Presentation - Shop Floor Control - The Road to Integrated Manufacturing

Date post: 01-Jun-2018
Category:
Upload: ajayvg
View: 224 times
Download: 0 times
Share this document with a friend

of 35

Transcript
  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    1/35

    MIT Solution Team Manager -

    September 2013 / SAP Manufacturing

    Shop FlooThe Road to Integrated Man

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    2/35

    Introducing ASMLA cornerstone of the chip industry

    Impact on OperationsA lean program to streamline production processes

    Program: Shop Floor Control

    The IT enabler for achieving business value

    Questions

    Agenda

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    3/35

    Introducing ASML

    A cornerstone of the chip industry

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    4/35

    ASML - A cornerstone of the chip industry

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    5/35

    ASML employees

    in US:1,617

    Source: VLSI Research/ASML Q4 2012

    Over 55 sales and service offices located worldwide

    ASML employees

    in Europe: 5,068

    ASML em

    in Asia:

    Salesto Europe

    27%

    sales

    to US

    69%

    sales

    to ASI

    4%

    ASML:

    Worlds largest semiconductor equipment vendor

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    6/35

    Moores Law holds steady for more than 40 years

    Double

    computpower p

    At equivpowerconsum

    For halfprice

    Every 12 years

    1970 1975 1980 1985 1990 1995 2000 2005 2010

    101

    102

    103

    104

    105

    106

    107

    108

    109

    1010

    100

    Tra

    nsistorsperDie

    Memory

    Microprocessor

    This graphic

    shows how h

    transistor sh

    realized over

    Source: Intel

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    7/35

    Overlay down to

    2 nanometers

    1 nm = 4 silicon atoms

    The technical challenges

    Stacking layers: what does that mean

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    8/35

    m/sec2

    0 10 20 40 7030 50 60 80 90 100 110 120 130

    The technical challenges

    Acceleration: a comparison...

    A stone drops at 9.8 m/sec2

    A dragster accelerates at 33 m/sec2

    A jet fighter in a catapult at 44 m/sec2

    An attack missile at 50 to 120 m/sec2

    A TWINSCAN NXT reticle stage at 150 m/sec2

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    9/35

    resulting in the systems that conquered the ma

    1984:

    PAS 2000Resolution:

    >1m

    Overlay: 250 nm

    1989:

    PAS 5000Resolution:

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    10/35

    Impact on Operations

    A lean program to streamlineproduction processes

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    11/35

    Or do you want to become the best factory?Does your factory look like this?

    What makes the differ

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    12/35

    ASML Manufacturing process

    WH

    SuppliersBuild OperationsDelivery Operations

    +/- 350 Suppliers

    Added Value >90%

    60 Partners (80%)

    +/- 10.000 People

    9 Modules /system

    18000 m2

    2000 Buy in Items /system

    +/- 300 goods receipts /day

    6-12 months Training / Engineer

    2 shifts per day /wk, 1 shift per d

    7x24 Test Area

    3-8 Systems / week

    Suppl iers Bui ld Operations Delivery Op

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    13/35

    ASML Manufacturing process

    WH

    What makes manufacturing @ ASML special?

    Suppl iers Bui ld Operations Delivery Op

    Dynamic Master Data - high number of Engineering Changes (100

    Rework, Recovery, Repair - continuously due to searching the limitMaster Production Sequences - contain all possible technical depe

    Operators - highly educated

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    14/35

    Flow: 8 key changes

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    15/35

    FLOW - High level impact

    The "blueprint" is introduced

    TaktsRegular rebalanced to improve

    cycletime and delivery

    Kits are adjusted onbasis of the Takts

    After approval:the changes are

    implemented

    Support andissue resolution

    are improved

    ImprovedTransparency

    Takted way ofworking isintroduced

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    16/35

    Program: Shop Floor Control

    The IT enabler for achieving business v

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    17/35

    Shop Floor Control program @ASML

    Work InstructionsDynamic customized per machine configuration

    Introducing SAP ME

    - Fair work packages per operator per shift- Blueprinting & Sequencing tooling

    - Real-time monitoring / progress tracking

    Production Orders- Customized per customers order

    Detailed integral planningof materials, skills, people, cabins, etc.

