EXECUTIVE SUMMERY GOPAL LAL SOMANI CEO Cell No.: +91 8826150873 email- gopallal.somani.mmepl @gmail.com
Transcript
Page 1: Presentation MMEPL Business Plan V1 26 07 2016

EXECUTIVE SUMMERY

GOPAL LAL SOMANICEOCell No.: +91 8826150873email- gopallal.somani.mmepl @gmail.com

Page 2: Presentation MMEPL Business Plan V1 26 07 2016

05/01/23 2

Page 3: Presentation MMEPL Business Plan V1 26 07 2016

10 MW PV Solar Plant at Vikarabad - Pictures India’s Power Scenario - Renewable Energy in India National Solar Mission Target Introduction – Group Companies Introduction – Business Plan of MMEPL MMEPL Solar Projects Development Plan Project Status – JNNSM Phase II Batch 1, 1x10 MW Project Status – AP Open Offer , 2x10 MW Project Variables and Financials.

05/01/23 3

Page 4: Presentation MMEPL Business Plan V1 26 07 2016

05/01/23 4

Page 5: Presentation MMEPL Business Plan V1 26 07 2016

05/01/23 5

Page 6: Presentation MMEPL Business Plan V1 26 07 2016

05/01/23 6

Page 7: Presentation MMEPL Business Plan V1 26 07 2016

05/01/23 7

Page 8: Presentation MMEPL Business Plan V1 26 07 2016

India’s power system had an installed generating capacity of around 3,05,017.80 MW (July 2016 Source - CEA)

The country rich in coal The thermal power plants i.e. coal, gas, naphtha or oil accounted for approximately 61% of total power generation capacity

Abundantly endowed with renewable energy in the form of solar, wind, hydro and bio-energy

Renewable sources of energy account for around 15% of the power generated.

Government of India under NSM has decided Grid Connected Solar Power Projects to I ,00,000 MW by the year 2021-22.

05/01/23 8

Page 9: Presentation MMEPL Business Plan V1 26 07 2016

05/01/23 9

Page 10: Presentation MMEPL Business Plan V1 26 07 2016

05/01/23 10

With corporate office at Hyderabad the company has excellent infrastructure, and network of offices at all the important ports from the eastern to the western coast of India and abroad.

Clientage

In India - Prominent Public sector Utilities like TNEB, KPCL, AP Genco, Nalco, WPDCL apart from major cement industries and power producers spread across east and west coast India

International - Peabody, Vitol, Cargill, PTT Thailand, Noble Trading, Samtan Co. Ltd., Glencore, Awan Trading Co., Phoenix Com Trade, Morgan Stanley, NCC Yemen etc.

Page 11: Presentation MMEPL Business Plan V1 26 07 2016

05/01/23 11

Established in 1979 by a team of enterprising individuals the group company is involved in Coal Trading, Processing, Beneficiation and Logistics service provider globally.Started as a domestic coal trader, the company transformed into one of the leading players in the International coal scenario.Growing in leaps and bounds, pioneering path breaking initiatives, the company is now one of the major coal traders in India providing expertise, end to end solutions for procurement, movement, handling, customs clearing, logistics services in Coal Sector.In 2013 -14 we imported approximately 30 Million MT of South African origin coal and 16 Million MT of Indonesian origin coal and carried a turnover of $ 750 Million.

Page 12: Presentation MMEPL Business Plan V1 26 07 2016

Solar Energy DevelopmentMaheshwari Mining and Energy Pvt. Ltd.

Coal logistics , Shipping, Beneficiation and WasheryMandhani carriers Pvt. Ltd., IndiaCoal washery at Ramagundem, AP ,India (washing 1

MTPA)Coal washery at Managuru, AP ,India (washing 1.5 MTPA)Coal washery at Talcher, Orissa,India (washing 4 MTPA)Coal washery at IB Valley, Orissa,India (washing 4 MTPA)

Real state Trident Properties Ltd., India

Information TechnologyMobiFusion Inc., California, USA Mobile applicationsVoyzze Communications Inc, USA Télécommunications

05/01/23 12

Page 13: Presentation MMEPL Business Plan V1 26 07 2016

MMEPL is promoted to implement Grid connected Solar Energy Project in India and abroad in Phases.

Long term business plan – Solar Energy 50 – 100 MW PV project development in Rajasthan - Participating in competitive bidding process in NSM Phase II and Rajasthan Solar Policy. 20 -50 MW PV solar project development in Andhra Pradesh under AP State Solar Policy.50 – 100 MW PV development in TN , MP and other states in India under its solar policy.   Development and investment plan under options of Open Access, Third Party Sale, REC, Captive consumption etc. – 50 – 100 MW

05/01/23 13

Page 14: Presentation MMEPL Business Plan V1 26 07 2016

Phase I Development Plan 2014 -16

1 x 10 MW PV Solar Project : LOI awaited under 750 MW capacity development program of NSM Phase II Batch I VGF program. (Petition pending at Honorable High Court New Delhi

2x10 MW PV Solar Energy Projects under Telangana State Open Offer Solar Policy - Projects completed and connected with GRID – 132 KV S/S VIKARABAD on 31st March, 2016

1x5 MW PV Solar Power Project : PPA and SPV Acquisition Abijit Solar – Completion Dead Line – 31st December, 2016

05/01/23 14

Page 15: Presentation MMEPL Business Plan V1 26 07 2016

MMEPL and its promoters identified broad synergies for the interests of Chinese PV equipment suppliers and financial institutions.

Development of Solar PV projects is the major activity MMEPL now experienced in bidding and winning the

projects, bringing Chinese solar module at attractive cost, BOS supplies from strong EPC company in India bringing huge economic benefits to both parties

Based on economic viability MMEPL will participate in the upcoming competitive bidding cycles of NSM phase II, Rajasthan, AP, TN, MP etc. State Solar Policies and secure additional capacity of 100 MW.

