Presentation for CONVERGENCE BETWEEN NREGA & WATERSHED SCHEMES IN CHHATTISGARH PILOT DISTRICTS : SURGUJA and BASTAR
Transcript
Page 1: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

Presentation forCONVERGENCE BETWEEN NREGA & WATERSHED

SCHEMES INCHHATTISGARH

PILOT DISTRICTS : SURGUJA and BASTAR

Page 2: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

Irrigation projects of Chhattisgarh

• 2280 Major, Medium and Minor irrigation projects

• 483 Major, Medium and Minor irrigation projects under construction.

• Storage capacity: 7865.592 cumec.

• 17.58 lakh hac. of area is being irrigated through these projects

Page 3: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

Our Strategies and Initiatives• Gap Filling by taking up works of water resource schemes under

NREGA not provided under State budget.

i.Optimising the irrigation capacity for agricultural purposes of all the major, medium and minor projects to their full capacity through

- construction of field channels- correction of system deficiencies- construction of drains

ii. Water Conservation and Harvesting- includes:- Stop dam- Irrigation Tanks- new as well as renovation of water bodies- Treatment of catchment area- Command area development

iii. Artificial recharge of ground water- dug wells- small farm ponds

iv. Land levellingv. Flood control

Page 4: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

Gap filling

OVERALL UTILIZATION

0500000

100000015000002000000

2000-01

2001-02

2002-03

2003-04

2004-05

2005-06

2006-07

2007-08

2008-09

YEAR

IRR

I C

REA

TED

/AC

TUA

L

IRRI CREATED

ACTAUL IRRIGATION

OVERALL UTILIZATION

13404711411514

14531181551595

16257621665676

17225151742409

546568952993

717849804817

10223501051858

11491301179264

0 500000 1000000 1500000 2000000

2000-01

2003-04

2006-07YEAR

IRR

I C

REA

TED

/AC

TUA

L

ACTAUL IRRIGATION

IRRI CREATED

Page 5: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

MAJOR PROJECT

0

200000

400000

600000

800000

1000000

2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09

YEAR

IRR

I CR

EATE

D/A

CTU

AL

Series1

Series2

MEDIUM PROJECT

0

50000

100000

150000

200000

250000

300000

2000-01

2001-02

2002-03

2003-04

2004-05

2005-06

2006-07

2007-08

2008-09

YEAR

IRRI C

REA

TED/A

CTU

A

Series1

Series2

MINOR PROJECT

0100000200000300000400000500000600000700000

YEAR 2000-01

2001-02

2002-03

2003-04

2004-05

2005-06

2006-07

2007-08

YEAR

IRRI C

REA

TED/A

CTU

A

Series1

Series2

Page 6: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

Major Project

SRNO YEAR KHARIF RABI

TOTAL POTENTIAL CAPACITY KHARIF RABI

TOTAL ACTUAL CAPACITY %IRRIGATION

1 2000-01 511280 131363 642643 496928 1106 498034 77.50

2 2001-02 545712 154431 700143 356931 1396 358327 51.18

3 2002-03 560984 163198 724182 443021 7691 450712 62.24

4 2003-04 610707 191992 802699 567285 2219 569504 70.95

5 2004-05 651513 206012 857525 591824 288 592112 69.05

6 2005-06 668887 211619 880506 600580 81696 682276 77.49

7 2006-07 690683 213893 904576 612153 62219 674372 74.55

8 2007-08 695437 213893 909330

9 2008-09MAJOR PROJECT

0100000200000300000400000500000600000700000800000900000

1000000

2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09

YEAR

IRR

I CR

EATE

D/A

CTU

A

Page 7: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

Medium Project

SRNO YEAR KHARIF RABI

TOTAL POTENTIAL CAPACITY KHARIF RABI

TOTAL ACTUAL CAPACITY %IRRIGATION

1 2000-01 197447 22267 219714 173972 13517 187489 85.33

2 2001-02 197544 26103 223647 152705 4438 157143 70.26

3 2002-03 198524 26158 224682 147048 18928 165976 73.87

4 2003-04 198524 26158 224682 173228 8297 181525 80.79

5 2004-05 199279 26654 225933 176129 7139 183268 81.12

6 2005-06 199799 26919 226718 189700 10287 199987 88.21

7 2006-07 225082 26919 252001 200254 9586 209840 83.27

