REVAMP PROGRAM PROJECTS AT MPN FIELD LOCATIONS
Client:Location:Main Contractor:Fabrication Site:
MOBIL PRODUCING NIGERIA UNLIMITEDIdoho Field, approx 50 km South of Nigerian CoastROSETTI PIVOT LTDPort Harcourt, NIGERIA
SCOPE OF WORKProject Management, HSEQ Management, Interface Management, Construction and Installation Engineering, Procurement, Onshore Fabrication, Offshore Demolition/Installation and Pre-commissioningScope of work - mostly like-for-like structural and piping replacement - covers the main deck, cellar deck and spider deck
TECHNICAL DATAPiping70 ton approx.
Structures260 ton approx
MechanicalPig Receiver, Sump Tank
E&IMOV’s, Line Instruments and Transmitters
160 POB [at peak]
DATE OF AWARDApril 2018[Work Order 002]
READY FOR OFFSHORE MOBILIZATIONOctober 2018
TYPE OF CONTRACT Fixed Term EPCOutline Agreement
WORK IN PROGRESS
Client:Location:Main Contractor:Fabrication Site:
HUMBER GATHERING SYSTEM LIMITEDTOLMOUNT FIELD - NORTH SEA ROSETTI MARINOPIOMBONI YARD, MARINA DI RAVENNA (ITALY)
SCOPE OF WORKProject management, HSEQ management, interface management, design, engineering, procurement,construction, mechanical completion, onshore commissioning, load-out, transportation, installation, HookUp and offshore commissioning of Wellhead Platform and Jacket.
TOLMOUNT PLATFORM EPCIC SERVICES
TECHNICAL DATATopside: NUI - Wellhead platform (4 wells + 2 furure), : 32x34 meters (LxW)
Jacket: 4 legs, height 75 meters
Weight: Topside approx. 1800 tonsJacket approx. 2200 tonsPiles approx. 2200 tons
DATE OF AWARDMay 2018
READY FOR SAIL AWAYApril 2020
TYPE OF CONTRACT EPCIC Lump sum
WORK IN PROGRESS
Client:Location:Main Contractor:Fabrication Site:
MAERSK OIL OG GAS A/SNORTH SEA ROSETTI MARINOPIOMBONI YARD, MARINA DI RAVENNA (ITALY)
SCOPE OF WORKProject management, HSEQ management, interface management, design, engineering, procurement,construction, preservation, mechanical completion, onshore commissioning, load-out and sea fastening ofthe TEH Topside. Certification Service Contract to DNV GL and novation of ICSS (Siemens), DieselGenerators (Framo), Fire Water Pumps (Framo).
TYRA FUTURE REDEVELOPMENT PROJECT
TECHNICAL DATATopside - Living Quarters (88 POB),Utility Deck and Helideck: 39x48x35 meters (LxWxH)
Weight: approx. 5,000 tons
DATE OF AWARDDecember 2017
READY FOR SAIL AWAYFebruary 2021
TYPE OF CONTRACT EPC Lump sum
WORK IN PROGRESS
Client:Location:Main Contractor:
QATARGAS OPERATING COMPANY LIMITEDNORTH FIELD BRAVO ROSETTI MARINO
WORK IN PROGRESS
SCOPE OF WORKConceptual and Detail Design, Procurement, Installation, Construction, Commissioning, Brownfield
DESCRIPTIONNo. 1 ALQ Jacket (N.4 legs; H=59mt) total weight: 754 t
No. 4 ALQ Piles (D=1,524 mt – thk = 38-50mm; L= 163,7mt)total weight: 1,302 tNo. 1 ALQ Topside (N.5 levels)total weight: 2,253 t
No. 1 ALQ Helideck (helipad in steel structural)total weight: 174 t
No. 6 Bridges (from LQ to new ALQ: L= 10mt)total weight: 37 tons
DATE OF AWARDApril 2017
READY FOR SAIL AWAYFebruary 2020
