19
SARENS NOTHING TOO HEAVY, NOTHING TOO HIGH
Transcript

SARENSNOTHING TOO HEAVY, NOTHING TOO HIGH

SGC-140NEXT STEP IN SGC FAMILY

A TRUE GIANT

HOW BIG IS IT?

44M

4000T COUNTERWEIGHT

2820T

LIFTING CAPACITY @ 50M

RING AND MACHINERY DECK

RING AND MACHINERY DECK

• 64 STEEL MATS

• DOUBLE RAIL BEAM

• 40 COUNTERWEIGHT CONTAINERS

• ROOM FOR 8 WINCHES

• 64 FRONT WHEELS, 32 REAR WHEELS

• 6 POWER PACK UNITS, ELECTRICAL

CONTAINER AND OPERATOR CABIN

BOOM AND MAST

BOOM AND MAST

• BOOM 515 TON - 130M

• MAST 250 TON – 60M

• COUNTERWEIGHT STRUT 110 TON – 51M

HOOKBLOCK

SGC-140 HOOKBLOCK

• DOUBLE RAMSHORN

• WEIGHT 102 TON

• 3200 TON SWL

WHY DID WE DESIGN IT?

New demands from our

clients meant we could not

buy new cranes to complete

the projects, so we designed

our own crane, which sets a

new standard for the

industry.

CAPACITY

COMPARISON OF THE CC 8800-1, SGC-120 AND SGC-

140 WITH THE SAME BOOM LENGTH

2820

700

0

500

1000

1500

2000

2500

3000

15 35 55 75 95 115

CC 8800-1

SGC-120

SGC-140

45 %STRONGER

THAN SGC-120

@120M

BOOM CONFIGURATIONS

3 DIFFERENT BOOM CONFIGURATIONS

89 METER 118 METER 130 METER

JIB CONFIGURATIONS

4 DIFFERENT JIB CONFIGURATIONS

• 40,5 METER

• 64,1 METER

• 87,7 METER

• 99,5 METER

130M BOOM + 99,5M JIB

UPGRADES IN THE SGC-140

IMPROVEMENTS

• 4000T EXTRA COUNTERWEIGHT

• REINFORCED BOOM AND MAST

• UPGRADED BOOM HOIST

• IMPROVED WINCHES AND POWER PACK UNITS

• NEW RAIL AND BOGIE DESIGN

BUILDING THE CRANE

FULL ASSEMBLY IN 6 WEEKS

• STEEL MATS AND RAILS ARE

PLACED IN CIRCLE

• BOGIES AND MACHINERY DECK IS

ASSEMBLED ON THE RAIL

• WINCHES AND POWER PACKS ARE

PLACED ON MACHINERY DECK

• MAST IS ERECTED WITH TWO

CRANES, ONE SIDE AT THE TIME

BUILDING THE CRANE

• COUNTERWEIGHT CONTAINERS

ARE STACKED

• BOOM IS CONNECTED TO MAIN

HINGE POINT

• BOOM HOIST WINCHES ARE

CONNECTED

• BOOM IS ERECTED WITH BOOM

HOIST WINCHES

WINCHES

ZOLLERN ZHP 4.36

MAIN HOIST WINCH

• 4 MAIN HOIST WINCHES :

• 40 TONS

• 50MM ROPE

• LENGTH 1300M

• 2 BOOM HOIST WINCHES :

• 40 TONS

• 50MM ROPE

• LENGTH 2100M

• MAX LINE PULL – 600 KN

POWER PACK UNITS (PPU)

POWER PACK UNIT

• SIX POWER PACKS

• TWO ENGINES PER PPU

• 260KW CATERPILLAR ENGINES

• POWER PACK WITH COLD TEMP

PACKAGE

• TIER4 COMPLIANT

• MAX 84 DB(A)

OPERATING CONDITIONS

WIND SPEEDS

• IN-SERVICE 22,4 M/S

• OUT-OF-SERVICE 56 M/S

GROUND PREPARATION :

• MAX. GROUND PRESSURE 25 T/M2

SAFETY

HOIST AND SLEWING CONTROL SYSTEM WITH PERFORMANCE LEVEL E

• FULL REDUNDANCY

• SAFETY PLC

• ONLY HIGHEST QUALITY COMPONENTS

• EN13000 COMPLIANT BUT ALL TEST AT 125% (DYNAMIC & STATIC)

SAFETY

CONTROL SYSTEM

• FULL REDUNDANCY

• SAFETY PLC

• ONLY HIGHEST QUALITY COMPONENTS

HIGHEST PERFORMANCE LEVEL (PLE)

CARL SARENS

TECHNICAL SOLUTIONS & ENGINEERING

DIRECTOR

AUTOWEG 10, 1861 WOLVERTEM - BELGIUM