Great Rivers Greenway and its partners held a pre-bid construction conference and DBE mixer on October 7, 2013 at 1520 Market Street in St. Louis, MO. For details on the project, visit www.CityArchRiver.org or www.GreatRiversGreenway.org. Bids will be publicly opened at Great Rivers Greenway offices at 6174A Delmar Blvd, St. Louis, MO 63112 on October 24, 2013 at 2:00 p.m.
Popular Tags:
19
Projects Central Riverfront Construction Pre-Bid Conference
Transcript
Page 1: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference

Projects

Central Riverfront ConstructionPre-Bid Conference

Page 2: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference

Agenda

• Project Overview• Considerations• Project & Bid Requirements• DBE participation• DBE networking event to follow

immediately after.

Page 3: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference

Great Rivers Greenway District

• About the District

• Our Role

Page 4: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference

CityArchRiver 2015 Projects

Federal Highway Administration Transportation Projects• Park Over the Highway• Central Riverfront

Department of Interior (DOI) & National Park Service (NPS) Projects• Luther Ely Smith Square• Old Courthouse• Museum/Visitor Center• Arch Grounds

• Reflecting ponds• East Slopes• Processional Allees• North Gateway Park

City of St. Louis, Great Rivers Greenway & CityArchRiver 2015 Foundation Project• Kiener Plaza

Page 5: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference

• Goals:– Enhancing the Gateway Arch experience for everyone.– Safe and easier access to park.

• Partners– CityArchRiver 2015 Foundation– National Park Service– Bi-State Development Agency (Metro)– MoDOT– City of St. Louis– Federal Highway Transportation Administration– Many more

CityArchRiver 2015

Page 6: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference

Central Riverfront Today

Page 7: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference

Central Riverfront 2015

Page 8: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference

Central Riverfront 2015

Page 9: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference

Central Riverfront 2015

Page 10: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference

Central Riverfront Today

Page 11: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference

Central Riverfront 2015

Page 12: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference

Packages & DBE Goals– #4 Demolition/Earthwork (12%)– #5 Asphalt Paving (19%)– #6 Landscaping (20%)– #7 Concrete (19%)– #8 Pavers (19%)– #9 Metals/Rails (19%)– #10 Signage (20%)– #11 Sewers/Plumbing (19%)– #12 Electrical (22%)– #13 Temporary Flood Protection (9%)

Page 13: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference

Bid Requirements– Bids must be for complete Bid Packages. See spec section

00310, Scope of Construction Work, for full description– Bids submitted to GRG at their office at 6174 Delmar by

2:00 pm, Thursday, October 24– All prime bidders (except landscaping, pavers, and

metals/rails) must submit or have on file a MoDOT Contractor Questionnaire on file at least 7 days prior to bid opening (October 17th). See MoDOT website.

– 5% bid bond with bid. 100 % performance and payment bonds at contract award.

Page 14: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference

Order of Work• Phase 1:

Chouteau to 2/3 of Grand Staircase. Estimated start 11/2013Estimated completion 9/2014

Page 15: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference

Access

Phase 1• Chouteau & Poplar Streets Closed at

LKS• Construction access from the south• Maintain Access to Material Sales• Maintain Emergency Fire / Rescue

Access to River• Maintain Access to Heliport, Riverboat,

and levee from the north• Maintain Pedestrian Access to River

from Grand Staircase

Page 16: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference

Order of WorkPhase 2:• 2/3 of Grand Staircase to Biddle Street Trailhead –

N. Riverfront Trail• Estimated start 9/2014• Estimated completion 9/2015

Page 17: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference

Access

Phase 2• Washington, Lucas, Morgan, Lacledes

Landing Blvd., and MLK Drive closed at LKS

• Construction access from the north• Maintain Access to First Street Parking

Garage (limited)• Maintain Access to Heliport, Riverboat,

and levee from the south• Maintain Pedestrian Access to River from

Grand Staircase

Page 18: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference

Transportation Resources & SupportMissouri Procurement Technical Assistance Center (PTAC)5988 Mid Rivers Mall Drive, Suite 111 | St. Charles, MO 63304Carolyn Jones | [email protected] | (314) 643-7684

Missouri Regional Certification Committee (MRCC)707 N. First Street | St. Louis, MO 63102(314) 982-1400 x 1352www.MetroStLouis.org/DBE

U.S. Department of Transportation Small Business and Disadvantaged Business Utilization1200 New Jersey Avenue SE | Washington, D.C. 20590(800) 532-1169 or (202) 366-7228 | www.dot.gov/osdbu

Missouri Office of Equal OpportunityTruman State Office Building | 301 West High Street, Room 360Jefferson City, MO 65102 | (877) 259-2963 | www.oeo.mo.gov

Page 19: Presentation from CityArchRiver 2015 Pre-Bid Construction Conference

Questions?

Connect with us for more at:www.GreatRiversGreenway.org

www.CityArchRiver.org

Please join us for our DBE mixer & networking event to immediately

follow Q&A.