Scope of Presentation Introduction and Background
Key achievements
Audit findings and plan
Challenges
22
Introduction and Background The NPA is mandated to institute criminal proceedings on
behalf of the state and to carry out any necessary functions incidental thereto.
The NPA is programme 4 within the DoJ&CD budget vote
and the Director-General is the Accounting Officer.
Certain functions have been delegated to the CEO and other
officials in the NPA.
33
Introduction and Background cont.
Aim of the NPA:
The NPA provides a coordinated prosecuting service that
protects certain witnesses and removes the profit from
crime.
The NPA had a particularly excellent year in terms of its
performance with substantial improvements in most areas.
44
Introduction and Background Cont.
The NPA has four sub-programmes: Public Prosecutions provides for general prosecutions and
several specialist prosecution units Witness Protection Programme provides for protection,
support & related services to witnesses. Asset Forfeiture Unit seizes assets that are the proceeds
of crime or have been part of an offence through a criminal or civil process.
Support Services provides corporate services support
55
NPA Budget vs. Exp as at 31/3/2010Per Sub-Programme
66
2009/10
AdjustedAppropriation
Shifting of Funds Virement Final
Appropriation Actual
Expenditure Variance % Spend
R'000 R'000 R'000 R'000 R'000 R'000 %
Public Prosecutions 1,581,402 484 -45,083 1,536,803 1,526,854 9,949 99.4%
Witness Protection Programme 127,611 6,597 -13,985 120,223 120,223 - 100.0%
Directorate Of Special Operations 143,699 842 -41,974 102,567 102,567 - 100.0%
Asset Forfeiture Unit 73,475 5,061 - 78,536 78,536 - 100.0%
Support Services 459,286 -12,984 -42,569 403,733 400,535 3,198 99.2%
Total 2,385,473 - (143,611) 2,241,862 2,228,715 13,147 99.4%
Establishment
Number of Posts (Including
contract posts)
Number of Posts Filled
including contract
appointments
Number of Vacant Posts
Vacancy
Rate
08/09 6243 4690 1553 24.9%
09/10 5562 4643 919 16.5%
77
88
Public Prosecutions: NPS
The NPS is responsible for achieving the following key measurable objectives:
Increase the number of cases finalised by 2 %
Increase the number of cases finalised (including diversion)
by 2 %
Maintain the high conviction rates in all courts
Achievement of NPS on ENE Targets and Indicators
Sub-
ProgrammeIndicator
Target
Actual
Deviation
Notes
2009/10 2009/10
Public Prosecutions
Outstanding court roll at the end of each financial year 236,983 230,477 -2.7%
Reduced inflow and increased finalisation rate resulted in a reduced outstanding court roll
Number of cases finalised: with diversion: NPS 404,229 469,541 16.2%
A significant improvement due to focus on performance management and monitoring
Number of cases finalised: without diversion: NPS 317,677 350,910 10.5%
A significant improvement due to more courts in session and increased focus on performance management
Conviction rate:
High courts86.0% 87.7% 2.0% Increase
Conviction rate:
Regional courts74.0% 73.6% -0.6% Reduction
Conviction rate:
District courts87.0% 90.5% 4.0% Increase
Conviction rate:
Sexual offences courts 66.0% 68% 2.6% Increase
9
Highlights of Achievement The NPA showed a marked improvement in service delivery
targets in most areas in the past year
The finalisation rate improved by 12.5%
Increased cases finalised by means of ADRM by 31.1%
The cases withdrawn was decreased by 15.6%
An increase in conviction rates was also recorded
10
Additional Indicators
The NPS in addition to the ENE indicators and targets monitors several other key indicators.
The NPA has also defined it key indicators which enables
the reader to better understand how the reported figures are
calculated. These are included in the annual report on page
50-52.