8 2007-08 227867 29819 257686

9 2008-09

MEDIUM PROJECT

0

50000

100000

150000

200000

250000

300000

2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09

YEAR

IRRI

CREA

TED/A

CTU

AL

Page 8: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

Minor Project

SRNO YEAR KHARIF RABI

TOTALPOTENTIA

LCAPACITY KHARIF RABI

TOTALACTUALCAPACITY %IRRIGATION

1 2000-01 439663 38451 478114 251784 15686 267470 55.94

2 2001-02 447995 39749 487724 193728 8651 202379 41.49

3 2002-03 462720 41534 504254 168229 19900 188129 37.31

4 2003-04 479827 44387 524214 260003 11318 271321 51.76

5 2004-05 496296 46008 542304 264130 12348 276478 50.98

6 2005-06 5102174 48238 558452 249266 17601 266867 47.79

7 2006-07 518181 47757 565938 279141 15911 295052 52.14

8 2007-08 533877 48516 582393

9 2008-09MINOR PROJECT

0

100000

200000

300000

400000

500000

600000

700000

YEAR 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08

YEAR

IRRI

CREA

TED/

ACT

UAL

Page 9: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

Irrigation works under NREGA• Personday generated through irrigation related

works: 2.32 cr(For the yr 2008-09 up to March’ 09)

• Total no. of work sanctioned : 3753- Water conservation and water harvesting

- Land Levelling

- Flood control - Renovation of traditional bodies, including desilting

of tanks

• Sanctioned amount : Rs. 62091.38 lakh

• Additional 17803 ha.

Page 10: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

District Surguja: An Overview

• GEOGRAPHICAL AREA 16,03,440 hac• NET SOWN AREA 4,80,000 hac• GROSS IRRIGATED AREA 39,000 hac• NET IRRIGATED AREA 37,000 hac

• By Dug wells 5849 hac• By Tube wells 1821 hac• By Tanks/Ponds 7529 hac• By Canals 4398 hac

AGRO – CLIMATIC ZONE 7 (Eastern Plateau and Northern Hills)

AVERAGE ANNUAL RAINFALL IS 130 cm

Page 11: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

SOURCES OF WATER

Traditionally : OPEN WELLS & TANKS“ Dabrees”: Storing rainwater for irrigation& “talabs”

Drawn by“ theda” - traditional water drawal

systems

NO MAJOR IRRIGATION SCHEMES

MODERN METHODS: BOREWELLS & TUBE WELLS

Drawn by Lift Irrigation systems through electric pumps or diesel pumps.Only 20% of the potential groundwater had been exploited

Estimated annual replinishable groundwater resource is 1662 mcm

Page 12: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

WATER HARVESTING /INTIATIVES AT VILLAGE LEVEL -

“Shakambari Yojana”

1. Tapping ground water potential and riparian runoff thru’ tubewells and lift irrigation

2. SAFEGUARDS – IT IS STATURORY TO MAINTAIN A MINIMUM DISTANCE OF 300 mtrs BETWEEN TWO TUBEWELLS

3. Assistance subsidy –rs. 10,000 – rs. 18,000 for DRILLINGRs. 10,000 – rs. 25,000 for PUMP ENERGIZING

FOR SC/ST’S rs. 45000

“Goan Ganga Yojana”

I. Create atleast one source of water in every village/ habitation

II. Community initiated maintenance and renewal with the involvement of Panchayats.

III. Prevention of encroachment on traditional “nistaritalabs”

Page 13: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY
Page 14: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

ASSETS CREATEDRenovation of traditional

water bodies4660.48 lakhs, 11.33%

• Canal lining worksCement concrete lining of canal length 95 kms

costing 23.49 cr, water reaching till tail end led to irrigation of 2300 acres

• Community pond deepening : 459

Estimated cost : 13.75 cr

Potential irrigation area : 1462 acres

• Nirmala ghat / Pond pitching work : 108

Estimated cost : 79.50 lakhs

Page 15: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY
Page 16: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

Kunwarpur Lining work

CANAL LINING WORKS-95KMS 23 crores

Page 17: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

Name : KUNWARPUR RESERVIOR MAIN CANAL LINING WORK.

Cost : 1.06 cr.