TYPE OF CONTRACT Lump sum
EPICC OF NFB OFFSHORE ACCOMMODATION EXPANSION PROJECT
WORK IN PROGRESS
Client:Location:Main Contractor:
Mellitah Oil & Gas B.V.Sabratha Platform – Block NC41Technip FMC
WORK IN PROGRESS
SCOPE OF WORKConstruction Engineering, Procurement of bulk material, onshore fabrication, offshore constructionactivities & Floatel
DESCRIPTIONNo. 1 ALQ Jacket (N.4 legs; H=59mt) total weight: 754 t
No. 4 ALQ Piles (D=1,524 mt – thk = 38-50mm; L= 163,7mt)total weight: 1,302 t
DATE OF AWARDApril 2017
READY FOR START UPFeb. 2018
TYPE OF CONTRACT Lump sum
BAHR ESSALAM PHASE II TOPSIDE REVAMPING
WORK IN PROGRESS110kV GIS MAIN SUBSTATION 52-SU-3301Client: GE Grid SolutionsFinal client: TENGIZCHEVROILProject: Future Growth Project, Wellhead
Pressure Management Project (FGP/WPMP)
Location: KAZAKHSTANMain Contractor: Rosetti Marino
SCOPE OF WORKConstruction Engineering, Structure and ArchitecturalProcurement and Fabrication, Load out activities of a 110kV GIS Substation
BUILDING DIMENSION [m] GIS MODULE 56,3 x 14,60 x 8,644 (h)UTILITY MODULE 24,8 x 14,60 x 8,644 (h)
BUILDING TOT WEIGHT [ton] 1300
DATE OF AWARDOctober 2016
READY FOR SAIL AWAYAugust 2018
TYPE OF CONTRACTePC/Lump Sum
MODULAR SUBSTATION 51-SU-33004
Client: GE Grid SolutionsFinal client: TENGIZCHEVROILProject: Future Growth Project, Wellhead
Pressure Management Project (FGP/WPMP)
Location: KAZAKHSTANMain Contractor: Rosetti Marino
SCOPE OF WORKDetail design, Construction Engineering, Procurement, Fabrication, Commissioning
BUILDING DIMENSION [m] 24,5 (l) x 14.14 (w) x 7,9 (h)BUILDING WEIGHT [ton] 414The proposed Substation is supplied as subdivided in N.14 modules of indicative dimensions (m)3,5 (W) x14,2 (L) x 3,9 (H)
DATE OF AWARDJanuary 2016
READY FOR SAIL AWAYMay 2017
TYPE OF CONTRACTEPC/Lump Sum
COMPLETED
Client:Location:Main Contractor:
PETRO PAYDAR IRANIAN OIL COMPANYIRAN – SOUTH PARS 13 FIELDROSETTI MARINO
SCOPE OF WORKConceptual and Detail Design, Procurement, Construction, Transportation and Installation of Jacket SPD13A
DESCRIPTIONNr.1 four-legged jacket with well-head module and appurtenancestotal weight: 1.800 t
Nr.4 piles (inside jacket legs)Total weight: 1.400 t
DATE OF AWARDSeptember 2016
READY FOR SAIL AWAYAugust 2017
OFFSHORE INSTALLATIONSeptember 2017
TYPE OF CONTRACT Fixed UR
EPCI FOR A NEW JACKET FOR SOUTH PARS
COMPLETED
Client:Location:Main Contractor:
ENI CONGORAVENNA - ITALYROSETTI MARINO
COMPLETED
SCOPE OF WORKDetail design, Procurement, Construction and Commissioning of WHP3 Platform Jacket and Deck for Nenè Oil Field - Congo
DESCRIPTIONSteel Structures:650 TonsPainting: 7,600 Sqm.
DATE OF AWARDJune 2016
READY FOR SAIL AWAYNovember 2016
TYPE OF CONTRACTEPC
WHP3 STRUCTURAL MODIFICATIONS – NENÈ OIL FIELD
Client:Location:Main Contractor:
PETROBELOffshore Egypt – Zohr FieldRosetti Marino
SCOPE OF WORKConstruction Engineering, Procurement and Fabrication activities of steel structures for Jacket, Foundation Piles, Pile Guide Frame (PGF) and Deck for ZOHR Central Control Platform.
