  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    1/80

    2009 Wi ro Ltd - Confidential

    R-APDRP

    In

    Jammu & Kashmir

    Power Development Department

    An overview

    PDD Complex Bemina

    12th July 2012

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    2/80

    2009 Wi ro Ltd - Confidential

    R-APDRp Re-structured Accelerated

    Power Development Reforms

    Programme

    (APDRP-II)

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    3/80

    2009 Wi ro Ltd - Confidential

    IntroductionThe Govt. of India has proposed to continue

    R-APDRP during the XI Plan with revised terms

    and conditions as a Central Sector Scheme. The

    focus of the programme shall be on actual,

    demonstrable performance in terms of sustainedloss reduction. Establishment of reliable and

    automated systems for sustained collection of

    accurate base line data, and the adoption of

    Information Technology in the areas of energyaccounting will be essential.

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    4/80

    2009 Wi ro Ltd - Confidential

    R-APDRpScheme has four parts

    Part- A: Establishment of Base Line Data by

    employing system metering and using IT

    Applications for energy accounting/auditing & IT

    based consumer service centres.

    Implementation of SCADA/DMS System Part- B: System Revamping Works. These shall

    include regular distribution strengthening

    projects.

    Part- C: Capacity building/Trainings to J&KPDD staff.

    Audit by Third Party Independent Evaluation

    Agencies (TPIEA).

    Part- D: Incentive scheme for employees

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    5/80

    ReduceAT&Closses

    upto 15% Increaseconsumer

    satisfaction

    Reduceoutages

    &interrupti

    ons

    Bringcommerc

    ialviability

    R-APDRP -Strategy fordistribution

    reforms

    R-APDRP Program

    rt A

    plementation ofinfrastructure forse lining of DataIT Consultant (ITC)IT Implementation Agency

    ITIA)Third Party Independentvaluation Agency (TPIEA)plementation of SCADAidentified Towns

    CADA/DMS Consultant (SDC)CADA Implementationgency (SIA)

    PIEA

    Part BStrengthening ofDistribution Network- Implementation of HVDS- Bifurcation of DT Capaci- Reducing of LT: HT ratio- Strengthening of

    DT Capacity- AB Cabling- Up gradation of 33/11 K

    Sub Stations to meet

    SCADA requirements

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    6/80

    e-s ruc ure cce era e ower ev.Reforms Programme (R-APDRP) at a

    Glance APDRP short closed by GOI in 2008-09.

    R-APDRP launched throughout the country on 01.04.2009. Towns with population of 10,000 (Census 2001) and above (Special

    category states) and 30,000 (Census 2001) and above (Non Specialcategory states) covered under the programme.

    R-APDRP aims at reduction of T&D losses in urban areas of a State

    @ minimum 3% p.a. (cumulative) for a period of 5 years to bringT&D losses to a minimum of 15%.

    30 towns of J&K State approved under the programme.

    Programme divided into 2 parts PART-A and PART-B.

    PART-A to cover Ring Fencing, Feeder metering, DT metering

    application of Information Technology in Distribution Sub sector andSupervisory Control and Data Acquisition implementation.

    PART-B to strengthen Sub Transmission Distribution System in theidentified project areas.

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    7/80

    R-APDRP - Milestones

    R-APDRP divided in 2 parts (PART-A & PART-

    B). PART-A involves engagement of IT

    Consultant, Ring Fencing, System

    Metering, DT metering, 3rd PartyMonitoring of T&D losses, Appointment ofInformation Technology ImplementingAgency, Appointment of SCADA

    Consultant. PART-B to strengthen Sub Transmission

    Distribution System including 66/33/11 kVReceiving stations, Improvement of HT / LT

    network, HVDS, ABC, replacement of

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    8/80

    Timeline of R-APDRP PART-A to be completed within 3 years from the date

    of sanction of the project.

    3 years started from Dec 2010 and will end till Dec2013.

    PART-B to be completed within 3 years from date ofsanction of the project.

    3 years started from Oct 2011 and will end tillOctober2014.

    Timeline for completion of SCADA by 2013.

    Conversion of 100% PFC loan into grant of PART-A if

    completed by J&K State by Dec 2013. Conversion of 90% loan of PART-B into grant if J&K

    State completed PART-B by October 2014.

    In case of failure and / or in case the State does not

    achieve reduction of T&D losses @ 3% p.a. (Cum) for5 years of the project period the whole amount

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    9/80

    R-APDRP Figures Speak

    S.No. Items J&K State Project Area

    1 Total population as per census 2001 (In Lacs) 101.00 22.61

    2 Total consumer (In lacs) 13.00 4.773 Total Households (In Lacs) 20.32 4.06

    4 Energy consumed (p.a) M. U.s 10972.06 3775.91

    5 Energy Billed M. U.s (2010-11) 4424.84 1843.04

    6 T&D losses (%age) 2010-11 62 50

    7 AT&C loss 2010-11 72 608 Total Receiving stations 66/33/11kV (In Nos.) 505 161

    9 Total 11 kV Feeders 1489 621

    10 Total DTs 35182 10457

    11 Total Sub Division Offices 117 64

    12 Total domestic consumers (In lacs) 10.85 3.74

    13 Total consumer; Commercial / others (In Lacs) 1.92 1.05

    14 Total agreemented load (MWs) 1589.053 777.912

    15 Total towns (2001 census) 69 30

    16 Revenue generated (2011-12) (Rs. In Crores) 802.82 375.60

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    10/80

    R-APDRP PART-A

    S.

    No.

    Items Financial

    (Rs. In crores)

    1 Total estimated cost 192.23

    2 GOI loan through PFC 151.99

    3 State component 40.244 Funds released by PFC so

    far46.50

    5 Cumulative Expenditure

    ending March 2012

    14.37

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    11/80

    R-APDRP PART-B

    S.

    No.

    Items Financial

    (Rs. In crores)

    1 Total estimated cost 1665.27

    2 GOI loan through PFC 1498.75

    3 State share component @10% 166.524 Funds released by PFC so far 472.39

    5 Total estimated cost of SCADA

    52.89

    6 Funds released by GOIthrough PFC loan for SCADA

    10.20

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    12/80

    R-APDRP IMPORTANT DATESS.

    No.Item Date of

    appointment/Sanction/award

    Original date ofCompletion

    1 Date of appointment of IT consultant by PDD July 2009 June 2013

    2 Date of sanction of PART-A by GOI (Basic) 26th Nov. 2009 -

    3 Date of Revised sanction of PART-A by GOI 8th Dec. 2010 8th Dec. 2013

    4 Date of Award of ITIA 26th Feb. 2011 August 2012

    5 Date of Award of Ring Fencing Contract 9th Dec 2010 May 2011

    6 Date of Award of Feeder Metering contract (33kV11kV, HT Consumers)

    10th Oct 2011 December 2011

    7 Date of Award of DT Metering Contract 7 Tenders receivedon 18th April 2012

    Opened on 21stApril. Evaluationunder progress

    8 Date of Award of SCADA Consultant 15th Feb 2011 15th Jan 2014

    9 Date of Award for SCADA implementation RFP under review Likely to befloated in 1stweek of May

    10 Date of sanction of SCADA DPRs by GOI 18th Oct. 2011 18th Sep. 2013

    11 Date of sanction of PART-B by GOI 18th Oct. 2011 18th Sep. 2014

    12 Date of Award of PART-B Draft tender under evaluation

    -

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    13/80

    S.No.

    Item UnitTotal

    Quanti

    ty

    Name ofAgency

    Originalscheduledate of

    Completion as per

    sanctionissued byPFC/GoI

    Date ofAward

    by

    JKPDD

    originalScheduled date ofcompleti

    on asperaward

    Progressachieved uptoending

    March2012

    RevisedDate ofcompleti

    on

    Periodof

    Slippageas per

    PFCSchedule

    Periodof

    Slippageas per

    originalschedul

    e ofcompletion afteraward

    Remarks

    1 2 3 4 5 6 7 8 9 10 11 12 13

    1System

    Metering

    Ring Fencing No 30ProminentHaryana

    01-June-10

    09-Dec-10

    01-Jun-11BoM

    underreview

    31-June-12

    24months

    12months

    FeederMetering(33kV/11kV/HTconsumers)

    No 1173 Prominent, Haryana

    01-June-10

    10-Oct-11

    29-April-12

    Underdevelopment andtesting(40%

    completed)

    31-June-12

    24months

    2months

    DT metering No. 9680 - 01-Dec-11 - -

    7 bidsreceivedon 18thApril.Bids

    openeed

    on 21-04-12

    Aug-127

    months-

    BidEvaluation underprocess

    2 TPIEA Towns No. 30 DRS 01-Aug-11PFC

    selection-

    5 townsinspected

    .

    Aug-12 12months

    3 SCADA

    Towns No. 2NDPL

    (Consultant)

    01-Jan-1101-Feb-

    1101-Dec-

    14 Closed - 1 month -

    Towns No. 2 -01-June-

    11-

    01-Dec-14

    To-Bestudy

    complete

    d

    -12

    month-

    RFPunderReview

    4IncentiveScheme

    No. 1 JKPDD 01-Jan-11Submitte

    d

    Part-A: Time lines

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    14/80

    S.No.

    Item UnitTotal

    Quantity

    Name of

    Agency

    Originalschedule date

    ofCompletion as

    persanctionissued

    byPFC/GoI

    Date ofAward

    byJKPDD

    originalScheduled date

    of

    completion asper

    award

    Progressachieved upto

    endingMarch2012

    RevisedDate of

    completion

    Periodof

    Slippageas per

    PFCSchedul

    e

    Periodof

    Slippageas per

    original

    schedule ofcompletion afteraward

    Remarks

    1 2 3 4 5 6 7 8 9 10 11 12 13

    5

    Civilworks

    DataCentre

    Design

    No. 1 JKPCC 01-Jun 1101-Jun-1101-Dec-

    11

    Columnstructurecomplete

    d on 3floors. 2

    Slabscomplete

    d

    01-Jun-1212

    months6

    months

    DataCenter

    Installation,Commissioning &Configuration ofHardware,Networks &

    OperatingSystem

    Lot 1 Wipro01-Oct-

    1131st May

    201101-Jun-12

    BoMunderreview

    31-Aug-12

    12months

    2months

    Installation,Configuration &Customisation ofApplicationSoftware

    Lot 1 Wipro 01-Jan-1231st May

    201129-Sep-

    12

    Underdevelopment andtesting(40%

    completed)

    31-Oct-12

    9months

    1months

    User

    acceptancetesting (UAT)

    Lot 1 Wipro 20-June-12 31st May2011 01-Oct-12

    Willfollow

    commissioning ofData

    27-Nov-12 5months 1months

    Part-A: Time lines

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    15/80

    S. No. Item Unit

    Total

    Quantity

    Name of

    Agency

    Originalschedule date

    ofComplet

    ion aspersanctionissued

    byPFC/GoI

    Date ofAward

    byJKPDD

    originalScheduled date

    of

    completion as

    peraward

    Progress

    achieve

    d uptoendingMarch2012

    RevisedDate of

    completion

    Periodof

    Slippag

    e as perPFCSchedul

    e

    Periodof

    Slippage as peroriginal

    schedule of

    completion afteraward

    Remark

    s

    1 2 3 4 5 6 7 8 9 10 11 12 13

    6Data

    RecoveryCenter

    DataRecoveryDesignDesign

    No. 1 JKPCC01-Jun

    1101-Jun-

    1101-Dec-

    11

    Superstructurecomplete

    d

    01-Jun-12

    12months

    6months

    Installation,Commissioni

    ng &Configuratio

    n ofHardware,Networks &OperatingSystem

    Lot 1 Wipro01-Oct-

    1131st May

    201101-Jun-

    12

    BoMunderreview

    31-Aug-12

    12months

    2months

    Installation,Configuratio

    n &Customisati

    on ofApplicationSoftware

    Lot 1 Wipro01-Jan-

    1231st May

    201129-Sep-

    12

    Underdevelop

    ment andtesting(40%

    completed)

    31-Oct-12

    9months

    1months

    UAT Lot 1 Wipro20-Sep-

    1131st May

    201101-Apr-

    12

    Willfollow

    commissioning of

    DataCenter

    27-Dec-12

    15months

    8months

    Part-A: Time lines

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    16/80

    Part-A: Time lines

    S.