Year : 2007-08

Gram panchayat : Kunwarpur

Janpad panchayat : Lakhanpur

• Completed in 1976-77

• Dilapidated due to lack of maintanance

• Catchment area 44.85 sq.Km

• Due to seepage the entire fields around the canal were water logged

• Extension in 530 hectares of irrigated land

• Canal lining in 10.5 kms length

KUNWARPUR RESERVIOR MAIN CANAL LINING WORK

1.06 Crores

Page 18: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY
Page 19: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

Odgi Main Canal Rock Cutting

• NAME : ODGI RESERVOIR MAIN CANAL LINING WORK

• COST : 15.00 LAKH• YEAR : 2007-08• GRAM PANCHAYAT : ODGI• JANPAD PANCHAYAT : ODGI

• STORY :-

• A hugly naxal affected area

• A total of 1080 mtrs of Canal lining and canal renovation work was carried out which involved a significant HARD ROCK CUTTING

•• EXTENTION in 136 HECTARES OF

IRRIGATED LAND

Page 20: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

NAME : BAIJNATHPUR WATER RESERVOIR MAIN CANAL LINING WORK

COST : 12.40 LAKHYEAR : 2007-08GRAM PANCHAYAT : BAIJNATHPUR JANPAD PANCHAYAT : BHAIYATHAN

STORY :-• A total of 1590 mtrs of canal was restored and lined consequent to which the water flow improved and seepage was controlled. • There has been extension in 120 hectares of irrigated land.

Baijnathpur Water Reservoir

Page 21: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

BAIJNATHPUR CANAL LINING WORK

Page 22: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

NAME : GIRJAPUR WATER RESERVOIR MAIN CANAL LINING WORK

COST : 16.00 LAKHYEAR : 2007-08GRAM PANCHAYAT : GIRJAPURJANPAD PANCHAYAT : ODGI

STORY :-• A canal lining work of 1110 mtrs was carried out. • This enabled improved water flow to the tail points• Lead to extension of 180 hectares of land under irrigation.

GIRIJAPUR MAIN CANAL LINING

Page 23: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY
Page 24: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY
Page 25: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

SHOOT FALL WORKS

Page 26: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

WORKS DISTRIBUTION under NREGA

1. Water conservation 23.04 croresAnd Water harvesting 5.06%

2. Drought proofing --- 49.09 crores(Afforestation and tree plantation) 11.93%

3. Micro – Irrigation works 67.22 crores16.34%

4. Provision of Irrigation facility 38.99 croreto land owned by SC/ST 9.48%

5. Renovation of traditional 46.60 croreswater bodies 11.33%

6. Land development 11.95 crores2.91%

7. Rural Connectivity 167.00 crores40.71%

(2006-07, 2007-08, 2008-09)

Page 27: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

2008-09• Canal Lining works and Desiltation 48• Wells/Irrigation facilities on SC/ST Land 4580 • Water Conservation and Water Harvesting 182

(Pond Construction and Pond Deepening) • Land Levelling and Bunding 2512• Stop Dams and Check Dams 460

Page 28: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

FINANCIAL SHARE OF VARIOUS DEPARTMENTS in NREGA

Irrigation Department 11.17%Forest Department 11.12%Agriculture Department 2.81%Horticulture Department 0.70%RES 17.13%GRAM PANCHAYATS 57.7%

Page 29: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

ASSETS CREATEDWater conservation and water

harvesting2304.62 lakhs, 5.60%

• New ponds constructed : 530

Page 30: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

PASTA TANK

Page 31: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

NAME : TANK DEEPING COST : 3.27 LAKHYEAR : 2006-07GRAM PANCHAYAT : TRIPURESHWARJANPAD PANCHAYAT : RAMANUJNAGAR

STORY :-

• Extension of irrigation to more than 25 acres of surrounding land.•Promoted dual cropping.

Success story

POND DEEPENING WORKS

Page 32: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

NAME : BIHI TANK DEEPNING WORK COST : 3.50 LAKHYEAR : 2007-08GRAM PANCHAYAT : BHAIYATHANJANPAD PANCHAYAT :BHAIYATHAN

•STORY :-• An area of around 16 acres was brought under irrigation.• The water storage capacity too has improved by almost 50 percent.• This has greatly alleviated the problem of water table depletion in the area due to large to wells.

Success story

POND DEEPENING WORKS

Page 33: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

NAME : PAKHANA POND DEEPENING AND PITCHING

WORK WITH GHAT CONSTRUCTION COST : 4.14 LAKHYEAR : 2007-08GRAM PANCHAYAT : JUNALAKHANPURJANPAD PANCHAYAT : LAKHANPUR

STORY :-• The pond deepening work proved to be a boon for the area.• The pond is a source of irrigation for 8 to 10 acres of surrounding area .• The pond is used for common usage by the residential communities• The GHAT is uses for bathing purposes and is an additional asset.

POND DEEPENING WORKS

Page 34: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

NAME : TANK CONSTRUCTION COST : 3.50 LAKHYEAR : 2006-07GRAM PANCHAYAT : GAHILAJANPAD PANCHAYAT : BATAULI

STORY :-• The water table has improved. Water scarcity was an acute problem in the area.• Water is stored and used all year around.• Around 10-12 farmers are being benefited irrigating 15 acres of land.