DESCRIPTIONNr. 1 four legged Jacket, nr. 1 topside, nr.1 PGF structure and nr.4 foundation piles.Jacket 95 m (H)Weight: 1714 TonsDeck Weight: 1039 TonsPiles Weight: 927 TonsPGFWeight: 360 Tons
DATE OF AWARDApril 2016
READY FOR SAIL AWAYBatches between June -November 2016
TYPE OF CONTRACTUnit rates
ZOHR PROJECT
COMPLETED
Client:Location:Main Contractor:
CONSORZIO VENEZIA NUOVAVenice – ItalyRosetti Marino SPA
MOSE I – COMPLETION PROJECTCONSTRUCTION & COMMISSIONING
DESCRIPTION
Modifications on structures and hydraulicsystems
Technical assistance for Mechanical Completion, Pre-comm and Commissioning
Operations and Maintenance
Offshore Tests in November 2016; Operations andMaintenance program to be agreed (most probably3 years period starting from January 2017)
SCOPE OF WORKStructural modifications, commissioning and Start-up of 4 leg jack up installation vessel specially designed for the installation and maintenance of dams for Venice. Entire system is called MOSE.
TYPE OF CONTRACT AWARD DURATIONCost plus fee Feb 2016 1 year
COMPLETED
Client:Location:Main Contractor:Nominated Sub.:
Abu Qir PetroleumOffshore Egypt – North Abu Qir FieldPetrojetRosetti Marino
SCOPE OF WORKEngineering and Procurement activities.
ABU QIR DEVELOPMENT PROJECTNAQ Q PIII PLATFORM
DESCRIPTIONNr. 1 four legged Jacket,nr. 1 wellhead module andtopside, nr. 6 gas/oil wells (4 + 2future)Jacket40,5 m (H) –Weight: 550 TonsDeckWeight: 2040 TonsPilesWeight: 720 Tons
DATE OF AWARDOctober 2014
READY FOR SAIL AWAYJuly 2016
TYPE OF CONTRACTEP/Lump Sum
COMPLETED
Client:Final client:Project:
Location:Main Contractor:
SKEMA SpATENGIZCHEVROILFuture Growth Project, Wellhead Pressure Management Project (FGP/WPMP)
KAZAKHSTANRosetti Marino
LER SUBSTATIONS
DESCRIPTION110 kV Main substationWeight: 500 Tons110 kV Core substationWeight: 310 Tons
DATE OF AWARDOctober 2014
READY FOR SAIL AWAYDecember 2016
TYPE OF CONTRACTePC/Lump Sum
SCOPE OF WORKConstruction Engineering, Procurement, Fabrication, Transportation, Commissioning and Start-up Assistance.
COMPLETED
DP4 – FPSO INTERFACE WORKS
Client:Final Client:Location:Main Contractor:
STX Offshore & ShipbuildingMELLITAH OIL & GAS B.V.Bouri Field - Offshore LibyaRosetti Marino
SCOPE OF WORKProject Management, Engineering (Basic Design review, detailed engineering development & Risksassessment), Procurement & Inspection Fabrication, Offshore installation and Hook up, Dismantling, installation and Hook up, recommissioning & Commissioning activities.
DESCRIPTION:New FPSO will be installed nearthe platform . Modification and interface works on the platformto be done for new risersconnection (HV electrical powercable and 16’’ inc. process piping)
TECHNICAL DATAMain new equipment: Transformer, UTA, Switchboard, fiber optic, Control&Safetysystem extension, ESDV.E&I, mechanical, structural and piping works to perform.
DATE OF AWARDOctober 2014
READY FOR SAIL AWAYFebruary 2016
TYPE OF CONTRACTEPIC contract on Turn Key LumpSum basis
COMPLETED
Client:Location:
Main Contractor:
KOSSCO LTD (Owner: ENI Norge)Ulsan, South Korea (1° phase) Norway, Barents sea (2° phase Hook up)Rosetti Marino
SCOPE OF WORKProvision of Services for mechanical completion activities on Goliat FPSO (Precommissioning & commissioning– all disciplines).
TECHNICAL DATAWeight approx. 60.000 Tons,diameter 120m, height 76m,FPSO with oil storage, seaballasting system, Gas TurbineGeneration and Living quarter
Manhours 1° phase: 82.795Manhours 2° phase: 26.977(as of 30 Nov. 2015)
DATE OF AWARDJanuary 2014
READY FOR SAIL AWAY1st Quarter 2016
HOOK UP: in progress
TYPE OF CONTRACTMSDaily rates
GOLIAT PROJECTGOLIAT FPSO
COMPLETED
Client:Location:Main Contractor:
LOTOS PETROBALTICPolandRosetti Marino
SCOPE OF WORKConversion of drilling rig from MODU to production center. Engineering, Procurement services, management and HUC works.
