Presentation to the Portfolio Committee on Trade and Industry on the NRCS’ Second Quarter Performance Report for the 2016-17 Financial Year 29 November 2016 Mr Edward Mamadise Acting Chief Executive Officer 1
Transcript
Page 1: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Presentation to the Portfolio Committee on Trade and Industry on the NRCS’ Second Quarter Performance

Report for the 2016-17 Financial Year

29 November 2016

Mr Edward Mamadise Acting Chief Executive Officer

1

Page 2: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

NRCS representation

Mr. Edward Mamadise Acting Chief Executive Officer

Ms. Reshma Mathura Chief Financial Officer

Ms. Meisie Katz General Manager Foods and Associated Industries

Mr. Bongani Khanyile General Manager Electrotechnical

Mr. Mandla Mkhabela Chief Information Officer

Mr. Edward Matemba Manager: Strategy and Risk

2

Page 3: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Scope of Presentation

Strategic Overview of the NRCS Strategic Goals, Mission, Vision Legislative mandate Regulated industries Highlights

Performance against Targets Non-Financial Performance Financial Performance

Challenges

3

Page 4: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

NRCS Strategy, Mission and Vision

NRCS Strategic Goals Mission & Vision

4

To ensure an optimally

capacitated institution

To develop, maintain and administer compulsory

specifications and technical regulations

To maximise compliance with all specifications

and technical regulations

To inform and educate our stakeholders

about the NRCS

Mission

• To develop compulsory specifications and technical regulations, and maximise compliance of regulated products and services

Vision

• A credible and respected regulator for the protection of the public, the economy and the environment

Page 5: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

5

National Regulator for Compulsory Specifications Act

(Act No. 5 of 2008)

Legal Metrology Act

(Act No. 9 of 2014)

National Building Regulations and Building Standards Act

(Act No. 103 of 1977)

The Foodstuffs, Cosmetics and Disinfectants Act

(Act 54 of 1972)

Mandate of the NRCS is derived from the following Acts.

Legislative Mandate

Page 6: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Industries regulated by NRCS

6

Industry Sector Product regulated / Service rendered Automotive Vehicles, Replacements components, Manufacturers Importers and

Builders Chemicals, Materials and Mechanicals

Building materials (Cement. Treated timber, Safety glass and other safety glazing material). PPE (Safety Footwear, Swimming aids, personal flotation devices, respirators

Electro-technical Electrical appliances and products, Electronic appliances and products

Foods and Associated Industries (FAI)

Fishery products, canned meat and processed meat

Legal Metrology Calibration of measuring instruments, weights, measures and gaming equipment

Building Regulations Ensure uniform interpretation of National Building Regulations and Standards Act, administer review Board

Page 7: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Key highlights

NRCS conducted 12 434 inspections 6 274 fishery and associated products consignment/productions 6 160 inspections for automotive, electro-technical, chemicals, materials and

legal metrology related products.

Non- Compliant Products NRCS found non-compliant products estimated at R123 million. The non-compliant

products included Fishery Products (Prawns), CFL’s, power supplies, pumps and filters, battery chargers, adaptors, lamp holders and paraffin stoves.

Electro-technical - non-compliant products was approximately R6,1 million, with Durban Port of Entry accounting for approximately 99%. Non-compliant products included CFL’s, luminaires, cord extension sets, incandescent lamps and adaptors. Durban Port of Entry accounting for approximately 99%.

Foods and Associated Products - The estimated monetary value of these non-compliant products was R75,4million.

Legal Metrology - The total monetary value of products tested R480 million. The value of products found non-compliant R 39 million

7

Page 8: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Progress on Commitments made to the Portfolio Committee

8

Page 9: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

BACKLOG SHORT-TERM INTERVENTIONS - UPDATE

9

COMMITMENT Progress to date

Separation of administrative from technical processes

• Developed and implemented Admin and Technical Evaluation checklists and processes.

Develop and piloted risk-based approach

• Low Risk: Renewals, Local Manufacturers and Low Risk Application ito. Products, Companies and Countries.

• Medium Risk: Products, Companies and Countries • High Risk: Products, Companies and Countries • Different approval routes used based on risk classification.

Human Resources • LOA approvals section resources have increased from 5 to 7 inspectors.

• Additional 2 candidate inspectors – Short-listing completed, recruitment process underway.

• 4 more positions are being created to further increase the staff complement to 13 inspectors.

Targeted to process 2500 applications by end October 2016

• Approved 1317 applications from 14 September to 30 October • Total workload by end October – 5231 with a backlog of 1615 • This intervention has been intensified to target processing more

applications by mid December and following months.