Success story

TANK CONSTRUCTION

Page 35: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

ASSETS CREATEDMicro irrigation works6722.24 lakhs, 16.34%

•Stop dams constructed : 711

•Irrigation potential of 8135 acres

Page 36: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

CHECK DAM TATAPANI

Page 37: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

NAME : STOP DAM COST : 4.89 LAKHYEAR : 2006-07GRAM PANCHAYAT : BADAJANPAD PANCHAYAT : BALRAMPUR

STORY :-

• Around 40 acres land has been brought under irrigation.• Around 15 acres land is being irrigated by simple flow system.Success story

STOP DAMS/ CHECK DAMS

Page 38: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

NAME : TURRA NALLAH STOP DAM COST : 4.86 LAKHYEAR : 2006-07GRAM PANCHAYAT : CHAURAJANPAD PANCHAYAT : RAJPUR

STORY :-• Around 10-12 ADIVASI farmers of the surrounding area are benefited from the scheme.• Land irrigated 16 acres.• The cropping pattern in the area has improved.• The economic condition of the farmers has also improved following dual cropping.

STOP DAMS AND CHEK DAMS

Page 39: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

NAME : CHEERAPAKHANA STOP DAM CONSTRUCTION COST : 5.00 LAKHYEAR : 2007-08GRAM PANCHAYAT : TARAJANPAD PANCHAYAT : PREMNAGAR

STORY :-• The Cheerapakhna Talapara stop dam is today a hub of community activity. • The Reservoir of the dam is used for drinking water for animals and common user rights of the residents.• For bathing and irrigation etc. • Total increase in irrigated area- 18 to 20 acres.

SUCCESS STORY

STOP DAMS/ CHECK DAMS

Page 40: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

NAME : BADKA DAHRA STOP DAM CONSTRUCTIONCOST : 5.00 LACSYEAR : 2007-08GRAM PANCHAYAT : SHIVNAGARJANPAD PANCHAYAT : PREMNAGAR

STORY :-• Due to the water storage of the catchments site around 6-7 farmers are being benefited irrigation an area of around 12 to 15 acres.• The water table has appreciated • Water scarcity is no longer an acute problem here.

SUCCESS STORY

STOP DAMS/ CHECK DAMS

Page 41: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

TRADITIONAL SYSTEM OF FARM DABREES AND THEDA

Page 42: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

ASSETS CREATEDProvision of irrigation facility to

land owned by SC/ST

3899.38 lakhs, 9.48%

• Wells in individual farmlands3450 works/beneficiariesEstimated cost 29.49 crPotential irrigation 3278 acres

• Ponds on individual farmlands : 128

Page 43: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

NAME : CONSTRUCTION OF WELL ON PRIVATE LAND COST : 1.05 LACSYEAR : 2007-08GRAM PANCHAYAT : LATORIJANPAD PANCHAYAT : LAKHANPUR

STORY :-• Shri Chandrabali Budga an adivasi farmer and owner of 2.5 acres of barren land received tremendous respite with the construction of this individual well in nrega.• Due to a reliable source of irrigation now the farmer is growing ginger & green chilli crops.

WELLS

Page 44: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

CONSTRUCTION OF WELL ON PRIVATE LAND

NAME : CONSTRUCTION OF WELL ON PRIVATE LAND COST : 1.00 LACSYEAR : 2007-08GRAM PANCHAYAT : BASKELAJANPAD PANCHAYAT : LAKHANPUR

STORY :-• Shri Sukhnandan an adivasi farmer and owner of 2.5 acres of barren land received tremendous respite with the construction of this individual well in nrega.• Due to a reliable source of irrigation now the farmer is growing ginger & pototo crops.

Page 45: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

NAME : LAND LEVELLINGCOST : 0.152 LAKHYEAR : 2007-08GRAM PANCHAYAT : BADAJANPAD PANCHAYAT : BALRAMPUR

STORY :-

• A BPL ADIVASI farmers life turned around when his total rock terrained barren land of 1.50 acres was leveled through NREGA project.• He is now taking PADDY on the land.

Success story

LAND LEVELLING

Page 46: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

ASSETS CREATED Land development

1195.87 lakhs, 2.91%

• Land leveling2312 works/beneficiaries

• Land bunding459 works/beneficiaries

Page 47: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

NAME : CHUHKA NALLAH FLOOD PROTECTION BARRIES COST : 14.73 LAKHYEAR : 2006-07GRAM PANCHAYAT : NAMADGIRIJANPAD PANCHAYAT : SURAJPUR

STORY :-

• Flood protection barrier of around 130 mtrs near the perennial chuhka nallah has ensured protection from massive soil erosion of surrounding land of about 15 acres.• Also serves a causeway for communication • And irrigation source in summer.