TECHNICAL DATAWeight: Approx. 3.000 tons new modules and removal and reconversion of drilling rig Hull and legs
DATE OF AWARDAugust 2013
READY FOR SAIL AWAYNovember 2015
TYPE OF CONTRACT EPMS
DRILLING RIG CONVERSION TO WHP PLATFORM
COMPLETED
Client:Location:Main Contractor:Fabrication site:
FOXTROT INTERNATIONAL LDCOffshore Ivory CoastRosetti MarinoPiomboni Yard, Marina di Ravenna (Italy)
COMPLETED
SCOPE OF WORKEngineering, Procurement and supply of all material and equipment, prefabrication, fabrication and assembly, precommissioning, commissioning load out, site hook-up, site commissioning and assistance for start-up of: One (1) 4-legged jacket, four (4) skirt piles, A Four (4) deck level Topside and a 20 POB Living Quarter
TECHNICAL DATATopside: LxWxH 54x31x20Weight: 4.500 tonsJacket: H 118 mWeight: 3.500 tons (+ 1.300 tons for piles)Living Quarter: 20 POBDATE OF AWARDDecember 2012
READY FOR SAIL AWAYJacket & piles: August 2014Deck: March 2015
TYPE OF CONTRACT EPC
MARLIN DEVELOPMENT PROJECT
Client:Location:Main Contractor:Fabrication site:
ENI SPAAdriatic SeaRosetti MarinoPiomboni Yard, Marina di Ravenna (Italy)
SCOPE OF WORKEngineering, procurement, construction, load-out and sea fastening, transportation to site, hook up, commissioning, preparation of the platform and assistance during dewatering operations, start up and performance tests of Elettra and Fauzia decks.
TECHNICAL DATADeck : 20x17x22 (LxWxH)Weight: Elettra – Approx. 450 tonsFauzia – Approx 610 tons
DATE OF AWARDApril 2013
READY FOR SAIL AWAYApril 2014
TYPE OF CONTRACT EPC
ELETTRA AND FAUZIA PLATFORMS
COMPLETED
Client:Location:Main Contractor:Fabrication site:
Inagip dooOffshore Adriatic Sea, Croatian SectorRosetti MarinoViktor Lenac yard - Croatia
SCOPE OF WORKEngineering, Procurement, Fabrication, Transportation, Offshore Hook-up and Commissioning and Start-up Assistance.
TECHNICAL DATADeck: LxWxH 54x31x20Weight: 510 tons Wellhead module: 78 tonsThree-legged jacket: H 72 m Weight: 735 tonsPiles: 690 tonsConductors:242 tons
DATE OF AWARDNovember 2012COMPLETION DATEJuly 2014
TYPE OF CONTRACTEPC contract
IKA & IVANA FIELD DEVELOPMENT PROJECTIKA JZ PLATFORM
COMPLETED
Client:Location:Main Contractor:Fabrication site:
SHELL UKNorth Sea UKCSRosetti MarinoPiomboni Yard, Marina di Ravenna (Italy)
COMPLETED
SCOPE OF WORKEngineering, procurement, fabrication, testing, onshore commissioning, load-out and sea fastening of the Clipper Accommodation Module with integral Utility Deck and Helideck, the link bridge, the jacket and piles.
TECHNICAL DATATopsides - Living Quarter (84 POB), Utility Deck and helideck: 50x25x25 (LxWxH)Four-legged jacket (weight: 800 tons)Weight: Approx. 3000 tons
DATE OF AWARDAugust 2012
READY FOR SAIL AWAYJune 2014
TYPE OF CONTRACTEPC
CLIPPER PLQ UPGRADE PROJECT
Client:Location:Main Contractor:Fabrication site:
ELF EXPLORATION UK LTD / TOTAL GroupNorth Sea, UKCS (240 Km East of Aberdeen)Rosetti MarinoPiomboni Yard, Marina di Ravenna (Italy)
SCOPE OF WORKEngineering, Procurement, Construction, Installation, Hook-up and Commissioning of Topsides for the West Franklin platform
DESCRIPTIONWest Franklin topside will be used in the extraction of gas and condensed crude oil, with 9 high-pressure and high-temperature wellheads, the estimatedproduction design rate of West Franklin platform is 40,000 barrels of oil equivalent per day.
