1. Jodhpur Discom. PRESENTATION Sr. OFFICERS MEETIN DATED 08.07.2011. 1. AG,DL & BPL CONNECTIONS. Status of AG. DN deposited & connections Released (2011-12). Gen.AG connections 1 st Phase DN. Issue Status FY 2011-12. Status of release of DL connections during FY 2011-12. - PowerPoint PPT Presentation
Popular Tags:

of 38

Click here to load reader

Transcript
  • *** Jodhpur Discom

  • *AG,DL & BPL CONNECTIONS

  • Status of AG. DN deposited & connections Released (2011-12)*

    Name GOR-D

    GOR-D

    1 TO 11 For The Month of June, 2011

    Jodhpur Discom

    GOR-D-01

    Progress of Distribution Companies ( JODHPUR DISCOM) REVISED

    Status of AG. DN deposited & connections Released

    Upto the Month:-June,11GOR-D-01

    Sr. No.Name of DistrictNo of DN issued During 2011-12DN depositedAg. Connections released During 2011-12 out of Colmn. 8% Connection Released of Col.8Cancelled after D.N. Deposited During 2011-12Balance Pending for connection

    As on 31.03.11During 2011-12Total DN Deposited

    GENERAL CATEGORYOTHERSDuring the monthUpto the monthDuring the monthUpto the month

    12345678910111213

    1Jodhpur448948449736493781174182322731717.39161490796

    2Pali582366186317341447713367.555436241

    3Sirohi44319563825427044770111415.853657177

    4Jalore17571111868229718987121643826.74121122269

    5Barmer10924781570227368618845159911.723743250

    6Jaisalmer3944343715511214530022227.33027833

    Jodhpur Zone8757134710104157720193785536233159711.133947261766

    7Bikaner16451064270929280714100618737537.280631634

    8HMH9968310792052024036084814123.190467201

    9SGNR524238762117253653715397.260498364

    10Churu126178320446626780487016718821.610682537

    1115116111314000.0001412

    Total Churu Cir.127678420606726881788416718821.610696549

    Bikaner Zone4441216966105657222470303541774324.48022921748

    Total Discom131983516167142142274162558397748134015.963970183514

    DN ISSUEDDN DEPOSITEDCANCELLEDPENDING

    JLRBMRJSMRJLRBMRJSMRJLRBMRJSMRJLRBMRJSMR

    86RE-7 SC18532261133325473006719734

    1393RE-9 GEN0548576711485218010701295819

    RE-10 SPL00025

    RE-11 FH000000000000

    RE-11A DRIP8118532671473300027525

    RE-11B DIGGI000

    TOTAL2665121417761183565248011891544858

    CONNECTION

    JLRBMRJSMR

    RE-7 SC14923573

    RE-9 GEN880807344

    RE-10 SPL1700

    RE-11 FH000

    RE-11A DRIP4010330

    RE-11B DIGGI00

    TOTAL10861145447

    DN ISSUEDDN DEPOSITEDCANCELLEDPENDING

    DCPALISIROHIDCPALISIROHIDCPALISIROHIDCPALISIROHI

    RE-7 SC426751594707216900010349179

    RE-8 TSP11645073

    RE-9 GEN80615144213116031421252402696

    RE-10 SPL10

    RE-11 FH212611180120114

    RE-11A DRIP323367030035380002474

    RE-11B DIGGI

    TOTAL831129366221324942031541379469966

    CONNECTION

    DCPALISIROHI

    RE-7 SC50760144

    RE-8 TSP536405

    RE-9 GEN22703442906476

    RE-10 SPL171

    RE-11 FH1108

    RE-11A DRIP2763334

    RE-11B DIGGI

    TOTAL3054447530

    GOR-D-2

    JODHPUR DISCOM

    Status of release of DL connections during FY 2011-12

    Upto the Month :-June,11GOR-D-02

    S.NoName of Distt./CircleApplication for DL connections pendingApplication for DL connections pendingconnections released During 2011-12Cancelled up the month out of (3) & (4)Pending at the end of Reporting month

    As on 31.03.11Received during FY 2011-12RuralUrbanTotalRuralUrbanTotal released

    RuralUrbanRuralUrbanDuring the monthup to the monthDuring the monthup to the monthDuring the monthup to the monthRuralUrbanRuralUrbanBPL DURING monthAPL DURING monthBPL DURING 2011-12APL DURING 2011-12

    123456345678910111212131415

    1City Circle021101523017341734005091372509137279.120003620000

    2Distt. Circle176201243494126211142502136491721503891955224110.72457718507152318861951955

    Total JU Distt.176203353494164921114198423098917215054714631464361315.96457718507514318861951955

    3Pali Distt.3858510352179373791303868289827172367351134345243.10622504040518089802717

    4Sirohi Distt.653101736292138939317822145485522826977644.8646679515902140548

    5Jalore Circle625112620742508325376870116452658811771726283537.05102920463817912815172732385

    6Barmer Distt375392561352345388916013949259920798821068722895.84262103655038192507921987

    7Jsm. Distt.357615202863576438401473127801751533027.531534482580730127

    Jodhpur Zone6949714801117736158067450958576943461027910872988543313267154.3347077592241798679782009251409505609719

    8Bikaner73606499636518323130096235891268205786794205421.381267043508058901268

    9Hanumangarh222631325137834739109658356842359228623912298254.06284352096438068402359

    10Sriganganagar3371204225899956291203683288719192988671185278643.7842841328229522865771842

    11Churu3751815178410535535186874034931417282892775230933.173351063783870049301417

    12127221326141159816217602285163412026263637.4658410243802280516

    Total Churu Cir.502383621101194713320309163721193331610121037294534.013931104807908072101933

    Bikaner Zone17980200278443627258245629314532881747910473288392810767153.2369160211117192172282149222859777402

    Total Discom8747734821902172421064981072411722272271775821346276936124034307.57162378023534290852064158273695463717121

    GOR-D-03

    Progress of Distribution Companies ( JODHPUR DISCOM)

    Status of release of BPL connections FY 2011-12

    Upto the Month:-June,11GOR-D-03

    Sr. NoName of DistrictBPL families as per Notification of GoR 2002Total BPL/Kutir Jyoti connections released as on 31.03.11Progress of release of BPL Connections FY 2011-12BPL AS ONRURAL DURING MONTH

    TargetReleasedBalanceTOTAL GoR-D-2APLBPL

    During the monthUpto the monthMMSLVYOTHER

    12345678

    1Jodhpur3565827928031195-195281239179778931

    2Pali531404823300004823389808980

    3Sirohi297091355200001355221402140

    4Jalore58655429770128273-273432501645603914128

    5Barmer74843225285091592925082322620599552-4592

    6Jaisalmer1593110433000010433730730

    Jodhpur Zone2679361656515091525156050355166211434612522843251

    7Bikaner84842408410000408415893182710

    8Hanumangarh43386367611101900110193676168406840

    9SGNGR634564653092482277917146607887086522

    10Churu656505087200005087249304930

    11328833170000331722802280

    Total Churu Cir.689385418900005418972107210

    Bikaner Zone260622178321202672277201901783982881318254122

    Total Discom5285583439727118227363770545344609722715705384273

    * Recently sanctioned by REC

    ** Pending for sanction with REC183949

    APRIL,102023

    852

    GOR-D-04(a) Dist. Wise

    Progress of Distribution Companies ( JODHPUR DISCOM)

    RGGVY Financial Status

    Upto the Month:-June,11GOR-D-04 (a)

    S.No.Name of Distrcit/DiscomNo. of SchemesSanctioned Cost (Rs. Lacs)Amount Released (in Lacs Rs.)Utilisation (in Lacs Rs.) (Tentavive)% Utilised

    1234567

    A. Sanctioned Before to Feb-08

    1HN.Garh (AREP)1222.85133.72211.95158.50

    2SG.Nagar (AREP)1681.69409.01520.84127.34

    3Jaisalmer (AREP)1603.53181.06593.00327.52

    4Jaisalmer11338.781144.251377.01120.34

    5Bikaner12333.901851.602047.76110.59

    6Sirohi11236.92963.30998.34103.64

    7Jalore12367.411805.321856.00102.81

    8Jodhpur12853.852385.922454.84102.89

    9Churu11962.481457.311583.14108.63

    101116.0687.5780.0091.36

    Jodhpur Discom(A)1013717.4710419.0611722.88112.51

    B. Sanctioned After Feb-08

    1Hanumangarh13256.161634.391560.0095.45

    2Sriganganagar13498.462042.10913.3944.73

    3Pali (PGCIL)12981.292377.792787.00117.21

    4Barmer (PGCIL)120995.8611272.6612055.00106.94

    Jodhpur Discom(B)430731.7717326.9417315.3999.93

    G.Total (A+B)1444449.2427746.0029038.27104.66

    1Jodhpur12853.852385.922454.84102.89

    2Pali12981.292377.792787117.21

    3Sirohi11236.92963.3998.34103.64

    4Jalore12367.411805.321856102.81

    5Barmer120995.8611272.6612055106.94

    6Jaisalmer21942.311325.311970.01148.65

    Jodhpur Zone732377.6420130.322121.19109.89

    7Bikaner12333.91851.62047.76110.59

    8Hanumangarh23479.011768.111771.95100.22

    9SGNGR24180.152451.111434.2358.51

    10Churu11962.481457.311583.14108.63

    11Nagaur (Ps. Ladnu)1116.0687.578091.36

    Total Churu Cir.22078.541544.881663.14107.65

    Bikaner Zone712071.67615.76917.0890.83

    Total Discom1444449.242774629038.27104.66

    GOR-D-04(b) Dist. Wise

    Progress of Distribution Companies ( JODHPUR DISCOM)

    Coverage & Progress under AREP & RGGVY Progress

    Upto the Month:-June,11GOR-D-04 (b)

    S.No.Name of DiscomNo. of SchemesCoverage ( Nos)Progress As on Month (Nos)% Achievement

    Electrification of Villages (DE/UE)Intensive ElectrificationConn. To BPLGen.DhaniesElectrification of Villages (DE/UE)Intensive ElectrificationConn. To BPLGen.DhaniesElectrification of Villages (DE/UE)Intensive ElectrificationConn. To BPLGen.Dhanies

    123456789101112131415161718

    A. Sanctioned Before to Feb-08

    1HN.Garh (AREP)14605163760460313322730100.000.00607.17604.520.00

    2SG.Nagar (AREP)1111012964701110400031620100.000.003100.78488.720.00

    3Jaisalmer (AREP)16002561237055035326091.670.0013.6726.350.00

    4Jaisalmer19834810112839869983227094690662100.0092.5370.1582.2389.86

    5Bikaner120558741481109513718055830744155603787.8095.0674.12142.09100.00

    6Sirohi1844724666899151844782461122350100.00100.0033.43124.8298.04

    7Jalore13066754217195821630524365892794016100.0078.5667.49142.68100.00

    10Jodhpur117388530365396731251738702119856399125100.0098.3169.81142.16100.00

    9Churu11184351488244787683135298319538754.5598.5868.561305.80100.00

    81097281426090962638505390.0098.9793.751943.46100.00

    Jodhpur Discom(A)10742387421604492562394707364814897516079538695.2894.1768.96173.7297.97

    B. Sanctioned After Feb-08

    1Hanumangarh1132157639319317042132525283002341532100.0033.3171.98738.6476.19

    2Sriganganagar1179250544133217253715262034940170902684.9224.7579.1778.6770.27

    3Pali (PGCIL)12191529334805517315913366583134713071.4399.78124.97389.1675.14

    4Barmer (PGCIL)1668123060124587313782071679363160012230.9913.5815.57272.451.60

    Jodhpur Discom(B)41000622617291038823163050622251092618785321050.6035.7463.19226.2912.88

    G.Total (A+B)1417421010038895413138520241213587325823624864859669.6358.1566.39189.2529.45

    Note:-Figures shown in shaded of column No. 6 (Coverage of Conn. to BPL) have been changed due to actual survey.

