By Joint Operation PT. Wijaya Karya (Persero)Tbk.
&PT. Mirlindo Padu Kencana
(JOWM)
DIESEL ENGINE POWER PLANT MFO
50 MW Bali
MARET 2015
DepartemenPower PlantEnergi
DepartemenPower PlantEnergi
DIESEL ENGINE POWER PLANT BALI 50 MW
WIKA (84,61%)MIRLINDO PADU KENCANA (15,39%)
Location Pesanggaran, BALI
SchemeBOT 8 years + 1 year of constructionCapacity Factor = 85%
Owner PT Indonesia Power
Equipment MAN Diesel 18V48/60B - France
SFC 0,2400 lt/kWh @ 150kV
Fuel Heavy Fuel Oil (ready to be converted to gas)
Progress
•Electricity has been sold since March 16, 2011
•Up to Feb 01, 2015 more than 1.465 million kWh sold to Indonesia Power
•With Capacity Factor = 86,16%
PLTD MFO 50MW PESANGGARAN, BALI
RESUME per 01 FEBRUARI 2015
Energi Listrik Netto (Aktual) (kWh)
1.465.051.622,17 (CF = 86,16%)
Proyeksi Energi Listrik TOP (kWh)
1.445.255.000,00 (CF = 85,00%)
Excess Energi (kWh)
19.796.622,17
Rata-Rata SFC Aktual (liter/kWh)
0,2326
Rata-Rata SFC Limit (liter/kWh)
0,2400
Tarif Price/kWh = Rp. 556,6233/kWh (USD / IDR 12.625); Jan 30, 2015
Project Location
1
1
Main Gate Main Gate
2
2
Settling + Service Tank Settling + Service Tank
3
3
Cooling Radiator & Silencer+StackCooling Radiator & Silencer+Stack
U
S
PLTD MFO 50 MW PESANGGARAN, BALIJL. Raya By Pass Ngurah Rai No. 535 Pesanggaran, Denpasar Selatan, Bali 80222 Telp/fax 0361-710169
PROJECT LOCATIONPROJECT LOCATION
Project Location
4
4
Engine + Power HouseEngine + Power House
5
5
Admin Building+Warehouse Admin Building+Warehouse
6
6
Transformer 70 MVA Transformer 70 MVA
7
7
MFO Storage Tank 5000 klMFO Storage Tank 5000 kl
U
S
PLTD MFO 50 MW Pesanggaran,Bali
WS/ WH & Office
Power House
Silencer+Stack
Cooling Radiator
HSD Tank
WTP
Muster Point
Security Guard
Gate
Gambaran PLTD MFO 50 MW Pesanggaran, Bali
DEPUTY PLANT MANAGERSUPANTO
DEPUTY PLANT MANAGERSUPANTO
ASSMAN. MAINTENANCE
AGUS NUGRAHA
ASSMAN. MAINTENANCE
AGUS NUGRAHA
MechanicalElectrical
laboratory
MechanicalElectrical
laboratory
ASSMAN. OPERATIONNICHOLAS A. MAMESAH
ASSMAN. OPERATIONNICHOLAS A. MAMESAH
Shift Leader OpOperator.
Shift Leader OpOperator.
ASSMAN. FINANCE & ACCTHIO PRASETYO
ASSMAN. FINANCE & ACCTHIO PRASETYO
AccountingGeneral Adm.
GA,Security,OB
AccountingGeneral Adm.
GA,Security,OB
BUSSINESS MANAGER
NOVITA
PROCUREMENTANGGA
OKADINATA
COM - RISKANGGA
OKADINATA
ENGINEERINGSUPANTO
SAFETY OFFICERM. NIZAR
PLANT MANAGERANGGA
OKADINATA
Operation & MaintenanceOperation & Maintenance
SITE ORGANIZATION CHARTSITE ORGANIZATION CHARTDepartemenPower PlantEnergi
DATA STATISTIK SHEDATA STATISTIK SHEDepartemenPower PlantEnergi
PLTD MFO 50 MW PESANGGARAN, BALI
Periode 31 Februari 2015
COD 16 Maret 2011, pukul 13:00 WITA
Pelaksanaan Pekerjaan Operation & Maintenance
16 Maret 2011 s/d 16 Maret 2019 (2.932 hari)
Sisa Hari Kerja (Remain days) 1.477. hari
Jumlah Tenaga Kerja di pembangkit (Manpower)
62 Tenaga kerja/Manpower (1 Safety Officer + 1 Safety Man)
Jumlah Hari Kerja Orang (Mandays) 79.347 hari kerja orang/mandays
Jumlah Jam Kerja Orang Selamat/Zero Accident (Manhour)
534.377 Manhours Sejak 16 Maret 2011
DISMANTLING ROTORY CAPDISMANTLING ROTORY CAP
LAPPING CYLINDER HEADLAPPING CYLINDER HEAD
MAINTENANCEMAINTENANCEDepartemenPower PlantEnergi
DISMANTLING CONROD BEARINGDISMANTLING CONROD BEARING
CHECK CONROD BEARING CHECK CONROD BEARING
MAINTENANCEMAINTENANCEDepartemenPower PlantEnergi
CAMSHAFT BEARING CHECKCAMSHAFT BEARING CHECK
DISMANTLING TURBOCHARGERDISMANTLING TURBOCHARGER
MAINTENANCEMAINTENANCEDepartemenPower PlantEnergi