+ All Categories
Home > Documents > Presentation Prefab

Presentation Prefab

Date post: 03-Jun-2018
Category:
Upload: anthony-federico
View: 234 times
Download: 0 times
Share this document with a friend

of 19

Transcript
  • 8/11/2019 Presentation Prefab

    1/19

    PREFABRICATED

    TECHNOLOGY

    BUILDING CONSTRUCTION

  • 8/11/2019 Presentation Prefab

    2/19

    Laundry

    Laboratory Emergency Accommod ation Uni ts .

    Struc tur al Steel Hangar

    Warehouse Hangar

    Office & Liv ing conta iners

    Monoblock complex System

    We are using Prefabricated Construction Technology (Concrete or

    Sandwich Panels) to provide:

    Prefabr icated Bui ldin gs

    Offices

    Dormitor ies

    WCShowers

    Recreat ion Room ,Spor t co ur t & Act iv i t ies

    PREFABRICATED CONSTRUCTION TECHNOLOGY

  • 8/11/2019 Presentation Prefab

    3/19

    Prefabricated houses represent an advanced,

    reliable and affordable construction technology

    recognized all over the world.

    We have a ready-to-use standard designs for

    Military Family Housing, dormitories, Kitchen,laundry, mess halls,

    Prefabricated Building in sandwich panels

    PREFABRICATED CONSTRUCTION TECHNOLOGY

    http://localhost/var/www/apps/conversion/tmp/scratch_5/links/Prefabricated%20Camp.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_5/links/Prefabricated%20Camp.ppt
  • 8/11/2019 Presentation Prefab

    4/19

    Prefabricated Building in sandwich panels

    PREFABRICATED CONSTRUCTION TECHNOLOGY

  • 8/11/2019 Presentation Prefab

    5/19

    PREFABRICATED CONSTRUCTION TECHNOLOGY

    http://localhost/var/www/apps/conversion/tmp/scratch_5/links/Prefabricated%20Camp.ppt
  • 8/11/2019 Presentation Prefab

    6/19

    The industrialized modular system is based on assemblage

    in building site of prefabricated elements like:

    wall panels

    partition panels

    floor and cover plate

    PREFABRICATED CONSTRUCTION TECHNOLOGY

  • 8/11/2019 Presentation Prefab

    7/19

    Foundation

    PREFABRICATED CONSTRUCTION TECHNOLOGY

  • 8/11/2019 Presentation Prefab

    8/19

    Walls Panels

    The wall panel is realized in order to planning requirements, with dimension in wide

    and different thickness.The structure is composed of:

    2 parts of reinforce concrete (Rck 300 kg/cm), electrically welded mesh and best

    cohesion irons (1)

    insulation (2) 3 Lift attachments and assembly (3)

    PREFABRICATED CONSTRUCTION TECHNOLOGY

  • 8/11/2019 Presentation Prefab

    9/19

    Floor and Cover Plate

    The floor slab as the roof covering system is achieved through reinforced concrete

    slabs of various size in width and thickness varying in height.The panels are equipped with a beam cross section breakers and accommodate the

    combined in situ concrete of concrete.

    Inside the tubes are arranged for electrical and plumbing. Alternatively, they may

    occur in normal predalle slabs, laid in the plant only at the bottom and ready to be

    installed and completed with additional armor and cast on site.

    PREFABRICATED CONSTRUCTION TECHNOLOGY

  • 8/11/2019 Presentation Prefab

    10/19

    The finished structure is ready to receive the finishing

    Military: Contractor, Service & Supply

  • 8/11/2019 Presentation Prefab

    11/19

    Thermal Characteristics

    Military: Contractor, Service & Supply

    External environment external surface resistance

    01 02

    03

    Concrete EPS70 Concrete Internal

    environment Internal surface

    resistance

    0,05000

    0,20000

    0,05000

    0,7

    0,036

    0,7

    14 0,18 14 2300 20 2300 0,07 5,56

    0,07 0,123

    Total thermal resistance Total thermal

    transmittance

    mK/W :

    W/mK : 5,82 0,17

    Cod. : EPS70 Description : EXTERNAL WALL 20 EPS

    Tipe : VE VERTICAL TO EXTERNAL

    Characteristics of the layers: EXTERNAL WALLS

    CodE Description s C m W/mK W/mK kg/m mK/W

  • 8/11/2019 Presentation Prefab

    12/19

    Construction Technology

    PREFABRICATED CONSTRUCTION TECHNOLOGY

  • 8/11/2019 Presentation Prefab

    13/19

    PREFABRICATED CONSTRUCTION TECHNOLOGY

  • 8/11/2019 Presentation Prefab

    14/19

    Construction Technology - Modular Options

    PREFABRICATED CONSTRUCTION TECHNOLOGY

  • 8/11/2019 Presentation Prefab

    15/19

    Construction Technology - Modular Options

    PREFABRICATED CONSTRUCTION TECHNOLOGY

  • 8/11/2019 Presentation Prefab

    16/19

    Build Faster, Stronger, Better

    The construction of a single-storey building, using conventional building methods,

    of 2000 square feet [185 square meters] area takes approximately 2-3 months to

    complete.

    PREFABRICATED CONSTRUCTION TECHNOLOGY

  • 8/11/2019 Presentation Prefab

    17/19

    PREFABRICATED CONSTRUCTION TECHNOLOGY

  • 8/11/2019 Presentation Prefab

    18/19

    PREFABRICATED CONSTRUCTION TECHNOLOGY

  • 8/11/2019 Presentation Prefab

    19/19

    PREFABRICATED CONSTRUCTION TECHNOLOGY


Recommended