    No.Item

    Uni

    t

    TotalQuantity

    Nameof

    Agency

    Originalschedule date

    ofCompletion as

    persanctionissued

    byPFC/GoI

    Date ofAward

    byJKPDD

    originalScheduled date

    of

    completion as

    peraward

    Progress

    achieved uptoendingMarch2012

    RevisedDate of

    completion

    Periodof

    Slippage as per

    PFCSchedul

    e

    Periodof

    Slippage as peroriginal

    schedule of

    completion afteraward

    Remark

    s

    1 2 3 4 5 6 7 8 9 10 11 12 13

    7

    CustomerCare

    Centre

    (CCC)

    CustomerCare CentreDesign

    No. 1 JKPCC 01-Jun-1101-Jun-

    1101-Dec-

    11

    Superstructur

    ecomplet

    ed

    01-Jun-1212

    months6

    months

    Installation,Commissioning &Configurationof Hardware,Networks &OperatingSystem

    Lot 1 Wipro01-Aug-

    1131st May

    201101-Jun-12

    BoMunderreview

    31-Oct-12

    14months

    2months

    Installation,Configuration&Customisationof ApplicationSoftware

    Lot 1 Wipro01-Sep-

    1131st May

    201129-July-

    12

    Under

    development and

    testing(40%

    completed)

    31-Nov-12

    14months

    4months

    Useracceptancetesting

    Lot 1 Wipro20-Oct-

    1131st May

    201101-Aug-

    12

    Willfollow

    commissioning of

    DataCenter

    27-Dec-12

    14months

    4months

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    17/80

    Part-A: Time lines

    S. N0. Item UnitTotal

    Quantity

    Name ofAgency

    Originalscheduledate of

    Completion as persanctionissued byPFC/GoI

    Date ofAward byJKPDD

    originalScheduled date ofcompletion as peraward

    Progressachieved

    uptoendingMarch2012

    RevisedDate of

    completion

    Period ofSlippage

    as perPFC

    Schedule

    Period ofSlippage

    as peroriginal

    scheduleof

    completio

    n afteraward

    Remarks

    8

    SubDivisionOffice(SDO)

    Infrastructure Design

    No. 64 JKPDD 15-Mar-1131-May-

    1130-June12

    60%complete

    d30-Sep-12

    19months

    6 months

    DGPS SurveyResults

    No. 30 Wipro 30-May-1131-May-

    1131-May-12

    4 townscompleted 6 underprogress

    31-Oct-12

    Installation,Commissioning &

    Configuration ofHardware,Networks &OperatingSystem

    No. 64 Wipro 01-May-1131-May-

    1131-July-12

    BoM underreview byJKPDD

    25-Feb-13

    Installation,Configuration &Customisation ofApplication

    Software

    Lot 1 Wipro 25-Jun-1131-May-

    1109-Aug-12

    40%completed

    10-Mar-13

    Integrationwith legacyapplications& DataCentrenetwork

    Lot 1 Wipro 01-Jul-1131-May-

    1109-Sep-12

    Will followcommissiong of Data

    Center

    10-Mar-13

    UserAcceptancetesting

    Lot 1 Wipro 20-Aug-1231-May-

    1115-Oct-12

    Will followcommissiong of Data

    Center

    16-Mar-13

    User Training Lot 1 Wipro 10-Sep-12

    31-May-

    11 27-Oct-12 26-Jan-13

    i li

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    18/80

    Part-A: Time lines

    S. No. Item UnitTotal

    Quantity

    Name ofAgency

    Originalscheduledate of

    Completion as persanctionissued byPFC/GoI

    Date ofAward byJKPDD

    originalScheduled date ofcompletion as peraward

    Progressachieved

    uptoendingMarch2012

    RevisedDate of

    completion

    Period ofSlippage

    as perPFC

    Schedule

    Period ofSlippage

    as peroriginal

    scheduleof

    completio

    n afteraward

    Remarks

    9Other

    Offices

    Infrastructure Design

    No. 71 JKPDD 15-Mar-1131-May-

    1130-June12

    60%complete

    d30-Sep-12

    19months

    6 months

    DGPS SurveyResults

    No. 30 Wipro 30-May-1131-May-

    1131-May-12

    4 townscompleted 6 underprogress

    31-Oct-12

    Installation,Commissioning &Configurationof Hardware,Networks &OperatingSystem

    No. 64 Wipro 01-May-1131-May-

    1131-July-12

    BoM underreview byJKPDD

    25-Feb-13

    Installation,Configuration&Customisationof ApplicationSoftware

    Lot 1 Wipro 25-Jun-1131-May-

    1109-Aug-12

    40%completed

    10-Mar-13

    Integrationwith legacyapplications &Data Centrenetwork

    Lot 1 Wipro 01-Jul-1131-May-

    1109-Sep-12

    Will followcommissiong of Data

    Center

    10-Mar-13

    UserAcceptancetesting

    Lot 1 Wipro 20-Aug-1231-May-

    1115-Oct-12

    Will followcommissiong of Data

    Center

    16-Mar-13

    User Training Lot 1 Wipro 10-Sep-1231-May-

    1127-Oct-12 26-Jan-13

    Di t i t M f J & K d P j t

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    19/80

    #ProjectArea

    # ofConsume

    rs

    ElectricalNetwork

    1 Srinagar 164366 1922 Jammu 154460 196.53 Akhnoor 2547 8.24 Anantnag 16063 12.55 Bandipora 4119 6.26 Baramulla 12026 15.6

    7Bhaderwah

    1978 8.5

    8 Bijbehera 3029 39 Budgam 2871 12.4

    10

    Doda 2966 17

    11

    Dooru 2811 4.5

    12

    Ganderbal 2428 10

    13

    Handwara 2152 12

    14

    Kargil 52 22

    15

    Kathua 12982 36

    16

    Kishtwar 2517 9

    17

    Kulgam 2973 5.92

    18

    Kupwara 1799 7.5

    19

    Leh 9296 32

    20

    Pattan 1268 6.2

    District Map of J & K and ProjectAreas

    71922 unmetered in Kashmir

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    20/80

    Coverage o f R-APDRP30 project areas of J&K State classified as Towns (urban) with

    population more than 10,000 as per Census, 2001

    19 towns in Kashmir

    (population 13,88,238) 11 towns in Jammu(population 8,72,960)

    s# Project AreaPopulationbenefited

    1 Anantnag 978962 Budgam 117673 Bandipora 25795

    4 Baramula 718965 Bijbehara 197946 Duru-Verinag 172367 Ganderbal 137218 Handwara 106389 Kargil 1065710 Kulgam 13136

    11Kupwara

    1485712 Leh 2863913 Pattan 1135514 Pulwama 1422915 Shopian 1224616 Sopore 59624

    17 Srinagar 98821018 Sumbal 1065519 Tral 11651

    s# Project AreaPopulationbenefited

    1 Akhnoor 10896

    2 Bhadherwah 10516

    3 Doda 113204 Jammu 6121635 Kathua 51034

    6 Kishtwar 14936

    7 Poonch 23978

    8 Rajouri 21580

    9

    Ranbir Singh Pora

    (Miran Sahib) 14324

    10 Samba 15914

    11 Udhampur 86299

    Srinagar has 34.27% of total

    consumersJammu has 32.21% of total consumers

    SCADA/DMS forSrinagarand Jammu City

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    21/80 2009 Wi ro Ltd - Confidential21

    ReduceAT&Clossesupto15% Increase

    consumersatisfaction

    Reduce outages& interruptions

    Bringcommercialviability

    R-APDRP - A Six levelIntervention Strategy for

    distribution reforms

    468,946Consumers benefitted (RAPDRP)

    30Total Towns Covered

    135Total No. of Offices Covered

    65.78%AT&C Losses at end of 2009-10

    Pattan,RSPuraPilot Town (Two)

    Srinagar/JammuData Centre / DR Centre

    SrinagarCustomer Care Centre

    64No. of Sub- Divisions

    71No. of Sub- Offices

    R-APDRP and J&K PDD Business Imperatives & Scope

    Snapshot of R-APDRP in J&K

    *Source: Order on ARR for FY 2009-10 & 2010-11 and determinationof retail tariff 2010-11 for PDD

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    22/80 2009 Wi ro Ltd - Confidential

    R-APDRp

    P t A A d P j t

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    23/80

    Part-A: Approved ProjectCosts

    Total Project Cost: Rs. 192.23crores

    Funded by PFC : Rs. 151.99crores

    Funded by PDD : Rs. 40.24crores

    Approved Project Costs:

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    24/80

    Approved Project Costs:Central assistance

    Funded by PFC : Rs. 151.99 crores

    IT consultant cost: Rs. 0.68 crores

    System/DT metering : Rs. 21.21 crores

    Set up cost ITIA : Rs. 121.84 crores

    Bandwidth Chargesfor 1st year : Rs. 3.12 crores

    Facility ManagementCharges for 1st year : Rs. 5.14 crores

    A d P j t C t

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    25/80

    Approved Project Costs:State (JKPDD)Contribution

    Funding under State grant : Rs. 40.24crores Civil infrastructure

    Data Center (DC) : Rs. 3.99 crores

    Disaster Recovery Center (DR): Rs. 1.99 crores Upgradation of SDOs : Rs. 4.50 crores

    Bandwidth for 4 years

    (2nd to 5th year) : Rs. 12.49 crores

    FMS for 4 years(2nd to 5th year) : Rs. 17.27 crores

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    26/80 2009 Wi ro Ltd - Confidential

    Funding Mechanism

    Part- AGoI will provide 100% Loan for part A of the

    R-APDRP schemes which shall include projects

    for establishing Base Line data and IT

    applications for energy accounting/ auditing andIT based consumer services etc. The entire

    amount of GoI loan (100%) for Part A of the

    project shall be converted into grant after

    establishment of the required Base-Line datasystem within a stipulated time frame and duly

    verified by Third Party Independent Evaluation

    Agency- Energy Auditor (TPIEA-EA).

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    27/80

    Part-A of R-APDRPCovers establishing base line data for accurate measurement of losses

    at various levels and improving customer services for the utilities.

