1
Presentation for Terms of Reference (TOR) before the Esteemed Members of
“STATE EXPERT APPRAISAL COMMITTEE – 1”, AHMEDABAD
COMPLETED
COMMERCIAL OFFICE/ CORPORATE PARK
Locality – Aambli Bopal Road
District – Ahmedabad City, State – Gujarat
Size of the Project: 21108 SQMTS
Expected cost of the project: Contact Information: 9825082984
SHAINAL SUTARIA Screening Category: 8A
PROPOSED BY
SARTHAV INFRASTRUCTURE PVT. LTD.
2
Agenda
Ahmedabad today and its needs
Planning of Abhishree Corporate Park
Abhishree Corporate Park Vision
Framework for Abhishree Corporate Park
Summary
3
Challenges faced by Ahmedabadtoday led to the genesis of Abhishree Coporate Park
“Abhishree Corporate Park will allow its Corporates to learn, grow, become prosperous, enjoy life with good health and live sustainably in harmony with the Earth. They will have every facility and opportunity they need to enjoy life to the fullest.”
5
2007 2008 2008 2012
Identifying the needs of
the corporate Park
Laid down the aspiration
for the Corporate Park
being Planned
Search for the master
planners - A
Site surveys to study land
forms, terrain, water
bodies, local flora, water
table & others
First draft of master plan
AUDA plans as approved
by ahmedabad urban
Development Authority
of India
Masterplan finalized for
entire 21108 Sqm.
Building Use Permission
Obtained
Major Corporates Moved
in and the building was
ready for use
The planning process for Abhishree Corporate Park started 8 Years ago and the project was completed in June 2012
6
A three pronged approach was used in the master-planning to achieve our vision of developing a world-class city
ABHISHREE CORPORATE
PARK
Engage with global experts; engagement with Indian counterparts to adapt their expertise to Indian context
Understand global best practices and benchmarks for design, construction & operations of a city
Translating the vision into a master plan – studies and surveys for further refinement
A
B
C
We have associated with the best-in-class partners and industry thought leaders over the past few years
Architect
Block design
and landscaping
Structural Consultants
Smart and Sustainablecity
7
A
Global benchmarks that define livability and its various aspects were studied and incorporated in the planning of Abhishree Corporate Park (1/2)
8
Mercer’s
Quality of living survey
Mercer conducts annual “quality of living” survey across 200+ cities in the world ranking them based on 39 factors categorized into various groups such as –
Political and Social environment
Economic and Socio-cultural environment
Housing and Recreation
Medical and health considerations
Schools and education
Public services and transportation
Consumer goods
Natural environment
EIU issues global livability report ranking all the cities in the world on various livability parameters with different weight as below –
Stability (25%) – Political & social stability; safety & security
Culture & environment (25%) – Climate; social fabric; cultural & sports facilities
Healthcare (20%) – Healthcare services; general health indicators
Infrastructure (20%) – Roads; power & water; public transport; communications
Education (10%) – Availability and quality of schools; public education indicators
Global livability report
B
9
A number of surveys and detailed studies were done that resulted in the current master plan
Geo-technical investigation of the site
Site surveys for contour and terrain
Soil and hydrology survey of site
Study and survey of regional flora
Survey of River edge line and HFL
Surveys are unavailable due to completion of the project
Towards more Livable Indian Cities. Decoding livability for a
city - A Future Institute Publication
Thinking about Abhishree Corporate Park –
Architect/Landscape Architect
Urban Design Guidelines Compilation – Architect/Landscape
Architect
Abhishree Corporate Park landscape guidelines - Architect
/Landscape Architect
Abhishree Corporate Park tree transplanting guidelines –
Architect/Landscape
SUR
VEY
S ST
UD
IES
C
Sample list only
10
Abhishree Corporate Park is envisioned to be “India’s most livable city”
Vision statement of Abhishree Corporate Park
To find a place which can cater to the existing needs of the people in the locality, and
thus creating an environment suitable for them. Enhance the workplace communities,
and thus creating an environment and spaces to enhance the workplace communication,
eye for details and networking. Through this corporate will gain a better understanding of
the latest news, innovation around the industry. The building was also aimed at a
sustainable living space. Also it is benchmarked on every important aspect of urban
appeal, walk to work opportunities, security, connectivity, technology enablement and
lots more
View of Abhishree Corporate Park
Completed View
Sitting Area View from BRTS Route
Our vision of Abhishree Corporate Park at the end of our journey
11
12
Planned
Abhishree Corporate Park is “Planned" to ensure easy living with
affordable high quality residences, varied commercial opportunities
and convenient access to open spaces, retail centers, educational
institutions, healthcare, clubhouses and cultural spaces.