TECHNICAL DATATopsideLxWxH: 40x40x20 mtWeight: 3.300 tons
DATE OF AWARDJuly 2011
READY FOR SAIL AWAYJune 2013
TYPE OF CONTRACT EPCI
WEST FRANKLIN PROJECT
COMPLETED
Client:Location:Main Contractor:Fabrication site:
ELF EXPLORATION UK LTD / TOTAL GroupNorth Sea, UKCS (240 Km East of Aberdeen)Rosetti MarinoPiomboni Yard, Marina di Ravenna (Italy)
SCOPE OF WORKEngineering, Procurement, Construction, Installation, Hook-up and Commissioning of Topsides for the Elgin B platform
DESCRIPTIONElgin B topside will be used in the extraction of gas and condensedcrude oil, with 12 high-pressure and high-temperature wellheads, the estimated production design rate of Elgin B platform is of 65,000 barrels of oil equivalentper day.
TECHNICAL DATATopsideLxWxH: 35x35x15mtWeight: 2.300 tons
DATE OF AWARDJuly 2011
READY FOR SAIL AWAYJune 2013
TYPE OF CONTRACT EPCI
ELGIN B PROJECT
COMPLETED
Client:Location:Main Contractor:Fabrication site:
MELLITAH OIL & GAS B.V.Bouri Field – Offshore LibyaRosetti MarinoDP3/DP4 (On board) & Fores Engineering warehouse (Italy)
COMPLETED
SCOPE OF WORKEngineering, Procurement, Fabrication, Transportation&Delivery, Off-shore installation, Testing, Precommissioning, Commissioning & assistance to the Company during Start-up
DESCRIPTIONDecommissioning and dismantling of Gas SweeteningUnit, Procurement of bulk material (structures, piping, E&I), Construction of 3 chemicaltransfer pump skids & 4 chemicalinjection skids.Offshore revamping worksonboard two platforms,Update of the DCS/ESD/PSD systemTECHNICAL DATADismantling of Unit 22 for a total weight of 240 tons (Columns, Piping and Structures)Cables: 3000m Piping: 60t
Scaffolding more than: 3500 m3Offshore works: 70.000 mhrs(SIMOPS)
DATE OF AWARDOctober 2012
PROVISIONAL ACCEPTANCENovember 2013
TYPE OF CONTRACTEPIC contract on Turn Key LumpSum basis
DP3/DP4 MODIFICATION & REVAMPING PROJECT
Client:Location:Main Contractor:Fabrication site:
ConocoPhillips UKCentral North SeaRosetti MarinoPiomboni Yard, Marina di Ravenna (Italy)
SCOPE OF WORKConstruction engineering, procurement, fabrication, load-out and sea-fastening.
DESCRIPTIONnr. 3 Jackets and piles
TECHNICAL DATAWHP Four-legged jacketWeight: 5.300 TeNr.9 skirt piles weighing 3.800 TeJRP Four-legged jacketWeight: 5.600 TeNr.8 skirt piles weighing 3.400 TeJLQ Four-legged jacketWeight: 3.400 TeNr.4 skirt piles weighing 1.700 Te
DATE OF AWARDFebruary 2010 (WHP)August 2010 (JLQ & JRP)
READY FOR SAIL AWAYApril 2011 (WHP)April 2012 (JLQ & JRP)
TYPE OF CONTRACT L/S
JASMINE DEVELOPMENT PROJECTJASMINE WHP, JLQ & JRP SUBSTRUCTURES
COMPLETED
Client:Location:Main Contractor:Fabrication site:
ConocoPhillips UKNorth Sea, UKCSRosetti MarinoPiomboni Yard, Marina di Ravenna (Italy)
SCOPE OF WORKProcurement, Construction and Commissioning of Topsides for the Jasmine platform
DESCRIPTIONThe Jasmine Gas SweeteningModule shall be installed on the Judy Riser Platform (JRP) on top of the structure housing the Jasmine HP Separator facilities. Designed to provide final gas treatment of Jasmine productprior to further downstream processing of the gas on the existing Judy Platform consistof two gas treatment trains, eachtrain equipped with a coalescerfilter, an electric heater, a gas sweetening bed and a fines filter, in that order.
