+ All Categories
Home > Documents > Presentation Investor Breakfast Le Bourget 2011

Presentation Investor Breakfast Le Bourget 2011

Date post: 04-Apr-2018
Category:
Upload: jean-francois-frezet
View: 215 times
Download: 0 times
Share this document with a friend

of 25

Transcript
  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    1/25

    Investor & AnalystBreakfast

    Le Bourget

    22 June 2011

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    2/25

    f

    Hans Peter RINGEADS CFO

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    3/25

    f

    Louis GALLOISEADS CEO

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    4/25

    Innovation A350, NEO, X3,Ariane 5 ME, UAVs

    Internationalisationand balance Acquisitions : Plant CML and

    Vector Expansion in U.S and AsiaProfitability

    Improvement Efficiency programmes :Power8, Power8+

    Successful order bookmanagement

    Operational marginimprovement

    Programmesexecution

    A380

    A400M

    A350XWB developmentmodel

    Progresstowardslong-termobje

    ctives

    EADS strategic road map

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    5/25

    f

    Tom ENDERSAirbus CEO

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    6/25

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    7/25EADS Le Bourget Investor Breakfast Meeting

    A380

    A350XWB

    Long Range

    Supply chain ramp-up

    Single Aisle

    The industry challenge:

    Volume ramp-up +40% in 5 years

    A400M

    Tom Enders 3

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    8/25EADS Le Bourget Investor Breakfast Meeting

    A320 Family

    Ramp up to 42+

    Continuous improvement of A320 Family Sharklets 2012

    A320neo: 15% higher fuel efficiency incl.savings in costs, emissions and noise

    4Tom Enders

    A320neo: a new engine option but minimal change approach

    protection of residual values

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    9/25

    EADS Le Bourget Investor Breakfast Meeting

    A330

    EADS Le Bourget Investor Breakfast Meeting

    789 A330 delivered, 87 customers and 91 operators

    Backlog: almost 4 years production

    Production rate:

    9 A/C per month from Jan 2012

    10 A/C per month from April 2013

    A330-200 Freighter: 54 orders from 9 customers

    5 aircraft delivered in 2010 to 3 customers with smooth EIS

    Tom Enders 5

    670 A330s sold since B787 launch

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    10/25

    EADS Le Bourget Investor Breakfast Meeting

    A380

    Challenges

    Further RC reductionsRamp-up to R3+

    with more Heads of Version at constant resource

    Customization process improvement

    51 in service

    Rate increase: R2+Final Assembly lead time reductions

    Airframe RC in 2011: -33% compared to 2009

    Progress

    Tom Enders 6

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    11/25

    EADS Le Bourget Investor Breakfast Meeting

    Airbus Military

    A400M

    4 aircraft in FT campaign: >1700hrs, >550 flights

    Type Certification & Initial Operating Clearance

    by year-endLRIP (low rate initial production) for first series a/c

    A330Military conversion process now fully mature

    4 customers: first deliveries in 2011 Australia (delivery in 2011)

    Saudi Arabia (delivery in 2011) United Arab Emirates (delivery in 2012)

    United Kingdom (delivery in 2011)

    Tom Enders 7

    238 aircraft, incl. 174 A400M and 28 MRTT, in backlog

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    12/25

    EADS Le Bourget Investor Breakfast Meeting

    Flight path to profitability target8

    EADS Le Bourget Investor Breakfast Meeting

    Production rate increase

    Year on year pricing improvement

    Continue P8+ efforts offsetting cost increase & escalation

    A380: from significant loss contribution to gross margin/EBIT breakeven

    R&D expenses decrease (A350 XWB)

    Negative gross margin of early A350 XWB deliveries (RoS dilution)

    2010-2015 drivers

    Tom Enders

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    13/25

    f

    Fabrice BREGIERAirbus COO

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    14/25

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    15/25

    A350 XWB a complete long-range family

    EADS Le Bourget Investor Breakfast Meeting

    A350-800

    A350-900

    A350-1000

    369 seats

    315 seats

    276 seats

    777

    787

    One New Family of technically superior aircraft Two aircraft types a generation apart

    3Fabrice Brgier

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    16/25

    A350-8004

    EADS Le Bourget Investor Breakfast Meeting

    Final assembly startFirstflight

    EIS

    Today

    We satisfy customer demand by delivering A350-800 mid 2016

    A market driven trend towards larger aircraft

    Fabrice Brgier

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    17/25

    Main A350-1000 changes from A350-9005

    EADS Le Bourget Investor Breakfast Meeting

    6 wheel bogie

    main landing gear1 frame longer MLG bay

    Higher thrust engineTrent XWB 97,000 lb thrust

    Revised wing trailing edge(high lift controls and actuators)

    Increased

    air conditioningsystem

    Changes introduced for optimum performances

    Fabrice Brgier

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    18/25

    Improved A350-1000 performance6

    EADS Le Bourget Investor Breakfast Meeting

    A350-1000 is consistently more capable than 777-300ER

    Smoother R & D timeframe

    Final assembly startFirstflight

    EIS

    Today

    Improved payload range on flights over 5000nm (50% of the flights)

    Fabrice Brgier

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    19/25

    A350-900 Development Highlights

    Main challenges related to new technologyhave been demonstrated in full scale(e.g. Wing covers, large fuselage panels ...)