    Consumer Survey, Indexing, Asset Mapping

    GIS Mapping of the entire distribution network of identified project areas

    Automatic Meter Reading (AMR) on DT & Feeder

    Automatic Data Logging for all Distribution Transformers and Feeders Asset Mapping of the entire distribution network at and below the 33kV

    transformers and includes the Distribution Transformers and Feeders, Low

    Tension lines, poles and other distribution network equipment.

    Feeder Segregation / Ring Fencing

    Adoption of IT applications for redressel of consumer grievances,

    Adoption of IT applications for meter reading, billing & collection.

    Energy accounting & auditing and MIS

    Activities include

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    28/80

    Part-A of R-APDRPActivit ies to be performed by PDD

    Setting up an Information Technology Cell. (IT cells with

    adhoc setup constituted: Human Resource augmentation

    required)

    Civil works for Data Centre, Data Recovery Centre, SDO and

    other offices for IT setup. (Work awarded to JKPCC. Work on

    DC under progress. DR drawings finalised)

    Ring fencing/ Installation of Boundary meters at

    Import/Export points. (Total 247 Units. 40% Completed)

    System Metering/ Feeder Meters (AMR compatible). (1091

    Units. LoI Issued)

    HT consumer meters and Distribution Transformer meters.

    (9610 Units. Tender for DT metering under process)

    100% consumer metering. (Under progress)

    P t A f R APDRP

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    29/80

    Part-A of R-APDRPActivit ies to be performed by ITIA

    ITIA: Wipro Infotech (Go Live September 2012)

    Setting up of IT infrastructure at Data Centre, DR centre, Call Centre andother offices. (Target date: June 2012)

    Hardware (Target date : April 2012)

    Networking (Target date : April 2012)

    GIS system software and maps (13 Maps received from NRSC)

    Door to Door DGPS survey and Consumer indexing, Asset Mapping

    (Work completed in pilot areas Pattan, R. S. Pura and

    Ganderbal and Kulgam. Work under progress in

    Srinagar) (Target date : July 2012) Meter Data Acquisition System (Target date : June 2012)

    Software (Under development at NOIDA : 50% completed)

    Web portal (Under Development at Kolkatta: 45% Completed)

    Facilit Mana ement services for 5 ears

    D t C t I f t t

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    30/80

    Data Center Infrastructure

    Data Center (DC) : Srinagar(Currently under construction

    through JKPCC at PDD Complex Bemina)

    Centralized Customer Call Center24 x 7 help desk integrated in DC : Srinagar

    Disaster Recovery Center (DR) : Jammu(Proposed at PDD Complex Gladni)

    AMR Data Logging : Data Center

    Billing / Customer Care : Sub-Division Offices

    Pilot Project Areas: Pattan - Kashmir R. S. Pura - Jammu

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    31/80

    Data Center Features

    The Data Center (DC) shall cater as a hub for all Offices working in the 30project areas. It shall house 45 high end servers for Billing, Collection,

    Metering, Automatic meter reading, Network analysis. It shall support futureexpansion and integration of other areas and shall be scalable to SCADA.

    Shall be connected to Disaster Recovery Center (DR) at Jammu which shall bea replica of the DC and shall be a live backup.

    The DC building shall house the 24x7 help line for Centralised Customer Carehousing 9 servers for IVRS and Customer care.

    All SDOs in the project area shall act as customer care units and shall havelive data excess to the Data Centre.

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    32/80

    Data Center

    Disaster

    Recovery Center

    MPLS/ VPN

    Cloud

    Customer Care

    Center

    DB

    Application server(s)(GIS,

    MDAS, MBC, NC, DC,

    EA etc)

    SAN

    Data collection

    from DTR, SS,

    HT Consumers

    D

    B

    Application

    server(s)

    (GIS,

    MDAS,

    MBC, NC,

    DC, EA etc

    SAN

    Replication

    Sub- DivisionOffice Other Office

    Internetgateway

    (ISP)

    GeneralArchitecture

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    33/80

    Server Deployment Architecture

    w

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    34/80

    wArchitecture

    Internal LAN

    CoreRouter7609

    InternetFirewall Router

    7609

    Core Switch6513 + FWSM+ ACE + NAM

    Distribution 6509-E

    Access6509-E DNSLDAP

    Web

    Proxy

    NMS Application&

    GIS ServerDB & V+CI

    clusterFor

    applications

    DB & V+CI clusterFor GIS and Map

    www

    Intranet

    Service ProviderMPLS

    IPS4260 IPS4260

    SiSi

    RAS Router3845

    Backup

    CSACS

    2960 L2 Switch

    CSMCSMARS

    IPS4260

    RemoteOffices

    Mail

    N t k A hit t

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    35/80

    Network Architecture

    u v s on an er ce

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    36/80

    u v s on an er ceConnectivity

    CORE ROUTER

    MPLS CLOUD

    Sub-Div & Other offices

    ISP

    Internet Router

    Sub-Div & Other offices

    Sub-Div & Other-Office

    Sub-Dev & Other OfficesSub-Div & Other Offices

    MPLS to SDO

    MPLS to OO

    MPLS to DC & DRR

    Sub-Div & Other offices

    DR DCReplication Links

    Data Centre: Srinagar 2800 Sq.ftData Recovery Centre: Jammu - 2800 sq.ft.

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    37/80

    Architecture for SDO's & Other Office

    MPLS VPS

    Cloud

    2900 Series

    Switch

    2900 Series

    Router

    w/t FW/VPN

    Customer Care Center Solution

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    38/80

    Customer Care Center SolutionOverview

    Proposed component & setuphighlight 12 CSR at Discom CC

    1no IP PBX at each Discom with

    Soft & hard Telephone for CSRs IVR ACD Dialer

    CTI integration Voice Logger Voice mail & voice broadcast

    features

    Solution capability highlights E1/PRI interface for i/b & o/b calls

    TTS & ASR capability

    100% voice logging & Quality monitoring Voice mail

    Real time monitoring

    Hard phones, soft phones & headsets

    Blend agents with inbound, outbound, e-mail & chat

    capability

    SMS gateway Integration with the help of

    professional services involvement

    PC

    Media

    Gateway IP PBX IVRTTS &

    ASR Logger

    PCPC

    Data Center

    DR

    PRI

    PC PCReal Time

    Monitoring

    Display

    Agent Agent Agent AgentSupervisor

    ACD CRM

    Customer

    E-Mail &

    Chat

    Project Area Covered (SDO/OO)

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    39/80

    2009 Wi ro Ltd - Confidential39

    Project Area Covered (SDO/OO)

    Sub Division Office/Other Office

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    40/80

    2009 Wi ro Ltd - Confidential40

    Appointment of ITC

    (CMC) Preparation of DPRs Approval of DPR from

    PFC

    Bidding Process

    Issuance of RFP forinvitation of bids

    Evaluation ofTechno-Commercialbid

    Appointment of ITImplementingAgency

    Execution

    Issuance ofLOI & LOA toM/s Wipro

    Signing ofContract withM/s Wipro

    Roll Out by PDD

    Ring Fencing DT Metering Civil Works for

    DC/DRC/CCC. Up gradation of SDOfor Installation of ITInfrastructure. E.gEarthing and civilWorks.

    Rollout by Wipro

    Application Developmentfor MBC, NC&DC, MDAS, GIS& NAM

    CI and Asset Mapping for 30Towns Installation of Modems atDTs and Feeder Meters

    Installation of HW andSoftware at DC/DRC/CCC/SDO & Other Offices.

    Connectivity of SDO &

    Other offices with the DataCenter through MPLS/ VPNConnectivit

    Validation byTPIEA

    Validation of

    the WorksDone

    Conversion ofLoan intoGrant

    Process Flow for Part A of R-APDRP

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    41/80

    2009 Wi ro Ltd - Confidential41

    Overall Program Scope

    Disaster Recovery

    Centre

    Disaster Recovery

    Centre

    Data CentreData Centre

    AssetManagement

    GIS

    Energy Audit Web Self Service

    MIS

    Mail & MessagingSystem

    Customer Service Application

    MDASNetwork Analysis

    Metering

    Billing

    New Connection

    Collection

    Dismantling &Disconnection

    BusinessIntelligence Portal & DMS

    CustomerCare Centre

    Subscribers

    IT based energy accounting & auditing

    GIS based consumer indexing & Asset

    Mapping

    Computerized billing & revenue

    collection

    Creation of Centralized 24*7 helplineCall Center for customer care

    Focus of RAPDRP Part A

    Sustained collection and establishment of baseline energy / reve nue data and improvement in customer

    services through

    Sustained collection and establishment of baseline energy / reve nue data and improvement in customer

    services through

    Pil /P R ll L d

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    42/80

    2009 Wi ro Ltd - Confidential42

    Pilot/Program Rollout Landscape

    Complete

    Rollout

    Application

    Implementation in

    DC/ CCC

    Infrastructure Rollout

    for two

    Pilot towns

    Data Migration

    and Image

    Scanning for

    two Pilot towns

    DGPS

    Survey for

    the pilot and

    other towns

    FMS

    Framework

    Setup

    Pattan - kashmir

    RS Pura - jammu

    DC (Srinagar)/

    CCC (Srinagar)

    Rollout

    [ 18 project Areas in Kashmir]

    Rollout

    [ 10 Project areas in Jammu]

    Pilot

    Rollout

    Learning & Experience

    Pilot Rollout

    DRC Rollout in

    Jammu

    P t B f R APDRP

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    43/80

    Part-B of R-APDRPCovers regular distribution strengthening projects.

    Activities include

    Renovation, modernization and strengthening of 11kV level

    Substations. Re-conductoring of lines at 11kV level and below. Load Bifurcation, Feeder Separation.

    Load Balancing, reorientation of Feeders. HVDS (11kV). Aerial Bunched Cabling in dense areas. Replacement of electromagnetic energy meters with tamper

    proof electronic meters.

    Installation of capacitor banks and mobile service centersetc.

    In exceptional cases, where the sub-transmission system is

    weak, strengthening at 33kV or 66kV levels may also be

    considered.

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    44/80

    Part B Project: Funding Structure

    Category ofStates

    % of Project

    Cost as loanthroughGross

    BudgetarySupport

    (GBS) fromGOI

    % of ProjectCost as loan

    fromPFC/REC/

    Own/ Other

    Sources

    Remarks

    Non-specialCategory

    Upto 25 Upto 75 Upto 50%(90% for specialcategory states)

    loan shall beconverted intogrant in five 5

    annual tranches onachieving 15%

    AT&C loss in the

    project area.