    1Jodhpur117388530365396731251738702119856399125100.0098.3169.81142.16100.00

    2Pali12191529334805517315913366583134713071.4399.78124.97389.1675.14

    3Sirohi1844724666899151844782461122350100.00100.0033.43124.8298.04

    4Jalore13066754217195821630524365892794016100.0078.5667.49142.68100.00

    5Barmer1668123060124587313782071679363160012230.9913.5815.57272.451.60

    6Jaisalmer215834810368963569153322712972326296.8492.5368.7675.0689.86

    Jodhpur Zone710584492209074918091812586324311918315014240555.3972.2057.01163.5422.35

    7Bikaner120558741481109513718055830744155603787.8095.0674.12142.09100.00

    8Hanumangarh2178157639835354642178525314332568832100.0033.3178.91724.4276.19

    9SGNGR2290250544262223723726362038940202522690.6924.7587.9890.5270.27

    10Churu11184351488244787683135298319538754.5598.5868.561305.80100.00

    11Nagaur (Ps. Ladnu)1097281426090962638505390.0098.9793.751943.46100.00

    Total Churu Cir.21194054302270796692737936370069654.5598.6269.861367.05100.00

    Bikaner Zone768456081798803957621262726301390539850619191.6746.9077.30248.9090.09

    Total Discom1417421010038895413138520241213587325823624864859669.6358.1566.39189.2529.45

    GOR-D-05

    Progress of Distribution Companies (JODHPUR DISCOM)

    Electrification of Villages & Dhanies FY 2011-12

    Upto the Month:-June,11GOR-D-05

    S.No.District & CircleElectrification of Dhanies & House Hold under MMSLVY

    DhaniesHouseholds

    Expected Dhanies less than 100 populationApplicationsDhanies SanctionedConnections CoveredDhanies ElectrifiedConnections Released

    Upto 31.3.11FY 2011-12TOTAL% ElectrifiedUpto 31.3.11FY 2011-12TOTAL% OF CONN. ELECT.CANCELLEDBALANCE

    During the Monthup to the MonthDuring the Monthup to the MonthGROUPAPPL.GROUPAPPL.

    12344567896.16666666676.66666666677.166666666710111213

    1Jodhpur54243843939972544229821538302075.5620436972372067381.266835710253617853

    2Pali232254321725501630016375.12165500165564.9069888WORK COMPLETED

    3Sirohi384153122522002270.9724100241107.1116174WORK COMPLETED

    4Jalore1337136531186109305168012764354.224526603956548250.1652862443623338

    5Barmer54073558718391142214559191154684.079138552552969084.841931256438328883

    6Jaisalmer50245592144681450014567.761110001110237.18223953793526

    Jodhpur Zone12940951967484510375283186256553974.0100037106125217453885176.12151114667766053600

    7Bikaner276717128125954749095395100479.7557713185706341115.84950556010566764

    8Hanumangarh959129589483008387.377800078087.2512132WORK COMPLETED

    9SGNGR ***10592810576799009994.2986300863112.52665WORK COMPLETED

    10Churu427267630115302410024180.07142500142593.14185124430187

    111347066831559005986.7633100331105.0875375110

    Total Churu Cir.561338236918453000030081.301756001756198.2166199813260161931197

    Bikaner Zone3528223501828898013915395148681.2900091703185709740513.81974870781228737611187158

    Total Discom164681175469312600176674239351702575.4400046276157023154859180.96273922043877860758

    16468117546924160017667400667472.2216210367000462760046276

    BKNR34942

    13649

    GOR-D-06

    Progress of Distribution Companies (JODHPUR DISCOM)

    Status of Consumers Grievances Redressal in Chhaupals FY 2011-12

    Upto the Month:-June,11GOR-D-06

    S.No.Name of Discom/District33/11 KV S/SProgress of Chhaupals organised during the monthProgress of Chhaupals organised upto the month

    No of chhaupals heldGrievances receivedRedressalNo of chhaupals heldGrievances receivedRedressal

    Related to billsOthersRelated to billsOthers% redressed (7+8)/(5+6)Related to billsOthersRelated to billsOthers% redressed (13+14)/(11+12)

    123456789101112131415

    1Jodhpur336601117511175100.0015830121130121100000100.00

    2Pali1074090419041100.0011022512222512200000100.00

    3Sirohi502550135013100.0076137461374600000100.00

    4Jalore169581305713057100.0014929211929211900000100.00

    5Barmer1681112017512016094.92333774853774500000095.94

    6Jaisalmer5235510555110103.1391702951702850000097.85

    Jodhpur Zone88219755646655645699.0253515021278150212330000098.38

    7Bikaner19115361628971.1537973777250000076.12

    8Hanumangarh89219835953597.745824774227720000093.15

    9SGNGR1084464316431100.00122178771787700000100.00

    10Churu111343710237102100.00101892648926400000100.00

    111145959100.00121220122000000100.00

    Total Churu Cir.122384211142111100.00113101284101284100.00

    Bikaner Zone51011824019322918695.843306234725834580000095.07

    Total Discom139231579665978564298.0886521251750208516910000097.45

    00000000000000000

    16993667557736545428

    -1699-3667-5577-3654-542800000000

    JPR (During)

    GOR-D-07

    Progress of Distribution Companies (JODHPUR DISCOM)

    Progress of Vigilance Checking

    Upto the Month:-June,11GOR-D-07

    S. No.Name of DiscomTotal CheckingTheft DetectedRs. In lacs.No .of Complaint/FIRsNo .of Arrests

    AssessmentRealisation

    Last Year.This Year.% Incr.Last Year.This Year.% Incr.Last Year.This Year.% Incr.Last Year.This Year.% Incr.Last Year.This Year.% Incr.Last Year.This Year.% Incr.

    1234567891011121314151617181920

    1Jodhpur25932065-20.36713681-4.49118.39123.314.1659.7955.10-7.849518089.47121525.00

    2Pali127213324.72105219108.5745.5147.554.4817.2233.4093.96141828.5700

    3Sirohi566399-29.51304136.678.269.1310.532.193.5562.10524380.0001

    4JALORE664509-23.342825-10.7132.6545.1538.2810.2413.9436.1321224.7612100.00

    5Barmer1284212765.65162135-16.6767.59102.2351.2525.0717.46-30.36233343.48110.00

    6Jaisalmer141121-14.18375445.9513.7418.8837.417.318.4315.321024140.0000

    Jodhpur Zone652065530.51107511557.44286.14346.2521.01121.82131.888.2616830179.17141935.71

    7Bikaner76491219.374544815.9549.1363.2228.6822.4543.4993.7249122148.9849125.00

    8HMH103611097.05372256-31.1854.2037.78-30.3037.7529.33-22.30233030.43312300.00

    9SGNGR13691221-10.81909802-11.7778.1079.341.5935.0041.1617.60445320.45166-62.50

    10Churu1070124716.54729107247.0559.5753.65-9.9415.3516.356.5123472-69.2303

    11316-80.65252-92.001.400.04-97.140.120.04-66.670000

    Bikaner Zone427044955.27248926134.98242.4234.03-3.45110.67130.3717.80350277-20.86233030.43

    Other326101-69.0217057-66.4767.9110.12-85.1028.4011.55-59.33517-86.2700

    Total11116111490.30373438252.44596.45590.40-1.01260.89273.804.955695852.81374932.43

    GOR-D-08

    Progress of Distribution Companies (JODHPUR DISCOM)

    Progress of feeder Renovation Programme FY 2011-12

    Upto the Month:-June,11GOR-D-08

    S.No.Name of DiscomFeeders Renovated up to the monthExpected date of completion for feeders convert from B to APhysical ProgressExpenditure (Rs in Crs)% of UtilisationFeeders Renovated up 31.03.09Feeders Renovated during 2009-10Feeders Renovated up 31.03.10Feeders Renovated during 2010-11Feeders Renovated up 31.03.11Feeders Renovated during 2011-12

    TargetA- typeB typeTotal (A+B)% Completion

    FeedersVillagesFeeders (4+5)Villages getting supply at par with nearby urban TownFeeders (7/3)*100Villages (8/4)*100Installation of small new type 3-phase Xformers (with Mtrs. MCCB etc) in nosInstallation of small new type 1-phase Xformers in nosLaying of AB Cable in Kms.Installation of pushfit type mtrs. In no.SanctionedUtilised Up to the month

    123456789101112131415161718

    1Jodhpur7771058687907771058100.00100.00195415053458432970406824881966843

    2Pali3359153350335915100.00100.001169422019117954618414532963350

    3Sirohi1294551290129455100.00100.0055071352107513530345791381290

    4Jalore4806974800480697100.00100.001907833751580296911421583001804800

    5Barmer4781264417614781264100.00100.001400531863836195602145927311038334

    6Jaisalmer1275021270127502100.00100.00178540843732757038108191270

    JODHPUR ZONE23264891217515123264891100.00100.0061085175941342317857210505391589549213837

    7Bikaner3686623680368662100.00100.0060641112121051960130210340283680

    8Han.garh229162922902291629100.00100.0033974287245253402229022902290

    9SGNGR214262321402142623100.00100.0050053987404150943214021402140

    10Churu24094622713240946100.00100.008352281755897340882371199821710

    1130973003097100.00100.0094137958278011301317300

    BIKANER ZONE1081595710681310815957100.00100.00237591258213874237514668247915143105810

    Discom3407108483243164340710848100.00100.0084844301762729741608617187862504692319647

    A type :- Where 1 Phase & 3 Phase transformer work is completed.

    B type:- Where 1 Phase transformer work 100 % completed but 3 phase transformer work partially complete.

    GoR-D-08(b)

    Progress of Distribution Companies (JODHPUR DISCOM)

    Statement of Progress of 3 PhaseTransformers under FRP

    Upto the Month:-June,11GOR-D-08(b)

    S.NoName of Discom / DistrictTotal no of 3 phase transformers to be installed under FRPTotal no of 3 phase transformers installed up to last MonthTotal no of 3 phase transformers installed during the MonthTotal no of 3 phase transformers installed up to the MonthBalance transformers to be installedTotal no of 3 phase transformers installed up to 31.03.09Total no of 3 phase transformers installed during 2009-10Total no of 3 phase transformers installed up to 31.03.10Total no of 3 phase transformers installed during 2010-11Total no of 3 phase transformers installed up to 31.03.11Total no of 3 phase transformers installed during 2011-12

    1234567

    1Jodhpur204381941812319541897586338909753900118754787

    2Pali116911690116904027671169011690

    3Sirohi55075507055070144716813128237955070

    4JALORE1907819078019078083755312136875391190780

    5Barmer145631375025514005558476125947355611213467538

    6Jaisalmer178517850178502151325154024517850

    JOD.ZONE625406070737861085145521063155693663223128597601325

    7Bikaner6064606406064020303781581125360640

    8Hanumangarh33973397033970339703397033970

    9SGNGR*50055005050050500505005050050

    10Churu8384834578352323211183850493276832527

    11Nagaur (Ps. Ladnu)94194109410181982796629410

    Total B.Z.2379123752723759321382457171954141912373227

    Total Discom863318445938584844148734887212865617327319834921352

    *Note:- Revised Progress by per SE (Plan) during the month Jan-10

    GoR-D-09(a)

    JDOHPUR VIDYUT VITRAN NIGAM LTD., JODHPUR

    Progress of Distribution Companies

    Circle Wise Revenue Analysis

    Information Upto :- May,11Reporting Month :- June,11GOR D 09 (A)

    S.No.NAME OF CIRCLEFor theAssessment in Lacs Rs.Realisation in Lacs Rs.% RealisationOutstanding in Cr. Rs.

    MonthLast YearThis Year% Diff.Last YearThis Year% Diff.Last YearThis Year% Diff.Mar.11This Year% Diff.

    1C.C. JOD.During3889.353954.641.683599.853982.6610.6392.56100.718.15

    Upto May7414.047628.182.896088.316971.2414.5082.1291.399.27109.02115.596.03

    2D.C.JOD.During3374.563681.479.092804.063062.369.2183.0983.180.09

    Upto May7085.047590.447.135697.915818.302.1180.4276.65-3.7784.51101.7320.37

    3JALOREDuring2188.412131.17-2.621565.771726.9210.2971.5581.039.48

    Upto May4007.624341.968.342795.873188.9914.0669.7673.453.6827.6939.2041.56

    4PALIDuring4765.434585.75-3.774661.764714.931.1497.82102.824.99

    Upto May8982.579193.292.357782.367473.36-3.9786.6481.29-5.3513.9230.85121.65

    5BARMERDuring2752.592996.118.852289.932532.5210.5983.1984.531.34

    Upto May5507.086022.529.364009.934328.727.9572.8171.88-0.9458.8975.8428.79

    TOTAL JU. ZONEDuring16970.3417349.142.2314921.3716019.397.3687.9392.344.41

    Upto May32996.3534776.395.3926374.3827780.615.3379.9379.88-0.05294.03363.2223.53

    6BIKANERDuring3307.043805.4115.073068.733593.6217.1092.7994.431.64

    Upto May6361.617295.0914.675607.196027.087.4988.1482.62-5.52150.98163.668.40

    7HMHDuring1601.081672.224.441374.291729.7625.8785.84103.4417.61

    Upto May3221.393591.1511.482173.032754.4126.7567.4676.709.2412.1720.5368.77

    8SGNRDuring2310.312397.313.772161.322456.2613.6593.55102.468.91

    Upto May4414.264830.119.423673.473996.388.7983.2282.74-0.4825.2333.5733.04

    9CHURUDuring1845.192061.1111.701539.201931.6125.4983.4293.7210.30

    Upto May3529.103990.0413.062760.923101.4412.3378.2377.73-0.5079.2488.1311.21

    BKN.ZONEDuring9063.629936.059.638143.549711.2519.2589.8597.747.89

    Upto May17526.3619706.3912.4414214.6115879.3111.7181.1080.58-0.52267.62305.8914.30

    JU.DISCOMDuring26033.9627285.194.8123064.9125730.6411.5688.6094.305.71

    Upto May50522.7154482.787.8440588.9943659.927.5780.3480.14-0.20561.65669.1119.13

    GoR-D-09(b)

    JDOHPUR VIDYUT VITRAN NIGAM LTD., JODHPUR

    Progress of Distribution Companies

    Circle Wise Revenue Analysis

    Information Upto :-May,11Reporting Month :- June,11GOR D 09 (B)

    S.No.NAME OF CIRCLEFor theEnergy Available (in LU)Energy Sold (in LU)T&D LossesEnergy Realised in LU% AT&C

    MonthLast YearThis Year% Diff.Last YearThis Year% Diff.Last YearThis Year% Diff.Last YearThis Year% Diff.Last YearThis Year% Diff.

