+ All Categories
Home > Documents > PRESENTATION : FP6-IST- SK – Implemented + Example of STRP Framework Programme 7 Structural Funds...

PRESENTATION : FP6-IST- SK – Implemented + Example of STRP Framework Programme 7 Structural Funds...

Date post: 30-Dec-2015
Category:
Upload: matthew-welch
View: 217 times
Download: 1 times
Share this document with a friend
Popular Tags:
34
PRESENTATION : FP6-IST- SK – Implemented + Example of STRP Framework Programme 7 Structural Funds Technology Platforms ~ Anton Lavrin, delegate /(ISTC)RI /TU Košice, 21. XI. 2006
Transcript

PRESENTATION :

•FP6-IST- SK – Implemented + Example of STRP

•Framework Programme 7

•Structural Funds

•Technology Platforms

•~

Anton Lavrin, delegate /(ISTC)RI /TU Košice, 21. XI. 2006

END of 6RP ---- SK participationOnly in Priority 2 – IST (Information Society Technologies)

FP6 IST implemented projects contribution to participants / Slovakia /

[Euro]

Call 1 .. 2-IP/2-NoE/5;5-Par…….…………………. 283 368

Call 2 .. 1-IP/2-STP/2-SSA/5;5-Par……………….. 434 902

Call 3 .. 13-SSA/2-CA /8;16-Par ……………….. 738 961

Call 4 .. 3-IP/2-NoE/9-STP/1-SSA /15;21-Par.. 2 752 482

Call 5 .. 3-IP/4-STP/1-SSA/1-CA/7;9-Par ……. 3 260 230 Call 6 100 774FET open + FET Proactive +Infrastructure-2 +

Join Call NMP 2 .. (1-IP/1-CA/1-STP/1-Inf/ 2;4-Par)………….. 534 641--------------------------------------------------------------------------------Sum of contribution……………………………… 8 105 358Total budget ……………………………………..(10 177 808) cca …… O.3 % shearing

Účasť TUKE v 6RP

Čísloprojektu

AkronymNázov projektu

(anglicky)Príspevok

Call 3015742 STAR-NET Support to Associated Countries and New Member States 82 600

016015 PRO_NMS PRO Active Actions for NMS 40 440

016020 ATVN - EU - GPACADEMIC INTERNET TELEVISION NETWORK SHOWCASES THE BEST OF GOOD PRACTICE ACTIVITIES

37 600

Call 4027490 KP-Lab Developing Knowledge Practices - Laboratory 562 656

027128 SAKE Semantic-enabled Agile Knowledge-based e-Government 165 960

027306 ABILITIES Application Bus for InteroperabiLITy In enlarged Europe SMEs 195 500

027219 DEMO_net The Democracy Network 340 000

027083 FLUID-WINFinance, Logistics and Production Integration Domain by Web-based Interaction Network

68 800

027020 Access-eGov Access to e-Government Services Employing Semantic Technologies 404 400

026476 SEAMLESSSmall Enterprises Accessings the Electronic Market of the Enlarged Europe by a Smart Service Infrastructure

89 520

Call 5033838 DfA@eInclusion Design for All for eInclusion 47 400

034891 HYDRANetworked Embedded System middleware for Heterogeneous physical devices in a distributed architecture

394 320

035147 MonAMI Mainstreaming on Ambient Intelligence 472 200

    Spolu: 2 901 396

Future: 7 FP will be open from 2007 to 2013

53, 3 BEuro

Financing Sub-Heading 1AFinancing Sub-Heading 1A

Research and the CIP are part of Sub-Heading 1AResearch and the CIP are part of Sub-Heading 1A

Council agreement: 7 Council agreement: 7 (5)(5) ,5% increase per year for Sub-Heading 1 ,5% increase per year for Sub-Heading 1

Particular priority for researchParticular priority for research

Research budget should increase progressively and Research budget should increase progressively and substantiallysubstantially

It should reach about 75% It should reach about 75% 46%46% of 2006 budget in 2013 of 2006 budget in 2013

Nuclear decommissioning budget fixedNuclear decommissioning budget fixed

Correction foe Fp7 ~ 53,3 BEuroCorrection foe Fp7 ~ 53,3 BEuro

Fp7 Specific Programmes – approved by EU ParliamentFp7 Specific Programmes – approved by EU Parliament

Year 2006 2007 2008 2009 2010 2011 2012 2013 Total Cut/Cion

Total 7569 8250 8860 9510 10200 10950 11750 12600 72120 40,60% ~ 53000

Fp7:

50,521 BEuro

+ 2,751 BEuro (Euroatom)