    Special Category

    States (All North-Eastern States,Sikkim,

    Uttarakhand,Himachal Pradesh

    and

    Jammu &

    Upto 90 Upto 10

    Part B Project DPRs

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    45/80

    jCost Abstract of Part-B Schemes of R-APDRP in respect of Kashmir Region

    appraised by PFC

    S. No. Name of town Appraised Cost (In Rs. Crores)

    1Srinagar

    669.3

    62 Anantnag 31.54

    3 Bandipore 8.40

    4 Baramulla 32.80

    5 Bijbehara 8.62

    6 Budgam 10.15

    7 Dooru-Verinag

    4.548 Ganderbal 15.96

    9 Handwara 7.39

    10 Kargil 7.90

    11 Kulgam 6.16

    12 Kupwara 7.39

    13 Leh 9.30

    14 Pattan 4.5715 Pulwama 11.79

    16 Shopian 6.65

    17 Sopore 36.38

    18 Sumbal 4.70

    19 Tral 5.96

    Total Kashmir

    889.56

    Part B Project DPRs

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    46/80

    Part B Project DPRsCost Abstract of Part-B Schemes of R-APDRP in respect of Jammu Region

    appraised by PFC

    S. No. Name of town Appraised Cost (In Rs. Crores)

    1 Jammu 610.482 Aknoor 13.64

    3 Badherwah 6.75

    4 Doda 7.28

    5 Kathua 62.41

    6 Kishtwar 7.427 Poonch 7.74

    8 Rajouri 11.72

    9 Ranbir Singh Pora 12.36

    10 Samba 10.08

    11 Udhampur 25.83 Total Jammu 775.71

    Total J&K PDD 1665.27

    SCADA DPRs

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    47/80

    SCADA DPRsCost Abstract of SCADA DPRs of R-APDRP in respect of Jammu and

    Kashmir Region appraised by PFC

    S. No. Name of town Appraised Cost (In Rs. Crores)

    1 Jammu 27.69

    2 Srinagar 25.20

    Total 52.89

    PART B: DISTRIBUTION SCHEME OF JK PDD FORSRINAGARTOWNA f S i

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    48/80

    A. Parameters of Town - Srinagar

    1 Total project cost proposed for sanction 669.36 Crs.2 Project cost proposed by Utility 675.35 Crs.3 Total Population (as per 2001 census) 988210 No.4 Total Number of Consumers 168586 No.5 Geographical Area 192 Sq. Km.6 Energy Input 1938.85 MUs

    7 Avg Load growth 15 %8 AT&C Loss 65.93 %9 Proposed AT&C loss after 3 Years 15 %10 IRR 36.91 %11 Cost per unit of Input energy 3.45 Rs.

    B. Summary of work proposed

    S. No. Major Works Quantity/DescriptionProposed Cost

    (in Lakhs)

    1 33/11 KV or 66/11 KV SS: New creation6 No./ (4No 2x6.3 MVA ,1No. 1x10 MVA & 1No.2x10 MVA 33/11

    KV) 1848.06

    233/11 KV or 66/11 KV SS: Transformer cap.enhancement 27 No. /(6.3 MVA to 10 MVA) 651.78

    2a 33/11 KV or 66/11 KV SS : Addl. X-MER 13 No. / (10x6.3 MVA & 3x10 MVA) 16943 33 KV Feeders: New/Bifurcation 17 Km 167.054 33 KV Feeders: Conversion/Underground 158 Km 1168.195 11 KV Feeders: New Feeder/Interconnection Bare Conductor 233 Km. 1309.216 11 KV Feeders: New lines for DTs ABC 670 Km 6713.44

    7 DTs & HVDS: New Installation 399 No. Conventional (100kVA-96/250kVA-297,400kVA-6) 12288No. HVDS (16kVA-427,25kVA-9547,63kVA-1024,100kVA-1290) 23353.95

    8 DTs Capacity Augmentation198 No.

    (2 No. 63 to 250, 80 No. 100 to 25091 No. 250 to 400, 25 No. 400 to 630) 558.79

    9 LT Line Augmentation/New Feeder/AB Cable 2824 Km 15042.07

    10 Metering 1 Ph Electronic HT/LT 74707 1419.4310a Metering 3 Ph Electronic HT/LT Nil Nil

    11 Others 9428.2

    Total B in Lacs 63354.17

    PART B: DISTRIBUTION SCHEME OF JK PDD FOR SRINAGAR TOWN (Contd.)

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    49/80

    ( )

    A. Parameters of Town - Srinagar

    1 Total project cost proposed for sanction 669.36 Crs.

    2 Project cost proposed by Utility 675.35 Crs.

    3 Total Population (as per 2001 census) 988210 No.

    4 Total Number of Consumers 168586 No.

    5 Geographical Area 192 Sq. Km.

    6 Energy Input 1938.85 MUs

    7 Avg Load growth 15 %

    Total Part-B (in Lacs) 63354.17

    C. SCADA compatible items (RMUs FPIs etc.)

    S. No. Major Works Quantity/DescriptionProposed

    Cost(in Lakhs)

    1 Installation of automated RMUsalongwith Aux. power supply

    16 No. 11 KV 3 Way,1 No.11 KV 4 Way,5 No. 33 KV 3 Way 252.11

    2 Installation of Remote Comm. FPIs 335 1313.2

    3 Others 2016.52

    Total C(in Lacs) 3581.83

    Total B + C (in Lacs) 66936

    Total B + C 669.36 Crores

    PART B: DISTRIBUTION SCHEME OF JK PDD FOR ANANTNAG TOWNA. Parameters of Town - Anantnag

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    50/80

    A. Parameters of Town Anantnag

    1 Total project cost proposed for sanction 31.54 Crs.

    2 Project cost proposed by Utility 38.95 Crs.

    3 Total Population (as per 2001 census) 97896 No.

    4 Total Number of Consumers 15297 No.

    5 Geographical Area 25 Sq. Km.

    6 Energy Input 65 MUs

    7 Avg Load growth 7 %8 AT&C Loss 76.12 %

    9 Proposed AT&C loss after 3 Years 15 %

    10 IRR 19.41 %

    11 Cost per unit of Input energy 4.85 Rs.

    B. Summary of work proposed

    S. No. Major Works Quantity/DescriptionProposed Cost

    (in Lakhs)

    1 33/11 KV or 66/11 KV SS: New creation Nil Nil

    2 33/11 KV or 66/11 KV SS: Transformer cap.enhancement

    Nil Nil

    2a 33/11 KV or 66/11 KV SS : Addl. X-MER Nil Nil

    3 33 KV Feeders: New/Bifurcation Nil Nil

    4 33 KV Feeders: Conversion/Underground 21 Km 67.83

    5 11 KV Feeders: New Feeder/Interconnection Bare Conductor 8Km. 50.46

    6 11 KV Feeders: New lines for DTs ABC 50 Km 564.45

    7 DTs & HVDS: New Installation 170 No. HVDS(,25kVA-129,63kVA-29,100kVA-12) 309.94

    8 DTs Capacity Augmentation Nil Nil

    9 LT Line Augmentation/New Feeder/AB Cable 330 Km 1488.43

    10 Metering 1 Ph Electronic HT/LT 2000 38

    10a Metering 3 Ph Electronic HT/LT Nil Nil

    11 Others 634.89

    Total Part-B 31.54 Crores

    PART B: DISTRIBUTION SCHEME OF JK PDD FOR BANDIPORA TOWNA. Parameters of Town - Bandipora

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    51/80

    A. Parameters of Town Bandipora

    1 Total project cost proposed for sanction 8.4 Crs.

    2 Project cost proposed by Utility 8.97 Crs.

    3 Total Population (as per 2001 census) 25795 No.

    4 Total Number of Consumers 5091 No.

    5 Geographical Area 3 Sq. Km.

    6 Energy Input 16.9 MUs

    7 Avg Load growth 20 %8 AT&C Loss 82 %

    9 Proposed AT&C loss after 3 Years 15 %

    10 IRR 33.79 %

    11 Cost per unit of Input energy 4.97 Rs.

    B. Summary of work proposed

    S. No. Major Works Quantity/DescriptionProposed Cost

    (in Lakhs)

    1 33/11 KV or 66/11 KV SS: New creation Nil Nil

    2 33/11 KV or 66/11 KV SS: Transformer cap.enhancement

    Nil Nil

    2a 33/11 KV or 66/11 KV SS : Addl. X-MER Nil Nil

    3 33 KV Feeders: New/Bifurcation Nil Nil

    4 33 KV Feeders: Conversion/Underground Nil Nil

    5 11 KV Feeders: New Feeder/Interconnection Bare Conductor 18 Km. 98.1

    6 11 KV Feeders: New lines for DTs ABC 3 Km 27.03

    7 DTs & HVDS: New Installation 228 No. HVDS(25kVA-70,63kVA-158)

    462.92

    8 DTs Capacity Augmentation Nil Nil

    9 LT Line Augmentation/New Feeder/AB Cable 20Km 86.2

    10Metering 1 Ph Electronic HT/LT

    300 5.7

    10a Metering 3 Ph Electronic HT/LT Nil

    11 Others 160.27

    Total B (in Lacs) 840.22 Total Part B 8.40 Crores

    PART B: DISTRIBUTION SCHEME OF JK PDD FOR BARAMULLA TOWN

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    52/80

    A. Parameters of Town - Baramulla

    1 Total project cost proposed for sanction 32.8 Crs.

    2 Project cost proposed by Utility 43.88 Crs.

    3 Total Population (as per 2001 census) 67915 No.

    4 Total Number of Consumers 11228 No.

    5 Geographical Area 15.6 Sq. Km.

    6 Energy Input 74 MUs7 Avg Load growth 9 %

    8 AT&C Loss 71.96 %

    9 Proposed AT&C loss after 3 Years 15 %

    10 IRR 40.09 %

    11 Cost per unit of Input energy 4.43 Rs.

    B. Summary of work proposed

    S. No. Major Works Quantity/DescriptionProposed Cost

    (in Lakhs)

    1 33/11 KV or 66/11 KV SS: New creation 1No./ (1No 1x 6.3 MVA 33/11 KV) 210.86

    233/11 KV or 66/11 KV SS: Transformer cap.enhancement

    Nil Nil

    2a 33/11 KV or 66/11 KV SS : Addl. X-MER Nil Nil

    3 33 KV Feeders: New/Bifurcation 4 Km 32.24

    4 33 KV Feeders: Conversion/Underground Nil Nil

    5 11 KV Feeders: New Feeder/Interconnection Bare Conductor 126.15 Km. 647.29

    6 11 KV Feeders: New lines for DTs ABC 40 Km 360.77

    7 DTs & HVDS: New Installation 1574 No. HVDS(25kVA-800,63kVA-87,100kVA-43)

    1632.74

    8 DTs Capacity Augmentation Nil Nil

    9 LT Line Augmentation/New Feeder/AB Cable 15 Km 78.75

    10Metering 1 Ph Electronic HT/LT

    2400 45.6

    10a Metering 3 Ph Electronic HT/LT Nil Nil

    11 Others 271.75

    Total Part-B 32.80 Crores

    PART B: DISTRIBUTION SCHEME OF JK PDD FOR BIJBEHARA TOWN

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    53/80

    PART B: DISTRIBUTION SCHEME OF JK PDD FOR BIJBEHARA TOWNA. Parameters of Town - Bijbehara

    1 Total project cost proposed for sanction 8.62 Crs.

    2 Project cost proposed by Utility 11.09 Crs.3 Total Population (as per 2001 census) 19794 No.4 Total Number of Consumers 3491 No.

