Who we are...
- Skateboarders & BMXers
- Professional Skatepark Designers
- Professional Skatepark Builders
PAGE 2v1.2 Skatepark Construction
Design CrewShaun ScarfeTrevor JohnsonIain Young
31 years riding17 years skating27 years skating
PAGE 2v1.2 Skatepark Construction
Design CrewIain is a skateboarder with 27 years of experience. Iain has worked in the construction industry for most of his working life.He has been building skateparks and obstacles since his passion in skateboarding began. With his experience and skill sets, Iain is able to operate and manage the on site construction to ensure that the end results are of the highest quality and meet the specification of the final design, with creative & innovative facilities as our hallmark.
Shaun Scarfe - Director / Designer
Iain Young - Director / Designer & Construction Manager
Shaun is a BMXer with 31 years experience. Shaun has been running Four One Four Skateparks Ltd 12 years building permanent indoor and outdoor skateparks. Four One Four have provided equipment for some of the most successful Events & Skatepark facilities in the UK & Europe.
These include The London 2012 Olympic Opening Ceremony, Adrenaline Alley Skatepark, Europe's first Resi Vert Ramp, NEC Cycle Show, Urban Games, NASS, Cologne Masters and the BMX Freestyle World Championships.
Trevor Johnson - DesignerTrevor has been skating for 17 years. In this time he has gained reputable sponsors and travelled the globe skating some of the best spots and parks in the world. Trevor has worked in the skatepark construction industry for over 10 years and with a keen eye for detail he has been able to apply his experience to design and build some of the most successful parks in the UK and Europe.
PAGE 2v1.2 Skatepark Construction
Build Crew
PAGE 2v1.2 Skatepark Construction
Our Skateparks
- Our passion translates into the parks we build
- It is in every step from the design to the finish
- We feel that this shows...
PAGE 2v1.2 Skatepark Construction
Examples of Previous Works
PAGE 2v1.2 Skatepark Construction
INVERNESS SKATEPARK - 3D Concept
Concept Images PAGE 4v1.2 Skatepark Construction
INVERNESS SKATEPARK - 3D Concept
Concept Images PAGE 5v1.2 Skatepark Construction
Projects managed by Iain Young
PAGE 9Project Images
Newtown Skatepark
INVERNESS SKATEPARK
v1.2 Skatepark Construction
Example of previous work Projects managed by Iain Young
PAGE 9Project Images
Newport Skatepark Newport Skatepark
Newtown Skatepark Newtown Skatepark
v1.2 Skatepark Construction
Shrewsbury Skatepark Shrewsbury Skatepark
Shrewsbury SkateparkShrewsbury Skatepark
Project Images PAGE 10
Example of previous work Projects managed by Iain Young
v1.2 Skatepark Construction
Project Images PAGE 12
Bay 66 Nike LondonBay 66 Nike London
Bay 66 Nike London
Example of previous work Projects managed by Iain Young
v1.2 Skatepark Construction
Project Images PAGE 11
Dudhope Skatepark
Dudhope Skatepark North Berwick Skatepark
Bay 66 Nike London
Example of previous work Projects managed by Iain Young
v1.2 Skatepark Construction
Project Images PAGE 11
Example of previous work Projects managed by Iain Young
v1.2 Skatepark Construction
Skatepark Concepts
PAGE 2v1.2 Skatepark Construction
SKATEPARK CONCEPT - Transition Park
PAGE 2v1.2 Skatepark Construction
PAGE 2
SKATEPARK CONCEPT - Transition Park
v1.2 Skatepark Construction
Concept Images PAGE 6
SKATEPARK CONCEPT - Transition Park
v1.2 Skatepark Construction
Concept Images PAGE 7
SKATEPARK CONCEPT - Plaza Park
v1.2 Skatepark Construction
Concept Images PAGE 8
SKATEPARK CONCEPT - Plaza Park
v1.2 Skatepark Construction
Concept Images PAGE 8
SKATEPARK CONCEPT - Extensions & Elevations
v1.2 Skatepark Construction
Concept Images PAGE 8
SKATEPARK CONCEPT - Flow Street Section
v1.2 Skatepark Construction
Concept Images PAGE 8
Design
- Identify the needs and requirements of the facility
- Understanding budget and achieving realistic goals
- We have an affinity to the clients & users vision
- Continual design development through user & client liaisons
- Design a facility to further user progression & skills development
v1.2 Skatepark Construction
Concept Images PAGE 8
Consultation
- Continual design group involvement through every stage
- Actualisation of design groups visualisation
- Truly bespoke design process inline with user group feedback
v1.2 Skatepark Construction
Concept Images PAGE 8
Integration of Facility
- Consideration of the surrounding areas and history of the site
- Integrated design space uses Topography for maximum use of materials & the available space
- Design & use of Landform & Architechture for improved Aesthetics
- Social benefits of completed facility
v1.2 Skatepark Construction
Concept Images PAGE 8
Professionalism
- All staff have formal qualifications in their fields with continual development training programs within Concreate Skateparks
- Quality Management H&S Systems
- ISO 9001, ISO 18001, ISO 14001 Assured
- Full Liability and Design Indemnity insurance cover
- High level 3D render models & full construction drawings
v1.2 Skatepark Construction
Concept Images PAGE 8
Company Structure- Management Management Tree
- Implementation How design vision is achieved with by intelligent management
- Protocol / Program of works Procedures in place to see the designers vision is maintained throughout, with clear communication channels & procedure.