    1C.C. JOD.During895.08904.201.02835.58844.421.066.656.61-0.04773.38850.409.9613.65.95-7.6592.56100.71

    Upto May1917.441920.270.151577.931619.372.6317.7115.67-2.041295.771479.9114.2132.4222.93-9.4982.1291.39

    2D.C.JOD.During2596.063238.3224.741628.341953.1719.9537.2839.692.411353.051624.7120.0847.8849.831.9583.0983.18

    Upto May4877.375647.6015.793480.223826.499.9528.6532.253.602798.852933.124.8042.6248.065.4480.4276.65

    3JALOREDuring1227.081216.38-0.871056.461075.231.7813.9011.60-2.30755.88871.2815.2738.428.37-10.0371.5581.03

    Upto May2392.012317.17-3.132011.142059.972.4315.9211.10-4.821403.051512.967.8341.3434.71-6.6369.7673.45

    4PALIDuring1248.941598.8228.011101.441190.528.0911.8125.5413.731077.481224.0613.6013.7323.449.7197.82102.82

    Upto May2538.503026.3919.222135.822502.8817.1915.8617.301.441850.442034.639.9527.132.775.6786.6481.29

    5BARMERDuring1120.201309.7516.92815.45886.118.6727.2032.355.14678.39749.0010.4139.4442.813.3783.1984.53

    Upto May2188.502341.436.991756.001891.857.7419.7619.20-0.561278.621359.786.3541.5841.930.3572.8171.88

    TOTAL JU. ZONEDuring7087.368267.4716.655437.275949.459.4223.2828.044.764780.785493.4514.9132.5433.551.0187.9392.34

    Upto May13913.8215252.869.6210961.1111900.568.5721.2221.980.768761.359506.598.5137.0337.670.6479.9379.88

    6BIKANERDuring2121.572712.0327.831420.541730.3721.8133.0436.203.151318.171634.0723.9637.8739.751.8892.7994.43

    Upto May3668.744466.2121.742640.793296.4924.8328.0226.19-1.832327.622723.5017.0136.5639.022.4688.1482.62

    7HMHDuring628.79581.20-7.57476.15474.83-0.2824.2818.30-5.97408.70491.1720.183515.49-19.5185.84103.44

    Upto May1112.691042.74-6.291036.161119.548.056.88-7.37-14.24698.96858.6922.8537.1817.65-19.5367.4676.70

    8SGNRDuring661.04656.83-0.64587.39581.70-0.9711.1411.440.30549.51596.008.4616.879.26-7.6193.55102.46

    Upto May1376.841349.82-1.961117.431132.701.3718.8416.09-2.76929.91937.180.7832.4630.57-1.8983.2282.74

    9CHURUDuring1052.551257.8119.50711.32858.7920.7332.4231.72-0.70593.36804.8335.6443.6336.01-7.6283.4293.72

    Upto May1858.082177.7117.201309.151580.5120.7329.5427.42-2.121024.191228.5219.9544.8843.59-1.2978.2377.73

    BKN.ZONEDuring4463.955207.8716.673195.43645.6914.0928.4230.001.582871.023563.2124.1135.6831.58-4.189.8597.74

    Upto May8016.359036.4812.736103.537129.2416.8123.8621.11-2.764950.225744.7116.0538.2536.43-1.8281.1080.58

    JU.DISCOMDuring11551.3113475.3416.668632.679595.1411.1525.2728.793.537648.159048.4718.3133.7932.85-0.9488.6094.30

    Upto May21930.1724289.3410.7617064.6419029.8011.5222.1921.65-0.5313709.4115249.5811.2337.4937.22-0.2780.3480.14

    GoR-D-09(c)

    Progress of Distribution Companies (JODHPUR DISCOM)

    Circle wise T&D Losses

    Information Upto:-May,11Reporting the Month:-June,11GOR-D-09 (C)

    S.No.Name of CircleT & D Loss for previous year 2010-11T & D Loss for current year 2011-12

    T & D loss for the MonthT & D loss up to the MonthT & D loss for the MonthT & D loss up to the Month

    Energy SuppliedEnergy Billed% T&D lossEnergy SuppliedEnergy Billed% T&D lossEnergy SuppliedEnergy Billed% T&D lossEnergy SuppliedEnergy Billed% T&D loss

    1234567891011121314

    1City Jodhpur1022.36835.5818.271917.441577.9317.711016.07844.4216.891920.271619.3715.67

    2Distt. Jodhpur2281.311628.3428.624877.373480.2228.652409.281953.1718.935647.603826.4932.25

    4Jalore1164.931056.469.312392.012011.1415.921100.791075.232.322317.172059.9711.10

    3Pali1289.561101.4414.592538.502135.8215.861427.571190.5216.613026.392502.8817.30

    5Barmer1068.30815.4523.672188.501756.0019.761031.68886.1114.112341.431891.8519.20

    Total Ju.Zone6826.465437.2720.3513913.8210961.1121.226985.395949.4514.8315252.8611900.5621.98

    6Bikaner1547.171420.548.183668.742640.7928.021754.181730.371.364466.213296.4926.19

    7Hanumangarh483.90476.151.601112.691036.166.88461.54474.83-2.881042.741119.54-7.37

    8SGNGR715.80587.3917.941376.841117.4318.84692.99581.7016.061349.821132.7016.09

    9Churu805.53711.3211.701858.081309.1529.54919.90858.796.642177.711580.5127.42

    Total Bik. Zone3552.403195.4010.058016.356103.5323.863828.613645.694.789036.487129.2421.11

    Total Discom10378.868632.6716.8221930.1717064.6422.1910814.009595.1411.2724289.3419029.8021.65

    GoR-D-10

    Progress of Distribution Companies (JODHPUR DISCOM)

    33 KV Sub-Stations Works Progress

    Upto the Month:-June,11GOR-D-10

    S.No.Name of Distt. / CircleNo of Gram PanchyatNo of Sub-Station to be installedNo of Sub-Station work order IssuedNo of Sub-Station Commissioned

    Rural AreaUrban AreaRural AreaUrban AreaRural AreaUrban Area

    Under GPVVYUnder STPUnder GPVVYUnder STPUnder GPVVYUnder STP

    123456789101112

    1Jodhpur33934171333130000

    2Pali31831142911000

    3Sirohi14914101310000

    4Jalore26812201020000

    5Barmer40223201810000

    6Jaisalmer12815211421000

    Total J.Z.16041292518117202000

    7Bikaner21918311551000

    8Hanumangarh25116121701000

    9SGNGR*3203104903000

    10Churu24930501640000

    1132300100000

    Total B.Z.107198975895000

    Total Discom26752273425175297000

    No of Gram PanchyatNo of Sub-Station to be installedNo of Sub-Station work order IssuedNo of Sub-Station Commissioned

    26752862110

    GoR-D-11

    Progress of Distribution Companies (JODHPUR DISCOM)

    Status of connection pending to release to Government Schools (FY 2011-12)

    Upto the Month:-June,11GOR-D-11

    S.No.Name of CircleName of DistrictNo. of applications pendingNo. of Demand Notes issued out of col(5)No. of DN depositedNo. of Demand Notes to be issued Col (5-6)No. of connections released up to the monthNo. of connections pending whose D.N. DepositedRemarks (reasons of pendency)Expenditure(Rs in Crs)% of Utilization

    As on 31.03.2011 but DN not issuedReceived during FY 11-12Total(3+4)DN deposited as on 31.03.11DN deposited during FY 11-12 out of col(5)

    123456789101111121314151617

    1CITYJODHPUR000000000

    2DISTRICTJODHPUR583896825938143859

    TOTAL JODHPUR DISTT.5838968259381438590

    3PALIPALI12132515141371512

    4SIROHISIROHI21719187151164

    5JALOREJALORE4232721272361634

    6BARMERBARMER0000301201824

    7JAISALMERJAISALMER000084093

    JODHPUR ZONE7691167136145105281121360

    8BIKANERBIKANER448544353

    9HNGH.HNGH.336454181

    10SGGNR.SGGNR.088706160

    CHURUCHURU1326393584243317

    P.S. LADNU314318118

    11TOTAL CHURU CIRCLE16274338950534250

    BIKANER ZONE2342655418641053290

    TOTAL DISCOM99133232190163169381651650

    GoR-D-11 E

    JODHPUR VIDHYUT VITRAN NIGAM LIMITED,JODHPUR.

    STATUS OF CONNECTIONS PENDING TO RELEASE TO GOVT. SCHOOLS

    Upto the Month:-June,11

    S.noName of CircleName of DistrictSTATUS AS ON 1.4.2011APPL. RECD./ RE-OPEN DURING 2011-12TOTALD.N. ISSUED UPTO REPORT MONTH 2011-12D.N. DEPO. UPTO REPORT MONTH 2011-12APPLI. CANCEL UP TO REPORT MONTH PRIOR D.N. ISSUEDAPPLI. CANCEL UP TO REPORT MONTH PRIOR D.N. DEPO.APPLI. CANCEL UP TO REPORT MONTH AFTER D.N. DEPO.CONNE. RELEASED UPTO REPORT MONTH 2011-12APPLICATIONS PENDING AT THE END OF THE MONTH

    D.N. DEPO. BUT CONN. NOT RELE.D.N. ISSUED BUT NOT DEPO.D.N. TO BE ISSUEDTOTALD.N. DEPO. BUT CONN. NOT RELE.D.N. ISSUED BUT NOT DEPO.D.N. TO BE ISSUEDTOTAL

    D.N.DEP.D.N.D.N.TOTAL(10+11)(10+11)

    12345678910111213141516171819

    1CITYJODHPUR0000000000000000

    2DISTRICTJODHPUR595858175382138238063038593914112

    TOTAL JODHPUR DISTT.595858175382138238063038593914112

    3PALIPALI14212281341151330015124723

    4SIROHISIROHI7321217291815052164116

    5JALOREJALORE2774382361212304016341641

    6BARMERBARMER301204204201200018240024

    7JAISALMERJAISALMER840120120400093003

    JODHPUR ZONE14586763079139813610537221121364528209

    8BIKANERBIKANER4541341754000536312

    9HNGH.HNGH.51393124410081113

    10SGGNR.SGGNR.03038117600060415

    CHURUCHURU82213432669354209033176427

    P.S. LADNU15391103800018019

    11TOTAL CHURU CIRCLE92716522779385009034256536

    BIKANER ZONE183623774211954641905329171056

    TOTAL DISCOM1631229938413351719016948121651656238265

    Sheet1

  • Gen.AG connections 1st Phase DN. Issue Status FY 2011-12*

    sheet 1 (2)

    JODHPUR VIDHYUT VITRAN NIGAM LIMITED,JODHPUR

    DISTRICTWISE AGRICULTURE(GENERALCAT.)D.N. ISSUED DURING 1ST PHASE

    S.N.Name of CircleName of DistrictD.N. TO BE ISSUED IN 1ST PHASE (APPLICATIONS RECEIVED JAN.08 TO SEPT.08)D.N. ISSUED IN 1ST PHASE (16.04.11 TO 15.05.11) 25%D.N. ISSUED IN 1ST PHASE (16.05.11 TO 15.06.11) 25%

    123478

    1CITY CIRCLEJODHPUR000

    2DISTT.CIRCLEJODHPUR732430821406

    TOTALJODHPUR732430821406

    4PALI CIRCLEPALI1061340242

    SIROHI833243196

    3JALORE CIRCLEJALORE3458196704

    5BARMER CIRCLEBARMER2188549547

    JAISALMER700171175

    TOTAL JODHPUR ZONE1556445813270

    6BIKANER CIRCLEBIKANER3281824783

    7HANUMANGARHHNGH1766443462

    8SRIGANGANAGARSGGNR906229229

    9CHURU CIRCLECHURU1813468466

    PS LADNU18211

    TOTAL CHURU CIRCLE1831470477

    TOTAL BIKANER ZONE778419661951

    TOTAL DISCOM2334865475221

    Information included Re-opened and specify Priorty Applications.