TECHNICAL DATATopsideLxWxH: 11x17x11 mtWeight: 1000 tons
DATE OF AWARDSeptember 2011
READY FOR SAIL AWAYAugust 2012
TYPE OF CONTRACTPCC
JASMINE PROJECT
COMPLETED
Client:Location:Main Contractor:
Titan-Micoperi srlGiglio Island, ItalyRosetti Marino
COMPLETED
SCOPE OF WORKManagement, Construction Engineering, Procurement, Prefabrication, Assembly, Load-out and Seafastening of nr. 2 platforms for the wreck removal of Costa Concordia cruise ship.
TECHNICAL DATA45x25x12 Weight: 1.000 Tons each
DATE OF AWARDJuly 2012
READY FOR SAIL AWAYNovember 2012
TYPE OF CONTRACTPC/Lump Sum
COSTA CONCORDIAWRECK REMOVAL
Client:Location:Main Contractor:Fabrication site:
SEREPTAshtart Field – Offshore TunisiaRosetti MarinoSfax-Tunisia/Ashtart Field Offshore Tunisia
COMPLETED
SCOPE OF WORKConstruction engineering, procurement, fabrication, dismantling , load-out and offshore revamping works.
DESCRIPTION• Procurement of bulk material
(structures, piping, E&I)• Prefabrication of loose and
assembled structures and piping spools
• Offshore revamping worksonboard five platforms
• Dismantling & RelocationEngineering
PRELIMINARY TECHNICAL DATAPrefabricated structures: 1.350 tonsPiping spools & supports: 195 tonsElectrical & instrumentation cables: 25 km
Offshore works: approx. 1.200.000 mhrs
DATE OF AWARDSeptember 2010
COMPLETION DATEDecember 2013
TYPE OF CONTRACTProcurement and FabricationContract at Unit/Time rates
ASHTART REVAMPING PROJECT
Client:Location:Main Contractor:Nominated Sub.:
Abu Qir PetroleumOffshore Egypt – North Abu Qir FieldPetrojetRosetti Marino
COMPLETED
SCOPE OF WORKEngineering and Procurement activities.
DESCRIPTIONNr. 1 four legged Jacket,nr. 1 wellhead module andtopside, nr.6 gas wells 100MMSCFD@48 bar at 60°C.Jacket30 m (H) –Weight: 410 TonsTopside22x22.5x17m (LxWxH)-Weight: 780 TonsPilesWeight: 640 Tons
DATE OF AWARDDecember 2009
READY FOR SAIL AWAYDecember 2010
TYPE OF CONTRACTEP/Lump Sum
ABU QIR DEVELOPMENT PROJECTNAQ Q PII PLATFORM
Client:Location:Main Contractor:
TOTAL E&P CongoOffshore CongoConsortium Rosetti Marino (Italy) + SaiBos (France)
SCOPE OF WORKDetail design, Fabrication engineering, Procurement, Jacket prefabrication , Deck Construction, On-shoreCommissioning, Load-out, Sea Fastening, Hook-up, Commissioning, Revamping of two existing platforms, Assistance to Start up.
DESCRIPTIONWellhead platform with production facilities.
TECHNICAL DATATopsideLxWxH: 25x25x15 mtWeight: 800 tons
Wells: nr. 3 oil + nr. 1 water injection
JacketType: 4-legs Height: 120 mtWeight: 1.400 tons
DATE OF AWARDAugust 2008
READY FOR SAIL AWAYMarch 2010
TYPE OF CONTRACTEPCILump sum
LIBONDO FIELD DEVELOPMENT PROJECTLIBONDO PLATFORM
COMPLETED
Client:Location:Main Contractor:
EDINA d.o.o.Adriatic Sea – Croatian sectorRosetti Marino
COMPLETED
SCOPE OF WORKFabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Commissioning, Assistance to Start up.
TECHNICAL DATAJacket & wellhead platform with production and separation facilities. Water depth: 37 m.Integrated deckWeight: 355 tonsWellhead moduleWeight: 37 tonsJacketType: 3 legsWeight: 350 tonsPiles & conductorsWeight: 390 tons
DATE OF AWARDApril 2008
READY FOR SAIL AWAYAugust 2009
TYPE OF CONTRACTEPCLump sum
IZABELA FIELD DEVELOPMENT PROJECTIZABELA NORTH PLATFORM
Client:Location:Main Contractor:
EDINA d.o.o.Adriatic Sea – Croatian sectorRosetti Marino
COMPLETED
SCOPE OF WORKFabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Commissioning, Assistance to Start up.