05/01/23 15

Page 16: Presentation MMEPL Business Plan V1 26 07 2016

05/01/23 16

Page 17: Presentation MMEPL Business Plan V1 26 07 2016

Parameter Value UnitPlant Capacity, AC 10.00 MWPlant Capacity ,DC 11.20 MWCUF 21 - 24.00% %Auxiliary Consumption 0.50% %Generation per MW (1st Yr) 20.919 Lac UnitsInterest Rate for Term Loan 11.50% %Repayment Period of Term Loan 12 YearsTariff Per Unit (PPA period of 20 Yrs) 6. 45 INRTariff Per Unit (Post PPA Period) TBD INRO&M Cost per MW 1.50% %O&M Escalation per Year 5.00% %Dep. rate for P&M (Co. Act) 5.28% %Corporate Tax 32.45% %Land Required Per MW 5 acres AcresLand Cost Per Acre 6-7 Rs./Lacs

05/01/23 17

Page 18: Presentation MMEPL Business Plan V1 26 07 2016

Completed EPC Turnkey Cost –69 .6 Crores for 10 MWCost Over Run – 2.5 Crores due to extra Transmission line, Excavation, Extra Hard ware and development .MEANS of FINANCEEquity – 21.99 CroreDEBT – 47.60 Crore SBI and IREDAProject Returns (Indian Environment of high interest

rates) Equity IRR – 16.85 % Project IRR- 13.71 % DSCR- 1. 53With low cost external funding i.e. Buyers Credit and

involvement of reliable module suppliers at attractive cost the project returns will improve

05/01/23 18

Page 19: Presentation MMEPL Business Plan V1 26 07 2016

Tier 1 310 /315 watt PV Crystalline module with DUV approved BOQ used

12% extra DC capacity installed for powering 10 MW AC capacity

Single axis Trackers with DC drives installed for additional output

RO system installed for module cleaning SCADA and Weather monitoring on line system

installed Site having hither GHI Yearly Mean Average 5.

52KWH /M2/Day. (+) 24 % CUF estimated. Buyers credit facility arrangement with SBI for

module sourcing.

05/01/23 19

Page 20: Presentation MMEPL Business Plan V1 26 07 2016

Dust level is low Sun angle is low Environment  temperature is low Moisture and Humidity low. Yearly Sun hours are more +320days GHI and Tilt  is good Lower degradation due to favourable weather

Page 21: Presentation MMEPL Business Plan V1 26 07 2016

Favourable Solar Policy – 2105 Thrust on Captive, Third Party sale and

Open Access development Single window clearance Assured Grid Connectivity and Availability Prompt payments 20 – 25 years PPA Investment friendly environment Projects awarded on transparent cost

competitive bidding process

05/01/23 21

Page 22: Presentation MMEPL Business Plan V1 26 07 2016

In view of these synergies, MMEPL expresses keen interest to partner with Foreign Company in the areas of Solar PV Development in India and also in the domestic manufacture of Solar PV Value Chain. Bringing equity (major / minor) as investor Implement projects through SPV Arrangement of buyers credit (Financial closer achieved

with Buyers Credit arrangement by SBI)Low cost debt financeProcured in Chinese Tier 1 PV modules and inverter

supplies from Italy at attractive price EPC turnkey service from KEC a strong transmission

company with very good financial strength and balance sheet  

05/01/23 22

Page 23: Presentation MMEPL Business Plan V1 26 07 2016

Strong credentials- The project is technically strong, financially viable, free from all risks, bankable, reliable financial projections having strong credential of the promoters and the company

Powerful management team and experienced technical lead having life time experience in Solar Energy Development

Expertise in finance management Crisil BBB and A3 rating for its long term and

short term credit facilities respectively

05/01/23 23

Page 24: Presentation MMEPL Business Plan V1 26 07 2016

DC drives are used, the drives are powered with uninterrupted source backed up by self supply modules - limiting auxiliary consumption.

Linear actuators with proven time tested selected Each row of 40 modules is driven by independent

drive The logic and schematics designed and selected

by me Tested in prototype and replicated for large scale

application Trackers follow SUN path every 10 minutes Economic benefits are huge compared to

investment.05/01/23 24

Page 25: Presentation MMEPL Business Plan V1 26 07 2016

05/01/23 25

Kothagadi 10 MW PV SOLAR PLANT - 12% Extra Module and Single Axis TrackerPerformance

Fixed - Calculated Tracker

Date GHI Units CUF (%) GHI - Tilt Units CUF AC (%) PR (%) % gain

11-Oct 4.91 38,000 15.37% 5.88 45,250 18.45% 75.35% 19.60%

12-Oct 6.26 48,560 20.92% 7.42 61,000 24.87% 80.37% 25.61%

13-Oct 6.52 50,456 20.96% 8.26 63,000 25.69% 74.57% 27.19%

14-Oct 6.25 49,786 19.66% 7.8 0 60,750 24.77% 76.12% 25.99%

15-Oct 7.14 51,260 21.22% 8.30 64,250 26.24% 78.67% 25.24%

Avg 5.98 46,701 19.23% 7.19 57,500 25.24% 76.60% 24.73%

Page 26: Presentation MMEPL Business Plan V1 26 07 2016

We Envision “To be an integrated player across the Energy Value Chain, delivering quality power at competitive cost and creating superior value for all stake holders"

05/01/23 26

Page 27: Presentation MMEPL Business Plan V1 26 07 2016

GOPAL LAL SOMANI

Mobile : + 91 8826150873

[email protected]

05/01/23 27