    Alert ManagementReal-time logging & progress trackingof disturbances in production

    Management ReportingBased on a single source of truth

    MES Machine InterfacingFully automated system qualification

    Increased dplanning re

    Reduced c

    Reduced s

    Improved p

    Transparen

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    18/35

    Shop Floor Control functions mapped on ISA95

    Machine - Level 1 & 2

    MES - Level 3

    ERP - Level 4

    Production

    OperatorDashboard(GU

    I)

    SAP

    Manufacturing

    Execution

    SAP ECC

    Graphical Routing

    Editor

    Quintiq

    Shift Planning

    QuintiqOperational

    Planning

    SiemensTCE

    RSuite / Coach

    Test Scripts

    SAP MII - Manufacturing

    Integration & Intelligence

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    19/35

    Machine - Level 1 & 2

    MES - Level 3

    ERP - Level 4

    SAP

    Manufacturing

    Execution

    SAP ECC

    Graphical Routing

    Editor

    Quintiq

    Shift Planning

    Production

    OperatorDashboard(GU

    I)

    SAP MII

    QuintiqOperational

    Planning

    SiemensTCE

    Indicenter /

    Coach

    Test Scripts

    SAP

    Manufacturing

    Execution

    SAP ECC

    Graphical Routing

    Editor

    Quintiq

    Shift Planning

    QuintiqOperational

    Planning

    SiemensTCE

    RSuite / Coach

    Test Scripts

    SAP MII - Manufacturing

    Integration & Intelligence

    Work PreparationCreate and Release Routing in E

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    20/35

    Work Preparation - Create sub-routings in GRE

    Machine - Level 1 & 2

    MES - Level 3

    ERP - Level 4

    SAP

    Manufacturing

    Execution

    SAP ECC

    Graphical Routing

    Editor

    Quintiq

    Shift Planning

    Production

    OperatorDashboard(GU

    I)

    SAP MII

    QuintiqOperational

    Planning

    SiemensTCE

    Indicenter /

    Coach

    Test Scripts

    SAP

    Manufacturing

    Execution

    SAP ECC

    Graphical Routing

    Editor

    Quintiq

    Shift Planning

    QuintiqOperational

    Planning

    SiemensTCE

    Indicenter /

    Coach

    Test Scripts

    SAP MII - Manufacturing

    Integration & Intelligence

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    21/35

    Work preparation:RoutingSub-routingWork package per operator

    1 2 3 8

    4 5

    6 7

    10 20Main routing in SAP-ECC

    Sub-routing in Graphical Routing Editor

    Optimized Work Package in SAP-ME1 4 5 8

    2 3 6

    Operator A

    Operator B

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    22/35

    Machine - Level 1 & 2

    MES - Level 3

    ERP - Level 4

    SAP

    Manufacturing

    Execution

    SAP ECC

    Graphical Routing

    Editor

    Quintiq

    Shift Planning

    Production

    OperatorDashboard(GU

    I)

    SAP MII

    QuintiqOperational

    Planning

    SiemensTCE

    Indicenter /

    Coach

    Test Scripts

    SAP

    Manufacturing

    Execution

    SAP ECC

    Graphical Routing

    Editor

    Quintiq

    Shift Planning

    QuintiqOperational

    Planning

    SiemensTCE

    RSuite / Coach

    Test Scripts

    SAP MII - Manufacturing

    Integration & Intelligence

    Work Preparation - Create optimal sequence per ope

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    23/35

    Machine - Level 1 & 2

    MES - Level 3

    ERP - Level 4

    SAP

    Manufacturing

    Execution

    SAP ECC

    Graphical Routing

    Editor

    Quintiq

    Shift Planning

    Production

    OperatorDashboard(GU

    I)

    SAP MII

    QuintiqOperational

    Planning

    SiemensTCE

    Indicenter /

    Coach

    Test Scripts

    SAP

    Manufacturing

    Execution

    SAP ECC

    Graphical Routing

    Editor

    Quintiq

    Shift Planning

    QuintiqOperational

    Planning

    SiemensTCE

    RSuite / Coach

    Test Scripts

    SAP MII - Manufacturing

    Integration & Intelligence

    Work PreparationRelease routing to SAP ME,report to SAP ECC

    M f i E i

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    24/35

    Machine - Level 1 & 2

    MES - Level 3

    ERP - Level 4

    SAP

    Manufacturing

    Execution

    SAP ECC

    Graphical Routing

    Editor

    Quintiq

    Shift Planning

    Production

    OperatorDashboard(GU

    I)