    Applications received January 2008 to September 2008(of which DN to be issued ) will be revised by adding overridig priorty Applications.

    sheet 1

    JODHPUR VIDHYUT VITRAN NIGAM LIMITED,JODHPUR

    DISTRICTWISE AGRICULTURE(GENERALCAT.)D.N. ISSUED DURING 1ST PHASE

    S.N.Name of CircleName of DistrictD.N. TO BE ISSUED IN 1ST PHASE (APPLI. RECEIVED JAN.08 TO SEPT.08)Re-opened/ specified overriding priorty filesTOTALD.N. ISSUED IN 1ST PHASE (16.04.11 TO 15.05.11) 25%D.N. ISSUED IN 1ST PHASE (16.05.11 TO 15.06.11) 25%Total Upto 15.06.11Total DN Issued Up to 30.6.11

    122345678910

    1CITY CIRCLEJODHPUR000000

    2DISTT.CIRCLEJODHPUR562417007324308214064488549344893924

    TOTALJODHPUR562417007324308214064488549344893924

    3PALI CIRCLEPALI968931061340242582796582875

    4SIROHI78449833243196439625443735

    5JALORE CIRCLEJALORE33331253458196704900259417573208

    6BARMER CIRCLEBARMER2188021885495471096164110922188

    7JAISALMER7000700171175346525394700

    TOTAL JODHPUR ZONE1359719671556445813270785111673875711630

    8BIKANER CIRCLEBIKANER3281032818247831607246116453281

    9HANUMANGARHHNGH172343176644346290513259961680

    10SRIGANGANAGARSGGNR9060906229229458680524906

    11CHURU CIRCLECHURU1783301813468466934136012611753

    12PS LADNU99182111314150

    TOTAL CHURU CIRCLE1792391831470477947137312761753

    TOTAL BIKANER ZONE7702827784196619513917583844417620

    TOTAL DISCOM212992049233486547522111768175111319819250

    Information included Re-opened and specify Priorty Applications.

    Applications received January 2008 to September 2008(of which DN to be issued ) will be revised by adding overridig priorty Applications.

  • Status of release of DL connections during FY 2011-12*

    Name GOR-D

    GOR-D

    1 TO 11 For The Month of June, 2011

    Jodhpur Discom

    GOR-D-01

    Progress of Distribution Companies ( JODHPUR DISCOM) REVISED

    Status of AG. DN deposited & connections Released

    Upto the Month:-June,11GOR-D-01

    Sr. No.Name of DistrictNo of DN issued During 2011-12DN depositedAg. Connections released During 2011-12 out of Colmn. 8% Connection Released of Col.8Cancelled after D.N. Deposited During 2011-12Balance Pending for connection

    As on 31.03.11During 2011-12Total DN Deposited

    GENERAL CATEGORYOTHERSDuring the monthUpto the monthDuring the monthUpto the month

    12345678910111213

    1Jodhpur448948449736493781174182322731717.39161490796

    2Pali582366186317341447713367.555436241

    3Sirohi44319563825427044770111415.853657177

    4Jalore17571111868229718987121643826.74121122269

    5Barmer10924781570227368618845159911.723743250

    6Jaisalmer3944343715511214530022227.33027833

    Jodhpur Zone8757134710104157720193785536233159711.133947261766

    7Bikaner16451064270929280714100618737537.280631634

    8HMH9968310792052024036084814123.190467201

    9SGNR524238762117253653715397.260498364

    10Churu126178320446626780487016718821.610682537

    1115116111314000.0001412

    Total Churu Cir.127678420606726881788416718821.610696549

    Bikaner Zone4441216966105657222470303541774324.48022921748

    Total Discom131983516167142142274162558397748134015.963970183514

    DN ISSUEDDN DEPOSITEDCANCELLEDPENDING

    JLRBMRJSMRJLRBMRJSMRJLRBMRJSMRJLRBMRJSMR

    86RE-7 SC18532261133325473006719734

    1393RE-9 GEN0548576711485218010701295819

    RE-10 SPL00025

    RE-11 FH000000000000

    RE-11A DRIP8118532671473300027525

    RE-11B DIGGI000

    TOTAL2665121417761183565248011891544858

    CONNECTION

    JLRBMRJSMR

    RE-7 SC14923573

    RE-9 GEN880807344

    RE-10 SPL1700

    RE-11 FH000

    RE-11A DRIP4010330

    RE-11B DIGGI00

    TOTAL10861145447

    DN ISSUEDDN DEPOSITEDCANCELLEDPENDING

    DCPALISIROHIDCPALISIROHIDCPALISIROHIDCPALISIROHI

    RE-7 SC426751594707216900010349179

    RE-8 TSP11645073

    RE-9 GEN80615144213116031421252402696

    RE-10 SPL10

    RE-11 FH212611180120114

    RE-11A DRIP323367030035380002474

    RE-11B DIGGI

    TOTAL831129366221324942031541379469966

    CONNECTION

    DCPALISIROHI

    RE-7 SC50760144

    RE-8 TSP536405

    RE-9 GEN22703442906476

    RE-10 SPL171

    RE-11 FH1108

    RE-11A DRIP2763334

    RE-11B DIGGI

    TOTAL3054447530

    GOR-D-2

    JODHPUR DISCOM

    Status of release of DL connections during FY 2011-12

    Upto the Month :-June,11GOR-D-02

    S.NoName of Distt./CircleApplication for DL connections pendingApplication for DL connections pendingconnections released During 2011-12Cancelled up the month out of (3) & (4)Pending at the end of Reporting month

    As on 31.03.11Received during FY 2011-12RuralUrbanTotalRuralUrbanTotal released

    RuralUrbanRuralUrbanDuring the monthup to the monthDuring the monthup to the monthDuring the monthup to the monthRuralUrbanRuralUrbanBPL DURING monthAPL DURING monthBPL DURING 2011-12APL DURING 2011-12

    123456345678910111212131415

    1City Circle021101523017341734005091372509137279.120003620000

    2Distt. Circle176201243494126211142502136491721503891955224110.72457718507152318861951955

    Total JU Distt.176203353494164921114198423098917215054714631464361315.96457718507514318861951955

    3Pali Distt.3858510352179373791303868289827172367351134345243.10622504040518089802717

    4Sirohi Distt.653101736292138939317822145485522826977644.8646679515902140548

    5Jalore Circle625112620742508325376870116452658811771726283537.05102920463817912815172732385

    6Barmer Distt375392561352345388916013949259920798821068722895.84262103655038192507921987

    7Jsm. Distt.357615202863576438401473127801751533027.531534482580730127

    Jodhpur Zone6949714801117736158067450958576943461027910872988543313267154.3347077592241798679782009251409505609719

    8Bikaner73606499636518323130096235891268205786794205421.381267043508058901268

    9HMH222631325137834739109658356842359228623912298254.06284352096438068402359

    10SGNR3371204225899956291203683288719192988671185278643.7842841328229522865771842

    11Churu3751815178410535535186874034931417282892775230933.173351063783870049301417

    12127221326141159816217602285163412026263637.4658410243802280516

    Total Churu Cir.502383621101194713320309163721193331610121037294534.013931104807908072101933

    Bikaner Zone17980200278443627258245629314532881747910473288392810767153.2369160211117192172282149222859777402

    Total Discom8747734821902172421064981072411722272271775821346276936124034307.57162378023534290852064158273695463717121

    GOR-D-03

    Progress of Distribution Companies ( JODHPUR DISCOM)

    Status of release of BPL connections FY 2011-12

    Upto the Month:-June,11GOR-D-03

    Sr. NoName of DistrictBPL families as per Notification of GoR 2002Total BPL/Kutir Jyoti connections released as on 31.03.11Progress of release of BPL Connections FY 2011-12BPL AS ONRURAL DURING MONTH

    TargetReleasedBalanceTOTAL GoR-D-2APLBPL

    During the monthUpto the monthMMSLVYOTHER

    12345678

    1Jodhpur3565827928031195-195281239179778931

    2Pali531404823300004823389808980

    3Sirohi297091355200001355221402140

    4Jalore58655429770128273-273432501645603914128

    5Barmer74843225285091592925082322620599552-4592

    6Jaisalmer1593110433000010433730730

    Jodhpur Zone2679361656515091525156050355166211434612522843251

    7Bikaner84842408410000408415893182710

    8Hanumangarh43386367611101900110193676168406840

    9SGNGR634564653092482277917146607887086522

    10Churu656505087200005087249304930

    11328833170000331722802280

    Total Churu Cir.689385418900005418972107210

    Bikaner Zone260622178321202672277201901783982881318254122

    Total Discom5285583439727118227363770545344609722715705384273

    * Recently sanctioned by REC

    ** Pending for sanction with REC183949

    APRIL,102023

    852

    GOR-D-04(a) Dist. Wise

    Progress of Distribution Companies ( JODHPUR DISCOM)

    RGGVY Financial Status

    Upto the Month:-June,11GOR-D-04 (a)

    S.No.Name of Distrcit/DiscomNo. of SchemesSanctioned Cost (Rs. Lacs)Amount Released (in Lacs Rs.)Utilisation (in Lacs Rs.) (Tentavive)% Utilised

    1234567

    A. Sanctioned Before to Feb-08

    1HN.Garh (AREP)1222.85133.72211.95158.50

    2SG.Nagar (AREP)1681.69409.01520.84127.34

    3Jaisalmer (AREP)1603.53181.06593.00327.52

    4Jaisalmer11338.781144.251377.01120.34

    5Bikaner12333.901851.602047.76110.59

    6Sirohi11236.92963.30998.34103.64

    7Jalore12367.411805.321856.00102.81

    8Jodhpur12853.852385.922454.84102.89

    9Churu11962.481457.311583.14108.63

    101116.0687.5780.0091.36

    Jodhpur Discom(A)1013717.4710419.0611722.88112.51

    B. Sanctioned After Feb-08

    1Hanumangarh13256.161634.391560.0095.45

    2Sriganganagar13498.462042.10913.3944.73

    3Pali (PGCIL)12981.292377.792787.00117.21

    4Barmer (PGCIL)120995.8611272.6612055.00106.94

    Jodhpur Discom(B)430731.7717326.9417315.3999.93

    G.Total (A+B)1444449.2427746.0029038.27104.66

    1Jodhpur12853.852385.922454.84102.89

    2Pali12981.292377.792787117.21

    3Sirohi11236.92963.3998.34103.64

    4Jalore12367.411805.321856102.81

    5Barmer120995.8611272.6612055106.94

    6Jaisalmer21942.311325.311970.01148.65

    Jodhpur Zone732377.6420130.322121.19109.89

    7Bikaner12333.91851.62047.76110.59

    8Hanumangarh23479.011768.111771.95100.22

    9SGNGR24180.152451.111434.2358.51

    10Churu11962.481457.311583.14108.63

    11Nagaur (Ps. Ladnu)1116.0687.578091.36

    Total Churu Cir.22078.541544.881663.14107.65

    Bikaner Zone712071.67615.76917.0890.83

    Total Discom1444449.242774629038.27104.66

    GOR-D-04(b) Dist. Wise

    Progress of Distribution Companies ( JODHPUR DISCOM)

    Coverage & Progress under AREP & RGGVY Progress

    Upto the Month:-June,11GOR-D-04 (b)

    S.No.Name of DiscomNo. of SchemesCoverage ( Nos)Progress As on Month (Nos)% Achievement

    Electrification of Villages (DE/UE)Intensive ElectrificationConn. To BPLGen.DhaniesElectrification of Villages (DE/UE)Intensive ElectrificationConn. To BPLGen.DhaniesElectrification of Villages (DE/UE)Intensive ElectrificationConn. To BPLGen.Dhanies

    123456789101112131415161718

    A. Sanctioned Before to Feb-08

    1HN.Garh (AREP)14605163760460313322730100.000.00607.17604.520.00

    2SG.Nagar (AREP)1111012964701110400031620100.000.003100.78488.720.00

    3Jaisalmer (AREP)16002561237055035326091.670.0013.6726.350.00

    4Jaisalmer19834810112839869983227094690662100.0092.5370.1582.2389.86

    5Bikaner120558741481109513718055830744155603787.8095.0674.12142.09100.00

    6Sirohi1844724666899151844782461122350100.00100.0033.43124.8298.04

    7Jalore13066754217195821630524365892794016100.0078.5667.49142.68100.00

    10Jodhpur117388530365396731251738702119856399125100.0098.3169.81142.16100.00

    9Churu11184351488244787683135298319538754.5598.5868.561305.80100.00

    81097281426090962638505390.0098.9793.751943.46100.00

    Jodhpur Discom(A)10742387421604492562394707364814897516079538695.2894.1768.96173.7297.97

    B. Sanctioned After Feb-08

    1Hanumangarh1132157639319317042132525283002341532100.0033.3171.98738.6476.19

    2Sriganganagar1179250544133217253715262034940170902684.9224.7579.1778.6770.27

    3Pali (PGCIL)12191529334805517315913366583134713071.4399.78124.97389.1675.14

    4Barmer (PGCIL)1668123060124587313782071679363160012230.9913.5815.57272.451.60

    Jodhpur Discom(B)41000622617291038823163050622251092618785321050.6035.7463.19226.2912.88

    G.Total (A+B)1417421010038895413138520241213587325823624864859669.6358.1566.39189.2529.45

    Note:-Figures shown in shaded of column No. 6 (Coverage of Conn. to BPL) have been changed due to actual survey.