    5 Geographical Area 3 Sq. Km.

    6 Energy Input 18.5 MUs7 Avg Load growth 25 %

    8 AT&C Loss 80.97 %9 Proposed AT&C loss after 3 Years 15 %

    10 IRR 30.89 %11 Cost per unit of Input energy 4.43 Rs.

    B. Summary of work proposed

    S. No. Major Works Quantity/DescriptionProposed Cost

    (in Lakhs)

    1 33/11 KV or 66/11 KV SS: New creation Nil Nil

    233/11 KV or 66/11 KV SS: Transformer cap.enhancement Nil Nil

    2a 33/11 KV or 66/11 KV SS : Addl. X-MER Nil Nil

    3 33 KV Feeders: New/Bifurcation Nil Nil

    4 33 KV Feeders: Conversion/Underground Nil Nil

    5 11 KV Feeders: New Feeder/Interconnection Bare Conductor 5Km 27.25

    6 11 KV Feeders: New lines for DTs Nil Nil

    7 DTs & HVDS: New Installation 50 No. Conventional (100kVA-50)108 No. HVDS (25kVA-108) 303.86

    8 DTs Capacity Augmentation Nil Nil

    9 LT Line Augmentation/New Feeder/AB Cable 80 Km 385.3

    10 Metering 1 Ph Electronic HT/LT183 3.48

    10a Metering 3 Ph Electronic HT/LT Nil Nil

    11 Others Nil 142.11

    Total Part-B 8.62 Crores

    PART B: DISTRIBUTION SCHEME OF JK PDD FOR BUDGAM TOWNA. Parameters of Town - Budgam

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    54/80

    g

    1 Total project cost proposed for sanction 10.15 Crs.

    2 Project cost proposed by Utility 10.18 Crs.

    3 Total Population (as per 2001 census) 11767 No.

    4 Total Number of Consumers 3250 No.

    5 Geographical Area 12.4 Sq. Km.

    6 Energy Input 26.5 MUs

    7 Avg Load growth 26 %8 AT&C Loss 75.7 %

    9 Proposed AT&C loss after 3 Years 15 %

    10 IRR 15.51 %

    11 Cost per unit of Input energy 3.83 Rs.

    B. Summary of work proposed

    S.No.

    Major Works Quantity/DescriptionProposed Cost

    (in Lakhs)

    1 33/11 KV or 66/11 KV SS: New creation Nil Nil

    233/11 KV or 66/11 KV SS: Transformer cap.enhancement

    1 No. /(24 MVA to 26.3 MVA) 17.13

    2a 33/11 KV or 66/11 KV SS : Addl. X-MER Nil Nil

    3 33 KV Feeders: New/Bifurcation Nil Nil

    4 33 KV Feeders: Conversion/Underground 11 Km 32.45

    5 11 KV Feeders: New Feeder/Interconnection Bare Conductor 9.5 Km. 51.78

    6 11 KV Feeders: New lines for DTs ABC 29.1 Km 343.79

    7 DTs & HVDS: New Installation 10 No. Conventional (100kVA-10)149 No. HVDS (25kVA-69,63kVA-40,100kVA-40)

    326.33

    8 DTs Capacity Augmentation 9 No. (7 No. 63 to 100, 2 No. 400 to 630) 16.01

    9 LT Line Augmentation/New Feeder/AB Cable 25 Km 116.44

    10 Metering 1 Ph Electronic HT/LT 380 7.22

    10a Metering 3 Ph Electronic HT/LT Nil

    11 Others 103.85 Total Part B 10.15 Crores

    PART B: DISTRIBUTION SCHEME OF JK PDD FOR DOORU VERINAG TOWN

    A P t f T D V i

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    55/80

    A. Parameters of Town - Dooru Verinag

    1 Total project cost proposed for sanction 4.54 Crs.

    2 Project cost proposed by Utility 6.12 Crs.

    3 Total Population (as per 2001 census) 17237 No.

    4 Total Number of Consumers 2811 No.

    5 Geographical Area 4.5 Sq. Km.

    6 Energy Input 7.36 MUs

    7 Avg Load growth 5 %

    8 AT&C Loss 78.5 %

    9 Proposed AT&C loss after 3 Years 15 %

    10 IRR 19.7 %

    11 Cost per unit of Input energy 6.17 Rs.

    B. Summary of work proposed

    S. No. Major Works Quantity/DescriptionProposed Cost

    (in Lakhs)

    1 33/11 KV or 66/11 KV SS: New creation Nil Nil

    233/11 KV or 66/11 KV SS: Transformer cap.enhancement

    Nil Nil

    2a 33/11 KV or 66/11 KV SS : Addl. X-MER Nil Nil

    3 33 KV Feeders: New/Bifurcation Nil Nil

    4 33 KV Feeders: Conversion/Underground Nil Nil

    5 11 KV Feeders: New Feeder/Interconnection Nil Nil

    6 11 KV Feeders: New lines for DTs ABC 9 Km 81.17

    7 DTs & HVDS: New Installation 77 No. HVDS (25kVA-40,63kVA-32,100kVA-5) 149.76

    8 DTs Capacity Augmentation Nil Nil

    9 LT Line Augmentation/New Feeder/AB Cable 45 Km 179.88

    10 Metering 1 Ph Electronic HT/LT 450 8.55

    10a Metering 3 Ph Electronic HT/LT 65 2.08

    11 Others 32.56

    Total Part B 4.54 Crores

    PART B: DISTRIBUTION SCHEME OF JK PDD FOR GANDERBAL TOWNA Parameters of Town - Ganderbal

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    56/80

    A. Parameters of Town Ganderbal

    1 Total project cost proposed for sanction 15.96 Crs.

    2 Project cost proposed by Utility 16.55 Crs.

    3 Total Population (as per 2001 census) 13944 No.

    4 Total Number of Consumers 2834 No.

    5 Geographical Area 10 Sq. Km.

    6 Energy Input 35 MUs

    7 Avg Load growth 7 %8 AT&C Loss 82.1 %

    9 Proposed AT&C loss after 3 Years 15 %

    10 IRR 28.22 %

    11 Cost per unit of Input energy 4.56 Rs.

    B. Summary of work proposed

    S. No. Major Works Quantity/DescriptionProposed Cost

    (in Lakhs)

    1 33/11 KV or 66/11 KV SS: New creation Nil Nil2

    33/11 KV or 66/11 KV SS: Transformer cap.enhancement

    2 No. ( 2.5MVA to 6.3mVA & 6.3 MVA to 10 MVA) 48.27

    2a 33/11 KV or 66/11 KV SS : Addl. X-MER Nil Nil

    3 33 KV Feeders: New/Bifurcation Nil Nil

    4 33 KV Feeders: Conversion/Underground 26 Km 75.19

    5 11 KV Feeders: New Feeder/Interconnection Bare Conductor 38 Km. 208.61

    6 11 KV Feeders: New lines for DTs ABC 1 Km 8.4

    7 DTs & HVDS: New Installation 11 No. Conventional (100kVA-8,250kVA-8)414No. HVDS(25kVA-414) 721.76

    8 DTs Capacity Augmentation5 No.

    (2 No. 63 to 250, 3 No. 100 to 250)7.6

    9 LT Line Augmentation/New Feeder/AB Cable 19 Km 73.57

    10 Metering 1 Ph Electronic HT/LT 500 13.5

    10a Metering 3 Ph Electronic HT/LT Nil Nil

    11 Others 439.1

    Total Part B 15.96 Crores

    PART B: DISTRIBUTION SCHEME OF JK PDD FOR HANDWARA TOWNA. Parameters of Town - Handwara

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    57/80

    1 Total project cost proposed for sanction 7.39 Crs.

    2 Project cost proposed by Utility 7.96 Crs.

    3 Total Population (as per 2001 census) 10638 No.

    4 Total Number of Consumers 1867 No.

    5 Geographical Area 12 Sq. Km.

    6 Energy Input 9.61 MUs

    7 Avg Load growth 12 %8 AT&C Loss 81.3 %

    9 Proposed AT&C loss after 3 Years 15 %

    10 IRR 16.78 %

    11 Cost per unit of Input energy 7.69 Rs.

    B. Summary of work proposed

    S. No. Major Works Quantity/DescriptionProposed Cost

    (in Lakhs)

    1 33/11 KV or 66/11 KV SS: New creation Nil Nil2

    33/11 KV or 66/11 KV SS: Transformer cap.enhancement

    1 No. /(11.3 MVA to 16.3 MVA) 24.14

    2a 33/11 KV or 66/11 KV SS : Addl. X-MER Nil Nil

    3 33 KV Feeders: New/Bifurcation 0.2 Km 1.61

    4 33 KV Feeders: Conversion/Underground Nil Nil

    5 11 KV Feeders: New Feeder/Interconnection Bare Conductor 7 Km. 38.15

    6 11 KV Feeders: New lines for DTs ABC 10 Km 90.1

    7 DTs & HVDS: New Installation304No. HVDS (16kVA-45,25kVA-259)

    501.83

    8 DTs Capacity Augmentation Nil Nil

    9 LT Line Augmentation/New Feeder/AB Cable 4.38 Km 23

    10 Metering 1 Ph Electronic HT/LT 350 6.65

    10a Metering 3 Ph Electronic HT/LT Nil Nil

    11 Others 53.24

    Total Part B 7.39 Crores

    PART B: DISTRIBUTION SCHEME OF JK PDD FOR KARGIL TOWNA. Parameters of Town - Kargil

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    58/80

    g

    1 Total project cost proposed for sanction 7.9 Crs.

    2 Project cost proposed by Utility 7.9 Crs.

    3 Total Population (as per 2001 census) 10657 No.

    4 Total Number of Consumers 2817 No.

    5 Geographical Area 22 Sq. Km.

    6 Energy Input 10.8 MUs

    7 Avg Load growth 17 %8 AT&C Loss 64.6 %

    9 Proposed AT&C loss after 3 Years 15 %

    10 IRR 18.4 %

    11 Cost per unit of Input energy 7.31 Rs.

    B. Summary of work proposed

    S. No. Major Works Quantity/DescriptionProposed Cost

    (in Lakhs)

    1 33/11 KV or 66/11 KV SS: New creation Nil Nil2

    33/11 KV or 66/11 KV SS: Transformer cap.enhancement

    Nil Nil

    2a 33/11 KV or 66/11 KV SS : Addl. X-MER Nil Nil

    3 33 KV Feeders: New/Bifurcation Nil Nil

    4 33 KV Feeders: Conversion/Underground Nil Nil

    5 11 KV Feeders: New Feeder/Interconnection Nil Nil

    6 11 KV Feeders: New lines for DTs ABC 30.5 Km 168.36

    7 DTs & HVDS: New Installation 153 No. HVDS(25kVA-98,63kVA-55) 284.11

    8 DTs Capacity Augmentation Nil Nil

    9 LT Line Augmentation/New Feeder/AB Cable 40 Km 210

    10 Metering 1 Ph Electronic HT/LT Nil Nil

    10a Metering 3 Ph Electronic HT/LT Nil Nil

    11 Others 127.53 Total Part B 7.90 Crores

    PART B: DISTRIBUTION SCHEME OF JK PDD FOR KULGAM TOWNA. Parameters of Town - Kulgam

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    59/80

    A. Parameters of Town Kulgam

    1 Total project cost proposed for sanction 6.16 Crs.

    2 Project cost proposed by Utility 8.86 Crs.

    3 Total Population (as per 2001 census) 13136 No.

    4 Total Number of Consumers 2973 No.

    5 Geographical Area 6 Sq. Km.

    6 Energy Input 12.4 MUs

    7 Avg Load growth 10 %

    8 AT&C Loss 76.6 %

    9 Proposed AT&C loss after 3 Years 15 %

    10 IRR 31.9 %

    11 Cost per unit of Input energy 4.97 Rs.

    B. Summary of work proposed

    S.