City master-plan that allows for easy phasing, provides open
spaces and amenities for better quality of life and encourages
walkability
Green design principles adopted in master planning and block
designing
Physical infrastructure design (power, water) that allows for easy
phasing and sustainability
A
B
C
13
Prudent - Focus on high quality and sustainable infrastructure: power and water self-
sufficiency; smart and connected corporate Park; safe and secure Offices
Place - Located between high growth corridors of S.G. Road and S.P. Ring Road. Located on
Aambli Bopal Road, with BRTS Corridor
Planned - Detailed planning of open spaces, amenities, commercial to ensure enhanced
productivity
Pulse - Great public spaces with beautiful landscapes and range of amenities that allow for
better communication
Potential – Schools, Malls, Shops and Banks in the vicinity
Abhishree Corporate Park “5P” framework for design, construction and operations was developed based on global best practices
greens Schools Neighbourhood centres Religious places Medical facilities
5 mins
5-7 mins
Walking distances
Wide
footpaths
Positive pedestrian environment as schools, neighborhood centers, religious places and other amenities are within 5 to 10 minutes of walk A
14
15
B
Maximum shading achieved for N-S roads on account of
overall zone layout
Landscaping strategy on E-W roads to ensure pedestrian
comfort by thick canopied tree plantation
Un-shaded internal courtyards in 20-storey blocks to be
catered through medium to large canopied trees
MLCP terrace with reduced shading expanding potential
for Solar PV
100% Courtyard Shading
35-40% Courtyard un-shaded throughout the year
N
Landscaping to resolve shading
Shading analysis of a typical zone
Each block has been designed to ensure adequate sunlight, natural shade and air circulation - allowing comfortable micro-climate throughout the year (2/3)
“Pedestrian-first” approach in road design: Wide footpaths with green cover to encourage walking for short commutes; use of technology to ensure road safety
16
A
Typical street view ROW Sections – 19m roads
ROW Sections – 25m roads ROW Sections – 39m roads
17
B
Range of velocity within the site is 1–
5m/s
Larger percentage of flats oriented
towards the wind ward side along E-W
running roads observing high velocity
Provision of wing wall at individual flat
level will ensure wind harvesting for
indoor ventilation
Wind catchers deliberated as an option to
improve natural ventilation in MLCPs
N
Highest wind velocity (5m/s) along E-W roads
Moderate-high velocity along N-S roads: 2-3m/s for spaces
between blocks 4-5 m/s at junctions
8-storey Blocks: Comfortable wind velocity of 3-4m/s in the courtyards on account of 6mx6m voids 20-storey Blocks: Reduced
velocity of 2-3m/s due to T-projection in the courtyard
Wind velocity analysis of a typical
zone
Each block has been designed to ensure adequate sunlight, natural shade and air circulation - allowing comfortable micro-climate throughout the year (3/3)
Block level UG tanks- 100000 Liters
Building level overhead tanks (OHT) ~5000 Liters
UGT via Bore Wells
OHT via submersible pumps
Drainage system provided by the local authority for all wastewater management types. During the inception of the project Soak Well and septic well were provided Percolating Well: Plot Area = 8500 SQ MT Required = 1NOS Percolating Well/ 4000 Sqmt = 3 Nos Total Provided: 3 Nos
Break tank (GSR)
Options for water distribution network have been evaluated and GSR planned in addition to normal network design for more reliability
Storage location
Normal operations
C
18
UNIT USER REQ( DIA DEPTH)
PROVI(DIA DEPTH)
17 255 3X6 (3 NOS) 4X 6.25 (3 NOS)
17 255 1.0X1.20X1.30(3 NOS)
1.20X1.35X1.50(3 NOS)
•Drainage system provided by the local authority for all wastewater management types.
•During the inception of the project Soak Well and septic well were provided
•Drainage system provided by the local authority for all wastewater management types.
•During the inception of the project Soak Well and septic well were provided
•Drainage system provided by the local authority for all wastewater management types.
•During the inception of the project Soak Well and septic well were provided
19
C
Phasing of power demPower demand load in Abhishree Corporate Park expected to be 400 KW towards the project
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
POWER 400 400 400 400 400 400 400 400 400 400
0
50
100
150
200
250
300
350
400
450
KW
POWER
• Parking: 3206 Sqmt 4 Wheelers
2206 Sqmt 2 Wheelers
1234 Sqmt Visitors Parking
6645 Sqmt Total Parking
Open Spaces: 4676 SQMT Community Facilities: Clubhouse- Gym, No disturbance to the existing ecology
21
Place
Abhishree Corporate Park is a “Place” of beauty, comfort and
harmony with a pleasant environment that offers excellent
connectivity to the region and the world.
