A CASE STUDY PRESENTATION PRESENTED BY :SUPER GROUP, UWA TUTORIAL : FRIDAY, 1 PM UNIT: PROJECT MANAGEMENT FRANCE, MILLAU VIADUCT ECT MANAGER: CHRISTIAN LEYRITT F ARCHITECT: NORMAN FOSTER & MICHEL VIRLOGEUX PROJECT DURATION : 17 YEARS (1987-2004) THE TALLEST BRIDGE IN THE WORLD PROJECT MEMBERS: SHOBHIT SHEKHAR 21777517 HARSH PATEL 21804443 DEVYN JACKAMARRA 20761794 KHADIJA BEGUM 21822517 XIOFAN WU 21795582 ERIC TANG
Transcript

PowerPoint Presentation

A CASE STUDY PRESENTATIONPRESENTED BY :SUPER GROUP, UWATUTORIAL : FRIDAY, 1 PMUNIT: PROJECT MANAGEMENTFRANCE,MILLAU VIADUCTPROJECT MANAGER: CHRISTIAN LEYRITTCHIEF ARCHITECT: NORMAN FOSTER & MICHEL VIRLOGEUXPROJECT DURATION : 17 YEARS (1987-2004)THE TALLEST BRIDGE IN THE WORLDPROJECT MEMBERS:SHOBHIT SHEKHAR 21777517HARSH PATEL 21804443DEVYN JACKAMARRA 20761794KHADIJA BEGUM 21822517XIOFAN WU 21795582ERIC TANG 21929169ZIYING ZHANG 20933753

AN OVERVIEW!why DO WE NEED the MILLAU VIADUCT ?INTRODUCTION TO FRANCE, MILLAU VIADUCT

PRESENTER: SHOBHIT SHEKHAR, GROUP COORDINATOR

DUE TO THE MISSING LINK IN BETWEEN PARIS & SPAIN

NEED TO CONSTRUCT THE TALLEST BRIDGE

Route Image by ArchitectsSatellite image of route before bridge construction

LETS SEE WHAT IT FEELS LIKE TO CONSTRUCT THE TALLEST BRIDGE IN THE WORLDSource: https://www.youtube.com/watch?v=a1ycF4uqXNs

Challenges & RecommendationConceptualizationFRANCE, MILLAU VIADUCT

PREPARED BY HARSH PATEL

CHOICE BETWEEN THE HIGH AND THE LOW SOLUTION

DIS-SUPPORTIVE NATURE OF THE STATE LEVEL AUTHORITY

LACK OF PUBLIC FUNDING

PROBLEMS FACED DURING CONCEPTUALIZATION

NEED TO COMMUNICATE WITH GEOLOGICAL ENGINEERS

CO-OPERATION OF STATE AUTHORITY WAS REQUIRED

COMPLETE ANALYSIS OF PROJECTIN TERMS OF FINANCIAL ASPECT.

recommendations to conceptualization

Challenges & RecommendationplanningFRANCE, MILLAU VIADUCT

PREPARED BY Devyn jackamarra

Processes to find the solution:Use focus groups

Risks involved in partnership:comprehensive risk identificationIdentification toolsassign accountability CHALLENGES & RECOMMENDATIONS

Challenges & RecommendationEXECUTIONFRANCE, MILLAU VIADUCT

Prepared by Khadija Begum

Was it a good idea to push the deck onto the pillars ?

What if the launching system failed ?

What could be the back-ups if anything beyond calculation happened ?THE GREATEST RISK FACTOR EVER

Risk management for prototype test

Local supplier over International one POSSIBLE ALTERNATIVES

(Source: Hartley 2008,2014)

TimeCostRisk

Challenges & Recommendation

FinalizationFrance, Millau Viaduct

Presenter: Xiaofan Wu

Landscape Restoration

Unexpectedly High Traffic Flows

Safety Issue

FINALISATIONChallenges and Recommendations

Reforestation

Extend Toll Barriers of Lanes, Update Maintenance Plan

Redisgn Siderail

Challenges & Recommendation

Gantt Chart & ScheduleFrance, Millau Viaduct

Presented by Eric Tang

What is a Gantt chart?Why is a Gantt chart used?Gantt chart

Four main parts:Feasibility studies and research

Project design and conception

Procurement

Project delivery and construction

Millau viaduct schedule

Millau viaduct schedule

The material the deck of the bridge was to made of was not specified (steel or concrete) and left to Eiffage to decide.

recommendations

Challenges & Recommendation

management strategy analysisFRANCE, MILLAU VIADUCT

presented by ziying zhang

Human Resource ManagementEngineers ArchitectsLawyers Local authoritiesGovernmentManagement Strategy Analysis

Risk Management

The financial riskSelf financing

The construction risksafetyeconomic

Management Strategy Analysis( cont. )

PercentGraph showing the risk factor in stages

Cost Management

completed within budget

BOT concessionaire procurement

Management Strategy Analysis (cont.)

A FINAL OVERVIEWCONCLUSION AND PROJECT LESSONSFrance, Millau Viaduct

Presented by Shobhit Shekhar

24

LESSONS LEARNTCONCEPT & PLANNING PHASEEXECUTION PHASEFINALIZATION PHASE

UWA

UNIT: PROJECT MANAGEMENT(GENG5505)

SUPER GROUP

UNIT COORDINATOR:DR. COSIMO FAIELLO

TUTOR:VERONICA BONNARTHANK YOU !QUESTIONS PLEASE ??A CASE STUDY PRESENTATION MADE BY:SUPER GROUP