Page 10: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

10

Manual Implementation status

• Implemented RBA on Low Risk Applications.

• Implemented RBA on Renewal Applications.

• Piloting RBA on Medium Risk Applications.

• Piloting RBA on POE inspections.

• Piloting RBA on Retail inspections.

RISK BASE APPROACH - UPDATE

Page 11: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

NRCS Systems Improvements Progress – SHORT TERM INTERVENTIONS

• The NRCS appointed a service provider to improve current CRM system for a period of six months.

• Business requirements received from business and built into the system

• The building was completed and ICT is currently doing quality assurance before testing.

• User Testing is planned for the first week of December 2016 and thereafter implementation by the 16 of December 2016.

Page 12: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

NRCS Systems Improvements Progress – LONG TERM INTERVENTIONS

• The business Case for the Long Term intervention was approved by the CEO.

• A business requirement document was finalised with business and submitted to SCM.

• Business and ICT had engagements with providers locally to look at similar systems in order to enhance the process.

• The SCM process is currently on the Bid Specification Process stage.

• Bid to be advertised in January 2017

Page 13: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

13

NRCS Systems Improvements Progress – SHORT AND LONG TERM INTERVENTIONS

Document NRCS processes and identify areas of Improvement

Benchmark with similar entities for best practices

Re-Engineering of NRCS processes in line with

NRCS Strategic Objectives

& Implement an ICT Solution that meets NRCS

requirements

6 Months – 18 Months 68% Complete

08/1

6

09/1

6

12/1

6

01/1

7

11/1

6

10/1

6

06/1

7

01/1

8

12/1

7

10% Complete Completed Tasks

-Appointment of Service provider (6 Months period)

System Optimisation -Fix Errors on system -Allocate user roles System Enhancement -Gather Requirements -Document and Sign off

Completed Tasks -Project Approval

-Engagement with Local vendors

Page 14: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

SHORT TERM – CURRENT SYSTEM IMPROVEMENTS

14

Task Name Duration Start Finish % Complete

CRM Short Term intervention 150 days Thu 6/16/16 Wed 1/11/17 68%

-Appointment of Service provider 30 days Thu 6/16/16 Wed 7/27/16 100%

System Optimisation 30 days Mon 8/1/16 Fri 9/9/16 100%

-Fix Errors on system 30 days Mon 8/1/16 Fri 9/9/16 100%

-Allocate user roles 7 days Thu 9/1/16 Fri 9/9/16 100%

System Enhancement 42 days Thu 9/1/16 Fri 10/28/16 100%

-Gather Requirements 12 days Thu 9/1/16 Fri 9/16/16 100%

-Document and Sign off 3 days Wed 10/26/16 Fri 10/28/16 100%

Develop requirements into CRM 40 days Mon 10/31/16 Fri 12/23/16 96%

-Product Information 40 days Mon 10/31/16 Fri 12/23/16 98%

-Service Request information 40 days Mon 10/31/16 Fri 12/23/16 98%

Post System Implementation 3 days Mon 1/9/17 Wed 1/11/17 0%

Page 15: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

LONG TERM – NRCS MODERNIZATION PROJECT

15

Task Name Duration Start Finish %

Complete

NRCS Modernization Project 128 days Mon 5/23/16 Wed 11/16/16 10%

Proposal by Current Service Provider 17 days Mon 5/23/16 Tue 6/14/16 100%

Prepare a Business case 5 days Mon 5/23/16 Fri 5/27/16 100% Table Business Case with CEO 1 day Tue 5/31/16 Tue 5/31/16 100% Engage with Other Business Committees 1 day Tue 6/7/16 Tue 6/7/16 100% Brief Oracle on NRCS Requirements 1 day Tue 6/14/16 Tue 6/14/16 100% Presentation by Oracle to all Teams 1 day Tue 6/14/16 Tue 6/14/16 100%

Benchmarking Exercise 122 days Mon 6/13/16 Tue 11/29/16 47%

Engage Vendors and other Regulators 122 days Mon 6/13/16 Tue 11/29/16 47%

Benchmark with Other Regulators (Funded by DOE) 10 days Wed 11/16/16 Tue 11/29/16 0%

Request for information - RFI 164 days Mon 7/4/16 Thu 2/16/17 32%

Tender Specifications 56 days Mon 2/20/17 Mon 5/8/17 0%

Appoint Service Provider 30 days Wed 5/17/17 Tue 6/27/17 0%

Implement Project with Selected partner 179 days Mon 7/3/17 Thu 3/8/18 0%

Page 16: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Actual Performance Against set targets (Non-Financial performance)

16

Page 17: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Strategic Goal 1: To develop, maintain and administer compulsory specifications and technical regulations

17

Performance Indicator / Measure

Annual Target Quarter 2 Target Quarter 2 Actual Performance

Variance Reason for Variance

Number of new VC’s/Tech

Regulations submitted to the

dti for approval.