    No.

    Major Works Quantity/DescriptionProposed Cost

    (in Lakhs)1 33/11 KV or 66/11 KV SS: New creation Nil Nil

    2 33/11 KV or 66/11 KV SS: Transformer cap. enhancement Nil Nil

    2a 33/11 KV or 66/11 KV SS : Addl. X-MER Nil Nil

    3 33 KV Feeders: New/Bifurcation Nil Nil

    4 33 KV Feeders: Conversion/Underground Nil Nil

    5 11 KV Feeders: New Feeder/Interconnection Nil Nil

    6 11 KV Feeders: New lines for DTs ABC 12 Km 135.4

    7 DTs & HVDS: New Installation13 No. Conventional (100kVA-13)

    54 No. HVDS (25kVA-10,100kVA-44)157.49

    8 DTs Capacity Augmentation Nil Nil

    9 LT Line Augmentation/New Feeder/AB Cable 35.5 Km 175.64

    10 Metering 1 Ph Electronic HT/LT 200 3.8

    10a Metering 3 Ph Electronic HT/LT Nil Nil

    11 Others 143.69

    Total Part B 6.16 Crores

    PART B: DISTRIBUTION SCHEME OF JK PDD FOR KUPWARA TOWNA. Parameters of Town - Kupwara

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    60/80

    p

    1 Total project cost proposed for sanction 7.39 Crs.

    2 Project cost proposed by Utility 7.44 Crs.

    3 Total Population (as per 2001 census) 14857 No.

    4 Total Number of Consumers 1925 No.

    5 Geographical Area 7.5 Sq. Km.

    6 Energy Input 14.75 MUs

    7 Avg Load growth 25 %8 AT&C Loss 70.87 %

    9 Proposed AT&C loss after 3 Years 15 %

    10 IRR 49.28 %

    11 Cost per unit of Input energy 5.01 Rs.

    B. Summary of work proposed

    S. No. Major Works Quantity/DescriptionProposed Cost

    (in Lakhs)

    1 33/11 KV or 66/11 KV SS: New creation Nil Nil

    233/11 KV or 66/11 KV SS: Transformer cap.enhancement

    Nil Nil

    2a 33/11 KV or 66/11 KV SS : Addl. X-MER Nil Nil

    3 33 KV Feeders: New/Bifurcation Nil Nil

    4 33 KV Feeders: Conversion/Underground Nil Nil

    5 11 KV Feeders: New Feeder/Interconnection Bare Conductor 9.21 Km. 48.62

    6 11 KV Feeders: New lines for DTs ABC 19 Km 171.37

    7 DTs & HVDS: New Installation 176No. HVDS (25kVA-156,63kVA-9,100kVA-11) 307.4

    8 DTs Capacity Augmentation Nil Nil

    9 LT Line Augmentation/New Feeder/AB Cable 10.32 Km 41.62

    10Metering 1 Ph Electronic HT/LT

    455 8.65

    10a Metering 3 Ph Electronic HT/LT Nil Nil

    11 Others 161.27

    Total Part B 7.39 Crores

    PART B: DISTRIBUTION SCHEME OF JK PDD FOR LEH TOWNA Parameters of Town - Leh

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    61/80

    A. Parameters of Town - Leh

    1 Total project cost proposed for sanction 9.3 Crs.

    2 Project cost proposed by Utility 9.36 Crs.

    3 Total Population (as per 2001 census) 28639 No.

    4 Total Number of Consumers 9453 No.

    5 Geographical Area 32 Sq. Km.

    6 Energy Input 28.88 MUs

    7 Avg Load growth 9 %

    8 AT&C Loss 42.95 %

    9 Proposed AT&C loss after 3 Years 15 %

    10 IRR 13.98 %

    11 Cost per unit of Input energy 3.22 Rs.

    B. Summary of work proposed

    S. No. Major Works Quantity/DescriptionProposed Cost

    (in Lakhs)

    1 33/11 KV or 66/11 KV SS: New creation Nil Nil

    2 33/11 KV or 66/11 KV SS: Transformer cap. enhancement Nil Nil

    2a 33/11 KV or 66/11 KV SS : Addl. X-MER Nil Nil

    3 33 KV Feeders: New/Bifurcation Nil Nil

    4 33 KV Feeders: Conversion/Underground Nil Nil

    5 11 KV Feeders: New Feeder/Interconnection Bare Conductor 51 Km. 262.14

    6 11 KV Feeders: New lines for DTs ABC 4 Km 36.047 DTs & HVDS: New Installation 247 No. HVDS (25kVA-247) 412.49

    8 DTs Capacity Augmentation Nil Nil

    9 LT Line Augmentation/New Feeder/AB Cable 18 Km 94.5

    10 Metering 1 Ph Electronic HT/LT Nil Nil

    10a Metering 3 Ph Electronic HT/LT Nil Nil

    11 Others 124.83

    Total Part B 9.30 Crores

    PART B: DISTRIBUTION SCHEME OF JK PDD FOR PATTAN TOWNA. Parameters of Town - Pattan

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    62/80

    1 Total project cost proposed for sanction 4.57 Crs.

    2 Project cost proposed by Utility 7.12 Crs.

    3 Total Population (as per 2001 census) 11355 No.

    4 Total Number of Consumers 1529 No.

    5 Geographical Area 6 Sq. Km.

    6 Energy Input 7.68 MUs

    7 Avg Load growth 20 %8 AT&C Loss 87.2 %

    9 Proposed AT&C loss after 3 Years 15 %

    10 IRR 39.17 %

    11 Cost per unit of Input energy 5.95 Rs.

    B. Summary of work proposed

    S. No. Major Works Quantity/DescriptionProposed Cost

    (in Lakhs)

    1 33/11 KV or 66/11 KV SS: New creation Nil Nil

    233/11 KV or 66/11 KV SS: Transformer cap.enhancement

    1 No. /(6.3 MVA to 10 MVA) 24.14

    2a 33/11 KV or 66/11 KV SS : Addl. X-MER Nil Nil

    3 33 KV Feeders: New/Bifurcation 0.2 Km 1.61

    4 33 KV Feeders: Conversion/Underground Nil Nil

    5 11 KV Feeders: New Feeder/Interconnection Nil Nil

    6 11 KV Feeders: New lines for DTs ABC 7.1 Km 66.367 DTs & HVDS: New Installation 64 No. HVDS (16kVA-1,25kVA-12,163kVA-41,100kVA-10) 136.07

    8 DTs Capacity Augmentation Nil Nil

    9 LT Line Augmentation/New Feeder/AB Cable 19.10 Km 150.92

    10 Metering 1 Ph Electronic HT/LT 350 6.65

    10a Metering 3 Ph Electronic HT/LT Nil

    11 Others 71.61

    Total Part B 4.57 Crores

    PART B: DISTRIBUTION SCHEME OF JK PDD FOR PULWAMA TOWNA. Parameters of Town - Pulwama

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    63/80

    1 Total project cost proposed for sanction 11.79 Crs.

    2 Project cost proposed by Utility 19.61 Crs.

    3 Total Population (as per 2001 census) 14229 No.

    4 Total Number of Consumers 5182 No.

    5 Geographical Area 36 Sq. Km.

    6 Energy Input 19.5 MUs

    7 Avg Load growth 14 %8 AT&C Loss 77.8 %

    9 Proposed AT&C loss after 3 Years 15 %

    10 IRR 39.67 %

    11 Cost per unit of Input energy 6.05 Rs.

    B. Summary of work proposed

    S. No. Major Works Quantity/DescriptionProposed Cost

    (in Lakhs)

    1 33/11 KV or 66/11 KV SS: New creation Nil Nil2 33/11 KV or 66/11 KV SS: Transformer cap. enhancement Nil Nil

    2a 33/11 KV or 66/11 KV SS : Addl. X-MER Nil Nil

    3 33 KV Feeders: New/Bifurcation Nil Nil

    4 33 KV Feeders: Conversion/Underground Nil Nil

    5 11 KV Feeders: New Feeder/Interconnection Nil Nil

    6 11 KV Feeders: New lines for DTs ABC 6.7 Km 92.52

    7 DTs & HVDS: New Installation 26 No. HVDS (100kVA-26) 64.23

    8 DTs Capacity Augmentation Nil Nil

    9 LT Line Augmentation/New Feeder/AB Cable 95 Km 508.63

    10Metering 1 Ph Electronic HT/LT

    3000 57

    10a Metering 3 Ph Electronic HT/LT Nil

    11 Others 456.62

    Total Part B 11.79 Crores

    PART B: DISTRIBUTION SCHEME OF JK PDD FOR SOPORE TOWNA. Parameters of Town - Sopore

    1 T t l j t t d f ti 36 38 C

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    64/80

    1 Total project cost proposed for sanction 36.38 Crs.

    2 Project cost proposed by Utility 40.58 Crs.

    3 Total Population (as per 2001 census) 59624 No.

    4 Total Number of Consumers 11392 No.

    5 Geographical Area 15.6 Sq. Km.

    6 Energy Input 69.17 MUs

    7 Avg Load growth 23 %8 AT&C Loss 75.11 %

    9 Proposed AT&C loss after 3 Years 15 %

    10 IRR 25.32 %

    11 Cost per unit of Input energy 5.26 Rs.

    B. Summary of work proposed

    S. No. Major Works Quantity/DescriptionProposed Cost

    (in Lakhs)

    1 33/11 KV or 66/11 KV SS: New creation 2 No./ (1No 6.3 MVA ,1No. 10 MVA 33/11 KV) 421.72

    233/11 KV or 66/11 KV SS: Transformer cap.enhancement

    Nil Nil

    2a 33/11 KV or 66/11 KV SS : Addl. X-MER Nil Nil

    3 33 KV Feeders: New/Bifurcation 11 Km 113.94

    4 33 KV Feeders: Conversion/Underground 11 Km 36.74

    5 11 KV Feeders: New Feeder/Interconnection Bare Conductor 14.65 Km. 81.78

    6 11 KV Feeders: New lines for DTs ABC 55Km 496.06

    7 DTs & HVDS: New Installation 984 No. HVDS(16kVA-8,25kVA-493,63kVA-429,100kVA-54) 1908.52

    8 DTs Capacity Augmentation Nil Nil

    9 LT Line Augmentation/New Feeder/AB Cable 75 Km 262.5

    10 Metering 1 Ph Electronic HT/LT 2000 38

    10a Metering 3 Ph Electronic HT/LT Nil Nil

    11 Others 278.74

    Total Part B 36.38 Crores

    PART B: DISTRIBUTION SCHEME OF JK PDD FOR SUMBAL TOWNA. Parameters of Town - Sumbal

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    65/80

    1 Total project cost proposed for sanction 4.7 Crs.

    2 Project cost proposed by Utility 4.76 Crs.

    3 Total Population (as per 2001 census) 10655 No.

    4 Total Number of Consumers 1402 No.

    5 Geographical Area 6 Sq. Km.

    6 Energy Input 10.5 MUs

    7 Avg Load growth 8 %

    8 AT&C Loss 82.5 %

    9 Proposed AT&C loss after 3 Years 15 %

    10 IRR 21.72 %

    11 Cost per unit of Input energy 4.48 Rs.

    B. Summary of work proposed

    S. No. Major Works Quantity/DescriptionProposed Cost

    (in Lakhs)