- Timeline Realistic Program of works is crated then implemented to ensure timely delivery of the project.
v1.2 Skatepark Construction
Concept Images PAGE 8
Construction- Methods, techniques & importance of H&S Bespoke Tools & Techniques - H&S compliance - COSSH & RAMS
- Groundworks Efficient Unit - Implemented to strict protocol and design standards
- Fabrication & Shuttering Techniques - Why is it so important to get right - Double checks
- Steel Installation Standards - Tie-ing of Steelwork - Correct Placement - Movement & Expansion
- Concreting Standards - intelligent planning of Concrete pours - How & why we lay our concrete
- Landscaping
v1.2 Skatepark Construction
Concept Images PAGE 8
Shuttering
v1.2 Skatepark Construction
Concept Images PAGE 8
Mesh & Rebar
v1.2 Skatepark Construction
LONDON 2012 OLYMPICS Opening Ceremonies - LOCOG
BMX FREESTYLE WORLDS - Spielbetrieb
RELENTLESS NASS - Sports Vision
3 DEGREES - Red Bull
NEC CYCLE SHOW - Upper Street Events
NIKE 6.0 SNOW SHACK - Urb Orbis
NIKE 6.0 FASHION SHOW - Urb Orbis
GAMESTARS LIVE - London Event Co.
SPRITE URBAN GAMES - Board-X
SPRITE URBAN GAMES - Haymarket Exhibitions
KING of STREET - Board -X
NASS - ASE Ltd
WINDFEST & WIGHT AIR - Red Bull
TRIX MUSIC CHANNEL - BSKYB
GOLD COAST - Red Bull
RELENTLESS TV Commercial - Sports Vision
LINTON PARISH COUNCIL - Skatepark Maintenance
NEC BIKE SHOW - Haymarket Exhibitions
SPRITE PARKOUR COURSE - Urb Orbis
SHROPSHIRE COUNCIL - Shrewsbury Skate Ramp
DUNDEE CITY COUNCIL - Dudhope Skatepark Updates
Previous Clients & Events
ADRENALINE ALLEY SKATEPARK -
VODAFONE - First Chance
HTC ONE - Selfridges Skatepark
XSITE SKATEPARK - Gelder Group
FELT BICYCLES TM - Xtra Distribution
BRAUN SPINE RAMP - Kjerag / Spielbetrieb
V FESTIVAL - Kjerag / Spielbetrieb
BOARDMASTERS - Sports Vision
BMX MASTERS COLOGNE - Spielbetrieb
SPRITE SUMMER SESSIONS - Urb Orbis
CENTRAL SKATEARK - Two Distribution
TENT EXHIBITION - Farm Designs
CANON BOWL FREESTYLE CH -
MOUNT HAWKE SKATEPARK -
DIGITAL SWITCH OVER - BSKYB
NIA ATHLETICS HIGH JUMP - Fast Track
BUG JAM - Santa Pod Raceway
FIFE COUNCIL - Design & Consultation with 'Skint Skateparks'
BOTTESFORD COUNCIL - Skatepark Maintenance
BURN ENERGY / LOTUS F1 - Junk Yard project
BAY 66 Skatepark / NIKE SB - Urb-Orbis
Previous Clients PAGE 14v1.2 Skatepark Construction
Concept Images PAGE 8
Concrete Works
v1.2 Skatepark Construction
Concept Images PAGE 8
Concrete Finishing
v1.2 Skatepark Construction
CONSTRUCTION PAGE 17
Grass Bunding 100mm Seeded Top Soil
Sub-Base 6F2 / 6F5or similar Recycled Fill
Teram Geo textile between Sub-
Base layers
Compacted MOT Type 1
or similar fill
Sub-Soil 6F2 / 6F5to engineer Spcification
150mm reinforced concreteHand Finished P380 - P450 grade
(specialist mix tested 60-70KNmm )
20mm Smooth Steel Bar600mm through join
A252 Reinforcing MeshTied at 200m centres
12mm Bent Rebar1200mm Long
150mm reinforced power floated concrete
Sealed Construction Joint to BS69120
Typical Construction
2
Concreate Skateparks - TYPICAL CONSTRUCTION - BS EN 14974:2006
v1.2 Skatepark Construction
Concept Images PAGE 8
Assurances
- Warranty
- Indemnity on Design
- 15 Year on Concrete & Reinforcement
- Exclusions
- High level 3D render models & full construction drawings
v1.2 Skatepark Construction
Concept Images PAGE 8
Assurances
v1.2 Skatepark Construction