1111
Service Delivery Achievements:
Indicator 2007/08 2008/09 2009/10 Progress
Total cases finalised
incl ADRM388,344 431,601 469,541 +8.8%
Admission of Guilt(S57A) 30,115 38,015 46,170 +21.5%
Informal mediation 15,393 38,032 68,270 +79.5%
Cases finalised with verdict and through diversion
343,126 355,554 401,271 +12.9%
Diversions 46,470 43,729 50,361 +15.2%
Cases finalised excl diversions 296,656 311,825 350,910 +12.5%
Cases finalised
(Sat & Add crts)3,503 4,497 4,587 +2.0%
New cases 1,037,538 1,058,298 1,044,346 -1.3%
Decision dockets received - lower crts 452,997 488,780 554,806 +13.5%
Withdrawals 305,893 286,837 242,103 -15.6%
Backlog cases (cases older than 12 m in HC, older than 9 m in RC, 6 m in DC)
39,736 42,495 38,563 -9.3%
Conviction rate 85.9% 86.3% 88.6% +2.7%
1212
Performance Overview of Public Prosecutions
131313
Cases Removed
595 728
New Cases
1 044 346
Total Finalised
469 541
Finalised Verdict
350 910
ADRM
118 631
INPUT OUTPUT: CASES DISPOSED
FORUM NEW CASES
CASES REMOVED FROM
THE ROLLCASES FINALISED
WITHDRAWN/
WARRANTS/
TRANSFERS/
STRUCK OFF ROLL/MENTALS
ADRM VERDICT CONVICTION RATE
HIGH
COURTS1 230 128 1 235 87.7%
REGIONAL COURTS 81 873 46 427 2 110 38 852 73.6%
DISTRICT COURTS 961 243 549 173 116 521 310 823 90.5%
14
Performance Overview of Public Prosecutions
Finalisation of Cases: District Courts
15
Sec 57A - AG Guilty Not GuiltyInformal
Mediation
Diversion
Adult
Diversion
Children
45 986 235 304 29 533 66 542 34 070 15 909
Finalisation of Cases: Regional Courts
16
Sec 57A - AG Guilty Not GuiltyInformal
Mediation
Diversion
Adult
Diversion
Children
184 28 394 10 274 1 728 118 264
Finalisation of Cases: High Courts
17
Guilty & Sentenced Not Guilty Minimum Sentences Confirmed
Minimum Sentences Remitted
1045 152 38 8
Priority Crimes Litigation Unit (PCLU)
PCLU primarily provides prosecution support to investigators in focus areas
The Missing Persons Task Team is managed by the PCLU
and the following was achieved:
• Robben Island Prisoners Project
• Tracing of remains of persons executed between 1960-
1970 – Post Chalmers cases (Pebco 3 and COSAS 2);
Langa six, Zinto Cele)
18
191919
Performance Overview of Specialised Commercial Crime Unit (SCCU)
Measurable Objectives
Increase the number of cases finalised by the specialised commercial crime
unit by 2%
Maintain the high conviction rate
Highlights of Achievement: SCCU 4 887 new cases (including decision dockets) were received
and 2 832 were disposed (58%)
Conviction rate of 93.66% was achieved on those enrolled
246 cases were withdrawn compared to 356 in the previous
year by the dedicated courts (30% reduction)
186 cases were referred to the AFU with an estimated value
of R250m
2020
21
Service Delivery Achievements: SCCU
Indicator 2008/09 2009/10 Progress
Number of courts 9 9 +0.0%
Convictions 1,408 1,025 -27.2%
Conviction Rate 93.70% 93.66% -0.04%
Cases enrolled for trial 1,919 1,339 -30.2%
Cases disposed of 3,529 2,832 -19.8%
2121
22
Service Delivery Achievements: Sexual Offences and Community Affairs (SOCA)
Indicator 2008/09 2009/10 Progress
Number of dedicated courts 50 42 -16.0%
Conviction rate: Dedicated Courts 66.7% 67.7% +1.5%
Number of Thuthuzela Care Centres 17 20 +17.6%
Conviction rate: TCC’s 61.2% 64.5% +5.3%
2222
A training manual on Child Justice was developed and 349
prosecutors trained
Policy Directives on Child Justice were prepared
Training provided to 239 prosecutors on sexual offences
Domestic Violence Statistics tool developed
Baseline study report on the level of awareness on human
trafficking was conducted
Hosted Human Trafficking Awareness week
232323
Highlights of Achievement: SOCA
Sub-programme 2: OWP Performance against ENE Targets
2424
Sub-Programme IndicatorTarget Actual
Deviation Notes2009/10 2009/10
Witness Protection
Number of witnesses harmed
or threatened0 0 0.0%
Percentage of walk-offs 14.0% 29.0% 107.1%
The amended definitions as previously reported contributed to this factor. The definition has been amended and submitted for approval
25
OWP: Service Delivery Achievements
Indicator 2008/09 2009/10 Progress
Witnesses 218 398 +82.6%
Total including families 431 743 +72.4%
Witnesses harmed 0 0 0%
Walking off program (%) 19.2% 28.0% +45.8%
Formal grievances laid (%) 2.4% 0% +0.0%
2525
Measurable Objective
Increase the value of freezing orders to R360m
Number of cases
New restraints 13% above target
Orders 11% above target
262626
Sub-programme 3: Asset Forfeiture Unit (AFU)
AFU Highlights of Achievement: Value Value of new restraints 36% above target
Value of confiscation orders: 23% above target and second
highest ever
Value of deposits into CARA: 48% above target and 2nd
highest ever
Value of orders in favour of victims of crime: 50% above
target and 2nd highest ever
2727
28
AFU: Service Delivery Achievements
Indicator 2008/09 2009/10 Progress
New restraint orders (no.) 275 316 +14.9%
Value of new restraints
(R'000)R 320,254 R 491,000 +53.3%
Completed forfeiture cases (no.) 277 271 -2.2%
Value of assets forfeited (R'000) R 271,588 R 185 ,000 -31.9%
Money paid to CARA R 65,933 R 51.700 -20.9%
Success rate (overall) 86.5% 92.4% +6.8%
Success rate in judgments 63.2% 57.7% -8.7%
2828
29
Challenges Vacancy rate within the prosecutorial component
Case flow related problems and absence of key role players
Lack of promotion of the use of other languages
Prosecutorial and investigative capacities in the NPA and
SAPS
Sub-programme 4: Support Services for NPA
Measurable Objective
Sub-programme aims to ensure effective leadership, management &
administrative support to NPA through continuous refinement of
organisational strategy & structure in compliance with appropriate
legislation & best practice
3030
Highlights of Achievement Quarterly performance reviews conducted
Top risk register developed
Strategic projects managed
Integrity reviews on state housing, management of sick
leave, vetting, implementation of performance mgt, policy
mgt and gift policy mgt.