    1Jodhpur117388530365396731251738702119856399125100.0098.3169.81142.16100.00

    2Pali12191529334805517315913366583134713071.4399.78124.97389.1675.14

    3Sirohi1844724666899151844782461122350100.00100.0033.43124.8298.04

    4Jalore13066754217195821630524365892794016100.0078.5667.49142.68100.00

    5Barmer1668123060124587313782071679363160012230.9913.5815.57272.451.60

    6Jaisalmer215834810368963569153322712972326296.8492.5368.7675.0689.86

    Jodhpur Zone710584492209074918091812586324311918315014240555.3972.2057.01163.5422.35

    7Bikaner120558741481109513718055830744155603787.8095.0674.12142.09100.00

    8Hanumangarh2178157639835354642178525314332568832100.0033.3178.91724.4276.19

    9SGNGR2290250544262223723726362038940202522690.6924.7587.9890.5270.27

    10Churu11184351488244787683135298319538754.5598.5868.561305.80100.00

    11Nagaur (Ps. Ladnu)1097281426090962638505390.0098.9793.751943.46100.00

    Total Churu Cir.21194054302270796692737936370069654.5598.6269.861367.05100.00

    Bikaner Zone768456081798803957621262726301390539850619191.6746.9077.30248.9090.09

    Total Discom1417421010038895413138520241213587325823624864859669.6358.1566.39189.2529.45

    GOR-D-05

    Progress of Distribution Companies (JODHPUR DISCOM)

    Electrification of Villages & Dhanies FY 2011-12

    Upto the Month:-June,11GOR-D-05

    S.No.District & CircleElectrification of Dhanies & House Hold under MMSLVY

    DhaniesHouseholds

    Expected Dhanies less than 100 populationApplicationsDhanies SanctionedConnections CoveredDhanies ElectrifiedConnections Released

    Upto 31.3.11FY 2011-12TOTAL% ElectrifiedUpto 31.3.11FY 2011-12TOTAL% OF CONN. ELECT.CANCELLEDBALANCE

    During the Monthup to the MonthDuring the Monthup to the MonthGROUPAPPL.GROUPAPPL.

    12344567896.16666666676.66666666677.166666666710111213

    1Jodhpur54243843939972544229821538302075.5620436972372067381.266835710253617853

    2Pali232254321725501630016375.12165500165564.9069888WORK COMPLETED

    3Sirohi384153122522002270.9724100241107.1116174WORK COMPLETED

    4Jalore1337136531186109305168012764354.224526603956548250.1652862443623338

    5Barmer54073558718391142214559191154684.079138552552969084.841931256438328883

    6Jaisalmer50245592144681450014567.761110001110237.18223953793526

    Jodhpur Zone12940951967484510375283186256553974.0100037106125217453885176.12151114667766053600

    7Bikaner276717128125954749095395100479.7557713185706341115.84950556010566764

    8Hanumangarh959129589483008387.377800078087.2512132WORK COMPLETED

    9SGNGR ***10592810576799009994.2986300863112.52665WORK COMPLETED

    10Churu427267630115302410024180.07142500142593.14185124430187

    111347066831559005986.7633100331105.0875375110

    Total Churu Cir.561338236918453000030081.301756001756198.2166199813260161931197

    Bikaner Zone3528223501828898013915395148681.2900091703185709740513.81974870781228737611187158

    Total Discom164681175469312600176674239351702575.4400046276157023154859180.96273922043877860758

    16468117546924160017667400667472.2216210367000462760046276

    BKNR34942

    13649

    GOR-D-06

    Progress of Distribution Companies (JODHPUR DISCOM)

    Status of Consumers Grievances Redressal in Chhaupals FY 2011-12

    Upto the Month:-June,11GOR-D-06

    S.No.Name of Discom/District33/11 KV S/SProgress of Chhaupals organised during the monthProgress of Chhaupals organised upto the month

    No of chhaupals heldGrievances receivedRedressalNo of chhaupals heldGrievances receivedRedressal

    Related to billsOthersRelated to billsOthers% redressed (7+8)/(5+6)Related to billsOthersRelated to billsOthers% redressed (13+14)/(11+12)

    123456789101112131415

    1Jodhpur336601117511175100.0015830121130121100000100.00

    2Pali1074090419041100.0011022512222512200000100.00

    3Sirohi502550135013100.0076137461374600000100.00

    4Jalore169581305713057100.0014929211929211900000100.00

    5Barmer1681112017512016094.92333774853774500000095.94

    6Jaisalmer5235510555110103.1391702951702850000097.85

    Jodhpur Zone88219755646655645699.0253515021278150212330000098.38

    7Bikaner19115361628971.1537973777250000076.12

    8Hanumangarh89219835953597.745824774227720000093.15

    9SGNGR1084464316431100.00122178771787700000100.00

    10Churu111343710237102100.00101892648926400000100.00

    111145959100.00121220122000000100.00

    Total Churu Cir.122384211142111100.00113101284101284100.00

    Bikaner Zone51011824019322918695.843306234725834580000095.07

    Total Discom139231579665978564298.0886521251750208516910000097.45

    00000000000000000

    16993667557736545428

    -1699-3667-5577-3654-542800000000

    JPR (During)

    GOR-D-07

    Progress of Distribution Companies (JODHPUR DISCOM)

    Progress of Vigilance Checking

    Upto the Month:-June,11GOR-D-07

    S. No.Name of DiscomTotal CheckingTheft DetectedRs. In lacs.No .of Complaint/FIRsNo .of Arrests

    AssessmentRealisation

    Last Year.This Year.% Incr.Last Year.This Year.% Incr.Last Year.This Year.% Incr.Last Year.This Year.% Incr.Last Year.This Year.% Incr.Last Year.This Year.% Incr.

    1234567891011121314151617181920

    1Jodhpur25932065-20.36713681-4.49118.39123.314.1659.7955.10-7.849518089.47121525.00

    2Pali127213324.72105219108.5745.5147.554.4817.2233.4093.96141828.5700

    3Sirohi566399-29.51304136.678.269.1310.532.193.5562.10524380.0001

    4JALORE664509-23.342825-10.7132.6545.1538.2810.2413.9436.1321224.7612100.00

    5Barmer1284212765.65162135-16.6767.59102.2351.2525.0717.46-30.36233343.48110.00

    6Jaisalmer141121-14.18375445.9513.7418.8837.417.318.4315.321024140.0000

    Jodhpur Zone652065530.51107511557.44286.14346.2521.01121.82131.888.2616830179.17141935.71

    7Bikaner76491219.374544815.9549.1363.2228.6822.4543.4993.7249122148.9849125.00

    8HMH103611097.05372256-31.1854.2037.78-30.3037.7529.33-22.30233030.43312300.00

    9SGNGR13691221-10.81909802-11.7778.1079.341.5935.0041.1617.60445320.45166-62.50

    10Churu1070124716.54729107247.0559.5753.65-9.9415.3516.356.5123472-69.2303

    11316-80.65252-92.001.400.04-97.140.120.04-66.670000

    Bikaner Zone427044955.27248926134.98242.4234.03-3.45110.67130.3717.80350277-20.86233030.43

    Other326101-69.0217057-66.4767.9110.12-85.1028.4011.55-59.33517-86.2700

    Total11116111490.30373438252.44596.45590.40-1.01260.89273.804.955695852.81374932.43

    GOR-D-08

    Progress of Distribution Companies (JODHPUR DISCOM)

    Progress of feeder Renovation Programme FY 2011-12

    Upto the Month:-June,11GOR-D-08

    S.No.Name of DiscomFeeders Renovated up to the monthExpected date of completion for feeders convert from B to APhysical ProgressExpenditure (Rs in Crs)% of UtilisationFeeders Renovated up 31.03.09Feeders Renovated during 2009-10Feeders Renovated up 31.03.10Feeders Renovated during 2010-11Feeders Renovated up 31.03.11Feeders Renovated during 2011-12

    TargetA- typeB typeTotal (A+B)% Completion

    FeedersVillagesFeeders (4+5)Villages getting supply at par with nearby urban TownFeeders (7/3)*100Villages (8/4)*100Installation of small new type 3-phase Xformers (with Mtrs. MCCB etc) in nosInstallation of small new type 1-phase Xformers in nosLaying of AB Cable in Kms.Installation of pushfit type mtrs. In no.SanctionedUtilised Up to the month

    123456789101112131415161718

    1Jodhpur7771058687907771058100.00100.00195415053458432970406824881966843

    2Pali3359153350335915100.00100.001169422019117954618414532963350

    3Sirohi1294551290129455100.00100.0055071352107513530345791381290

    4Jalore4806974800480697100.00100.001907833751580296911421583001804800

    5Barmer4781264417614781264100.00100.001400531863836195602145927311038334

    6Jaisalmer1275021270127502100.00100.00178540843732757038108191270

    JODHPUR ZONE23264891217515123264891100.00100.0061085175941342317857210505391589549213837

    7Bikaner3686623680368662100.00100.0060641112121051960130210340283680

    8Han.garh229162922902291629100.00100.0033974287245253402229022902290

    9SGNGR214262321402142623100.00100.0050053987404150943214021402140

    10Churu24094622713240946100.00100.008352281755897340882371199821710

    1130973003097100.00100.0094137958278011301317300

    BIKANER ZONE1081595710681310815957100.00100.00237591258213874237514668247915143105810

    Discom3407108483243164340710848100.00100.0084844301762729741608617187862504692319647

    A type :- Where 1 Phase & 3 Phase transformer work is completed.

    B type:- Where 1 Phase transformer work 100 % completed but 3 phase transformer work partially complete.

    GoR-D-08(b)

    Progress of Distribution Companies (JODHPUR DISCOM)

    Statement of Progress of 3 PhaseTransformers under FRP

    Upto the Month:-June,11GOR-D-08(b)

    S.NoName of Discom / DistrictTotal no of 3 phase transformers to be installed under FRPTotal no of 3 phase transformers installed up to last MonthTotal no of 3 phase transformers installed during the MonthTotal no of 3 phase transformers installed up to the MonthBalance transformers to be installedTotal no of 3 phase transformers installed up to 31.03.09Total no of 3 phase transformers installed during 2009-10Total no of 3 phase transformers installed up to 31.03.10Total no of 3 phase transformers installed during 2010-11Total no of 3 phase transformers installed up to 31.03.11Total no of 3 phase transformers installed during 2011-12

    1234567

    1Jodhpur204381941812319541897586338909753900118754787

    2Pali116911690116904027671169011690

    3Sirohi55075507055070144716813128237955070

    4JALORE1907819078019078083755312136875391190780

    5Barmer145631375025514005558476125947355611213467538

    6Jaisalmer178517850178502151325154024517850

    JOD.ZONE625406070737861085145521063155693663223128597601325

    7Bikaner6064606406064020303781581125360640

    8Hanumangarh33973397033970339703397033970

    9SGNGR*50055005050050500505005050050

    10Churu8384834578352323211183850493276832527

    11Nagaur (Ps. Ladnu)94194109410181982796629410

    Total B.Z.2379123752723759321382457171954141912373227

    Total Discom863318445938584844148734887212865617327319834921352

    *Note:- Revised Progress by per SE (Plan) during the month Jan-10

    GoR-D-09(a)

    JDOHPUR VIDYUT VITRAN NIGAM LTD., JODHPUR

    Progress of Distribution Companies

    Circle Wise Revenue Analysis

    Information Upto :- May,11Reporting Month :- June,11GOR D 09 (A)

    S.No.NAME OF CIRCLEFor theAssessment in Lacs Rs.Realisation in Lacs Rs.% RealisationOutstanding in Cr. Rs.

    MonthLast YearThis Year% Diff.Last YearThis Year% Diff.Last YearThis Year% Diff.Mar.11This Year% Diff.