Success story

FLOOD EMBANKMENTS

Page 48: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

FLOOD EMBANKMENTS

Page 49: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

FLOOD EMBANKMENTS

Page 50: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

FLOOD EMBANKMENTS

Page 51: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

FARM DEVELOPMENTField channels

Page 52: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

•Roadside Plantation

86250 trees planted along 345 kms of PMGSY roads

•Jetropha Plantation

3.87 cr jetropha saplings planted on an area of 15277 hectares

•Bamboo Plantation

19 lakhs saplings planted

ASSETS CREATEDDrought proofing, including afforestationand tree plantation4909.05 lakhs, 11.93%

Page 53: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

ASSETS CREATEDRural connectivity to provide all

weather access16751.82 lakhs, 40.71%

• WBM roads : 1518• Earthen roads : 1247

Page 54: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

PILOT DISTRICT II BASTAR

Page 55: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

WORKS/ACTIVITIES06-07 07-08 08-09 TOTAL COST

1. POND DEEPENING 3 4 2 9 92.82

2. STOP DAM 86 57 11 154 24.66

3. CANAL LINING & RENOVATION

46 32 7 85 1046.13

4. CHECK DAMS 18 06 04 28 178.99

5. FOOD EMBANKMENTS 0 09 0 09 138.62

Page 56: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

NAME OF THE WORK : STOP DAM

COST :15.75 LakhGRAM PANCHAYAT: BOLBOLAJANPAD PANCAYAT :

KONDAGOAN

SUCCESS STORY

Page 57: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

NAME OF THE WORK : STOP DAMCOST :11.68 LakhAGENCY : IRRIGATION DEPARTMENTGRAM PANCHAYAT: KUNKURDAKARPALJANPAD PANCAYAT : KONDAGOAN

SUCCESS STORY

Page 58: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

NAME OF THE WORK : KUNDANLAL STOP DAMCOST :.10.50 LakhAGECY : IRRIGATION DEPARTMENTGRAM PANCHAYAT: BADEBHIRAUANDJANPAD PANCAYAT : KONDAGOAN

SUCCESS STORY

Page 59: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

NAME OF THE WORK : CHINDGOAN STOP DAM

COST :24.41 LakhGRAM PANCHAYAT: CHINDGOANDJANPAD PANCAYAT : BAKAWAND

STORY1. The extent of the reservoir is up to 1500 m2. The capacity of the reservoir is 39600 sq m

SUCCESS STORY

Page 60: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

1. NAME OF THE WORK : CANAL LINING NEWATA

COST :23.90 LakhGRAM PANCHAYAT: NEWATAJANPAD PANCAYAT : KONDAGOAN

SUCCESS STORY

Page 61: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

NAME OF THE WORK : SURAJMUNDA (CHINARI) STOP DAM

COST :9.82 LakhGRAM PANCHAYAT: CHINARIJANPAD PANCAYAT : BAKWAND

SUCCESS STORY

Page 62: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

NAME OF THE WORK : GANGAMUNDA CHECK DAMCOST :7.34 LakhGRAM PANCHAYAT: KEWAIBALENGAJANPAD PANCAYAT : KONDAGOAN

SUCCESS STORY

Page 63: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

2. NAME OF THE WORK : CANAL LINING WORK PALLICOST :17.09 LakhGRAM PANCHAYAT: PALLIJANPAD PANCAYAT : KONDAGOAN

SUCCESS STORY

Page 64: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

3. NAME OF THE WORK : UMGOAN CANAL LINING

COST :25.36 LakhGRAM PANCHAYAT: UMERGOANJANPAD PANCAYAT : KONDAGOAN

SUCCESS STORY

Page 65: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

4. NAME OF THE WORK : NARANGI CANAL LINING WORK

COST :8.40 LakhGRAM PANCHAYAT: KUMARPKAJANPAD PANCAYAT : KONDAGOAN

SUCCESS STORY

Page 66: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

5. NAME OF THE WORK : JAMKOT CANAL LINING WORKCOST :13.55 LakhGRAM PANCHAYAT: MASORAJANPAD PANCAYAT : KONDAGOAN

SUCCESS STORY

Page 67: Presentation for - NREGAnrega.net/csd/water/field-initiatives/Chhattisgarh.pdfTU A L Minor Project SRNO YEAR KHARIF RABI TOTAL POTENTIA L CAPACITY KHARIF RABI TOTAL ACTUAL CAPACITY

Recommended