Odors
Origin of Odors
Coal tar contamination in the subsurface Pre-clearing/Excavation Active In-situ Solidification Stockpiles Site Maintenance
1
Odors
Site-wide Odor/Dust Mitigation Methods
Improved methods and increased frequency as odors increased
RUSMAR foam Posi-shell Misters along fence Poly plastic sheeting Other methods
2
4/10/2018 3
4/10/2018 4
4/10/2018 5
Odors
Pre-clearing / Excavation
Previously: Multiple cells open for debris removal, 7 days ahead
Currently: Fewer cells, 1 day ahead
6
4/10/2018 7
4/10/2018 8
Odors
Active In-situ Solidification (ISS)
Previously: Deep clearing being performed ahead of active ISS cells
Currently: Same day as ISS Soil mixing releases vapors
9
4/10/2018 10
4/10/2018 11
4/10/2018 12
4/10/2018 13
4/10/2018 14
4/10/2018
Region 2 serving the people of New Jersey, New York, Puerto Rico and the U.S. Virgin Islands
15
Odors
Stockpile Management
Previously: Multiple stockpiles, including bermed materials, across site
Currently: Stockpiles managed in central location
16
4/10/2018 17
4/10/2018 18
4/10/2018 19
Odors
Site Maintenance
Previously: Grading completed at end Currently:
Grading following completion of ISS in each area Completed ISS will be covered with gravel or Posi-Shell to
minimize standing water and reduce working zones
20
4/10/2018 21
4/10/2018 22
4/10/2018 23
4/10/2018 24
Odors
Weather Impacts
Changes in temperature, humidity, and precipitation Wind speed and direction
25
Block 93 Dust
26
4/10/2018 27