58 of the 82 cases of misconduct received were investigated
by the IMU
3131
Highlights of Achievement Quarterly performance reviews conducted
Top risk register developed
Strategic projects managed
Integrity reviews on state housing, management of sick
leave, vetting, implementation of performance mgt, policy
mgt and gift policy mgt.
58 of the 82 cases of misconduct received were investigated
by the IMU
3232
Highlights of Achievement cont
National road-shows per plan
Public education and awareness on: human trafficking,
Domestic Violence and Sexual Offences.
Public exhibitions: Grahamstown Art festival, Royal Show,
Pretoria Show and Macufe.
OHS system rolled out at HO and 6 regions
3333
Highlights of achievement cont No staff harmed after implementing protection services
SISP completed and approved
EDRMS rolled out to four more regions
Network availability maintained at 92% uptime
Number of research projects undertaken
Increase in use of library services
3434
Human Resource Development
Conducted a comprehensive skills needs identification process
Successfully rolled-out delivery of training
programmes, with a marked improvement
compared to the previous year.
Prosecution training conducted by Justice College
3535
Human Resource Development Highlights
3636
Programme Number of beneficiaries
PROFESSIONAL DEVELOPMENT PROGRAMME (including MDP, EDP & PDP)
210
SECRETARIAL TRAINING 102
PUBLIC ADMINISTRATION LEARNERSHIP 54
PERFORMANCE MANAGEMENT 95
Human Resource Development Highlights
3737
Programme Number of beneficiaries
PROFESSIONAL DEVELOPMENT PROGRAMME (including MDP, EDP & PDP)
210
SECRETARIAL TRAINING 102
PUBLIC ADMINISTRATION LEARNERSHIP 54
PERFORMANCE MANAGEMENT 95
Human Resource Development Highlights Cont. ITEM DESCRIPTION 2008/09 2009/10
Interns 33 30
Bursaries 312 194
(decline in the no of applications)
3838
Human Resource Management and Development cont.
Employment Equity workshops conducted and EE Forums and the national forum set up
594 employees assisted with counseling services
64 employees dealing with sexual offences cases participated in trauma
management group sessions
Labour relations:
3% decrease in formal disciplinary matter
49% increase in external disputes
30% increase in grievances
20% increase in use of ADR
91% success rate in external disputes
3939
Grievances & Other Disciplinary Action (update) 2009/10 2008/09
Number of disciplinary hearings conducted for the period 72 74
Pending disciplinary hearings 23 35
Levels (main) of employees charges C5 and D1 and D2 prosecutors C5, D1 and D2 prosecutors
Employees suspended 2118
Employees precautionary transferred 0 3
External disputes 105 95
Pending external disputes 2871 (24) finalised
Number of grievances 175106
Number of grievances pending 6963
Number of appeals 12 12
Number of appeals pending 64
Number of labour court/high court matters 3626
Number of labour court/high court matters pending 2326
4040
Financial Management Asset Ware system introduced and all acquisitions since
2008 are accounted for by invoice, asset description, location, custodian, and bar code.
