New for MineSight
Economic Planner Presentation by Jose Sanchez
Workshop overview
MSEP enhancements
MSEP workflow
Analyzing MSEP results
Workshop overview
MSEP enhancements
MSEP workflow
Analyzing MSEP results
MSEP enhancements
Expanded GSF
200 pits!
Design
Series/AutoP/Starter pit
MSVALP
Series/Worst Scheduling
MSEP expanded GSF
200 pits!
•No need for multiple GSF files
• Easily create GSF using procedure p60110.dat
• Support for old GSF files
Additional items
•More TOPO items TOPO1-TOPO5
•More Area items AREA1-AREA5
•More slope estimate items
Complex slopes
• Continues to support current slopes
• Soon to allow more slope detail
MSOPIT–Creating a series of pits
OP
TIO
NS
Multi-Run using BASE option
BASE option for selected areas
MULTP – limit pushback size
MULTV – vary value
MULTZ – vary bottom elevation
AUTOP – pushbacks limited by face angle
BASE - option with vary prices feature
Starter pit for AUTOP and MULTP options
Design a series of pits
• Determine the ultimate pit limit
• Develop phases for scheduling
BASE option with vary price feature
Scheduling with economic sequential pits
THE “GAP”
360 degree mining
Scheduling with economic sequential pits
Create pits in a preferred direction
Create a series of non-concentric pit shells
Targets high grade material
Honors maximum mining width
Fixes the ‘gap’ issue
AutoP – More realistic phase design