Strategically located that will ensure “not a ghost town” but a
vibrant city for housing, commerce and entertainment
Connectivity gets better over time (road and rail) based on
ongoing and proposed enhancements in external infrastructure
In addition to encouraging walkability, extensive Sarthav Group
operated transport service to reduce car usage
A
B
C
Abhishree Corporate Park is located in geographical proximity of S.G. Road and S.P. Ring Road A
22
S.G. Road
S.P. Ring Road
Abhishree Corporate Park has good road & rail connectivity to major parts of Ahmedabad B
23
AIR CONNECTIVITY RAILWAY CONNECTIVITY
25
A Malls on opposite
side
Clubhouse
Lake front plaza
Landscape Areas
Business Center
Key public amenities planned in Abhishree Corporate Park
Three-pronged plan for generation of economic activity and creation of jobs in the city to make it successful
26
B
Abhishree
Corporate Park
10 Building comprises majority of
IT/ITeS companies
Media Companies
Manufacturing
Services
Short Distance to
Retail
Hospitality
Education
Medical/Legal
Transport
Facility Management
7 Other Buildings consisting of
Large MNCs / corporate offices
B1
B2
B3
Nearby Police Station Bopal Police Station
Hospital Bopal multispeciality hospital School Tulip School, Bopal
27
Prudent
Abhishree Corporate Park is “Prudent” such as to inspire responsible
co-existence by investing in new age technologies and creating a place
that is smart, secure, eco-friendly and sustainable.
Environment-friendly design that reduces waste of precious
resources and allows conservation of nature
Governance model that allows citizens’ participation and
sustainable city operations
Cutting-edge technology for e-governance that allows for
efficient city operations and to make the city safe & secure
A
B
C
28
Solid waste set-up for Abhishree Corporate Park needs to be a mix of on-site - segregation & collection - and off-site processing facilities (1/2)
Waste
segregation
Dry and wet waste to be segregated at
apartment level and collected at building level
bins -
Separate dry and wet waste bags to be
provided to residents
Awareness camps and incentive schemes
to be designed to ensure maximum
segregation at source
Waste
collection
Waste to be transferred from building level
collection bins to community bins via Auto
Trippers or Manual carts
ON
SIT
E:
Ab
his
hre
e C
orp
ora
te P
ark
89
7 A
CR
ES
Abhishree
Corporate
Park Facility
Mgmt
External
agency
A
29
Solid waste set-up for Abhishree Corporate Park needs to be a mix of on-site - segregation & collection - and off-site processing facilities (2/2)
Waste
processing
Biodegradable / Organic waste to be
processed and converted to manure /
soil improviser – manure to be used in
maintaining the landscape at Abhishree
Corporate Park
Recyclables to be sorted and sold to
Recycling vendors for further recycling
Waste
disposal
Inert waste to be transferred from the
processing facility to a scientific landfill
site using portable compactor trucks by
AMC
Key principle is to reduce waste to
landfill to extent possible
OF
F_
SIT
E F
AC
ILIT
Y
Outsourced
Outsourced
A
Waste to be collected from the community bins on site and transferred to the offsite
Waste Processing and Material Recovery facility via Potable compactors
30
BRTS in the region connect Nehrunagar, Sivranjini, Iskcon , Bopal and Sanad.
BRTS stop located at
Ambli.
Consistent travel times
from bopal to sivranjini
and nehrunagar.
32
C
Block-level Security Design
Card / Numpad based access control – only for residents
Card / Numpad based access control – only for residents
Turnstiles & security cabins – for visitor access and management
Turnstiles & security cabins – for visitor access and management
Abhishree Corporate Park is planned as an “Open City”; but secure at a block level with eyes on the street to ensure safety of public spaces (2/2)
33
PLANNING OF THE PROJECT AND ITS EXECUTION
0
2
4
6
8
10
12
14
16
18
JAN- JUNE2008
JULY- DEC2008
JAN- JUNE2009
JULY- DEC2009
JAN- JUNE2010
JULY- DEC2010
JAN- JUNE2011
JULY- DEC2011
UNITS
YEARS
RMC VS SITE BATCHING
• RMC was preferred over site batching due to low need of concrete in the project