MUAROJAMBI BIOMAS POWER PLANT August 5, 2010
Transcript
  • MUAROJAMBI BIOMAS POWER PLANT

    August 5, 2010

  • Huge resources !

    Why EFB / palm shell?

    8.2m TON

    X TON X TON

    The BACKGROUND

    2

    65.5m TON 13.6m TON8.2m TON

    Continous supply Easy to collect Good calorific value Can be fermented EFB currently has no value

  • CPO Mass Balance

    3

  • CPO Waste Potential in JAMBI

    4

    Biomass Potential in JAMBI

    No POM Unit Capacity FFB Biomass (T/Month) RemarksEFB Shell Fiber

    BSP (T/H) (T/M)*** 21% 6% 16% (/FFB ratio)*1 SNP 1 30 10,028 2,106 602 1,604 actual2 EMAL 1 60 12,367 2,597 742 1,979 actual3 AGW 1 60 18,700 3,927 1,122 2,992 actual4 DOMAS 1 1 60 28,500 5,985 1,710 4,560 estimate5 DOMAS 2 1 60 28,500 5,985 1,710 4,560 estimate

    Sub Total 5 270 98,095 20,600 5,886 15,695 KAB.JAMBI**

    1 BTG HARI 3 145 72,500 15,225 4,350 11,600 estimate2 MUARO JAMBI 10 405 202,500 42,525 12,150 32,400 estimate3 BUNGO 4 135 67,500 14,175 4,050 10,800 estimate4 SAROLANGUN 1 57 28,500 5,985 1,710 4,560 estimate5 MERANGIN 5 215 107,500 22,575 6,450 17,200 estimate6 TANJAB BARAT 6 254 127,000 26,670 7,620 20,320 estimate7 TEBO 4 150 75,000 15,750 4,500 12,000 estimate

    Sub Total 33 1361 680,500 142,905 40,830 108,880 TOTAL 38 1631 778,595 163,505 46,716 124,575

    *) source: Indonesian Oil Palm Research Institute (IOPRI)

    **) source: dari website pemerintah propinsi Jambi

    ***) t/h x 20 hr ops ops x 25 working days

  • Project name Biomass Power PlantLocation Sungai Gelam, Kab Muaro Jambi, Jambi

    ProvinceFuel/feedstock Empty Fruit Bunch (EFB) + shellCapacity Up to 10 MWDistance to PLN Grid Up to 8 kmDistance to Mill Less than 10 kmOff Taker PLN S2JBIndicative price Rp. 787.2 /kWhArea 5 Ha

    The PROJECT

    5

  • 6Confirmed supply from: Agrowiyana - Sarolangun Sumbertama Nusa Pertiwi -

    Muarojambi Eramitra Agro Lestari

    Tanjung Jabung Barat

    Those mills under BSP group

  • The LOCATION

    7

    POM 3Tanjung jabung barat

    POM 2Pauh Sorolangun

    POM 1Kumpeh, muarojambi

    Jambi Town

  • Location Matrix

    8

    Nama Lokasi

    Uraian satuan

    Nama Gardu Hubung / Gardu Induk GH Sei Gelam GH Sei Gelam GH Sei Gelam GI Aur Duri

    Jarak plant ke GH atau GI km +/- 4 +/- 3 +/- 121) +/- 3

    Laluan Jaring 20kVTepi Jalan dan cenderung bebas dari pepohonan

    Tepi Jalan dan cenderung bebas dari pepohonan

    Tepi Jalan dan cenderung tidak bebas dari pepohonan

    Tepi Jalan dan cenderung bebas dari pepohonan

    Jarak ke PKS sumber km +/- 18 +/- 17 +/- 5 +/- 46

    Jarak plant ke Sumber air meter +/- 200 +/- 50 +/- 100 +/- 50

    Nama Sumber airPertemuan Sungai Toman & Sungai Air Merah

    Sungai Air Merah Sungai Parit (anak Sungai Kumpeh)Rawa bantaran Sungai Batanghari

    Kondisi Aliran sepanjang tahun Tidak pernah kering2) Tidak pernah kering2) Tidak pernah kering2) Tidak pernah kering2)

    Kondisi Kualitas air

    pH 5,59 5,52 3,86 6,34

    Turbidity NTU 7,53 11,00 12,80 88,00

    Conductivity s/cm 16,00 17,00 73,00 41,00

    Kandungan Amonia mg/ltr

  • Alternative Location

    9

    Alternatif Lokasi

    Sei Gelam1 & 2

    Altenatif Lokasi

    Desa Parit

    Alternatif Lokasi

    Aur Duri

    Alternatif Lokasi

    Sei Gelam1 & 2

    Altenatif Lokasi

    Desa Parit

    Alternatif Lokasi

    Aur Duri

    Factors to be considered:

    Distance to mills Distance to grid Water availibility

  • Distances from PLANT

    10

    GH PLTD GasSei Gelam

    dariGH The Hok

    Ke Desa Tangkit

    Ke DesaPetaling

    Titik PencabanganSei Gelam

    Alternatif 2 LokasiPLTBS Sei Gelam

    +/- 0,8 km

    +/-2

    km

    +/- 2 km

    Alternatif 1 LokasiPLTBS Sei Gelam

    +/-1

    km

    GH PLTD GasSei Gelam

    dariGH The Hok

    Ke Desa Tangkit

    Ke DesaPetaling

    Titik PencabanganSei Gelam

    Alternatif 2 LokasiPLTBS Sei Gelam

    +/- 0,8 km

    +/-2

    km

    +/- 2 km

    Alternatif 1 LokasiPLTBS Sei Gelam

    +/-1

    km

  • Common Scheme of PLTBS

    11

  • 12

    Deskripsi singkatan basis analisis satuan TBK Press Cangkang

    Total Moisture TM ar % wgt 52,23 3,97Inherent Moisture IM adb % wgt 4,72 5,45Ash A adb % wgt 4,73 7,54Volatile Matter VM adb % wgt 75,89 69,58Fixed Carbon FC adb % wgt 14,66 17,43Sulphur S adb % wgt 0,12 0,08Gross Calorific Value GCV adb kcal/kg 5334,0 4500,0Calorific Value CV daf kcal/kg 5891,0 5172,0Carbon C adb % wgt 52,80 48,10Hydrogen H adb % wgt 7,05 5,36Nitrogen N adb % wgt 0,82 0,53Oxygen O adb % wgt 29,77 32,96

    Proximate & Ultimate Analysis

    Deskripsi satuan TBK Press Cangkang

    SiO2 % 35,30 72,30Al2O3 % 1,78 7,95Fe2O3 % 12,60 10,10MgO % 4,79 0,59CaO % 5,65 1,46Na2O % 1,06 0,14MnO % 0,25 0,05TiO2 % 0,25 0,41P2O5 % 4,10 0,82SO3 % 2,73 0,34K2O % 24,20 2,08

    Ash Composition

  • Mills vs Biomass Steam Power Plant

    13

    -

    50,000

    100,000

    150,000

    200,000

    250,000

    300,000

    350,000

    400,000

    450,000

    500,000

    30 ton 60 ton 90 ton

    EFB Shell PLTBS 5MW PLTBS 7Mw

    (mill

    ion

    kca

    l)

  • KOMPOFERM Technology

    14

    Raw material FermentedMethane

    GasElectricity

  • EFB Biogas Yield

    15

  • Kompoferm Process

    16

  • Financial Analysis &Comparision

    PLTBS 5MW PLTBS 7MW Kompoferm

    Installed Capacity 5.5MW 8.2MW 10MW

    Technology Steam boiler Steam boiler Fermentation

    Feedstock EFB + shell EFB + shell EFB

    Investment 7,371,703 11,867,808 15,989,130

    Debt to Equity ratio 30:70 30:70 30:70

    Project life 20 years 20 years 20 years

    IRR project 15.70% 14.56% 16.45%

    Payback period 4.92 year 5.33 year 5.86 year

    17

    More clean, no air pollutant Easy to handle No shell used Easy to expand

  • SCHEDULE

    18

    Start Finish Duration 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

    1 Site Reconnaissance 1

    2 Preparation of Project Summary or Pre FS for applying permit 1 2 2

    3 Obtaining approval for IPP on this area 2 3 2

    4 Prepare Proposal to be submitted to PLN WS2JB 4 5 2

    5 Proposal Submit 5

    6 Presentation PLN WS2JB upon agreement of proposal 6 6 1

    7 Negotiation with PLN WS2JB for proposed Generated Power Tariff 7 8 2

    8 Issuence of Head of Agreement by WS2JB 8

    9 Prepare Full FS and Environmental assesment and other related study 4 8 5

    13 Preparation of PPA (Power Purchase Agreement) 8 9 2

    14 Signing PPA 9

    15 Project Effective Date 9

    16 Design & Proposal 9 12 4

    17 Contraction Work 9 24 16

    18 Pillig & Foundation 9 14 6

    19 Steam Blow Out 20

    20 First Steam Admission 22

    21 1st Synchronising 22

    22 Commisioning 24 26 2

    23 COD 26

    No Activities Period, month

  • thank you.

    19

    Mega Plaza, 12th floorJl. HR. Rasuna Said Kav.C-1Jakarta SelatanP. 021 521 2966F. 021 521 2967

    Yayan Cahyana - [email protected] Zenal Mutakin [email protected]

    Slide Number 1The BACKGROUNDCPO Mass BalanceCPO Waste Potential in JAMBIThe PROJECTSlide Number 6The LOCATIONLocation MatrixAlternative LocationDistances from PLANTCommon Scheme of PLTBSSlide Number 12Mills vs Biomass Steam Power PlantKOMPOFERM TechnologyEFB Biogas YieldKompoferm ProcessFinancial Analysis &ComparisionSCHEDULESlide Number 19


Recommended