TECHNICAL DATAWellhead platform with production facilities for 2+1 wells.
Topside:LxWxH: 22x22x7Weight: 570 tons
Wellhead module:Weight: 70 tons
Jacket :Type: 3-legsHeight: 100 mtWeight: 1.200 tons
PilesWeight: 770 tons
DATE OF AWARDApril 2008
READY FOR SAIL AWAYJuly 2009
TYPE OF CONTRACTEPCLump sum
IZABELA FIELD DEVELOPMENT PROJECTIZABELA SOUTH PLATFORM
Client:Location:Main Contractor:
ENI TUNISIA B.V.Offshore TunisiaATI Intermare Sarda-Saipem Energy Services-Rosetti Marino
COMPLETED
SCOPE OF WORKFabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Commissioning, Assistance to Start up.
TECHNICAL DATAWellhead platform with production facilities for 2+1 wells.Topside:LxWxH: 22x22x7Weight: 570 tonsWellhead module:Weight: 70 tonsJacket :Type: 3-legsHeight: 100 mtWeight: 1.200 tonsPilesWeight: 770 tons
L.O.I:17/04/2008
READY FOR SAIL AWAY:Jacket+Wellhead Module+Piles:March 2010
TYPE OF CONTRACT:Target price contract basedon risk and reward philosophy
BARAKA FIELD DEVELOPMENT PROJECTBARAKA PLATFORM
Client:Location:Main Contractor:
INAgip dooAdriatic Sea – Offshore CroatiaConsortium Rosetti Marino/Intermare Sarda/S.E.I.
COMPLETED
SCOPE OF WORKFabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening,Transportation to Site, Hook-up, Commissioning, Assistance to Start up.
TECHNICAL DATAWellhead platform and living quarter (19/10) with production and separation facilities for 6+2 wells, helideck.TopsideLxWxH: 21x8x10,6 mtWeight: 1900 tonsFour legged JacketHeight: 70 mtWeight: 980 tonsPilesWeight: 920 tons
DATE OF AWARDDecember 2007
READY FOR SAIL AWAYApril 2009
TYPE OF CONTRACTePCLump sum
ANNAMARIA FIELD DEVELOPMENT PROJECTANNAMARIA A PLATFORM
Client:Location:Main Contractor:
ENI SpAAdriatic Sea – Offshore ItalyConsortium Rosetti Marino/Intermare Sarda/S.E.I.
COMPLETED
SCOPE OF WORKFabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening,Transportation to Site, Hook-up, Commissioning, Assistance to Start up.
TECHNICAL DATAWellhead platform and living quarter (19/10) with production and separation facilities for 6+2 wells, helideck.TopsideLxWxH: 21x8x10,6 mtWeight: 1800 tonsFour legged JacketHeight: 70 mtWeight: 1020 tonsPilesWeight: 810 tons
DATE OF AWARDDecember 2007
READY FOR SAIL AWAYApril 2009
TYPE OF CONTRACTePCLump sum
ANNAMARIA FIELD DEVELOPMENT PROJECTANNAMARIA B PLATFORM
Client:Location:Main Contractor:
ENI CONGO SAOffshore CongoConsortium Rosetti Marino/Intermare Sarda/S.E.I.
SCOPE OF WORKFabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Revamping of nr.3 neighbouring platforms, Commissioning, Assistance to Start up.
DESCRIPTIONUnmanned wellhead platforms with production and separation facilities for 4 wells.
TECHNICAL DATATopsides IkalouLxWxH: 35x25x17 mtWeight: 1.050 tons
Jacket IkalouType: 3-legs Height: 90 mtWeight: 1.320 tons
Piles IkalouWeight: 890 tons
DATE OF AWARDSeptember 2006
READY FOR SAIL AWAYJune 2007
TYPE OF CONTRACTEPCAlliance Risk/Reward
IKALOU FIELD DEVELOPMENT PROJECTIKALOU SOUTH PLATFORM
COMPLETED
Client:Location:Main Contractor:
ENI CONGO SAOffshore CongoConsortium Rosetti Marino/Intermare Sarda/S.E.I.