99,4% of voted funds spent
96% of S&T claims and advances are paid within a 4 day
turnaround time
4141
Audit Findings 2007/08 – disclaimer
2008/09 – qualified audit opinion (Tangible assets; intangible
assets; employee benefits; prepayments and advances; finance
leases; cash and cash equivalents; irregular expenditure)
2009/10 – qualified audit opinion (Tangible assets; irregular
expenditure; prepayments and advances; fruitless and wasteful
expenditure)
4242
2009/10 Audit Outcome – Tangible Assets
Opening balances not supported by a complete, updated asset register
No supporting documents for adjustments
amounting to R128 million made to movable
tangible assets – R1 valuation
Asset transfer process to SAPS incomplete
4343
2009/10 Audit Outcome – Employee Benefits
Completeness and leave entitlement amounting to R67 million and capped leave commitment of R105 million
4444
2009/10 Audit Outcome – Irregular Expenditure
Irregular expenditure understated with an estimated R108 million (extrapolation)
Uncertainty regarding nature of noted cases
amounting to R17 million
Implementation of cost-of-living adjustments for
prosecutors – R82 million
4545
2009/10 Audit Outcome – Prepayments and Advances
2005/06 sale-and-leaseback transaction
Not surrendered R19, 2 million to National Treasury
Forensic report completed after submission of
financial statements
4646
2009/10 Audit Outcome – Fruitless and Wasteful Expenditure
Qualitative finding
Slow progress with investigations into fruitless and
wasteful expenditure
Little movement amounts disclosed (R2, 8 million
and R1, 2 million)
4747
Audit Action Plan Verification of the records conducted to address
transfer of ex-DSO assets to SAPS
Leave audit being conducted to redress gaps
Audit firm appointed to address to investigate noted,
irregular & F&W cases
Detailed process flow to be developed to facilitate
compliance with payments within 30 days
4848
Audit Action Plan
Non-submission of the declaration of interests referred to Labour Relations for disciplinary process
96 Managers trained on performance management.
Planning cycle to reviewed effective December
2010
4949
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
Ninth Outline LevelClick to edit Master text styles
Second level Third level
Fourth level» Fifth level
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
Ninth Outline LevelClick to edit Master text styles
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
Ninth Outline LevelClick to edit Master text styles
Second level Third level
Fourth level» Fifth level
Progress on Audit Action Plan FindingsEx – DSO assets
ProgressVerification of the assets is being conducted in an effort to construct the asset register, to be followed by the reconciliation of the NPA and SAPS records. Scheduled end date is 31 November 2010.
5050
Incomplete Asset register
Photographs of assets being taken to sort out the description and ultimately valuation. The valuation method approved.Asset verification data received from all the business units to address location and custodian gaps on the assets register.
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
Ninth Outline LevelClick to edit Master text styles
Second level Third level
Fourth level» Fifth level
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
Ninth Outline LevelClick to edit Master text styles
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
Ninth Outline LevelClick to edit Master text styles
Second level Third level
Fourth level» Fifth level
Progress on Audit Action Plan FindingEmployee Benefits
ProgressLeave audit from date of employment of all officials being conducted to address leave management gaps. Audit up to 2007 completed. 2008 and 2009 is 50% completed. Scheduled end date 1 April 2011.
Circular 7 of 2010 issued on submission and capturing of leave.
Leave forms to be numbered to facilitate tracking and address non-submission by the officials.
5151
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
Ninth Outline LevelClick to edit Master text styles
Second level Third level
Fourth level» Fifth level
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
Ninth Outline LevelClick to edit Master text styles
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
Ninth Outline LevelClick to edit Master text styles
Second level Third level
Fourth level» Fifth level
Progress on Audit Action Plan Findings
Irregular expenditure
ProgressAudit firm appointed to address and investigate irregular expenditure cases.
Supply chain process being revised.
5252
Prepayment and advances
Fruitless and Wasteful expenditure
Forensic Audit Firm report being reviewed.
Audit Firm appointed to address and investigate Fruitless and Wasteful expenditure.
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
Ninth Outline LevelClick to edit Master text styles
Second level Third level
Fourth level» Fifth level
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
Ninth Outline LevelClick to edit Master text styles
Click to edit the outline text format
Second Outline Level Third Outline Level
Fourth Outline Level
Fifth Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
Ninth Outline LevelClick to edit Master text styles
Second level Third level
Fourth level» Fifth level
Progress on Audit Action Plan Findings
Performance information
ProgressVerification method in place.
5353
Internal Audit Audit plan revised, to be considered by Audit Committee in November 2010. Continuing professional development being addressed.
Non-payment of invoices within 30 days Detailed process flow to be developed to facilitate compliance. Monthly report to be provided to Audit Facilitator and Executive Manager: Finance for monitoring.
Performance Agreements Planning cycle to be reviewed effective December 2010.96 Managers trained on performance management.
Declaration of Financial interests Warning letters issued. Awaiting feedback from other business units.
Challenges
In addition to the above, the physically infrastructure
constrains, particularly at the lower courts, in terms of factors
such as accommodation, working conditions and other
resources, continue to pose challenges.
5454