    1C.C. JOD.During3889.353954.641.683599.853982.6610.6392.56100.718.15

    Upto May7414.047628.182.896088.316971.2414.5082.1291.399.27109.02115.596.03

    2D.C.JOD.During3374.563681.479.092804.063062.369.2183.0983.180.09

    Upto May7085.047590.447.135697.915818.302.1180.4276.65-3.7784.51101.7320.37

    3JALOREDuring2188.412131.17-2.621565.771726.9210.2971.5581.039.48

    Upto May4007.624341.968.342795.873188.9914.0669.7673.453.6827.6939.2041.56

    4PALIDuring4765.434585.75-3.774661.764714.931.1497.82102.824.99

    Upto May8982.579193.292.357782.367473.36-3.9786.6481.29-5.3513.9230.85121.65

    5BARMERDuring2752.592996.118.852289.932532.5210.5983.1984.531.34

    Upto May5507.086022.529.364009.934328.727.9572.8171.88-0.9458.8975.8428.79

    TOTAL JU. ZONEDuring16970.3417349.142.2314921.3716019.397.3687.9392.344.41

    Upto May32996.3534776.395.3926374.3827780.615.3379.9379.88-0.05294.03363.2223.53

    6BIKANERDuring3307.043805.4115.073068.733593.6217.1092.7994.431.64

    Upto May6361.617295.0914.675607.196027.087.4988.1482.62-5.52150.98163.668.40

    7HMHDuring1601.081672.224.441374.291729.7625.8785.84103.4417.61

    Upto May3221.393591.1511.482173.032754.4126.7567.4676.709.2412.1720.5368.77

    8SGNRDuring2310.312397.313.772161.322456.2613.6593.55102.468.91

    Upto May4414.264830.119.423673.473996.388.7983.2282.74-0.4825.2333.5733.04

    9CHURUDuring1845.192061.1111.701539.201931.6125.4983.4293.7210.30

    Upto May3529.103990.0413.062760.923101.4412.3378.2377.73-0.5079.2488.1311.21

    BKN.ZONEDuring9063.629936.059.638143.549711.2519.2589.8597.747.89

    Upto May17526.3619706.3912.4414214.6115879.3111.7181.1080.58-0.52267.62305.8914.30

    JU.DISCOMDuring26033.9627285.194.8123064.9125730.6411.5688.6094.305.71

    Upto May50522.7154482.787.8440588.9943659.927.5780.3480.14-0.20561.65669.1119.13

    GoR-D-09(b)

    JDOHPUR VIDYUT VITRAN NIGAM LTD., JODHPUR

    Progress of Distribution Companies

    Circle Wise Revenue Analysis

    Information Upto :-May,11Reporting Month :- June,11GOR D 09 (B)

    S.No.NAME OF CIRCLEFor theEnergy Available (in LU)Energy Sold (in LU)T&D LossesEnergy Realised in LU% AT&C

    MonthLast YearThis Year% Diff.Last YearThis Year% Diff.Last YearThis Year% Diff.Last YearThis Year% Diff.Last YearThis Year% Diff.

    1C.C. JOD.During895.08904.201.02835.58844.421.066.656.61-0.04773.38850.409.9613.65.95-7.6592.56100.71

    Upto May1917.441920.270.151577.931619.372.6317.7115.67-2.041295.771479.9114.2132.4222.93-9.4982.1291.39

    2D.C.JOD.During2596.063238.3224.741628.341953.1719.9537.2839.692.411353.051624.7120.0847.8849.831.9583.0983.18

    Upto May4877.375647.6015.793480.223826.499.9528.6532.253.602798.852933.124.8042.6248.065.4480.4276.65

    3JALOREDuring1227.081216.38-0.871056.461075.231.7813.9011.60-2.30755.88871.2815.2738.428.37-10.0371.5581.03

    Upto May2392.012317.17-3.132011.142059.972.4315.9211.10-4.821403.051512.967.8341.3434.71-6.6369.7673.45

    4PALIDuring1248.941598.8228.011101.441190.528.0911.8125.5413.731077.481224.0613.6013.7323.449.7197.82102.82

    Upto May2538.503026.3919.222135.822502.8817.1915.8617.301.441850.442034.639.9527.132.775.6786.6481.29

    5BARMERDuring1120.201309.7516.92815.45886.118.6727.2032.355.14678.39749.0010.4139.4442.813.3783.1984.53

    Upto May2188.502341.436.991756.001891.857.7419.7619.20-0.561278.621359.786.3541.5841.930.3572.8171.88

    TOTAL JU. ZONEDuring7087.368267.4716.655437.275949.459.4223.2828.044.764780.785493.4514.9132.5433.551.0187.9392.34

    Upto May13913.8215252.869.6210961.1111900.568.5721.2221.980.768761.359506.598.5137.0337.670.6479.9379.88

    6BIKANERDuring2121.572712.0327.831420.541730.3721.8133.0436.203.151318.171634.0723.9637.8739.751.8892.7994.43

    Upto May3668.744466.2121.742640.793296.4924.8328.0226.19-1.832327.622723.5017.0136.5639.022.4688.1482.62

    7HMHDuring628.79581.20-7.57476.15474.83-0.2824.2818.30-5.97408.70491.1720.183515.49-19.5185.84103.44

    Upto May1112.691042.74-6.291036.161119.548.056.88-7.37-14.24698.96858.6922.8537.1817.65-19.5367.4676.70

    8SGNRDuring661.04656.83-0.64587.39581.70-0.9711.1411.440.30549.51596.008.4616.879.26-7.6193.55102.46

    Upto May1376.841349.82-1.961117.431132.701.3718.8416.09-2.76929.91937.180.7832.4630.57-1.8983.2282.74

    9CHURUDuring1052.551257.8119.50711.32858.7920.7332.4231.72-0.70593.36804.8335.6443.6336.01-7.6283.4293.72

    Upto May1858.082177.7117.201309.151580.5120.7329.5427.42-2.121024.191228.5219.9544.8843.59-1.2978.2377.73

    BKN.ZONEDuring4463.955207.8716.673195.43645.6914.0928.4230.001.582871.023563.2124.1135.6831.58-4.189.8597.74

    Upto May8016.359036.4812.736103.537129.2416.8123.8621.11-2.764950.225744.7116.0538.2536.43-1.8281.1080.58

    JU.DISCOMDuring11551.3113475.3416.668632.679595.1411.1525.2728.793.537648.159048.4718.3133.7932.85-0.9488.6094.30

    Upto May21930.1724289.3410.7617064.6419029.8011.5222.1921.65-0.5313709.4115249.5811.2337.4937.22-0.2780.3480.14

    GoR-D-09(c)

    Progress of Distribution Companies (JODHPUR DISCOM)

    Circle wise T&D Losses

    Information Upto:-May,11Reporting the Month:-June,11GOR-D-09 (C)

    S.No.Name of CircleT & D Loss for previous year 2010-11T & D Loss for current year 2011-12

    T & D loss for the MonthT & D loss up to the MonthT & D loss for the MonthT & D loss up to the Month

    Energy SuppliedEnergy Billed% T&D lossEnergy SuppliedEnergy Billed% T&D lossEnergy SuppliedEnergy Billed% T&D lossEnergy SuppliedEnergy Billed% T&D loss

    1234567891011121314

    1City Jodhpur1022.36835.5818.271917.441577.9317.711016.07844.4216.891920.271619.3715.67

    2Distt. Jodhpur2281.311628.3428.624877.373480.2228.652409.281953.1718.935647.603826.4932.25

    4Jalore1164.931056.469.312392.012011.1415.921100.791075.232.322317.172059.9711.10

    3Pali1289.561101.4414.592538.502135.8215.861427.571190.5216.613026.392502.8817.30

    5Barmer1068.30815.4523.672188.501756.0019.761031.68886.1114.112341.431891.8519.20

    Total Ju.Zone6826.465437.2720.3513913.8210961.1121.226985.395949.4514.8315252.8611900.5621.98

    6Bikaner1547.171420.548.183668.742640.7928.021754.181730.371.364466.213296.4926.19

    7Hanumangarh483.90476.151.601112.691036.166.88461.54474.83-2.881042.741119.54-7.37

    8SGNGR715.80587.3917.941376.841117.4318.84692.99581.7016.061349.821132.7016.09

    9Churu805.53711.3211.701858.081309.1529.54919.90858.796.642177.711580.5127.42

    Total Bik. Zone3552.403195.4010.058016.356103.5323.863828.613645.694.789036.487129.2421.11

    Total Discom10378.868632.6716.8221930.1717064.6422.1910814.009595.1411.2724289.3419029.8021.65

    GoR-D-10

    Progress of Distribution Companies (JODHPUR DISCOM)

    33 KV Sub-Stations Works Progress

    Upto the Month:-June,11GOR-D-10

    S.No.Name of Distt. / CircleNo of Gram PanchyatNo of Sub-Station to be installedNo of Sub-Station work order IssuedNo of Sub-Station Commissioned

    Rural AreaUrban AreaRural AreaUrban AreaRural AreaUrban Area

    Under GPVVYUnder STPUnder GPVVYUnder STPUnder GPVVYUnder STP

    123456789101112

    1Jodhpur33934171333130000

    2Pali31831142911000

    3Sirohi14914101310000

    4Jalore26812201020000

    5Barmer40223201810000

    6Jaisalmer12815211421000

    Total J.Z.16041292518117202000

    7Bikaner21918311551000

    8Hanumangarh25116121701000

    9SGNGR*3203104903000

    10Churu24930501640000

    1132300100000

    Total B.Z.107198975895000

    Total Discom26752273425175297000

    No of Gram PanchyatNo of Sub-Station to be installedNo of Sub-Station work order IssuedNo of Sub-Station Commissioned

    26752862110

    GoR-D-11

    Progress of Distribution Companies (JODHPUR DISCOM)

    Status of connection pending to release to Government Schools (FY 2011-12)

    Upto the Month:-June,11GOR-D-11

    S.No.Name of CircleName of DistrictNo. of applications pendingNo. of Demand Notes issued out of col(5)No. of DN depositedNo. of Demand Notes to be issued Col (5-6)No. of connections released up to the monthNo. of connections pending whose D.N. DepositedRemarks (reasons of pendency)Expenditure(Rs in Crs)% of Utilization

    As on 31.03.2011 but DN not issuedReceived during FY 11-12Total(3+4)DN deposited as on 31.03.11DN deposited during FY 11-12 out of col(5)

    123456789101111121314151617

    1CITYJODHPUR000000000

    2DISTRICTJODHPUR583896825938143859

    TOTAL JODHPUR DISTT.5838968259381438590

    3PALIPALI12132515141371512

    4SIROHISIROHI21719187151164

    5JALOREJALORE4232721272361634

    6BARMERBARMER0000301201824

    7JAISALMERJAISALMER000084093

    JODHPUR ZONE7691167136145105281121360

    8BIKANERBIKANER448544353

    9HNGH.HNGH.336454181

    10SGGNR.SGGNR.088706160

    CHURUCHURU1326393584243317

    P.S. LADNU314318118

    11TOTAL CHURU CIRCLE16274338950534250

    BIKANER ZONE2342655418641053290

    TOTAL DISCOM99133232190163169381651650

    GoR-D-11 E

    JODHPUR VIDHYUT VITRAN NIGAM LIMITED,JODHPUR.

