 TURBIN PACKAGE 
Transcript
Page 1: Presentasi Turbin Package

7/16/2019 Presentasi Turbin Package

http://slidepdf.com/reader/full/presentasi-turbin-package 1/10

 TURBIN PACKAGE 

Page 2: Presentasi Turbin Package

7/16/2019 Presentasi Turbin Package

http://slidepdf.com/reader/full/presentasi-turbin-package 2/10

Page 3: Presentasi Turbin Package

7/16/2019 Presentasi Turbin Package

http://slidepdf.com/reader/full/presentasi-turbin-package 3/10

Turbine Package :1. Steam Turbine and Auxiliary Equipment

1. Turbine

2. Speed, load control & protection system

- Main stop valve

- Control valve

- Emergency governor

3. Lubricating and hydraulic oil system

- Main oil tank-Turning Gear Oil Pump

- Main oil pump

- Emergency oil pump

- Auxiliary oil pump4. Gland steam seal system

- Gland steam seal regulator

- Gland steam seal exhaust blower

- Gland steam seal condenser

5. BFP

Page 4: Presentasi Turbin Package

7/16/2019 Presentasi Turbin Package

http://slidepdf.com/reader/full/presentasi-turbin-package 4/10

2. Condensate and Feed Water Heating Plant

1. Condenser

2. Feed Water Heating System

- LP heater

- HP heater

3. Air extraction equipment

- Steam Air Ejector

4. Circulating Water Pump

5. Condensate pump

6. Deaerator

7. Closed Cooling Water System

- Closed cooling heat exchanger

- Closed cooling water pump

8. Intake Screen

Page 5: Presentasi Turbin Package

7/16/2019 Presentasi Turbin Package

http://slidepdf.com/reader/full/presentasi-turbin-package 5/10

Heat Balance Diagram

Page 6: Presentasi Turbin Package

7/16/2019 Presentasi Turbin Package

http://slidepdf.com/reader/full/presentasi-turbin-package 6/10

Flow Diagram of Main Steam and Water System

Page 7: Presentasi Turbin Package

7/16/2019 Presentasi Turbin Package

http://slidepdf.com/reader/full/presentasi-turbin-package 7/10

Flow Diagram of Circulating Water System

Page 8: Presentasi Turbin Package

7/16/2019 Presentasi Turbin Package

http://slidepdf.com/reader/full/presentasi-turbin-package 8/10

Page 9: Presentasi Turbin Package

7/16/2019 Presentasi Turbin Package

http://slidepdf.com/reader/full/presentasi-turbin-package 9/10

Cara Kerja Governor

Keterangan :

1. Main Stop Valve

2. Turbin

3. Generator 4. Sistem Eksitasi

5. AVR (Automatic Voltage Regulator)

6. Sensor Tegangan

7. Sensor frekuensi8. LFC ( Load Frequency Control)

9. Governor 

10. Contro l Valve  