2 Compulsory

Specifications/

Technical

Regulations

0 Compulsory

Specifications/

Technical

Regulations

0 VC/TRs submitted to the dti for approval/1st gazetting

None

Number of VC’s/Tech

Regulations reviewed and

Review Reports produced

6 VCs/TRs

reviewed and

Review Reports

produced

1 2 Compulsory Specification reviewed

+100% Technical Specialists assigned with VC development duties to assist in meeting target and the projects spilled over from 2015/16 financial year

Number of Feasibility Studies

conducted 2 Feasibility

Studies

conducted

1 4 feasibility studies

conducted on

Smoked fish and live

bivalves

+300%

Administer Review Board: % of

Review Board decisions

finalised within 30 calendar

days

100% 100% 100% None

Page 18: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

SG 2: To maximise compliance with all specifications and technical regulations: Automotive

18

Performance Indicator / Measure

Annual Target

Quarter 2 Target

Quarter 2 Actual

Variance Reason for Variance Corrective Action

Number of Source

Inspections

conducted by the

NRCS automotive

business unit

3200 960 1214 +26% Implemented the recovery strategy due to non-achievement of Quarter 2 targets

Number of retail

inspections

conducted

800 240 340 +41,7%

Total: 4000

1200 1554

+29,5%

Percentage of automotive approval applications processed within the set timeframes.

100% 100% 95,39% (1 013 out of 1 028)

-4.61% Not all required documents/ information was submitted Increase in the number of Tyre Homologation applications

NRCS implementing the revised procedure to cancel applications with outstanding information. The adoption of the RBA to Tyre Homologations

Page 19: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

SG 2: To maximise compliance with all specifications and technical regulations: Chemicals, materials and mechanicals

19

Performance Indicator / Measure

Annual Target

Quarter 2 Target

Quarter 2 Actual

Variance Reason for Variance Corrective Action

Number of Source

Inspections CMM

business unit

2860 800 532 -33,5% Inspectors assisting with

approval applications.

CMM started with group

inspections and the second

phase in the

implementation of the

dormant VCs.

Resources dedicated to

Retail Inspections

Number of retail

inspections 3200 900 1182 +31%

Total: 6060

1700 1 714 +0,8%

Percentage of CMM approval applications

90% 90% 52% -38% Incorrect test reports for Safety Footwear Delays in the implementation of Treated Timber and Safety Footwear VCs

Page 20: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

SG 2: To maximise compliance with all specifications and technical regulations: Electro-technical

20

Performance Indicator / Measure

Annual Target

Quarter 2 Target

Quarter 2 Actual

Variance Reason for Variance

Corrective Action

Number of Source

Inspections -

electro-technical

business unit

2640 792 602 -24% Utilising inspectors within the approvals domain, in order to eradicate the backlog

None- Year to date target achieved

Number of retail

inspections

1760

528 629 +19%

Total: 4400

1320 1231 -6,7%

Percentage of Electro-technical approval applications processed within 120 calendar days

80% 80% 24% (issued 572 out of 2452 within 120 days)

-69% Backlog within the Electro-technical Unit Inadequate human resources High number of applications received

NRCS piloting Risk Based Approach (RBA) to Approval. RBA categorising applications based on the risk of the product, company, country of origin and whether it’s new application or renewal. There are three risk categories which are high, medium and or Low risk. Management have embarked on a process to increase staff compliment by 6 new inspectors from 7 to 13.

Page 21: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

SG 2: To maximise compliance with all specifications and technical regulations: Legal metrology

21

Performance Indicator / Measure

Annual Target Quarter 2 Target

Quarter 2 Actual Performance

Variance Reason for Variance

Corrective Action

Number of Source

Inspections 4151 1141 1 398 +22,5% Dedicated

resources to non-compliant manufacturers and Ports of Entries

Year to date target achieved

Number of retail

Inspections 1250 350 263 -25% Total: 5401 1 491 1 661 +11%

Percentage of

type approval

applications

100% - within 120

calendar days 100% - within

120 calendar

days

100% (47 out of 47)

No Variance No variance

Percentage of gaming approval applications

100% of all

applications

processed within

30 calendar days

100% of all

applications

processed

within 30

calendar days

53% processed within 30 calendar days (93 out of 175)

