PUBLIC TRANSPORT
THE HON JACINTA ALLAN MPMINISTER FOR PUBLIC TRANSPORTMINISTER FOR MAJOR PROJECTS
CROSSING REMOVED
CONTRACT AWARD AND UNDER CONSTRUCTION
IN PROCUREMENT
IN PLANNING
LEVEL CROSSING REMOVAL PROGRAM
1
2
3
5
1 MOVING STABLING FROM CARRUM TO KANANOOK
2 PLANNING ‐ HURSTBRIDGE LINE UPGRADE 2ND STAGE
3 EXTRA WERRIBEE PEAK SERVICES AND NEW BUS SRVICES TO MEET DEMAND
4 ACCESS IMPROVEMENTS – OAKLEIGH STATION
5 PLANNING ‐ BOOSTING BUSY STATION INTERCHANGES
6 NEW STABLING ‐MERNDA
7 ST KILDA RD TRAM SHUTTLE
8 NORTH‐WEST TRAM SERVICES (57, 58, 59)
9 EXTRA FISHERMANS BEND PEAK SERVICES
10 EXTRA BUS SERVICES NORTH MELBOURNE STATION‐PARKVILLE
4
6
7
8
9
MAJOR METROPOLITAN INVESTMENT10
10
$193 MILLION TO CONTINUE 24-HOUR PUBLIC TRANSPORT ON WEEKENDS
18 million
16 million
14 million
12 million
10 million
8 million
6 million
4 million
2 million
02000/01 2001/02 2002/03 2003/04 2004/05 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17
REGIONAL TRAIN PATRONAGE
Annu
al passengers c
arrie
d
V/LINE BU
YBAC
K
ARAR
AT, B
AIRN
SDALE
SERV
ICES RESTO
RED
REGIONAL
FAS
T RA
IL
38 NEW
V’LOCITY
SOUTH
ERN CRO
SS
STAT
ION O
PENS
20 PER
CEN
T FA
RE RED
UCT
ION
REGIONAL
RAIL LINK OPENS
V/LINE FU
NDING RE
STORE
D342 NEW
SER
VICE
S, 21 V’LO
CITY CAR
RIAG
ES
$194M CUT FROM V/LINE
80 NEW
SER
VICE
S, 27 NEW
V’LOCITY
142 NEW
SER
VICE
S, 39 NEW
V’LOCITY
WORK
COMMEN
CES ON REG
IONAL
RAIL LINK
54 V’LOCITY CAR
RIAG
ES
43 V’LOCITY CAR
RIAG
ES
MAR
YBORO
UGH SERV
ICES IN
TRODU
CED
BENDIGO
MARYBOROUGH
BALLARAT
TRARALGON
ARARAT
GEELONG
BAIRNSDALE
SALE
SEYMOUR
142NEWSERVICES
+18SERVICES
+10SERVICES
+74SERVICES
+18SERVICES
+18SERVICES +4
SERVICES
NEW AUGUST TIMETABLE
$1.45 BILLION REGIONAL RAIL REVIVAL PROGRAMFUNDED BY ASSET RECYCLING AGREEMENT
Infrastructure enabling works for new trains
Station improvements ‐Wallan
Station improvements ‐Donnybrook
Avon River bridge upgrade
Gippsland line upgrade
Torquay transit corridorreservation
Signalling upgrade –Bendigo‐Epsom
Crossing loop –Boorcan to Weerite
Signalling upgrade and track work – Ballarat
Signalling upgrade –Bendigo ‐ Eaglehawk
Stabling ‐Ararat
Signalling upgrade – WaurnPonds to Warrnambool
Second platform and pedestrian crossing – Waurn Ponds
GIPPSLAND RAIL INFRASTRUCTURE STAGE 1
Local project office in LaTrobe Valley400 construction jobs, local contracts, local suppliers
Paves the way for more services to Bairnsdale
A new second platform and rail stabling relocated from Traralgon
Modernised rail signalling at Traralgon Station
9km of track duplicated from Traralgon toward Morwell
Morwell crossing loop extended and second platform built at Morwell Station
Upgraded drainage at Morwell River
Extended track duplication between Moe and Traralgon
20 level crossings upgraded between Traralgon and Pakenham
Track duplication and second platforms at Bunyip and Longwarry
$1.45 BILLION REGIONAL RAIL REVIVAL PROGRAMFUNDED BY ASSET RECYCLING AGREEMENT
Infrastructure enabling works for new trains
Station improvements ‐Wallan
Station improvements ‐Donnybrook
Avon River bridge upgrade
Gippsland line upgrade
Torquay transit corridorreservation
Signalling upgrade –Bendigo‐Epsom
Crossing loop –Boorcan to Weerite
Signalling upgrade and track work – Ballarat
Signalling upgrade –Bendigo ‐ Eaglehawk
Stabling ‐Ararat
Signalling upgrade – WaurnPonds to Warrnambool
Second platform and pedestrian crossing – Waurn Ponds
$43.5 MILLION SHEPPARTON LINE UPGRADENew stabling at Shepparton making trains more available
New crossing loop to accommodate an increased number of services from 2020
Additional Weekday evening coach service between Seymour and Shepparton to be replaced by train once stabling is complete
NEW TRAINS AND TRAMS
19
30
65
E‐class trams$492 million
V/Locity rail cars$877 million
New high‐capacity trainsMore than $2 billion
87
X’TrapolisMore than $300 million19
THE HON JACINTA ALLAN MPMINISTER FOR PUBLIC TRANSPORTMINISTER FOR MAJOR PROJECTS