Presentation to the Portfolio Committee on Transport Gautrain Update Presentation to the Portfolio Committee on Transport Gautrain Update Jack vd Merwe (Pr. Eng) CEO: Gautrain Management Agency 25 August 2009
Transcript
Page 1: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

Presentation to the Portfolio Committee on

Transport Gautrain Update

Presentation to the Portfolio Committee on

Transport Gautrain Update

Jack vd Merwe (Pr. Eng)CEO: Gautrain Management Agency

25 August 2009

Page 2: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

Gautrain in a nutshellGautrain in a nutshell

Page 3: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

Scope

Currently the largest Greenfields rail infrastructure project in the world.

Emphasis on the integration of Gautrain with all existing public transport modes in Gauteng

Was voted “Best Global Deal to Sign” in 2007 by the International Public Finance

Association

Page 4: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain
Page 5: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

Technical specifications• Safety and security paramount • International standard gauge• Maximum speed: 160 km/h• 24 modern state of the art trains

– Bombardier’s Electrostar– Thus totally different from existing SA system

• Different couches for commuters and air passengers• Frequency every 10 to 30 minutes• Minimum operating hours 05:30 to 20:30

Page 6: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

Feeder & distribution service• Gautrain bus service integrated with Gautrain rail• 125 buses • 36 feeder and distribution routes spanning 420 km • Every 12 to 30 minutes in relation to train time-table• 2 200 bus trips per day• 26 000 km of bus services per day• Gautrain bus links to complement

BRT & bus services in metropolitan areas• Ample park and ride facilities

Page 7: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

Objectives of the Gautrain Project

Objectives of the Gautrain Project

Page 8: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

Development Goals

• Economic growth, development and job creation

• Must meet other goals of Government (SMME promotion, Business tourism, BBBEE, etc.)

• To promote business tourism by means of the link between JIA and Sandton

Page 9: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

Transportation Goals

• Alleviate severe traffic congestion (traffic volumes in corridor growing at 7% p.a. for more than a decade)

• Show Government’s commitment to the promotion of public transport (National Land Transport Transitional Act, Act 22 of 2000) – Catalyst public transport project

• Improve the image of public transport with this project and attract more car users to public transport

• To link to the Tshwane Ring Rail Project, linking Mamelodi, Atteridgeville and Soshanguve / Mabopane

• Part of holistic transport plan and network for Gauteng• Catalyst public transport project of national importance

Page 10: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

2000 Northbound and Southbound Vehicle Volumes

0

1000

2000

3000

4000

5000

6000

7000

00:0

0:00

01:0

0:00

02:0

0:00

03:0

0:00

04:0

0:00

05:0

0:00

06:0

0:00

07:0

0:00

08:0

0:00

09:0

0:00

10:0

0:00

11:0

0:00

12:0

0:00

13:0

0:00

14:0

0:00

15:0

0:00

16:0

0:00

17:0

0:00

18:0

0:00

19:0

0:00

20:0

0:00

21:0

0:00

22:0

0:00

23:0

0:00

Hour Beginning

Hou

rly V

olum

e

Northbound Southbound

0

1000

2000

3000

4000

5000

6000

7000

00:0

0:00

01:0

0:00

02:0

0:00

03:0

0:00

04:0

0:00

05:0

0:00

06:0

0:00

07:0

0:00

08:0

0:00

09:0

0:00

10:0

0:00

11:0

0:00

12:0

0:00

13:0

0:00

14:0

0:00

15:0

0:00

16:0

0:00

17:0

0:00

18:0

0:00

19:0

0:00

20:0

0:00

21:0

0:00

22:0

0:00

23:0

0:00

Hour Beginning

Hou

rly V

olum

e

Northbound Southbound

Page 11: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

2005 Northbound and Southbound Vehicle Volumes

0

1000

2000

3000

4000

5000

6000

70000:

00:0

00:

45:0

0

1:30

:00

2:15

:00

3:00

:00

3:45

:00

4:30

:00

5:15

:00

6:00

:00

6:45

:00

7:30

:00

8:15

:00

9:00

:00

9:45

:00

10:3

0:00

11:1

5:00

12:0

0:00

12:4

5:00

13:3

0:00

14:1

5:00

15:0

0:00

15:4

5:00

16:3

0:00

17:1

5:00

18:0

0:00

18:4

5:00

19:3

0:00

20:1

5:00

21:0

0:00

21:4

5:00

22:3

0:00

Hour Beginning

Hou

rly V

olum

e

Northbound Southbound

0

1000

2000

3000

4000

5000

6000

70000:

00:0

00:

45:0

0

1:30

:00

2:15

:00

3:00

:00

3:45

:00

4:30

:00

5:15

:00

6:00

:00

6:45

:00

7:30

:00

8:15

:00

9:00

:00

9:45

:00

10:3

0:00

11:1

5:00

12:0

0:00

12:4

5:00

13:3

0:00

14:1

5:00

15:0

0:00

15:4

5:00

16:3

0:00

17:1

5:00

18:0

0:00

18:4

5:00

19:3

0:00

20:1

5:00

21:0

0:00

21:4

5:00

22:3

0:00

Hour Beginning

Hou

rly V

olum

e

Northbound Southbound

Page 12: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

Flagship Public Transport Project of National Significance

• Gautrain is a flagship public transport project of national importance. It can be the catalyst to free existing resources or to generate new resources to promote public transport in a holistic fashion

• Need to ensure Gautrain is integrated into the public transport system of Gauteng:– Promotion of public transport– Strategic integration– Operational integration– Funding strategy / process– Gautrain governance structure

Page 13: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

Spatial Development and Urban Planning Goals• To contribute towards urban restructuring,

shortening travel distances and improving city sustainability

• Stimulate the renovation and upliftment of the Johannesburg and Tshwane CBDs

• Link the main economic nodes in Gauteng with JIA

Page 14: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

The The GautrainGautrain will promotewill promotePublic TransportPublic Transport

SMME & BBBEE DevelopmentSMME & BBBEE DevelopmentTourismTourism

Business developmentBusiness development

The project stimulatesThe project stimulatesEconomic growthEconomic growth

Investment Investment New developmentNew development

Job creationJob creation

Design toDesign toRestructure urban areasRestructure urban areas

Reduce travel distances, time Reduce travel distances, time and costand cost

Improve city sustainability Improve city sustainability

Gautrain: More than Just Another Transport Project

Page 15: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

FundingFunding

Page 16: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

Funding

• Gautrain has 5 sources of funding– DoRA (Division of Revenue Act) money from central

government via the Department of Transport– MTEF (Medium Term Expenditure Framework) from

Gauteng Provincial Government– Private Sector Equity– Private Sector Borrowing– Provincial Borrowing

Page 17: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

Project Financing

Page 18: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

Expenditure• Currently in month 30 (of 54 month development

period)• Expenditure to date R 16,221 billion• Financial Close amount : R 25,1 billion• CA is:

– Fixed Price;– Fixed Scope;– Fixed time concession contract

• Estimated cost at completion?

Page 19: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

Expenditure• PPP regulations & authorisation must be followed• TA3 Authorisation has specified a

– CAPEX Cap– OPEX Cap

• How can the project cost increase?– Increase in FOREX (Hedged)– Increase in CPIX (only the delta of )– Variation Orders– Claims from the Concessionaire

Page 20: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

Lessons Learned

• Creation of the GMA– Single point accountability

• Contract form – Public Private Partnership (PPP)– Complex– Difficult to handle variations

• Composition of Concessionaire– Equity– Operator

Page 21: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

Lessons Learned

• Link to external events– FIFA 2010 Soccer World Cup– Added pressure / Places Government at a

disadvantage

• Scope of work must be well defined• Interaction & co-operation 3rd Parties essential

– Stakeholders & Role players

• Continuous consultation vs. time it takes to implement the project

Page 22: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

Lessons Learned

• Challenges of integration– Strategic integration – infrastructure– Operational integration– Ticket integration vs. Fare integration

• EIA process– Time it takes to complete the approval process– Compliance to the Environmental Management Plan

• Technical challenges– Tunnel & Dolomites

Page 23: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

Lessons Learned

• Creation of a competent team to manage the process– In-house – Consultants (local & international)– Cost– Retention of expertise

• Challenges of a green-fields project– Public sector comparator– Ridership predictions

Page 24: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

Lessons Learned

• Acceleration cost to open the Airport link in time for the FIFA 2010 Soccer World Cup

• Possible future claims

Page 25: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

The Seven Stages of a PPP Project• Enthusiasm• Promises & Programmes• Disillusionment• Panic• Hunt for the guilty• Punishment of the innocent• Reward for those who had nothing to do with

it

Page 26: Presentation to the Portfolio Committee on Transport ...pmg-assets.s3-eu-west-1.amazonaws.com/docs/090825gautrain-edi… · Presentation to the Portfolio Committee on Transport Gautrain

Thank YouThank Youwww.gautrain.co.za