    1 33/11 KV or 66/11 KV SS: New creation Nil Nil

    233/11 KV or 66/11 KV SS: Transformer cap.enhancement Nil Nil

    2a 33/11 KV or 66/11 KV SS : Addl. X-MER Nil Nil

    3 33 KV Feeders: New/Bifurcation 9Km 89.55

    4 33 KV Feeders: Conversion/Underground Nil Nil

    5 11 KV Feeders: New Feeder/Interconnection Bare Conductor 10Km. 54.5

    6 11 KV Feeders: New lines for DTs ABC 3 Km 27.03

    7 DTs & HVDS: New Installation1 No. Conventional (250kVA-1)

    99 No. HVDS (25kVA-68,63kVA-22,100kVA-9) 187.51

    8 DTs Capacity Augmentation Nil Nil

    9 LT Line Augmentation/New Feeder/AB Cable 11 Km 57.75

    10 Metering 1 Ph Electronic HT/LT Nil Nil

    10a Metering 3 Ph Electronic HT/LT Nil Nil

    11 Others 53.66

    Total Part B 4.70 Crores

    PART B: DISTRIBUTION SCHEME OF JK PDD FOR SHOPIAN TOWNA. Parameters of Town - Shopian

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    66/80

    p

    1 Total project cost proposed for sanction 6.65 Crs.

    2 Project cost proposed by Utility 7.07 Crs.

    3 Total Population (as per 2001 census) 12246 No.

    4 Total Number of Consumers 3315 No.

    5 Geographical Area 18 Sq. Km.

    6 Energy Input 14 MUs

    7 Avg Load growth 14 %

    8 AT&C Loss 83 %

    9 Proposed AT&C loss after 3 Years 15 %

    10 IRR 38.51 %

    11 Cost per unit of Input energy 4.75 Rs.

    B. Summary of work proposed

    S. No. Major Works Quantity/DescriptionProposed Cost

    (in Lakhs)

    1 33/11 KV or 66/11 KV SS: New creation Nil Nil

    2 33/11 KV or 66/11 KV SS: Transformer cap. enhancement Nil Nil

    2a 33/11 KV or 66/11 KV SS : Addl. X-MER Nil Nil

    3 33 KV Feeders: New/Bifurcation Nil Nil

    4 33 KV Feeders: Conversion/Underground Nil Nil

    5 11 KV Feeders: New Feeder/Interconnection Bare Conductor 5.6Km. 31.59

    6 11 KV Feeders: New lines for DTs ABC 8Km 72.08

    7 DTs & HVDS: New Installation 42 No. HVDS (63kVA-30,100kVA-12) 95.34

    8 DTs Capacity Augmentation Nil Nil

    9 LT Line Augmentation/New Feeder/AB Cable 40 Km 203.6

    10 Metering 1 Ph Electronic HT/LT 1200 22.8

    10a Metering 3 Ph Electronic HT/LT Nil Nil

    11 Others 239.39

    Total Part B 6.65 Crores

    PART B: DISTRIBUTION SCHEME OF JK PDD FOR TRAL TOWNA. Parameters of Town - Tral

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    67/80

    1 Total project cost proposed for sanction 5.96 Crs.

    2 Project cost proposed by Utility 6.87 Crs.

    3 Total Population (as per 2001 census) 11651 No.

    4 Total Number of Consumers 2236 No.

    5 Geographical Area 6 Sq. Km.

    6 Energy Input 11.95 MUs

    7 Avg Load growth 6 %8 AT&C Loss 74.7 %

    9 Proposed AT&C loss after 3 Years 15 %

    10 IRR 21.73 %

    11 Cost per unit of Input energy 4.99 Rs.

    B. Summary of work proposed

    S. No. Major Works Quantity/DescriptionProposed Cost

    (in Lakhs)

    1 33/11 KV or 66/11 KV SS: New creation Nil Nil

    233/11 KV or 66/11 KV SS: Transformer cap.enhancement

    Nil Nil

    2a 33/11 KV or 66/11 KV SS : Addl. X-MER Nil Nil

    3 33 KV Feeders: New/Bifurcation Nil Nil

    4 33 KV Feeders: Conversion/Underground Nil Nil

    5 11 KV Feeders: New Feeder/Interconnection Bare Conductor 2.5Km. 13.63

    6 11 KV Feeders: New lines for DTs ABC 1.5 Km 13.52

    7 DTs & HVDS: New Installation 7No. Conventional (100kVA-4,63kVA-3)148 No. HVDS (100kVA-148)

    263.61

    8 DTs Capacity Augmentation Nil Nil

    9 LT Line Augmentation/New Feeder/AB Cable 52 Km 239.74

    10Metering 1 Ph Electronic HT/LT

    600 11.4

    10a Metering 3 Ph Electronic HT/LT Nil Nil

    11 Others

    54.1 Total Part B 5.96 Crores

    progress

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    68/80

    2009 Wi ro Ltd - Confidential

    progressPart- A:1) Selection of IT Consultant (CMC)

    3) Preparation of base DPRs for Part-A works.

    4) Sanction of DPRs for all 30 project areas.

    5) ITIA award (Wipro)

    6) Ring Fencing (Boundary metering) and feeder meteringaward (Prominent)

    7) Appointment of SCADA Consultant (NDPL)

    8) Sanction of SCADA DPRs for 2 project areas

    Part- B:1) Preparation of DPRs for Part-B works.

    9) Sanction of DPRs for all 30 project areas

    Non-RAPDRP Areas: The Road Ahead

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    69/80

    2009 Wi ro Ltd - Confidential

    Non RAPDRP Areas: The Road Ahead 288 areas including NACs and towns with population greater

    than 4000 (as per 2001 census) identified for integration with

    R-APDRP. Inclusion of these areas agreed to in principle by MoP GoI/CEA.

    Part-A and Part-B DPRs under preparation for the identified

    areas on R-APDRP format template/pattern.

    Areas where prime town (project area) is already included inR-APDRP to be parented to upgraded SDO and shall not

    require new IT hardware.

    All 288 identified areas to be scaled to Data Center being

    constructed under R-APDRP. SDOs and other offices not covered under R-APDRP to be

    upgraded to meet IT and automation requirement.

    Ultimate aim is to bring all consumer base under e-care, energy

    accounting and auditing to improve the power scenario of J&K.

    Non R-APDRP; NACs and towns of Kashmir region(With Population > 4000 as per Census 2001)

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    70/80

    2009 Wi ro Ltd - Confidential

    ( p p )

    S # TownParented to

    SDO

    TOTALPOPULATION(as per Census

    2001)

    ExpectedPopulation

    as on 31-3-2011( 50 % increase)

    ExpectedConnections

    as on31-3-2011

    1 Achabbal (NAC) Acchabal 5834 8751 1750

    2 Kokernag (NAC) Acchabal 4863 7295 1459

    3 Chhatar Gul Acchabal 4693 7040 1408

    4 Uttarsoo Acchabal 6636 9954 1991

    5 Shangas Acchabal 6354 9531 1906

    6 Nowgam Kothar Acchabal 4432 6648 1330

    7 Sagam Acchabal 4834 7251 1450

    8 Soaf Shalli Acchabal 4016 6024 12059 Deval Gam Acchabal 9325 13988 2798

    10 Gadool Ahlan Acchabal 9476 14214 2843

    11 Pahalgam (NAC) Aishmuqam 6066 9099 1820

    12 Salar Aishmuqam 6553 9830 1966

    13 Grand Aish Aishmuqam 5480 8220 1644

    14 Salia Ponchal Pora Aishmuqam 4140 6210 1242

    15 Seer Kanli Gund (SeerHamdan) Aishmuqam 5463 8195 1639

    16 Mattan (NAC) Anantnag 6537 9806 1961

    17 Ranbir Pora Anantnag 4615 6923 1385

    18 Awantipora (NAC) Awantipora 6252 9378 1876

    19 Giru (Nor Pora) Awantipora 5141 7712 1542

    20 Pari Gam Jagir Awantipora 4023 6035 1207

    Note: SDOs' of areas marked in redare already included in Part-A of R-APDRP and will notrequire computer and networking hardware.

    Non R-APDRP; NACs and towns of Kashmir region(With Population > 4000 as per Census 2001)

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    71/80

    2009 Wi ro Ltd - Confidential

    Note: SDOs' of areas marked in redare already included in Part-A of R-APDRP

    and will not require computer and networking hardware.

    (With Population 4000 as per Census 2001)

    S # TownParented to

    SDO

    TOTALPOPULATION(as per Census

    2001)

    ExpectedPopulation

    as on 31-3-2011( 50 % increase)

    ExpectedConnections

    as on31-3-2011

    21 Toknu Awantipora 5670 8505 170122 Arin Dard Pora Bandipora 4780 7170 1434

    23 Sumblar Shok Baba Bandipora 4982 7473 1495

    24 Chithi Bandi Bandipora 6351 9527 1905

    25 Shah Gund Bandipora 5537 8306 1661

    26 Dilna Baramulla-I 6847 10271 2054

    27 Beerwah (NAC) Beerwah 6295 9443 1889

    28 Magam (NAC) Beerwah 4312 6468 1294

    29 Rathsun Beerwah 4636 6954 1391

    30 Khag Beerwah 4664 6996 1399

    31 Marhama Bijbehara 12133 18200 3640

    32 Sir Hama Bijbehara 4718 7077 1415

    33 Khiram Bijbehara 7809 11714 2343

    34 Waghama Bijbehara 4097 6146 1229

    35 Nanilang Bijbehara 5606 8409 1682

    36 Jabli Pora Bijbehara 6407 9611 192237 Arwani Bijbehara 4875 7313 1463

    38 Khan Sahib (NAC) Budgam 2038 3057 611

    39 Ichgam Budgam 6074 9111 1822

    40 Kachwari Budgam 6720 10080 2016

    Non R-APDRP; NACs and towns of Kashmir region(With Population > 4000 as per Census 2001)

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    72/80

    2009 Wi ro Ltd - Confidential

    Note: SDOs' of areas marked in redare already included in Part-A of R-APDRP

    and will not require computer and networking hardware.