-47% Inadequate capacity (One on maternity leave)

Page 22: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

SG 2: To maximise compliance with all specifications and technical regulations: Foods and associated industries

22

Performance Indicator / Measure

Annual Target Quarter 2 Target

Quarter 2 Actual Performance

Variance Reason for Variance

Corrective Action

Percentage of Inspections conducted on locally produced canned fishery and meat products

100% 100% 100% Inspections conducted Canned Fish: 697 Canned Meat: 925

No Variance

N/A N/A

Number of inspections conducted on locally produced Frozen products

1045 frozen fish inspections

262 frozen fish inspection conducted

259 inspections conducted

-1% N/A

Percentage of inspections conducted on all declared Imported canned fish, meat and frozen fishery

100%

100% 100% Inspection Conducted Canned and Frozen Fish: 1 463

No Variance

N/A N/A

Page 23: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

SG 2: To maximise compliance with all specifications and technical regulations: Foods and associated industries

23

Performance Indicator / Measure

Annual Target Quarter 2 Target

Quarter 2 Actual Performance

Variance Reason for Variance Corrective Action

Percentage of inspections conducted on requests received for fish & fishery and canned meat export products consignments

100% 100% 100% Exported Inspections product: 2 930

No variance

N/A N/A

Number of Inspections conducted on fishery and canned meat processing factories and vessels

1090 320 266 Facilities inspections

-16,9 Land based facilities are inspected by the NRCS as scheduled. The number of requests received in the quarter was less than the planned target.

Page 24: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

SG 3: To inform and educate our stakeholders about the NRCS

24

Performance Indicator / Measure

Annual Target Quarter 2 Target Quarter 2 Actual Performance

Variance Reason for Variance

Number of

multimedia awareness

ccampaigns

12 Internal and

4 external

electronic

publications

3 Internal and 1

external

electronic

publications

3 internal and 1 external newsletters published

No Variance

N/A

Number of

stakeholder consumer

education events and

campaigns

2 multimedia

awareness

campaign

1 multimedia

awareness

campaign

1 multimedia awareness campaign

No Variance

N/A

Number of stakeholder consumer education events or campaigns

12 NRCS

consumer

education

events or

campaigns

3 NRCS

consumer

education

events or

campaigns

3 Consumer education events hosted

No variance N/A

Page 25: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Strategic Goal 4: To ensure an optimally capacitated institution

25

Performance Indicator / Measure

Annual Target Quarter 2 Target

Quarter 2 Actual Performance

Variance Reason for Variance

Corrective Action

A capacitated

organisation

with relevant

systems to

support business

Percentage (%

of vacancy rate

of approved

and funded

posts

6% - Average annual vacancy rate 8%

N/A N/A

Build IT platform

and systems that

supports and

improve business

Developed,

approved and

implemented

ICT Master

System Plan

Develop and

approve ICT

Master

System Plan

Needs analysis

conducted on

the Master

System Plan

Needs analysis conducted and NRCS in the process of finalising Request for Information documents for ERP and Modernization project

No Variance

Page 26: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Financial Performance

26

Page 27: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Financial Overview: Income Statement

27

Actual Budget Actual Budget Actual Budget Full year Budget

Transfers from the dti 42 959 25 926 43 459 60 492 86 418 86 418 86 418

Interest Income 3 125 2 368 900 5 321 1 800 7 914 13 600

Levies from Compulsory Specs 14 024 6 791 77 028 72 798 91 052 79 606 181 178

Services 11 915 13 711 12 854 12 218 24 770 26 001 50 205

Levy Audits 1 250 - 1 250 8 184 2 500 8 184 5 000

Other Income - (96) 2 225 510 4 451 286 38 201

Total Income 73 274 48 699 137 716 159 523 210 990 208 410 374 603

Compensation of Employees 64 708 57 233 69 130 64 271 133 838 121 503 270 778

Goods and Services 27 862 13 877 22 136 14 866 50 248 29 446 103 669

Total Expenditure 92 571 71 110 91 266 79 137 184 087 150 949 374 447

Surplus / (Deficit) (19 297) (22 411) 46 450 80 387 26 903 57 461 156

Income statement Q1 Q2 YTD

Page 28: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Financial Overview: Revenue

28

(50,000)

-

50,000

100,000

150,000

200,000

250,000

300,000

350,000

400,000

Transfers fromthe dti

InterestIncome

Levies fromCompulsory

Specs

Services Levy Audits Other Income Total Income

43,459

900

77,028

12,854 1,250 2,225

137,716

86,418

13,600

181,178

50,205

5,000

38,201

374,603

Revenue Q1, Q2, Year to date

Q1 Q1 Q2 Q2 YTD YTD YTD

Page 29: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Financial Overview: Revenue