    Critical Design Reviews (CDRs) for systemsand airframe components have been

    successfully closed together with partners- High design maturity before start of assembly

    phase

    Cabin definition and overall A/Cconfiguration for first customer aircraft havebeen frozen

    7

    EADS Le Bourget Investor Breakfast Meeting

    Fabrice Brgier

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    20/25

    A350-900 Development Highlights

    Functional integration tests at Airbusand systems suppliers now inoperational mode more than one year

    before first flight

    Engine test at Rolls Royceprogressing well

    - Engine for Flying Test Bed under

    acceptance testing at Rolls Royce- Flying Test Bed working party has

    started on A380

    8

    EADS Le Bourget Investor Breakfast Meeting

    Fabrice Brgier

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    21/25

    A350-900 Next steps

    Summer: Start of Pre-FALs for major component structure assembly at Broughton,Saint-Nazaire, Hamburg, Getafe

    - Driven by Risk Sharing Partners deliveries, closely followed by on-site representatives

    Autumn: Start of system installation and equipping

    - Tubes, pipes, harnesses for fuselage sections, stress gauges for static test specimen

    End of 2011: Start of FAL

    - First in: static tests specimen followed by MSN1

    End of 2012: First flight, driven by:

    - Sections assembly, FAL development tests, electrical systems integration

    - Results of static tests- Flight clearance

    End 2013: type certification and entry into service

    9

    EADS Le Bourget Investor Breakfast Meeting

    Fabrice Brgier

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    22/25

    EADS Le Bourget Investor Breakfast Meeting

    10

    Detailed Design

    Parts Manufacturing

    -3Sections Assembly(Centre Wing Box)

    Major ComponentAssembly Equipping

    08 09 10 11 12 13

    FAL Groundbreaking

    Target Loads

    First composite lay-up (4th Dec)

    (5th Mar) First cut horizontal cruciform

    Integration Testing

    Sys. & Cabin Development

    DetailedDefinition

    End ofDetailed Design

    StartProduction

    DemoboxAssembly

    FALStart First Flight

    Barrel 1Bstart

    Static Specimentest start

    Fatigue Specimenstart

    First metal cut (2nd Dec)

    Functional Testing (AI & Suppliers)

    Systems Installation

    Tooling Manufacturing

    Supplier Selections

    FinalAssembly Flight Test

    & Certification

    today

    Pre-FAL Start

    EIS

    A350-900 XWB Schedule UpdateFabrice Brgier

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    23/25

    A350-900 Programme risks

    Potential programme risks in the next phase

    Volume and quality of assembly and installation drawings

    Supply chain readiness for detailed parts (clips, brackets, tubes and pipes) Learning of production support teams

    Tools and processes to the Extended Enterprise in delivery phase

    Travelled work from components to Pre-FAL and FALs

    Preparation of the ramp-up : design cleaning, concessions closure, design cleaningand maturity, manufacturing processes capability, supply chain performance

    Resources

    Test results involving changes

    Risks are being mitigated at each maturity gate and through Alert and Fixprinciple but no room in the planning for significant problem.

    11

    EADS Le Bourget Investor Breakfast Meeting

    Fabrice Brgier

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    24/25

    Conclusion

    Successful aircraft family in line with market current and future demand

    New CFRP technology is ready for manufacturing

    Extended Enterprise provides collaborative working environment : Suppliers support actions are launched jointly when necessary

    Systems maturity developing well and major integration test benches are already in

    service

    First Aircraft large parts now manufactured and focus moving to pre-FAL start forcomponent assembly and then systems installation

    Challenges remain to reach FAL start end of 2011 with an appropriate level of quality to

    enable the ramp-up

    First flight end 2012 will prepare for entry into service end 2013

    Risks are being managed through lessons learned from previous programmes

    12

    EADS Le Bourget Investor Breakfast Meeting

    ...but A350 programme remains very challenging

    Fabrice Brgier

  • 7/31/2019 Presentation Investor Breakfast Le Bourget 2011

    25/25


Recommended