53,272 BEuro

+ JRC and Euratom

LINKhttp://ec.europa.eu/information_society/research/index_en.htmhttp://cordis.europa.eu/fp7/ict/

http://ec.europa.eu/research/fp7/home_en.htmlhttp://cordis.europa.eu/fp7/

http://www.euractiv.com/en/science/7th-research-framework-programme-fp7/article-117494

Info Days:Istanbul: 29-30. January, 2007 www.ictconference-istanbul.orgKoln: 1. February, 2007http://ec.europa.eu/information_society/events/koln_2007/index_en.htm

The 7th Framework Programme for Research and Technological Development The EU currently invests just below 2% of GDP in R&D (32% less than the US in 2001) and devotes only 20% of research expenditure to ICT, compared with 30% by our major competitors in the OECD. The Financial Perspective will allow the EU to take the necessary steps to achieve the 2010 target of 3% of Gross Domestic Product

(GDP) invested in R&D. (~ 53 BEuro)Competitiveness and Innovation Framework Programme (CIP) ~4 BEuro(20.04.2006)The CIP will among other things include the SME Guarantee Facility from which more than 200,000 SMEs have benefited so far. The European Commission aims at increasing the number to more than 300,000 for the period 2007-2013 and proposes to add risk capital instruments supporting the start, development and expansion of innovative SMEs.

The Education & Training 2010 strategy will improve the quality of education and training systems in the Member States and merge COMENIUS, ERASMUS, LEONARDO da VINCI, and GRUNDTVIG into one single Lifelong Learning Programme. (~6 BEuro )

EC Financial funds, instruments and resources for developmenthttp://europa.eu.int/comm/financial_perspective/competitiveness/index_en.htm

R&D Funding

Something about ETP -- very shortly

European Technology Platforms / nowadays more like - 30 platforms !!

http://cordis.europa.eu.int/technology-platforms/summaries.htm

DG IS and Media (coordination):

1 ENIAC - European Nanoelectronics Initiative Advisory Council (?)  2 Embedded Systems (ARTEMIS- Advanced Research and Technology for Embedded Inteligence and Systems)  3 The Mobile and Wireless Communications Technology Platform (eMobility)   4 Networked European Software and Services Initiative (NESSI)5 The NEM Initiative - European Initiative on NETWORKED and ELECTRONIC MEDIA  6 European Technology Platform in Robotics – EUROP7 PHOTONICS21 - Photonics for the 21st century 8 The Integral Satcom Initiative(Mirror Group – SK participation)+ AAL169 initiative; …..

Nanoelectronics:addressing the needs of silicon-based technologies & beyond

• shrinking of CMOS logic & memory devices• development of value-added functions for

System-on-Chip or System-in-Package solutions

• equipment & materials• design automation

Nanoelectronics:addressing the needs of silicon-based technologies & beyond

• shrinking of CMOS logic & memory devices• development of value-added functions for

System-on-Chip or System-in-Package solutions

• equipment & materials• design automation

Embedded Intelligens and Systems: ubiquitous, interoperable & cost-effective embedded systems

• reference designs and architectures• middleware for interoperability and seamless

connectivity• integrated design software tools for rapid

development & prototyping

Embedded Intelligens and Systems: ubiquitous, interoperable & cost-effective embedded systems

• reference designs and architectures• middleware for interoperability and seamless

connectivity• integrated design software tools for rapid

development & prototyping

PARADES

To implement parts of the Strategic Research Agendas of ENIAC and ARTEMIS, aligning fragmented R&D efforts at European level in the

fields of:

FP7

TPs

ENIAC & ARTEMIS

Industry-driven long-term vision

Common pan-European SRA

Overall coordination and policy alignment in ERA

Joint monitoring of projects and impact assessment of programmes

National programmesJoint Technology

InitiativeNational programmes

National programmes

Coordinated approach to SCoordinated approach to Strategic trategic RResearch esearch AAgendagenda implementation implementation

Member & Associated States support numerous activities/ policies in the two areas.