    SAP MII

    QuintiqOperational

    Planning

    SiemensTCE

    Indicenter /

    Coach

    Test Scripts

    SAP

    Manufacturing

    Execution

    SAP ECC

    Graphical Routing

    Editor

    Quintiq

    Shift Planning

    QuintiqOperational

    Planning

    SiemensTCE

    RSuite / Coach

    Test Scripts

    SAP MII - Manufacturing

    Integration & Intelligence

    Manufacturing Execution: Create Production Order in

    M f t i E ti R l O d t SAP

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    25/35

    Manufacturing Execution: Release Order to SAP

    Machine - Level 1 & 2

    MES - Level 3

    ERP - Level 4

    SAP

    Manufacturing

    Execution

    SAP ECC

    Graphical Routing

    Editor

    Quintiq

    Shift Planning

    Production

    OperatorDashboard(GU

    I)

    SAP MII

    Quintiq

    Operational

    Planning

    SiemensTCE

    Indicenter /

    Coach

    Test Scripts

    SAP

    Manufacturing

    Execution

    SAP ECC

    Graphical Routing

    Editor

    Quintiq

    Shift Planning

    QuintiqOperational

    Planning

    SiemensTCE

    RSuite / Coach

    Test Scripts

    SAP MII - Manufacturing

    Integration & Intelligence

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    26/35

    M f t i E ti St t 1st R ti St i t

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    27/35

    Machine - Level 1 & 2

    MES - Level 3

    ERP - Level 4

    SAP

    Manufacturing

    Execution

    SAP ECC

    Graphical Routing

    Editor

    Quintiq

    Shift Planning

    ProductionOperatorDashboard(GU

    I)

    SAP MII

    Quintiq

    Operational

    Planning

    SiemensTCE

    Indicenter /

    Coach

    Test Scripts

    SAP

    Manufacturing

    Execution

    SAP ECC

    Graphical Routing

    Editor

    Quintiq

    Shift Planning

    Quintiq

    Operational

    Planning

    SiemensTCE

    RSuite / Coach

    Test Scripts

    SAP MII - Manufacturing

    Integration & Intelligence

    Manufacturing Execution: Start 1stRouting Step in tProduction Operator Das

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    28/35

    Manufacturing Execution: POD d hb

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    29/35

    Machine - Level 1 & 2

    MES - Level 3

    ERP - Level 4

    SAP

    Manufacturing

    Execution

    SAP ECC

    Graphical Routing

    Editor

    Quintiq

    Shift Planning

    ProductionOperatorDashboard(GU

    I)

    SAP MII

    Quintiq

    Operational

    Planning

    SiemensTCE

    Indicenter /

    Coach

    Test Scripts

    SAP

    Manufacturing

    Execution

    SAP ECC

    Graphical Routing

    Editor

    Quintiq

    Shift Planning

    Quintiq

    Operational

    Planning

    SiemensTCE

    RSuite / Coach

    Test Scripts

    SAP MII - Manufacturing

    Integration & Intelligence

    Manufacturing Execution: POD accesses dashboarreports, work instructions

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    30/35

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    31/35

    Shop Floor Control impact on FLOW improvemen

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    32/35

    Shop Floor Control impact on FLOW improvemen

    Graphical Rodefine bluep

    Calculate opt

    (in 2 min. ins

    Fair Work Packages

    per operator, per shift

    Dynamic sequencing

    Real-time progress tracking

    (even available for operator during shift)

    Monitoring and reporting

    Escalate disturbance

    notifications

    Assure production

    progress

    Trigger the just-in-time

    delivery of kit carts

    Dynamic Work inst

    Operator assignme

    Execute Work Packages in takt

    Disturbance

    resolution process

    Whats next ?

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    33/35

    What s next ?

    This week : Start of Work preparation in PRD

    Next week : Final UAT

    Sept. 30 : Start Roll-out to 1st

    workcentersTill end Q1 : Roll-out in ASML Netherlands

    To be planned / follow-up projects:

    - Potential enhancements after pilot in EUV factory;

    - MESMachine interfacing;

    - World-Wide roll-out:USA - Wilton

    USA - San Diego

    Taiwan - Linkou

    - Next step for disturbance resolution (QIM ??)

    - Workplace efficiencyUse of Mobile / iPad

  • 8/9/2019 Presentation - Shop Floor Control - The Road to Integrated Manufacturing

    34/35

    Questions