    STATUS OF CONNECTIONS PENDING TO RELEASE TO GOVT. SCHOOLS

    Upto the Month:-June,11

    S.noName of CircleName of DistrictSTATUS AS ON 1.4.2011APPL. RECD./ RE-OPEN DURING 2011-12TOTALD.N. ISSUED UPTO REPORT MONTH 2011-12D.N. DEPO. UPTO REPORT MONTH 2011-12APPLI. CANCEL UP TO REPORT MONTH PRIOR D.N. ISSUEDAPPLI. CANCEL UP TO REPORT MONTH PRIOR D.N. DEPO.APPLI. CANCEL UP TO REPORT MONTH AFTER D.N. DEPO.CONNE. RELEASED UPTO REPORT MONTH 2011-12APPLICATIONS PENDING AT THE END OF THE MONTH

    D.N. DEPO. BUT CONN. NOT RELE.D.N. ISSUED BUT NOT DEPO.D.N. TO BE ISSUEDTOTALD.N. DEPO. BUT CONN. NOT RELE.D.N. ISSUED BUT NOT DEPO.D.N. TO BE ISSUEDTOTAL

    D.N.DEP.D.N.D.N.TOTAL(10+11)(10+11)

    12345678910111213141516171819

    1CITYJODHPUR0000000000000000

    2DISTRICTJODHPUR595858175382138238063038593914112

    TOTAL JODHPUR DISTT.595858175382138238063038593914112

    3PALIPALI14212281341151330015124723

    4SIROHISIROHI7321217291815052164116

    5JALOREJALORE2774382361212304016341641

    6BARMERBARMER301204204201200018240024

    7JAISALMERJAISALMER840120120400093003

    JODHPUR ZONE14586763079139813610537221121364528209

    8BIKANERBIKANER4541341754000536312

    9HNGH.HNGH.51393124410081113

    10SGGNR.SGGNR.03038117600060415

    CHURUCHURU82213432669354209033176427

    P.S. LADNU15391103800018019

    11TOTAL CHURU CIRCLE92716522779385009034256536

    BIKANER ZONE183623774211954641905329171056

    TOTAL DISCOM1631229938413351719016948121651656238265

    Sheet1

  • Status of release of BPL connections *

    Name GOR-D

    GOR-D

    1 TO 11 For The Month of June, 2011

    Jodhpur Discom

    GOR-D-01

    Progress of Distribution Companies ( JODHPUR DISCOM) REVISED

    Status of AG. DN deposited & connections Released

    Upto the Month:-June,11GOR-D-01

    Sr. No.Name of DistrictNo of DN issued During 2011-12DN depositedAg. Connections released During 2011-12 out of Colmn. 8% Connection Released of Col.8Cancelled after D.N. Deposited During 2011-12Balance Pending for connection

    As on 31.03.11During 2011-12Total DN Deposited

    GENERAL CATEGORYOTHERSDuring the monthUpto the monthDuring the monthUpto the month

    12345678910111213

    1Jodhpur448948449736493781174182322731717.39161490796

    2Pali582366186317341447713367.555436241

    3Sirohi44319563825427044770111415.853657177

    4Jalore17571111868229718987121643826.74121122269

    5Barmer10924781570227368618845159911.723743250

    6Jaisalmer3944343715511214530022227.33027833

    Jodhpur Zone8757134710104157720193785536233159711.133947261766

    7Bikaner16451064270929280714100618737537.280631634

    8Hanumangarh9968310792052024036084814123.190467201

    9SGNGR524238762117253653715397.260498364

    10Churu126178320446626780487016718821.610682537

    1115116111314000.0001412

    Total Churu Cir.127678420606726881788416718821.610696549

    Bikaner Zone4441216966105657222470303541774324.48022921748

    Total Discom131983516167142142274162558397748134015.963970183514

    DN ISSUEDDN DEPOSITEDCANCELLEDPENDING

    JLRBMRJSMRJLRBMRJSMRJLRBMRJSMRJLRBMRJSMR

    86RE-7 SC18532261133325473006719734

    1393RE-9 GEN0548576711485218010701295819

    RE-10 SPL00025

    RE-11 FH000000000000

    RE-11A DRIP8118532671473300027525

    RE-11B DIGGI000

    TOTAL2665121417761183565248011891544858

    CONNECTION

    JLRBMRJSMR

    RE-7 SC14923573

    RE-9 GEN880807344

    RE-10 SPL1700

    RE-11 FH000

    RE-11A DRIP4010330

    RE-11B DIGGI00

    TOTAL10861145447

    DN ISSUEDDN DEPOSITEDCANCELLEDPENDING

    DCPALISIROHIDCPALISIROHIDCPALISIROHIDCPALISIROHI

    RE-7 SC426751594707216900010349179

    RE-8 TSP11645073

    RE-9 GEN80615144213116031421252402696

    RE-10 SPL10

    RE-11 FH212611180120114

    RE-11A DRIP323367030035380002474

    RE-11B DIGGI

    TOTAL831129366221324942031541379469966

    CONNECTION

    DCPALISIROHI

    RE-7 SC50760144

    RE-8 TSP536405

    RE-9 GEN22703442906476

    RE-10 SPL171

    RE-11 FH1108

    RE-11A DRIP2763334

    RE-11B DIGGI

    TOTAL3054447530

    GOR-D-2

    JODHPUR DISCOM

    Status of release of DL connections during FY 2011-12

    Upto the Month :-June,11GOR-D-02

    S.NoName of Distt./CircleApplication for DL connections pendingApplication for DL connections pendingconnections released During 2011-12Cancelled up the month out of (3) & (4)Pending at the end of Reporting month

    As on 31.03.11Received during FY 2011-12RuralUrbanTotalRuralUrbanTotal released

    RuralUrbanRuralUrbanDuring the monthup to the monthDuring the monthup to the monthDuring the monthup to the monthRuralUrbanRuralUrbanBPL DURING monthAPL DURING monthBPL DURING 2011-12APL DURING 2011-12

    123456345678910111212131415

    1City Circle021101523017341734005091372509137279.120003620000

    2Distt. Circle176201243494126211142502136491721503891955224110.72457718507152318861951955

    Total JU Distt.176203353494164921114198423098917215054714631464361315.96457718507514318861951955

    3Pali Distt.3858510352179373791303868289827172367351134345243.10622504040518089802717

    4Sirohi Distt.653101736292138939317822145485522826977644.8646679515902140548

    5Jalore Circle625112620742508325376870116452658811771726283537.05102920463817912815172732385

    6Barmer Distt375392561352345388916013949259920798821068722895.84262103655038192507921987

    7Jsm. Distt.357615202863576438401473127801751533027.531534482580730127

    Jodhpur Zone6949714801117736158067450958576943461027910872988543313267154.3347077592241798679782009251409505609719

    8Bikaner73606499636518323130096235891268205786794205421.381267043508058901268

    9Hanumangarh222631325137834739109658356842359228623912298254.06284352096438068402359

    10Sriganganagar3371204225899956291203683288719192988671185278643.7842841328229522865771842

    11Churu3751815178410535535186874034931417282892775230933.173351063783870049301417

    12127221326141159816217602285163412026263637.4658410243802280516

    Total Churu Cir.502383621101194713320309163721193331610121037294534.013931104807908072101933

    Bikaner Zone17980200278443627258245629314532881747910473288392810767153.2369160211117192172282149222859777402

    Total Discom8747734821902172421064981072411722272271775821346276936124034307.57162378023534290852064158273695463717121

    GOR-D-03

    Progress of Distribution Companies ( JODHPUR DISCOM)

    Status of release of BPL connections FY 2011-12

    Upto the Month:-June,11GOR-D-03

    Sr. NoName of DistrictBPL families as per Notification of GoR 2002Total BPL/Kutir Jyoti connections released as on 31.03.11Progress of release of BPL Connections FY 2011-12BPL AS ONRURAL DURING MONTH

    TargetReleasedBalanceTOTAL GoR-D-2APLBPL

    During the monthUpto the monthMMSLVYOTHER

    12345678

    1Jodhpur3565827928031195-195281239179778931

    2Pali531404823300004823389808980

    3Sirohi297091355200001355221402140

    4Jalore58655429770128273-273432501645603914128

    5Barmer74843225285091592925082322620599552-4592

    6Jaisalmer1593110433000010433730730

    Jodhpur Zone2679361656515091525156050355166211434612522843251

    7Bikaner84842408410000408415893182710

    8Hanumangarh43386367611101900110193676168406840

    9SGNGR634564653092482277917146607887086522

    10Churu656505087200005087249304930

    11328833170000331722802280

    Total Churu Cir.689385418900005418972107210

    Bikaner Zone260622178321202672277201901783982881318254122

    Total Discom5285583439727118227363770545344609722715705384273

    * Recently sanctioned by REC

    ** Pending for sanction with REC183949

    APRIL,102023

    852

    GOR-D-04(a) Dist. Wise

    Progress of Distribution Companies ( JODHPUR DISCOM)

    RGGVY Financial Status

    Upto the Month:-June,11GOR-D-04 (a)

    S.No.Name of Distrcit/DiscomNo. of SchemesSanctioned Cost (Rs. Lacs)Amount Released (in Lacs Rs.)Utilisation (in Lacs Rs.) (Tentavive)% Utilised

    1234567

    A. Sanctioned Before to Feb-08

    1HN.Garh (AREP)1222.85133.72211.95158.50

    2SG.Nagar (AREP)1681.69409.01520.84127.34

    3Jaisalmer (AREP)1603.53181.06593.00327.52

    4Jaisalmer11338.781144.251377.01120.34

    5Bikaner12333.901851.602047.76110.59

    6Sirohi11236.92963.30998.34103.64

    7Jalore12367.411805.321856.00102.81

    8Jodhpur12853.852385.922454.84102.89

    9Churu11962.481457.311583.14108.63

    101116.0687.5780.0091.36

    Jodhpur Discom(A)1013717.4710419.0611722.88112.51

    B. Sanctioned After Feb-08

    1Hanumangarh13256.161634.391560.0095.45

    2Sriganganagar13498.462042.10913.3944.73

    3Pali (PGCIL)12981.292377.792787.00117.21

    4Barmer (PGCIL)120995.8611272.6612055.00106.94

    Jodhpur Discom(B)430731.7717326.9417315.3999.93

    G.Total (A+B)1444449.2427746.0029038.27104.66

    1Jodhpur12853.852385.922454.84102.89

    2Pali12981.292377.792787117.21

    3Sirohi11236.92963.3998.34103.64

    4Jalore12367.411805.321856102.81

    5Barmer120995.8611272.6612055106.94

    6Jaisalmer21942.311325.311970.01148.65

    Jodhpur Zone732377.6420130.322121.19109.89

    7Bikaner12333.91851.62047.76110.59

    8Hanumangarh23479.011768.111771.95100.22

    9SGNGR24180.152451.111434.2358.51

    10Churu11962.481457.311583.14108.63

    11Nagaur (Ps. Ladnu)1116.0687.578091.36

    Total Churu Cir.22078.541544.881663.14107.65

    Bikaner Zone712071.67615.76917.0890.83

    Total Discom1444449.242774629038.27104.66

    GOR-D-04(b) Dist. Wise

    Progress of Distribution Companies ( JODHPUR DISCOM)

    Coverage & Progress under AREP & RGGVY Progress

    Upto the Month:-June,11GOR-D-04 (b)

    S.No.Name of DiscomNo. of SchemesCoverage ( Nos)Progress As on Month (Nos)% Achievement

    Electrification of Villages (DE/UE)Intensive ElectrificationConn. To BPLGen.DhaniesElectrification of Villages (DE/UE)Intensive ElectrificationConn. To BPLGen.DhaniesElectrification of Villages (DE/UE)Intensive ElectrificationConn. To BPLGen.Dhanies

    123456789101112131415161718

    A. Sanctioned Before to Feb-08

    1HN.Garh (AREP)14605163760460313322730100.000.00607.17604.520.00

    2SG.Nagar (AREP)1111012964701110400031620100.000.003100.78488.720.00

    3Jaisalmer (AREP)16002561237055035326091.670.0013.6726.350.00

    4Jaisalmer19834810112839869983227094690662100.0092.5370.1582.2389.86

    5Bikaner120558741481109513718055830744155603787.8095.0674.12142.09100.00

    6Sirohi1844724666899151844782461122350100.00100.0033.43124.8298.04

    7Jalore13066754217195821630524365892794016100.0078.5667.49142.68100.00

    10Jodhpur117388530365396731251738702119856399125100.0098.3169.81142.16100.00

    9Churu11184351488244787683135298319538754.5598.5868.561305.80100.00

    81097281426090962638505390.0098.9793.751943.46100.00

    Jodhpur Discom(A)10742387421604492562394707364814897516079538695.2894.1768.96173.7297.97

    B. Sanctioned After Feb-08

    1Hanumangarh1132157639319317042132525283002341532100.0033.3171.98738.6476.19

    2Sriganganagar1179250544133217253715262034940170902684.9224.7579.1778.6770.27

    3Pali (PGCIL)12191529334805517315913366583134713071.4399.78124.97389.1675.14

    4Barmer (PGCIL)1668123060124587313782071679363160012230.9913.5815.57272.451.60

    Jodhpur Discom(B)410006226172910388231630506222510926121050.6035.7463.190.0012.88

    G.Total (A+B)14174210100388954131385202412135873258236059669.6358.1566.390.0029.45

    Note:-Figures shown in shaded of column No. 6 (Coverage of Conn. to BPL) have been changed due to actual survey.