    (With Population > 4000 as per Census 2001)

    S # TownParented to

    SDO

    TOTALPOPULATION(as per Census

    2001)

    ExpectedPopulation

    as on 31-3-2011( 50 % increase)

    ExpectedConnectionsas on

    31-3-2011

    41 Now Gam Chadura 4123 6185 123742 Chatar Gam Chadura 4726 7089 1418

    43 Chinar Bagh (Puhroo) Chadura 4595 6893 1379

    44 Nagam Chadura 5770 8655 1731

    45 Sursyar Chadura 4019 6029 1206

    46 Brenwar Chadura 4500 6750 1350

    47 Chari-Sharief (NAC) Chararishareef 7374 11061 2212

    48 Chelen Chunt Nar Chararishareef 4013 6020 120449 Darwan Nowgam Chararishareef 4914 7371 1474

    50 Damhal Hanji Pora D H Pora 4005 6008 1202

    51 Manzgam D H Pora 5629 8444 1689

    52 Ahmad Abad D H Pora 4210 6315 1263

    53 Qasba Khul D H Pora 4211 6317 1263

    54 Nandimarg D H Pora 4925 7388 1478

    55 Dano Kandi Marag D H Pora 7123 10685 2137

    56 Fateh Pora Dooru 4702 7053 1411

    57 Hillar Arhama Dooru 4482 6723 1345

    58 Lok Bawan Larki Pora Dooru 4032 6048 1210

    59 Hakura Badas Gam Dooru 6307 9461 1892

    60 Bata Gund Dooru 6283 9425 1885

    Non R-APDRP; NACs and towns of Kashmir region(With Population > 4000 as per Census 2001)

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    73/80

    2009 Wi ro Ltd - Confidential

    Note: SDOs' of areas marked in redare already included in Part-A of R-APDRP

    and will not require computer and networking hardware.

    (With Population > 4000 as per Census 2001)

    S # TownParented to

    SDO

    TOTALPOPULATION(as per Census

    2001)

    ExpectedPopulation

    as on 31-3-2011( 50 % increase)

    ExpectedConnections

    as on31-3-2011

    61 Now Gam Shah Abad Dooru 4481 6722 134462 Hajin (NAC) Hajin 9972 14958 2992

    63 Sadhunara Hasti Khan Hajin 7390 11085 2217

    64 Ajas Hajin 9870 14805 2961

    65 Gund Sadra Kote Hajin 5722 8583 1717

    66 Bahar Abad (Amcha Kundal) Hajin 4352 6528 1306

    67 Sultan Pora Khai Hajin 6720 10080 2016

    68 Magam Handwara 6526 9789 195869 Kandi Khas Handwara 4556 6834 1367

    70 Bana Koot Kaloosa 7011 10517 2103

    71 Mantrigam Kaloosa 5353 8030 1606

    72 Koyal Mukam Kaloosa 5437 8156 1631

    73 Malan Gam Kaloosa 6703 10055 2011

    74 Aloosa Kaloosa 7925 11888 2378

    75 Ashtongu Kaloosa 4275 6413 1283

    76 Qazipora Patushi Kaloosa 5241 7862 1572

    77 Chater Gul Kangan 5919 8879 1776

    78 Wangat Kangan 4910 7365 1473

    79 Kangan Kangan 4027 6041 1208

    80 Hari Ganiwan Kangan 5000 7500 1500

    Non R-APDRP; NACs and towns of Kashmir region(With Population > 4000 as per Census 2001)

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    74/80

    2009 Wi ro Ltd - Confidential

    Note: SDOs' of areas marked in redare already included in Part-A of R-APDRP

    and will not require computer and networking hardware.

    (With Population > 4000 as per Census 2001)

    S # TownParented to

    SDO

    TOTALPOPULATION(as per Census

    2001)

    ExpectedPopulation

    as on 31-3-2011( 50 % increase)

    ExpectedConnections

    as on31-3-2011

    81 Red Wana Kulgam 5821 8732 174682 Kaimoh Kulgam 7454 11181 2236

    83 Ashmji Khalsa Kulgam 4097 6146 1229

    84 Khurhama Kupwara 4582 6873 1375

    85 Sever Thendi Pora Kupwara 4711 7067 1413

    86 Warnow Kupwara 6213 9320 1864

    87 Kuhigam Kupwara 4403 6605 1321

    88 Maidan Pora Kupwara 5272 7908 158289 Dara Pora Kupwara 4466 6699 1340

    90 Lal Pora Kupwara 11894 17841 3568

    91 Dever Inder Bug Kupwara 7442 11163 2233

    92 Teki Pora Kupwara 5472 8208 1642

    93 Sogam Kupwara 6890 10335 2067

    94 Gagal Kupwara 4599 6899 1380

    95 Sorigam Kupwara 4342 6513 1303

    96 Khumriyal Kupwara 4874 7311 1462

    97 Kalarooch Kupwara 25970 38955 7791

    98 Manigah Kupwara 6245 9368 1874

    99 Hayihama Kupwara 18446 27669 5534

    100 Halmat Pora Kupwara 5226 7839 1568

    Non R-APDRP; NACs and towns of Kashmir region

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    75/80

    2009 Wi ro Ltd - ConfidentialNote: SDOs' of areas marked in redare already included in Part-A of R-APDRPand will not re uire com uter and networkin hardware.

    (With Population > 4000 as per Census 2001)

    S # TownParented to

    SDO

    TOTALPOPULATION(as per Census

    2001)

    ExpectedPopulation

    as on 31-3-2011

    ( 50 % increase)

    ExpectedConnections

    as on

    31-3-2011101 Sool Koot Kupwara 4600 6900 1380

    102 Ander Hama Kupwara 4960 7440 1488

    103 Drug Mulla Kupwara 9062 13593 2719

    104 Chunt Valiwar Manigam 4523 6785 1357

    105 Mani Gam Manigam 5354 8031 1606

    106 Wail Manigam 7069 10604 2121

    107 Uri (NAC) Mohra 4246 6369 1274108 Nambla Mohra 6042 9063 1813

    109 Ghar Kote Mohra 4285 6428 1286

    110 Lal Pora Mohra 6142 9213 1843

    111 Feroz Pora Mohra 5039 7559 1512

    112 Sozeth Gori Pora Narbal 5992 8988 1798

    113 Kawsa Khalisa Narbal 4763 7145 1429

    114 Soya Bug Narbal 8178 12267 2453

    115 Kaka Pora Newa 4563 6845 1369116 Romu Newa 4060 6090 1218

    117 Pampore (NAC) Pampore 16963 25445 5089

    118 Khrew (NAC) Pampore 7166 10749 2150

    119 Owan Pampore 5247 7871 1574

    120 Shar-I- Shali Pampore 4292 6438 1288

    Non R-APDRP; NACs and towns of Kashmir region(With Population > 4000 as per Census 2001)

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    76/80

    2009 Wi ro Ltd - Confidential

    Note: SDOs' of areas marked in redare already included in Part-A of R-APDRP

    and will not require computer and networking hardware.

    (With Population > 4000 as per Census 2001)

    S # TownParented to

    SDO

    TOTALPOPULATION(as per Census

    2001)

    ExpectedPopulation

    as on 31-3-2011( 50 % increase)

    ExpectedConnections

    as on31-3-2011

    121 Ledhu Pampore 4437 6656 1331122 Let Pora Pampore 4819 7229 1446

    123 Taper Wari Pora Pattan 4339 6509 1302

    124 Palhallan Pattan 11773 17660 3532

    125 Nihal Pora Pattan 5549 8324 1665

    126 Mati Pora Pattan 7717 11576 2315

    127 Hanji Wera Pattan 7978 11967 2393

    128 Ratni Pora Pulwama 4711 7067 1413129 Qazigund (NAC) Qazigund 3537 5306 1061

    130 Kelam Bozgam Qazigund 4858 7287 1457

    131 Chowgam Qazigund 4020 6030 1206

    132 Brinial Lamar Qazigund 6745 10118 2024

    133 Khuri Bata Pora Khalsa Qazigund 7073 10610 2122

    134 Panzat Wan Pora Qazigund 4274 6411 1282

    135 Drabh Gam Rajpora 4062 6093 1219

    136 Frisal Reshipora 4863 7295 1459

    137 Hir Pora Shopian 6579 9869 1974

    138 Achha Bal Sopore-I 5858 8787 1757

    139 Seer Jagir Sopore-II 8849 13274 2655

    140 Tarazuea Sopore-II 6530 9795 1959

    Non R-APDRP; NACs and towns of Kashmir region(With Population > 4000 as per Census 2001)

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    77/80

    2009 Wi ro Ltd - Confidential

    Note: SDOs' of areas marked in redare already included in Part-A of R-APDRP

    and will not require computer and networking hardware.

    (With Population > 4000 as per Census 2001)

    S # TownParented to

    SDO

    TOTALPOPULATION(as per Census

    2001)

    ExpectedPopulation

    as on 31-3-2011( 50 % increase)

    ExpectedConnectionsas on

    31-3-2011

    141 Haigam Sopore-II 5297 7946 1589142 Tujar Pahle Har Sopore-III * 5714 8571 1714

    143 Hardushuo Sopore-III * 5180 7770 1554

    144 Danger Pora Sopore-III * 7280 10920 2184

    145 Wara Pora Sopore-III * 5046 7569 1514

    146 Khonmoh Srinagar 8307 12461 2492

    147 Bimna Srinagar 7179 10769 2154

    148 Lasjan Srinagar 4644 6966 1393149 Sadat Pora (Naid Khi) Sumbal 7278 10917 2183

    150 Safa Pora Sumbal 7792 11688 2338

    151 Nowgam Sumbal 4729 7094 1419

    152 Tangdhar Tangdhar 6064 9096 1819

    153 Nowangabra Tangdhar 4801 7202 1440

    154 Kunzer (NAC) Tangmarg 1901 2852 570

    155 Gulmarg (NAC) Tangmarg 878 1317 263

    156 Dadh Sara Tral 4529 6794 1359

    157 Gulgam Trehgam 8755 13133 2627

    158 Auwoora Trehgam 9705 14558 2912

    159 Heri Trehgam 4864 7296 1459

    160 Trehgam Trehgam 9054 13581 2716

    Non R APDRP; NACs and towns of Kashmir region

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    78/80

    2009 Wi ro Ltd - Confidential

    Note: SDOs' of areas marked in redare already included in Part-A of R-APDRP

    and will not require computer and networking hardware.

    Non R-APDRP; NAC s and towns of Kashmir region(With Population > 4000 as per Census 2001)

    S # Town Parented toSDO

    TOTAL

    POPULATION(as per Census

    2001)

    Expected

    Populationas on 31-3-2011( 50 % increase)

    Expected

    Connectionsas on

    31-3-2011

    161 Kral Pora Trehgam 5286 7929 1586

    162 Dard Sun Resh Gund Trehgam 5260 7890 1578

    163 Warsun Trehgam 4694 7041 1408164 Dard Pora Trehgam 10651 15977 3195

    165 Panzgam Trehgam 9198 13797 2759

    166 Yan Goora Tulmulla 4110 6165 1233

    167 Tulmulla Tulmulla 5410 8115 1623

    168 Ruhama Watergam 4954 7431 1486

    169 Naid Hal Watergam 5962 8943 1789

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    79/80

    2009 Wi ro Ltd - Confidential

    Non R-APDRP towns of Ladakh(With Population > 4000 as per Census 2001)

    S # TownParented to

    SDO

    TOTALPOPULATION(as per Census

    2001)

    ExpectedPopulation

    as on 31-3-2011(50 % increase)

    ExpectedConnectionsas on

    31-3-2011

    1 Baroo Kargil-I 4769 7154 1431

    2 Spituk Leh-I 4339 6509 1302

    3 Chuglamsar Leh-I 4897 7346 1469

    Note:

    SDOs' of areas marked in redare already included in Part-A of R-APDRP andwill not require computer and networking hardware.

  • 7/28/2019 Presentation R-APDRP Extension Lecture 12th July 2012 Bemina

    80/80

    THANK YOU