29

31%

1% 56%

9%

1%

2%

ACTUAL REVENUE Q2

Transfers from the dti

Interest Income

Levies from Compulsory Specs

Services

Levy Audits

Other Income

Page 30: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Financial Overview: Expenditure

30

73%

27%

ACTUAL EXPENDITURE Q2

Compensation of Employees

Goods and Services

Page 31: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Financial Overview: Expenditure

31

(50,000)

-

50,000

100,000

150,000

200,000

250,000

300,000

350,000

400,000

Actual Budget Actual Budget Actual Budget Full yearBudget

Q1 Q2 YTD

(19,297) (22,411)

46,450

80,387

26,903 57,461

156

Income, Expenditure, Surplus

Total Income Total Expenditure Surplus / (Deficit)

Page 32: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Financial Overview: Expenditure

32

13% 2%

63%

2%

20%

EXPENDITURE PER GOAL

Programme 1: Administration

Strategic Goal 1: To develop, maintainand administer compulsoryspecifications and technicalregulations

Strategic Goal 2: To maximisecompliance with all specifications andtechnical regulations

Strategic Goal 3: To inform andeducate our stakeholders about theNRCS

Strategic Goal 4: To ensure anoptimally capacitated institution

Page 33: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Progress on Revenue qualification

33

Page 34: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Recap: Revenue Qualification

34

Grap 23 – Non-exchange Revenue

Revenue recognition based on a taxable event

Taxable event different from the timing of revenue

NRCS Act, NRCS Regulations

Taxable event is the import / manufacture of regulated products

Unclear timing of revenue

Weak on punitive measures

Systems and controls

Systems and processes that allow for timely recognition of revenue

Integrated information

Integration of information internally (Surveillance, Approvals and Revenue)

Third party integration

Page 35: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Recap: Revenue Qualification Plan

35

Internal control improvements

NRCS Modernisation

• ERP system implement-ation

• Business process re-design

SARS Collaboration

• Information sharing and system integration

Legislative options

Legal opinion re: NRCS Act

• Amendment to the Act, or

• Engage the dti on the NRCS Act

LOA Conditionality

• Quarterly volumes forecast

• Introduce LOA validity period

Page 36: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Revenue Qualification Plan: Progress

36

Plan Progress to date

NRCS Modernisation • ERP system implementation • Business process re-design

• Modernisation concept has been developed. • Request for Information for procurement process at an advanced

stage, pending advertisement • Implementation strategy to be discussed with ICT Steering

Committee. • Business process redesign is dependent on the modernisation

approval

SARS Collaboration • Information sharing and

system integration

• HSS codes project with SARS will be finalised end November. • Way forward: Roll out to all NRCS regulated commodities (Planning

phase)

Legal opinion re: NRCS Act • To determine if the NRCS Act

needs to be amended

• Clarity being sought in respect of the legal opinion that was obtained

LOA Conditionality • Quarterly volumes forecast • Introduce LOA validity period

• In the process of investigating mechanisms to operationalise

Page 37: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Challenges

37

Page 38: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Key challenges

Operational challenges Number of Electro-technical LOA Applications as of end October 2016

Total applications registered (includes backlog) : 5231 Total application on backlog (more than 120 days) : 1615

The application and regulation of products covered under Compulsory Specifications that are outdated.

High transportation and storage costs for confiscated goods. Long turnaround times and capacity constraints at the test houses

compromises the effectiveness of the Regulator

Border enforcement challenges: Inadequate information supplied on the bill of entry and shipping manifests High number of abandoned goods at Ports of Entry which results in high

transportation and storage costs after confiscation.

Revenue challenges Collection dependent on the industry co-operation Declining economic activity impacting revenue collection Reduction in government funding allocation in current and prior year

38

Page 39: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

Abbreviations and Acronyms

39

AG – Auditor General CMM – Chemicals, Materials and Mechanical DAFF – Department of Agriculture, Forestry and fisheries FY – Financial year LOA – Letter of Authority NBR – National Building Regulations NCC – National Consumer Commission SABS – South African Bureau of Standards SAPS – South African Police Services SARS – South African Revenue Services TR – Technical Regulation VC – Compulsory Specification YTD – Year to Date

Page 40: Presentation to the Portfolio Committee on Trade and ... · Resources dedicated toTotal: Retail Inspections Number of retail inspections 3200 900 1182 +31% 6060 1700 1 714 +0,8% Percentage

40

Thank You