÷8=525 1965600  

-             1بوكلين__3     20 2106000   7200h   7200(88+75)=1173600$=12.5÷90000قالبي           truck 2شويل 1173600÷90000=13 13     100m3/day÷8h/day=12.5m3/h           اليتجاوز بعمق واالساسات الربط كمرات لزوم خنادق 1حفر

االرض       مكنسوب من excavate trenches for tie beams and bases not       3800 50 3م76مترexceeding1 m deep                     اليتجاوز لعمق االعمدة قواعد الطبيعية       1حفر االرض منسوب من     15400 50 3م308متر

excavate pits for column pads not exceeding 1m deep             commencing at existing ground level         الموقع       خارج من او الحفر نواتج مواد من اختيارها تم معتمدة حبيبية بمواد فحص m3 108072$/12 3م9006ردم تقرير توصيات حسب

القسم             المواصفات حسب اعمال من ذلك وماشابه الدك اعمال متضمنة المناسيب لتعويض وذلك الموقع                 02200تربةapproved granular fill selected from excavated material according or imported fill material to site soil report recommendation and subject to engineers approval in making up levels including compaction and the like as per specifications section 02200         quantity daily prod of crew crew make up man hours total man hours total crew hours avg wage rate 9006 600m3/day 2 per unit 234.156 117 12.5       0.026       labor subtotal

rate per hour equip subtotal material total cost material total cost $/m3 2927 350 40950 5 $/m3 45030 88907 تريال 10$ =6 ×3م20سعة يوم / =8يوم/ ÷ 3م120رحلة يوم/ ÷3م600ساعة/       3م15س لشويل/ للقالبي/ =3م120يوم تريال       5يوم

س/ +150تريال×5س)120ساعة       120يوم=15تريال=5÷120÷3م9006      $125=) /$ س $105000             م/ 12=$9006÷105000 و                               $3 االساسات فوق جيدة بصورة ومدكوكة الموقع خارج من موردة انشائية ردم مواد

من                         m3 633395$/35 3م18097 طبقة المطلوبة الكثافة الى الوصول حتى الدك ذاك شامال المناسيب إلى للوصول القواعدبسمك المدموك الخشن االوض       100الحصى سطح على البالطات تحت m3 640         100mmthick drainage layer$/8 3م80مم

to underside of slab on grade as per specifications section 02200     وعلى البالطات االبيضتحت النمل ضد التربة معالجةالمبنى       محيط m3 128480       to formation subgrade of slabs and beds including periphery of$/8 2م16060طول

building             الموقع ظروف حسب بالصخر الفراغات ومأل m3 500000   allow for cavity filling as$/1000 3م500حصرrequired                                   total cost 6245287$

By Emad & Faisa;

sample calculationFOR CONCRETE

quantity HEIGHT WIDTH LENGTH quantity DESCRIPTOIN

2946 0.5 49.1 60 26" SLAB

By Emad & Faisa;

By Emad & Faisa;

By Emad & Faisa;

By Emad & Faisa;

By Emad & Faisa;

By Emad & Faisa;

By Emad & Faisa;

By Emad & Faisa;

By Emad & Faisa;

By Emad & Faisa;

By Emad & Faisa;

المملكة في الهندسي التأمينالسعودية العربية

مقدمة : , و V متأخرا السعودية العربية المملكة في التأمين وصل

تزال , ال اآلن وحتى الهندسي الجانب في V خصوصاالضخمة , المشاريع في محدودة التأمين استخدامات

التأمين أنواع على ج نعر[ الجزئية هذه في ولعلناالمثال , – سبيل على ونأخذ بالمملكة الموجودة

للتأمين التعاونية بالسوق – الشركة قدمها بحكمالتأمين شركات سوق على تربعها على Vعالوة السعودي

.

الهندسي : الـتأمين أنواع

" " : األخطار جميع ضد المقاولين تأمين أوًال' : المقاولين وآليات تجهيزات تأمين ثانيا' : اآلًالت عطب تأمين ثالثا' : عنعطب الناتجة األرباح خسائر تأمين رابعا'

اآلًالت : الضغط وأوعية المراجل تأمين خامسا' : األلكترونية األجهزة تأمين سادسا'

األخطار جميع ضد المقاولين تأمين

.. المشروع هذا في المستخدم V شيوعا األكثر

التالية : البيانات يحضر أن التأمين طالب يطلبمن , , , المقاولين العنوان الموقع رقمه و المشروع اسم

االستشاريين , المهندسين الباطن و الرئيسين , , : طرق األساسات نوع المساحة المشروع أعمال وصف

التشييد , مواد التشييد

بعض بعد على يجيب أن منه يطلب ذلكمنفذ و بالمشروع المتعلقة األسئلة

المشروع : ؟ خبرة سابق المقاول هل التأمين مدة , , , : العواصف الفيضان الحرائق في الخطوة مدى

الزالزل , , البراكين التفجير ؟ السالمة مستوى مدى ما التحتية التربة تفاصيل الجوفية المياه األمطار مواسم بالمشروع المحيطة الممتلكات تأثر مدى

على : النوع هذا في التأمين يشمل : المادية األضرار : , توريدها تم التي المواد منها المؤقتة و الدائمة األعمال

العمل صاحب قبل من التشييد معدات و تجهيزات االنشاءات في المستخدمة االليات المخلفات إزالة العمل بموقع الكائنة الممتلكات

: الغير تجاه المسؤولية

الجسدية اإلصاباتالممتلكات المواسير و الكابالت