1 Wayne County Lift Station 1A The Boring that Wasn’t (Boring) 2012 MWEA Annual Conference Overview of Rouge Valley (RV) Sewage Disposal System Short Term Corrective Action Plan Background Lift Station 1A Background Capacity Alternatives Design Construction Presentation Outline
Transcript
Page 1: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

1

Wayne County

Lift Station 1A

The Boring that Wasn’t

(Boring)

2012 MWEA Annual

Conference

Overview of Rouge Valley (RV) Sewage Disposal

System

Short Term Corrective Action Plan Background

Lift Station 1A

Background

Capacity Alternatives

Design

Construction

Presentation Outline

Page 2: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

2

Transports wastewater from 14 communities in

Wayne County and 1 community in Oakland

County to Detroit for treatment and disposal

93 miles of sewer subdivided into two major

interceptor systems which parallel the Rouge

River

First sewers built in the 1930s, with additions in the

1960s and 1980s

30-in to 102-in

1,126 manholes; 27 siphons; 19 overflow

structures

Wayne County

Rouge Valley (RV) Sewage Disposal System

Wayne County Rouge Valley STCAP

Project Highlights

Page 3: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

3

Short Term Corrective Action Plan (STCAP)

Part of a Final Order of

Abatement for SSO control

Manhole Rehabilitation: 958

Modifications to Regulators

(10) and Comfort Stations (4)

Modifications to Stop Plate

Access Covers at Junction

Chambers (7)

Nearly 1,000 MH Rehabilitated

Page 4: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

4

Wrapid Seal

external heat

shrink wrap

8 Rouge Valley Sewage Disposal System

Short Term Corrective Action

Plan

195 Manhole

Chimneys coated

with Calcium

Aluminate

Cement

Page 5: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

5

9 Rouge Valley Sewage Disposal System

Short Term Corrective Action Plan Update

Additional Repairs

Stop Plate Access Covers at Junction Chambers: High Potential For Inflow

• Sewer Rehabilitation:

– 7 segments lined with Cured In Place Pipe:

• 643 ft 48-inch RCP

• 2,834 ft 60-inch RCP

• 806 ft 66-inch RCP,

• 2,594 ft 78-inch RCP

– 3 segments slip lined with HOBAS flush joint pipe

• 1,596 ft 78-inch

• 580 ft 102-inch concrete tunnel

– Spot repairs

– Joint repairs

Page 6: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

6

11 Rouge Valley Sewage Disposal System

Short Term Corrective Action

Plan

Pre and Post

Sewer Lining

Top of host pipe

removed and new pipe

inserted.

Page 7: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

7

Yes, this is in a wetland!

14 Rouge Valley Sewage Disposal System

Short Term Corrective Action

Plan Update

Minor Interceptor Repairs Complete

164 Joints Grouted

9 Spot Repairs

Page 8: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

8

RV Sewer Evolution

1955

Middle Rouge Parkway Interceptor Extension

60” – 66” Diameter

1965

Rouge Valley Interceptor

78” Diameter

1991

Middle Rouge Interceptor Relief

66” – 72” Diameter

2000

LS1A

54” Diameter

DWSD

RV Sewer Operation

DWSD

Page 9: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

9

RV Sewer Operation

DWSD

Lift Station 1-A Capacity

Completed in 2000

Four 65 cfs Vertical Turbine Pumps w/ VFDs

Design Capacity 250 cfs

Actual Capacity 190 cfs

Operates only in wet weather

Page 10: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

10

Preconstruction HGL

Page 11: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

11

LS1A – Operation

LS1A – Operation

Page 12: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

12

Precast concrete slab

for accessing discharge

box

Operators locked out

pumps to prevent

station flooding.

Page 13: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

13

Alternatives

8 Alternatives

Simple and inexpensive to complex and expensive

3 Options fixing problem at the Lift Station

5 Options fixing problem at siphon / sewers (including

Vent and Access Chamber at LS 1A)

Alternative 3-

New Discharge Chamber

Page 14: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

14

Design Features

Four New Junction Chambers

New Parallel Twin Siphon Tubes

New Bypass Gate and Slide Plates

Reverse Slope and Preferential Flow

Vent and Access Chamber at LS 1A

Sealed Existing Downstream

Chambers

Selected Alternative:

New Siphon and Sewer

with Emergency Bypass

Page 15: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

15

Alternative 6A -

JACK & BORE (2) 54 STEEL CONTAINMENT PIPE WITH

42” CARRIER PIPE (HDPE OR CCFRPMP)

Pipe Slope

Reverse Slope and Preferential Flow

Construction

$18 M STCAP, Inland Waters Construction

$5 M Lift Station 1A: O’Laughlin Construction

State Revolving Loan financing

The successful efforts of Wayne County to secure

ARRA funding for this project results in over $7.75

million cost savings for our system customers of the

estimated $19.85 million total projects costs.