COMPLETED
SCOPE OF WORKFabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Revamping of nr.3 neighbouring platforms, Commissioning, Assistance to Start up.
DESCRIPTIONUnmanned wellhead platforms with production and separation facilities for 4 wells.
TECHNICAL DATATopsides IkalouLxWxH: 35x25x17 mtWeight: 1.050 tons
Jacket IkalouType: 3-legs Height: 86 mtWeight: 1.290 tons
Piles IkalouWeight: 890 tons
DATE OF AWARDSeptember 2006
READY FOR SAIL AWAYJune 2007
TYPE OF CONTRACTEPCAlliance Risk/Reward
IKALOU FIELD DEVELOPMENT PROJECTIKALOU PLATFORM
Client:Location:Main Contractor:
MAERSK OLIE og GAS ASOffshore Denmark – North SeaRosetti Marino
COMPLETED
SCOPE OF WORKEngineering, Procurement, Construction, On-shore, Commissioning, Load-out, Sea Fastening
TECHNICAL DATALiving Quarter Module for 80people.5 floors of Accommodation, galleyand recreation area.2 Floors + Mezzanine of UtilitiesHelideck
Dimensions:Length: 46,6 mWidth: 27 mHeight: 35,2 mWeight: 2 800 Tons
DATE OF AWARDFebruary 2006
READY FOR SAIL AWAYJuly 2007
TYPE OF CONTRACTEPCLump sum
HALFDAN NORTH EAST PHASE 3 DEVELOPMENTHBC TOPSIDE ACCOMMODATION MODULE
Client:Location:Main Contractor:
INAGIP DOOAdriatic Sea – Croatian watersRosetti Marino
COMPLETED
SCOPE OF WORKDetail design, Engineering, Procurement, Fabrication, On-shore Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Offshore Commissioning, Assistance to Start up.
TECHNICAL DATAJacket & conductor pipesWeight: 1.160 tons
PilesWeight: 920 tons
Deck, Topside and Living QuarterWeight: 950 tons
DATE OF AWARDJuly 2005
READY FOR SAIL AWAYSeptember 2006
TYPE OF CONTRACTEPCLump sum
KATARINA FIELD DEVELOPMENT PROJECTKATARINA PLATFORM
Client:Location:Main Contractor:
ENI OIL CO. LTD - Libyan branchBouri Field - Offshore LibyaRosetti Marino
COMPLETED
SCOPE OF WORKProject Management, Engineering (Basic Design review, detailed engineering development & Risksassessment), Procurement & Inspection Fabrication, Offshore installation and Hook up, Dismantling, installation and Hook up, recommissionig & Commissioning activities.
DESCRIPTION:Topside flowlines (from riserscounter/top hubs to L&R traps)• Connections between new
flowlines and existing topsidewellheads
• New launching and receiving traps• Methanol and Wax inhibitor
injection package (new (MCC)• Interconnecting piping between
new facilities and existing utilities• Piping (accessories & supports),
Valves• Local instrumentation and control
panels• Power and control panels• Power & Control cables, electrical
& instrumental bulk materials• Structural extension (for methanol
and wax skid) and Reinf.• Fire&Gas system extension• Upgrading DCS ABB-INFI 90&ESD
system (new I/O cards & cabinet)TECHNICAL DATASteel structures: approx. 15 tonsPiping (carbon steel, stainless (316L), Cupro-Nichel, Duplex, Inconel 625, Inconel 825: approx. 60 tonsEquipment: approx. 10 tonsProject tot. manhours: approx. 50.000DATE OF AWARDDecember 2004READY FOR SAIL AWAYApril 2006
DP4 TOPSIDE MODIFICATIONS DP4 PLATFORM
Client:Owner:Location:Main Contractor:
BECHTEL LTD BG TUNISIA120 km Offshore Tunisia, Mediterranean SeaRosetti Marino
COMPLETED
SCOPE OF WORKConstruction Engineering, Partial Procurement, Fabrication. Onshore Construction, Onshore Commissioning, Load-out, Seafastening, Transport and Tow.
TECHNICAL DATATopside Compression Module23x40 (WxH) Weight: 1.500 Tons
DATE OF AWARDMarch 2003
READY FOR SAIL AWAYJuly 2004
TYPE OF CONTRACTepC/Lump Sum
MISKAR DEVELOPMENT PROJECTMISKAR COMPRESSION MODULE