Page 1: Presentation on Flyover at Aziz Cross on GT Road Gujranwala

1

Page 2: Presentation on Flyover at Aziz Cross on GT Road Gujranwala

RUBNAWAZ2015-UET-CCET-CIVIL-02

3rd SEMESTERCIVIL ENGINEERING DEPARTMENT

Page 3: Presentation on Flyover at Aziz Cross on GT Road Gujranwala

February 2012

GOVERNMENT OF THE PUNJAB

COMMUNICATION & WORKS DEPARTMENT

Construction of Flyover on G.T Road at Aziz Cross Gujranwala

Page 4: Presentation on Flyover at Aziz Cross on GT Road Gujranwala

February 2012

GOVERNMENT OF THE PUNJAB

CONSTRUCTION OF FLYOVER ON G.T ROAD AT AZIZ CROSS GUJRANWALA

Construction of Flyover on G.T Road at Aziz Cross Gujranwala

Page 5: Presentation on Flyover at Aziz Cross on GT Road Gujranwala

SALIENT FEATURE

ADP (2016-17) Gr. Sr. No. 2775 Approved Cost Rs. 6672 Million Construction Cost Rs. 3435 M Land Acquisition (80 Kanal) Rs. 2920 M Miscellaneous Rs. 317 M Consultant M/s NESPAK Contract M/s NLC Client C & W Dept Agreement Amount Rs.3115 M (9.35% below Est.cost) Date of Commencement 30.01.2016 Date of Completion 29.11.2016

Page 6: Presentation on Flyover at Aziz Cross on GT Road Gujranwala

INTRODUCTION

Aziz Cross project is a signal free interchange with partial clover

leaf system and two additional directional ramps.

Clover leaf interchange Partial Clover leaf interchange with two

directional ramps instead of loops

Page 7: Presentation on Flyover at Aziz Cross on GT Road Gujranwala

INTRODUCTION

There are normally 32 conflicts at any interchange which are

completely resolved at Aziz Cross.

32 No. Traffic Conflicts

Traffic Count 2014

Page 8: Presentation on Flyover at Aziz Cross on GT Road Gujranwala

31,775

36,543

17,541

RAWALPINDI

LAHOREGUJRANWALA

SIALKOT13,000

NEW TRAFFIC DIRECTIONS & VOLUMES (ADT 2014)

Page 9: Presentation on Flyover at Aziz Cross on GT Road Gujranwala

BASIC COMPONENTS OF FLYOVER

Bridge cross-section can be divided

into two portions.

1. Super StructureThis portion receives the live load

directly. For example, Box Girder

2. Sub StructureThis Portion supports the entire

structure and live loads. Piles Pile cap Piers Abutments

Bottom Slab

Web W

eb

Web

Web

Top Slab

Barrier

Pier

C

anop

yPi

er

Shaf

t

Pile Cap

Pile

PilePile

Supe

r St

ruct

ure

Sub

Stru

ctur

e

Page 10: Presentation on Flyover at Aziz Cross on GT Road Gujranwala

CONCRETE PILES

A pile is a vertical structural element of a deep foundation which transfers super structure loads to the earth farther down from the surface to a subsurface layer.

Page 11: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 12: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 13: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 14: Presentation on Flyover at Aziz Cross on GT Road Gujranwala

PILE CAP

PILE CAP

Pile cap is a thick

reinforced concrete mat that

rests on concrete piles that

have been casted into ground.

concrete pile cap distributes the

load of the superstructure (from

piers and abutments into the

piles.Pile Cap

Piles

Pier

Page 15: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 16: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 17: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 18: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 19: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 20: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 21: Presentation on Flyover at Aziz Cross on GT Road Gujranwala

PILE CAP AND PIER

PIER

A pier is a reinforced,

raised structure in form of

pillars typically supported by

well-spaced pile caps. It

transfers the loads from deck to

pile caps.

