By Joint Operation PT. Wijaya Karya (Persero)Tbk. & PT. Mirlindo Padu Kencana (JOWM) DIESEL ENGINE POWER PLANT MFO 50 MW Bali MARET 2015 Departem en Power Plant Energi
Transcript

By Joint Operation PT. Wijaya Karya (Persero)Tbk.

&PT. Mirlindo Padu Kencana

(JOWM)

DIESEL ENGINE POWER PLANT MFO

50 MW Bali

MARET 2015

DepartemenPower PlantEnergi

DepartemenPower PlantEnergi

DIESEL ENGINE POWER PLANT BALI 50 MW

WIKA (84,61%)MIRLINDO PADU KENCANA (15,39%)

Location Pesanggaran, BALI

SchemeBOT 8 years + 1 year of constructionCapacity Factor = 85%

Owner PT Indonesia Power

Equipment MAN Diesel 18V48/60B - France

SFC 0,2400 lt/kWh @ 150kV

Fuel Heavy Fuel Oil (ready to be converted to gas)

Progress

•Electricity has been sold since March 16, 2011

•Up to Feb 01, 2015 more than 1.465 million kWh sold to Indonesia Power

•With Capacity Factor = 86,16%

PLTD MFO 50MW PESANGGARAN, BALI

RESUME per 01 FEBRUARI 2015

Energi Listrik Netto (Aktual) (kWh)

1.465.051.622,17 (CF = 86,16%)

Proyeksi Energi Listrik TOP (kWh)

1.445.255.000,00 (CF = 85,00%)

Excess Energi (kWh)

19.796.622,17

Rata-Rata SFC Aktual (liter/kWh)

0,2326

Rata-Rata SFC Limit (liter/kWh)

0,2400

Tarif Price/kWh = Rp. 556,6233/kWh (USD / IDR 12.625); Jan 30, 2015

Project Location

1

1

Main Gate Main Gate

2

2

Settling + Service Tank Settling + Service Tank

3

3

Cooling Radiator & Silencer+StackCooling Radiator & Silencer+Stack

U

S

PLTD MFO 50 MW PESANGGARAN, BALIJL. Raya By Pass Ngurah Rai No. 535 Pesanggaran, Denpasar Selatan, Bali 80222 Telp/fax 0361-710169

PROJECT LOCATIONPROJECT LOCATION

Project Location

4

4

Engine + Power HouseEngine + Power House

5

5

Admin Building+Warehouse Admin Building+Warehouse

6

6

Transformer 70 MVA Transformer 70 MVA

7

7

MFO Storage Tank 5000 klMFO Storage Tank 5000 kl

U

S

PLTD MFO 50 MW Pesanggaran,Bali

WS/ WH & Office

Power House

Silencer+Stack

Cooling Radiator

HSD Tank

WTP

Muster Point

Security Guard

Gate

Gambaran PLTD MFO 50 MW Pesanggaran, Bali

DEPUTY PLANT MANAGERSUPANTO

DEPUTY PLANT MANAGERSUPANTO

ASSMAN. MAINTENANCE

AGUS NUGRAHA

ASSMAN. MAINTENANCE

AGUS NUGRAHA

MechanicalElectrical

laboratory

MechanicalElectrical

laboratory

ASSMAN. OPERATIONNICHOLAS A. MAMESAH

ASSMAN. OPERATIONNICHOLAS A. MAMESAH

Shift Leader OpOperator.

Shift Leader OpOperator.

ASSMAN. FINANCE & ACCTHIO PRASETYO

ASSMAN. FINANCE & ACCTHIO PRASETYO

AccountingGeneral Adm.

GA,Security,OB

AccountingGeneral Adm.

GA,Security,OB

BUSSINESS MANAGER

NOVITA

PROCUREMENTANGGA

OKADINATA

COM - RISKANGGA

OKADINATA

ENGINEERINGSUPANTO

SAFETY OFFICERM. NIZAR

PLANT MANAGERANGGA

OKADINATA

Operation & MaintenanceOperation & Maintenance

SITE ORGANIZATION CHARTSITE ORGANIZATION CHARTDepartemenPower PlantEnergi

SPECIFIC FUEL CONSUMPTIONSPECIFIC FUEL CONSUMPTIONDepartemenPower PlantEnergi

SPECIFIC FUEL CONSUMPTIONSPECIFIC FUEL CONSUMPTIONDepartemenPower PlantEnergi

DATA STATISTIK SHEDATA STATISTIK SHEDepartemenPower PlantEnergi

PLTD MFO 50 MW PESANGGARAN, BALI

Periode 31 Februari 2015

COD 16 Maret 2011, pukul 13:00 WITA

Pelaksanaan Pekerjaan Operation & Maintenance

16 Maret 2011 s/d 16 Maret 2019 (2.932 hari)

Sisa Hari Kerja (Remain days) 1.477. hari

Jumlah Tenaga Kerja di pembangkit (Manpower)

62 Tenaga kerja/Manpower (1 Safety Officer + 1 Safety Man)

Jumlah Hari Kerja Orang (Mandays) 79.347 hari kerja orang/mandays

Jumlah Jam Kerja Orang Selamat/Zero Accident (Manhour)

534.377 Manhours Sejak 16 Maret 2011

ONLINE MONITORINGONLINE MONITORINGMONITAMONITA

DepartemenPower PlantEnergi

DIESEL POWER PLANT MFO 50MW Pesanggaran, Bali

Operation & Maintenance

ENGINE MAN 18V48 / 60BENGINE MAN 18V48 / 60BDepartemenPower PlantEnergi

TANK FARMTANK FARMDepartemenPower PlantEnergi

STEP UP TRANSFORMERSTEP UP TRANSFORMERDepartemenPower PlantEnergi

WATER TREATMENT PLANTWATER TREATMENT PLANTDepartemenPower PlantEnergi

AUXILARY MODULEAUXILARY MODULEDepartemenPower PlantEnergi

SILENCER + STACKSILENCER + STACK

ADMIN BUILDINGADMIN BUILDING

CONTROL ROOMCONTROL ROOMDepartemenPower PlantEnergi

DISMANTLING ROTORY CAPDISMANTLING ROTORY CAP

LAPPING CYLINDER HEADLAPPING CYLINDER HEAD

MAINTENANCEMAINTENANCEDepartemenPower PlantEnergi

DISMANTLING CONROD BEARINGDISMANTLING CONROD BEARING

CHECK CONROD BEARING CHECK CONROD BEARING

MAINTENANCEMAINTENANCEDepartemenPower PlantEnergi

CAMSHAFT BEARING CHECKCAMSHAFT BEARING CHECK

DISMANTLING TURBOCHARGERDISMANTLING TURBOCHARGER

MAINTENANCEMAINTENANCEDepartemenPower PlantEnergi

AERIAL PHOTOGRAPHAERIAL PHOTOGRAPHDepartemenPower PlantEnergi

AERIAL PHOTOGRAPHAERIAL PHOTOGRAPHDepartemenPower PlantEnergi

DepartemenPower PlantEnergi

DepartemenPower PlantEnergi

SEKIANSEKIAN

Atas Perhatiannya diucapkanAtas Perhatiannya diucapkanTERIMAKASIHTERIMAKASIH