Page 16: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

16

Eliminated access to discharge

box from inside station.

New vent and access chamber

Page 17: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

17

Sealed

downstream

chanbers.

LS1A – Post-Improvements

Page 18: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

18

Vent and Access Chamber Operating

Successfully prior to Siphon Completion

Siphon Construction

Twin Tubes

54” Steel Casing

42” HOBAS Pipe

Water Main Location: “Known Unknown”

River Boring Clay Hardpan

Siphon Casing Crown 5 Ft. Below River Bottom

Page 19: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

19

Contractor Modification JC-1

Significantly reduced the size of JC-1 by

constructing in two phases.

Minimize potential for failure of existing 72” sewer

Replaced stop plates with sluice gates

$60,000 Owner credit

Phase 1

Receiving Pit

Phase 2

Excavation Over Existing

Sewer

Phase 1

Receiving Pit

Phase 2

Excavation Over

Existing Sewer

Page 20: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

20

Phase 1 Shaft for New Downstream

Siphon Chamber JC-1

20 ft x 25 ft x 55 ft

Phase 2 Shaft for New Downstream

Siphon Chamber JC-1

Phase 1

Hobas Pipe at New Downstream Siphon

Chamber JC-1

Page 21: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

21

Phase 2 Shaft for New Downstream

Siphon Chamber JC-1

Phase 2 Precast New Downstream

Siphon Chamber JC-1

Shaft for New Upstream Siphon

Chamber JC-2

25 ft x 40 ft x 30 ft

Page 22: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

22

Jack & Bore 54” Casing October 20, 2010

The Next day jacking pit floods

Page 23: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

23

Sheeting and relocate 12” water main.

46 Rouge Valley Sewage Disposal System

Short Term Corrective Action

Plan Update

Repair of River Breach

•Relocation of Dearborn Heights Water Main

•Mid December 2011: Start installation of sheeting in river to

cut-off flow in the trench.

Page 24: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

24

Sheeting complete Feb. 11, 2011

Pump down JC-2

Page 25: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

25

Resume north bore Feb. 15, 2011

Cutting head breaks Feb. 16, 2011

Page 26: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

26

2/17/11 Bore is back on track – advance

30’ since resuming operations.

Hit obstacle 6:00 PM

2/18/11 Jacking pit

floods for second time.

Page 27: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

27

Great another trip to the

MDEQ – can’t wait

3/3/11 Divers used to

salvage equipment.

Page 28: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

28

Page 29: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

29

Page 30: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

30

Page 31: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

31

62 Rouge Valley Sewage Disposal System

Short Term Corrective Action

Plan Update Siphon Installation

• Construction site was

frequently inundated

last spring by near

record flooding of the

Rouge River, including

complete flooding of

the construction site 3

times

• 37 rain events in

April and May

2011 alone, which

impeded work

due to the high

flows in the

Rouge River.

Page 32: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

32

Page 33: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

33

Page 34: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

34

Page 35: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

35

Page 36: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

36

Page 37: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

37

Page 38: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

38

RV – STCAP

Project Highlights

Substantial Completion of Siphon January 10, 2011

So far so good no overflows but haven’t had a large

event.

River crossings can be problematic and contingencies

are needed just in case.

Page 39: Presentation Outline 3 - Kelly Cave-Tim Sullivan.pdf · $5 M Lift Station 1A: O’Laughlin Construction State Revolving Loan financing The successful efforts of Wayne County to secure

39

Wayne County Department of

Public Services – Engineering and

Operations:

Kelly Cave, Razik Alsaigh, Kerreen

Conley, Firooz Fath-Azam, Dan

Alford and Ancell Noel

Project Team:

Hubbell, Roth & Clark, Inc.:

Bill Davis, Tim Sullivan, Eric Warner


Recommended