Mirror Groups are intended to:

– Provide for appropriate representation and input from public authorities, including the definition of the SRAs

– Coordination of relevant national, regional or local programmes and initiatives in the area in view of implementing the Strategic Agenda and advancing ERA

– Close the loop between technology development and policy-making, promoting a fertile innovation environment and a state-of-the art research infrastructure in the areas concerned

ARTEMIS (17 members):

– A, B, CZ, D, E, F, HU, I, IRL, ISR, FIN, MT, NL, PT, SE, SLO, SK

ENIAC (16 members):

– A, B, D, DK, E, F, GR, I, ISR, FIN, LV, MT, NL, PT, SE, UK, (SK)

Mirror Groups of Technology PlatformsMirror Groups of Technology Platforms

Some Technology Platforms from DG Research

MANUFUTURE - Platform on Future Manufacturing Technologies

Global Monitoring for Environment and SecurityAeronautics and Air TransportTechnology Platform on Sustainable ChemistryThe European Hydrogen and Fuel Cell Technology Platform (HFP)Innovative Medicines for EuropeThe European Space Technology Platform (ESTP)   The European Construction Technology Platform(ECTP)    EuMaT - European Technology Platform for Advanced Engineering

Materials and TechnologiesERTRAC European Road Transport Research Advisory Council  ERRAC European Rail Research Advisory CouncilThe European : Steel Technology Platform  + Aluminium TP SMR - Sustainable mineral resources (mining, material, metallurgy and

products) The European Technology Platform on Industrial Safety  Food European Technology Platform " Food for Life"

~ ~ ~ ~ ~ ~Work program ICT / Fp7 / 2007 - 2008

ICT - Information and Communication Technologies / WP Structure1Objective2Policy and socio-economic context2.1i2010, achieving the renewed Lisbon agenda2.2Partnering in ICT research and development2.3ICT in FP7: An approach focused on a limited set of challenges2.4Funding schemes2.5Involving SMEs and feeding innovation2.6Developing global partnerships2.7The socio-economic dimensions of ICT2.8European Technology Platforms in ICT and the Work programme2.9Joint Technology Initiatives and support to the Coordination of national programmes2.10Co-ordination of non-Community research programmes2.11Links with other Programmes3Content of calls in 20073.1Challenge 1: Pervasive and Trusted Network and Service Infrastructures3.2Challenge 2: Cognitive Systems, Interaction, Robotics3.3Challenge 3: Components, systems, engineering3.4Challenge 4: Digital Libraries and Content3.5Challenge 5: Towards sustainable and personalised healthcare3.6Challenge 6: ICT for Mobility, Environmental Sustainability and Energy Efficiency3.7Challenge 7: ICT for Independent Living and Inclusion3.8Future and Emerging Technologies3.9Horizontal support actions4Implementation of calls5Indicative priorities for future callsAnnex 1: International cooperation partner countriesAnnex 2: Evaluation, selection and award criteriaAnnex 3: Funding schemesAnnex 4: ERA-NETGlossary

Links:

http://cordis.europa.eu/fp7/ict/home_en.html

!!!

WP ICT / 7FP ; 2007 - 2008 Budget (M€) Call 1 Call 2 Call 3FET Open

Challenge 1:        

1. The network of the future 200 200      

2. Service and software architectures, infrastructures and engineering 120 120      

3. ICT in support of the networked enterprise 30 30

4. Secure, dependable and trusted infrastructures 90 90      

5. Networked media 85 85      

6. New Paradigms and experimental facilities 40   40    

7. Critical infrastructure protection[1] 20   20    

Challenge 2:        

1. Cognitive systems, interaction, robotics 193 96   97  

Challenge 3:        

1. Next generation nanoelectronics components and electronics integration 86 86      

2. Organic and large-area electronics and display systems 63 63      

3. Embedded systems design 40 40      

4. Computing systems 25 25      

5. Photonic components and subsystems 90   90    

6. Micro/nanosystems 83   83    

7. Networked embedded and control systems 47   47    

Challenge 4:        

1. Digital libraries and technology-enhanced learning 102 52   50  

2. Intelligent content and semantics 101  51 50   

           

Challenge 5:        

1. Personal health systems for monitoring and point-of-care diagnostics 72 72      

2. Advanced ICT for risk assessment and patient safety 30 30      

3. Virtual physiological human 72   72    

Challenge 6:        

1. ICT for the intelligent vehicles and mobility services 57 57      

2. ICT for cooperative systems 48   48    

3. ICT for the environmental management and energy efficiency 54   54    

Challenge 7:        

1. ICT and ageing 30 30    

2. Accessible and inclusive ICT 43 43    

FET        

Open scheme 65       65

1. Nano-scale ICT devices and systems 20 20      

2. Pervasive adaptation 20 20      

3. Bio-ICT convergence 20 20      

4. Science of complex systems for socially intelligent ICT 20     20  

5. Embodied intelligence 20     20  

6. ICT forever yours 20     20  

           

Horizontal support actions        

International cooperation 12 7 5   

Trans-national co-operation among NCPs 3 3    

           

Total (9 100 MEuro) 2021 1197 497 262 65

Thank you for attention – please questions

[email protected]


Recommended