    1Jodhpur117388530365396731251738702119856399125100.0098.3169.81142.16100.00

    2Pali12191529334805517315913366583134713071.4399.78124.97389.1675.14

    3Sirohi1844724666899151844782461122350100.00100.0033.43124.8298.04

    4Jalore13066754217195821630524365892794016100.0078.5667.49142.68100.00

    5Barmer1668123060124587313782071679363160012230.9913.5815.57272.451.60

    6Jaisalmer215834810368963569153322712972326296.8492.5368.7675.0689.86

    Jodhpur Zone710584492209074918091812586324311918315014240555.3972.2057.01163.5422.35

    7Bikaner120558741481109513718055830744155603787.8095.0674.12142.09100.00

    8Hanumangarh2178157639835354642178525314332568832100.0033.3178.91724.4276.19

    9SGNGR2290250544262223723726362038940202522690.6924.7587.9890.5270.27

    10Churu11184351488244787683135298319538754.5598.5868.561305.80100.00

    11Nagaur (Ps. Ladnu)1097281426090962638505390.0098.9793.751943.46100.00

    Total Churu Cir.21194054302270796692737936370069654.5598.6269.861367.05100.00

    Bikaner Zone768456081798803957621262726301390539850619191.6746.9077.30248.9090.09

    Total Discom1417421010038895413138520241213587325823624864859669.6358.1566.39189.2529.45

    GOR-D-05

    Progress of Distribution Companies (JODHPUR DISCOM)

    Electrification of Villages & Dhanies FY 2011-12

    Upto the Month:-June,11GOR-D-05

    S.No.District & CircleElectrification of Dhanies & House Hold under MMSLVY

    DhaniesHouseholds

    Expected Dhanies less than 100 populationApplicationsDhanies SanctionedConnections CoveredDhanies ElectrifiedConnections Released

    Upto 31.3.11FY 2011-12TOTAL% ElectrifiedUpto 31.3.11FY 2011-12TOTAL% OF CONN. ELECT.CANCELLEDBALANCE

    During the Monthup to the MonthDuring the Monthup to the MonthGROUPAPPL.GROUPAPPL.

    12344567896.16666666676.66666666677.166666666710111213

    1Jodhpur54243843939972544229821538302075.5620436972372067381.266835710253617853

    2Pali232254321725501630016375.12165500165564.9069888WORK COMPLETED

    3Sirohi384153122522002270.9724100241107.1116174WORK COMPLETED

    4Jalore1337136531186109305168012764354.224526603956548250.1652862443623338

    5Barmer54073558718391142214559191154684.079138552552969084.841931256438328883

    6Jaisalmer50245592144681450014567.761110001110237.18223953793526

    Jodhpur Zone12940951967484510375283186256553974.0100037106125217453885176.12151114667766053600

    7Bikaner276717128125954749095395100479.7557713185706341115.84950556010566764

    8Hanumangarh959129589483008387.377800078087.2512132WORK COMPLETED

    9SGNGR ***10592810576799009994.2986300863112.52665WORK COMPLETED

    10Churu427267630115302410024180.07142500142593.14185124430187

    111347066831559005986.7633100331105.0875375110

    Total Churu Cir.561338236918453000030081.301756001756198.2166199813260161931197

    Bikaner Zone3528223501828898013915395148681.2900091703185709740513.81974870781228737611187158

    Total Discom164681175469312600176674239351702575.4400046276157023154859180.96273922043877860758

    16468117546924160017667400667472.2216210367000462760046276

    BKNR34942

    13649

    GOR-D-06

    Progress of Distribution Companies (JODHPUR DISCOM)

    Status of Consumers Grievances Redressal in Chhaupals FY 2011-12

    Upto the Month:-June,11GOR-D-06

    S.No.Name of Discom/District33/11 KV S/SProgress of Chhaupals organised during the monthProgress of Chhaupals organised upto the month

    No of chhaupals heldGrievances receivedRedressalNo of chhaupals heldGrievances receivedRedressal

    Related to billsOthersRelated to billsOthers% redressed (7+8)/(5+6)Related to billsOthersRelated to billsOthers% redressed (13+14)/(11+12)

    123456789101112131415

    1Jodhpur336601117511175100.0015830121130121100000100.00

    2Pali1074090419041100.0011022512222512200000100.00

    3Sirohi502550135013100.0076137461374600000100.00

    4Jalore169581305713057100.0014929211929211900000100.00

    5Barmer1681112017512016094.92333774853774500000095.94

    6Jaisalmer5235510555110103.1391702951702850000097.85

    Jodhpur Zone88219755646655645699.0253515021278150212330000098.38

    7Bikaner191000000.0022612149160000079.27

    8Hanumangarh89000000.003714939132370000089.89

    9SGNGR108000000.0078114461144600000100.00

    10Churu111000000.0067521625216200000100.00

    1111000000.00871171100000100.00

    Total Churu Cir.122000000.00755917359173100.00

    Bikaner Zone510000000.002123832793542720000094.56

    Total Discom139219755646655645699.0274718851557185615050000097.65

    00000000000000000

    16993667557736545428

    -1699-3667-5577-3654-542800000000

    JPR (During)

    GOR-D-07

    Progress of Distribution Companies (JODHPUR DISCOM)

    Progress of Vigilance Checking

    Upto the Month:-June,11GOR-D-07

    S. No.Name of DiscomTotal CheckingTheft DetectedRs. In lacs.No .of Complaint/FIRsNo .of Arrests

    AssessmentRealisation

    Last Year.This Year.% Incr.Last Year.This Year.% Incr.Last Year.This Year.% Incr.Last Year.This Year.% Incr.Last Year.This Year.% Incr.Last Year.This Year.% Incr.

    1234567891011121314151617181920

    1Jodhpur1767886-49.86522404-22.6175.2865.59-12.8740.1232.11-19.97729227.7881475.00

    2Pali557500-10.2348126162.5029.0028.02-3.3812.9518.6844.2581025.0000_

    3Sirohi195156-20.002316-30.434.322.11-51.161.271.5421.26022_01_

    4JALORE198184-7.071810-44.4422.3213.81-38.135.857.3425.47182116.6712100.00

    5Barmer840542-35.4814217-88.0354.6911.55-78.8821.249.22-56.59212519.05110.00

    6Jaisalmer9752-46.39233552.178.629.9014.854.202.15-48.811024140.0000_

    Jodhpur Zone36542320-36.51776608-21.65194.23130.98-32.5685.6371.04-17.0412919450.39101880.00

    7Bikaner5165639.113033226.2732.0931.16-2.9013.3222.0765.6938101165.7902_

    8HMH60370416.75224182-18.7527.9226.15-6.3419.5920.494.59122391.6738166.67

    9SGNGR875751-14.17567494-12.8754.9942.45-22.8027.2121.56-20.76354940.00112-81.82

    10Churu58580036.7539669174.4940.4327.29-32.5011.119.03-18.7221963-71.2302_

    1190-100.0080-100.000.160.00-100.000.000.00_00_00_

    Bikaner Zone258828188.891498168912.75155.59127.05-18.3471.2373.152.70304236-22.3714140.00

    Other22258-73.8712240-67.2150.585.47-89.1919.246.94-63.93467-84.7800_

    Total64645196-19.6223962337-2.46400.40263.50-34.19176.1151.13-14.18479437-8.77243233.33

    GOR-D-08

    Progress of Distribution Companies (JODHPUR DISCOM)

    Progress of feeder Renovation Programme FY 2011-12

    Upto the Month:-June,11GOR-D-08

    S.No.Name of DiscomFeeders Renovated up to the monthExpected date of completion for feeders convert from B to APhysical ProgressExpenditure (Rs in Crs)% of UtilisationFeeders Renovated up 31.03.09Feeders Renovated during 2009-10Feeders Renovated up 31.03.10Feeders Renovated during 2010-11Feeders Renovated up 31.03.11Feeders Renovated during 2011-12

    TargetA- typeB typeTotal (A+B)% Completion

    FeedersVillagesFeeders (4+5)Villages getting supply at par with nearby urban TownFeeders (7/3)*100Villages (8/4)*100Installation of small new type 3-phase Xformers (with Mtrs. MCCB etc) in nosInstallation of small new type 1-phase Xformers in nosLaying of AB Cable in Kms.Installation of pushfit type mtrs. In no.SanctionedUtilised Up to the month

    123456789101112131415161718

    1Jodhpur7771058687907771058100.00100.00195415053458432970406824881966843

    2Pali3359153350335915100.00100.001169422019117954618414532963350

    3Sirohi1294551290129455100.00100.0055071352107513530345791381290

    4Jalore4806974800480697100.00100.001907833751580296911421583001804800

    5Barmer4781264417614781264100.00100.001400531863836195602145927311038334

    6Jaisalmer1275021270127502100.00100.00178540843732757038108191270

    JODHPUR ZONE23264891217515123264891100.00100.0061085175941342317857210505391589549213837

    7Bikaner3686623680368662100.00100.0060641112119051935130210340283680

    8Han.garh229162922902291629100.00100.0033974267243153164229022902290

    9SGNGR214262321402142623100.00100.0050053987404150943214021402140

    10Churu24094622713240946100.00100.008352281155347192382371199821710

    1130973003097100.00100.0094137958074171301317300

    BIKANER ZONE1081595710681310815957100.00100.00237591255613776235382668247915143105810

    Discom3407108483243164340710848100.00100.0084844301502719941395417187862504692319647

    A type :- Where 1 Phase & 3 Phase transformer work is completed.

    B type:- Where 1 Phase transformer work 100 % completed but 3 phase transformer work partially complete.

    GoR-D-08(b)

    Progress of Distribution Companies (JODHPUR DISCOM)

    Statement of Progress of 3 PhaseTransformers under FRP

    Upto the Month:-June,11GOR-D-08(b)

    S.NoName of Discom / DistrictTotal no of 3 phase transformers to be installed under FRPTotal no of 3 phase transformers installed up to last MonthTotal no of 3 phase transformers installed during the MonthTotal no of 3 phase transformers installed up to the MonthBalance transformers to be installedTotal no of 3 phase transformers installed up to 31.03.09Total no of 3 phase transformers installed during 2009-10Total no of 3 phase transformers installed up to 31.03.10Total no of 3 phase transformers installed during 2010-11Total no of 3 phase transformers installed up to 31.03.11Total no of 3 phase transformers installed during 2011-12

    1234567

    1Jodhpur204381941812319541897586338909753900118754787

    2Pali116911690116904027671169011690

    3Sirohi55075507055070144716813128237955070

    4JALORE1907819078019078083755312136875391190780

    5Barmer145631375025514005558476125947355611213467538

    6Jaisalmer178517850178502151325154024517850

    JOD.ZONE625406070737861085145521063155693663223128597601325

    7Bikaner6064606406064020303781581125360640

    8Hanumangarh33973397033970339703397033970

    9SGNGR*50055005050050500505005050050

    10Churu8384834578352323211183850493276832527

    11Nagaur (Ps. Ladnu)94194109410181982796629410

    Total B.Z.2379123752723759321382457171954141912373227

    Total Discom863318445938584844148734887212865617327319834921352

    *Note:- Revised Progress by per SE (Plan) during the month Jan-10

    GoR-D-09(a)

    GoR-D-09(b)

    GoR-D-09(c)

    Progress of Distribution Companies (JODHPUR DISCOM)

    Circle wise T&D Losses

    Information Upto:-May,11Reporting the Month:-June,11GOR-D-09 (C)

    S.No.Name of CircleT & D Loss for previous year 2010-11T & D Loss for current year 2011-12

    T & D loss for the MonthT & D loss up to the MonthT & D loss for the MonthT & D loss up to the Month

    Energy SuppliedEnergy Billed% T&D lossEnergy SuppliedEnergy Billed% T&D lossEnergy SuppliedEnergy Billed% T&D lossEnergy SuppliedEnergy Billed% T&D loss

    1234567891011121314

    1City Jodhpur1022.36835.5818.271917.441577.9317.711016.07844.4216.891920.271619.3715.67

    2Distt. Jodhpur2281.311628.3428.624877.373480.2228.652409.281953.1718.935647.603826.4932.25

    4Jalore1164.931056.469.312392.012011.1415.921100.791075.232.322317.172059.9711.10

    3Pali1289.561101.4414.592538.502135.8215.861427.571190.5216.613026.392502.8817.30

    5Barmer1068.30815.4523.672188.501756.0019.761031.68886.1114.112341.431891.8519.20

    Total Ju.Zone6826.465437.2720.3513913.8210961.1121.226985.395949.4514.8315252.8611900.5621.98

    6Bikaner1547.171420.548.183668.742640.7928.021754.181730.371.364466.213296.4926.19

    7Hanumangarh483.90476.151.601112.691036.166.88461.54474.83-2.881042.741119.54-7.37

    8SGNGR715.80587.3917.941376.841117.4318.84692.99581.7016.061349.821132.7016.09

    9Churu805.53711.3211.701858.081309.1529.54919.90858.796.642177.711580.5127.42

    Total Bik. Zone3552.403195.4010.058016.356103.5323.863828.613645.694.789036.487129.2421.11

    Total Discom10378.868632.6716.8221930.1717064.6422.1910814.009595.1411.2724289.3419029.8021.65

    GoR-D-10

    Progress of Distribution Companies (JODHPUR DISCOM)

    33 KV Sub-Stations Works Progress

    Upto the Month:-June,11GOR-D-10

    S.No.Name of Distt. / CircleNo of Gram PanchyatNo of Sub-Station to be installedNo of Sub-Station work order IssuedNo of Sub-Station Commissioned

    Rural AreaUrban AreaRural AreaUrban AreaRural AreaUrban Area

    Under GPVVY


Recommended