SARENSNOTHING TOO HEAVY, NOTHING TOO HIGH
SGC-140NEXT STEP IN SGC FAMILY
A TRUE GIANT
HOW BIG IS IT?
44M
4000T COUNTERWEIGHT
2820T
LIFTING CAPACITY @ 50M
RING AND MACHINERY DECK
RING AND MACHINERY DECK
• 64 STEEL MATS
• DOUBLE RAIL BEAM
• 40 COUNTERWEIGHT CONTAINERS
• ROOM FOR 8 WINCHES
• 64 FRONT WHEELS, 32 REAR WHEELS
• 6 POWER PACK UNITS, ELECTRICAL
CONTAINER AND OPERATOR CABIN
BOOM AND MAST
BOOM AND MAST
• BOOM 515 TON - 130M
• MAST 250 TON – 60M
• COUNTERWEIGHT STRUT 110 TON – 51M
HOOKBLOCK
SGC-140 HOOKBLOCK
• DOUBLE RAMSHORN
• WEIGHT 102 TON
• 3200 TON SWL
WHY DID WE DESIGN IT?
New demands from our
clients meant we could not
buy new cranes to complete
the projects, so we designed
our own crane, which sets a
new standard for the
industry.
CAPACITY
COMPARISON OF THE CC 8800-1, SGC-120 AND SGC-
140 WITH THE SAME BOOM LENGTH
2820
700
0
500
1000
1500
2000
2500
3000
15 35 55 75 95 115
CC 8800-1
SGC-120
SGC-140
45 %STRONGER
THAN SGC-120
@120M
BOOM CONFIGURATIONS
3 DIFFERENT BOOM CONFIGURATIONS
89 METER 118 METER 130 METER
JIB CONFIGURATIONS
4 DIFFERENT JIB CONFIGURATIONS
• 40,5 METER
• 64,1 METER
• 87,7 METER
• 99,5 METER
130M BOOM + 99,5M JIB
UPGRADES IN THE SGC-140
IMPROVEMENTS
• 4000T EXTRA COUNTERWEIGHT
• REINFORCED BOOM AND MAST
• UPGRADED BOOM HOIST
• IMPROVED WINCHES AND POWER PACK UNITS
• NEW RAIL AND BOGIE DESIGN
BUILDING THE CRANE
FULL ASSEMBLY IN 6 WEEKS
• STEEL MATS AND RAILS ARE
PLACED IN CIRCLE
• BOGIES AND MACHINERY DECK IS
ASSEMBLED ON THE RAIL
• WINCHES AND POWER PACKS ARE
PLACED ON MACHINERY DECK
• MAST IS ERECTED WITH TWO
CRANES, ONE SIDE AT THE TIME
BUILDING THE CRANE
• COUNTERWEIGHT CONTAINERS
ARE STACKED
• BOOM IS CONNECTED TO MAIN
HINGE POINT
• BOOM HOIST WINCHES ARE
CONNECTED
• BOOM IS ERECTED WITH BOOM
HOIST WINCHES
WINCHES
ZOLLERN ZHP 4.36
MAIN HOIST WINCH
• 4 MAIN HOIST WINCHES :
• 40 TONS
• 50MM ROPE
• LENGTH 1300M
• 2 BOOM HOIST WINCHES :
• 40 TONS
• 50MM ROPE
• LENGTH 2100M
• MAX LINE PULL – 600 KN
POWER PACK UNITS (PPU)
POWER PACK UNIT
• SIX POWER PACKS
• TWO ENGINES PER PPU
• 260KW CATERPILLAR ENGINES
• POWER PACK WITH COLD TEMP
PACKAGE
• TIER4 COMPLIANT
• MAX 84 DB(A)
OPERATING CONDITIONS
WIND SPEEDS
• IN-SERVICE 22,4 M/S
• OUT-OF-SERVICE 56 M/S
GROUND PREPARATION :
• MAX. GROUND PRESSURE 25 T/M2
SAFETY
HOIST AND SLEWING CONTROL SYSTEM WITH PERFORMANCE LEVEL E
• FULL REDUNDANCY
• SAFETY PLC
• ONLY HIGHEST QUALITY COMPONENTS
• EN13000 COMPLIANT BUT ALL TEST AT 125% (DYNAMIC & STATIC)
SAFETY
CONTROL SYSTEM
• FULL REDUNDANCY
• SAFETY PLC
• ONLY HIGHEST QUALITY COMPONENTS
HIGHEST PERFORMANCE LEVEL (PLE)
CARL SARENS
TECHNICAL SOLUTIONS & ENGINEERING
DIRECTOR