For this project, special shape

of pier is adopted. It as two

components

1. Pier Shaft as column

2. Pier Canopy as transom

Pier Canopy

Pier Shaft

Box Girder

Page 22: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 23: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 24: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 25: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 26: Presentation on Flyover at Aziz Cross on GT Road Gujranwala

Abutment refers to the substructure at the ends of a bridge span. It

supports; Super Structure load Live Load Lateral Earth Pressure

ABUTMENTS

Abutment

Pile Cap

Piles

Page 27: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 28: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 29: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 30: Presentation on Flyover at Aziz Cross on GT Road Gujranwala

REINFORCED EARTH WORK

Reinforced earth wall is earth retaining structure and provided at

approaches (from road level to bridge level). The key components of a Reinforced Earth wall are geo-strips,

granular backfill and precast concrete facing panels. The frictional bond between the backfill supports the lateral earth

pressure and stresses induced due to traffic load.

Page 31: Presentation on Flyover at Aziz Cross on GT Road Gujranwala

ABUTMENT 01 ABUTMENT 06

LOOP 2 ABUTMENT 07

Page 32: Presentation on Flyover at Aziz Cross on GT Road Gujranwala

REINFORCED EARTH WORK

Page 33: Presentation on Flyover at Aziz Cross on GT Road Gujranwala

PRE-STRESSED BOX GIRDERS

Bottom View of Box Girder

Piers

An optimal and most efficient design of beam is box girder. A box girder consists of enclosed tube with multiple walls.

The advantage of a box girder is that it better resists torsion. Having multiple vertical webs, it can also carry more load than an I-shape girder of equal height.

Pre-stressing Mechanism

Page 34: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 35: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 36: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 37: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 38: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 39: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 40: Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Page 41: Presentation on Flyover at Aziz Cross on GT Road Gujranwala

SCOPE OF WORK

05/01/2023

Flyover 1Length 301.5Piles 80P. Cap 15Piers 15Abt. 2Spans 10Flyover 2

Length 301.5Piles 66P. Cap 11Piers 12Abt. 2Spans 10

Flyover 5Length 80.05Piles 38P. Cap 4Piers 6Abt. 2Spans 3Flyover 3

Length 417.3Piles 64P. Cap 15Piers 13Abt. 2Spans 14

Flyover 4Length 564.41Piles 84P. Cap 20Piers 18Abt. 2Spans 18

RWP

LHRGRW

SKT

Pile= 332 Ramp 3 (L=361.14m) Ramp 6(L=369.39 m) Bridge approaches (841m)

Pile caps=65 Ramp 3A(L=573.11m) Ramp 7(L=369.39 m)

Abutment= 10 Ramp 4( L=379.35m) Loop 1(270.18m) Bridge Lengths(1664m)

Piers=60 Ramp 5 (L=846.94m) Loop 2(L=195.23) Road Length (4660m)

Page 42: Presentation on Flyover at Aziz Cross on GT Road Gujranwala

FLYOVER S– 1, 2, 3 & 4Piles 100 % Completed (294 out of 294)Pile Caps 100 % Completed (62 out of 62)Piers 100 % Completed (62 out of 62)Abutment 100 % Completed (8 out of 8)Box Girders 20% in progress (4 out of 17)Reinforce Earth Wall 50 % Completed (0.6 km out of 1.12

km)At Grade Roads 60% up to WBM (3 Km out of 5 Km)

RAILWAY BRIDGEPiles 100% Completed (38 out of 38)Pile Caps 100% Completed (4 out of 4)Piers 100% Completed (2 out of 2)Transoms 50% Completed (1 out of 2)Abutments 50% Completed (1 out of 2)Pre-cast Girders 100% Completed (21 out of 21)

PHYSICAL PROGRESS

Page 43: Presentation on Flyover at Aziz Cross on GT Road Gujranwala

Year Release Expr. %age Remarks

2014-15 2500 2500 100% Payment made for land acquisition.

2015-16 1555 1555 100%

Rs. 400 M land acquisition.Rs. 215 M shifting of services.Rs. 940 M paid to NLC.

2016-17 1000 510 51% Rs. 510 M paid to NLC.

FINANCIAL PROGRESS

Page 44: Presentation on Flyover at Aziz Cross on GT Road Gujranwala