OCTOBER 2018 MAIN REFERENCES
Transcript

OCTOBER 2018MAIN REFERENCES

REVAMP PROGRAM PROJECTS AT MPN FIELD LOCATIONS

Client:Location:Main Contractor:Fabrication Site:

MOBIL PRODUCING NIGERIA UNLIMITEDIdoho Field, approx 50 km South of Nigerian CoastROSETTI PIVOT LTDPort Harcourt, NIGERIA

SCOPE OF WORKProject Management, HSEQ Management, Interface Management, Construction and Installation Engineering, Procurement, Onshore Fabrication, Offshore Demolition/Installation and Pre-commissioningScope of work - mostly like-for-like structural and piping replacement - covers the main deck, cellar deck and spider deck

TECHNICAL DATAPiping70 ton approx.

Structures260 ton approx

MechanicalPig Receiver, Sump Tank

E&IMOV’s, Line Instruments and Transmitters

160 POB [at peak]

DATE OF AWARDApril 2018[Work Order 002]

READY FOR OFFSHORE MOBILIZATIONOctober 2018

TYPE OF CONTRACT Fixed Term EPCOutline Agreement

WORK IN PROGRESS

Client:Location:Main Contractor:Fabrication Site:

HUMBER GATHERING SYSTEM LIMITEDTOLMOUNT FIELD - NORTH SEA ROSETTI MARINOPIOMBONI YARD, MARINA DI RAVENNA (ITALY)

SCOPE OF WORKProject management, HSEQ management, interface management, design, engineering, procurement,construction, mechanical completion, onshore commissioning, load-out, transportation, installation, HookUp and offshore commissioning of Wellhead Platform and Jacket.

TOLMOUNT PLATFORM EPCIC SERVICES

TECHNICAL DATATopside: NUI - Wellhead platform (4 wells + 2 furure), : 32x34 meters (LxW)

Jacket: 4 legs, height 75 meters

Weight: Topside approx. 1800 tonsJacket approx. 2200 tonsPiles approx. 2200 tons

DATE OF AWARDMay 2018

READY FOR SAIL AWAYApril 2020

TYPE OF CONTRACT EPCIC Lump sum

WORK IN PROGRESS

Client:Location:Main Contractor:Fabrication Site:

MAERSK OIL OG GAS A/SNORTH SEA ROSETTI MARINOPIOMBONI YARD, MARINA DI RAVENNA (ITALY)

SCOPE OF WORKProject management, HSEQ management, interface management, design, engineering, procurement,construction, preservation, mechanical completion, onshore commissioning, load-out and sea fastening ofthe TEH Topside. Certification Service Contract to DNV GL and novation of ICSS (Siemens), DieselGenerators (Framo), Fire Water Pumps (Framo).

TYRA FUTURE REDEVELOPMENT PROJECT

TECHNICAL DATATopside - Living Quarters (88 POB),Utility Deck and Helideck: 39x48x35 meters (LxWxH)

Weight: approx. 5,000 tons

DATE OF AWARDDecember 2017

READY FOR SAIL AWAYFebruary 2021

TYPE OF CONTRACT EPC Lump sum

WORK IN PROGRESS

Client:Location:Main Contractor:

QATARGAS OPERATING COMPANY LIMITEDNORTH FIELD BRAVO ROSETTI MARINO

WORK IN PROGRESS

SCOPE OF WORKConceptual and Detail Design, Procurement, Installation, Construction, Commissioning, Brownfield

DESCRIPTIONNo. 1 ALQ Jacket (N.4 legs; H=59mt) total weight: 754 t

No. 4 ALQ Piles (D=1,524 mt – thk = 38-50mm; L= 163,7mt)total weight: 1,302 tNo. 1 ALQ Topside (N.5 levels)total weight: 2,253 t

No. 1 ALQ Helideck (helipad in steel structural)total weight: 174 t

No. 6 Bridges (from LQ to new ALQ: L= 10mt)total weight: 37 tons

DATE OF AWARDApril 2017

READY FOR SAIL AWAYFebruary 2020

TYPE OF CONTRACT Lump sum

EPICC OF NFB OFFSHORE ACCOMMODATION EXPANSION PROJECT

WORK IN PROGRESS

Client:Location:Main Contractor:

Mellitah Oil & Gas B.V.Sabratha Platform – Block NC41Technip FMC

WORK IN PROGRESS

SCOPE OF WORKConstruction Engineering, Procurement of bulk material, onshore fabrication, offshore constructionactivities & Floatel

DESCRIPTIONNo. 1 ALQ Jacket (N.4 legs; H=59mt) total weight: 754 t

No. 4 ALQ Piles (D=1,524 mt – thk = 38-50mm; L= 163,7mt)total weight: 1,302 t

DATE OF AWARDApril 2017

READY FOR START UPFeb. 2018

TYPE OF CONTRACT Lump sum

BAHR ESSALAM PHASE II TOPSIDE REVAMPING

WORK IN PROGRESS110kV GIS MAIN SUBSTATION 52-SU-3301Client: GE Grid SolutionsFinal client: TENGIZCHEVROILProject: Future Growth Project, Wellhead

Pressure Management Project (FGP/WPMP)

Location: KAZAKHSTANMain Contractor: Rosetti Marino

SCOPE OF WORKConstruction Engineering, Structure and ArchitecturalProcurement and Fabrication, Load out activities of a 110kV GIS Substation

BUILDING DIMENSION [m] GIS MODULE 56,3 x 14,60 x 8,644 (h)UTILITY MODULE 24,8 x 14,60 x 8,644 (h)

BUILDING TOT WEIGHT [ton] 1300

DATE OF AWARDOctober 2016

READY FOR SAIL AWAYAugust 2018

TYPE OF CONTRACTePC/Lump Sum

MODULAR SUBSTATION 51-SU-33004

Client: GE Grid SolutionsFinal client: TENGIZCHEVROILProject: Future Growth Project, Wellhead

Pressure Management Project (FGP/WPMP)

Location: KAZAKHSTANMain Contractor: Rosetti Marino

SCOPE OF WORKDetail design, Construction Engineering, Procurement, Fabrication, Commissioning

BUILDING DIMENSION [m] 24,5 (l) x 14.14 (w) x 7,9 (h)BUILDING WEIGHT [ton] 414The proposed Substation is supplied as subdivided in N.14 modules of indicative dimensions (m)3,5 (W) x14,2 (L) x 3,9 (H)

DATE OF AWARDJanuary 2016

READY FOR SAIL AWAYMay 2017

TYPE OF CONTRACTEPC/Lump Sum

COMPLETED

Client:Location:Main Contractor:

PETRO PAYDAR IRANIAN OIL COMPANYIRAN – SOUTH PARS 13 FIELDROSETTI MARINO

SCOPE OF WORKConceptual and Detail Design, Procurement, Construction, Transportation and Installation of Jacket SPD13A

DESCRIPTIONNr.1 four-legged jacket with well-head module and appurtenancestotal weight: 1.800 t

Nr.4 piles (inside jacket legs)Total weight: 1.400 t

DATE OF AWARDSeptember 2016

READY FOR SAIL AWAYAugust 2017

OFFSHORE INSTALLATIONSeptember 2017

TYPE OF CONTRACT Fixed UR

EPCI FOR A NEW JACKET FOR SOUTH PARS

COMPLETED

Client:Location:Main Contractor:

ENI CONGORAVENNA - ITALYROSETTI MARINO

COMPLETED

SCOPE OF WORKDetail design, Procurement, Construction and Commissioning of WHP3 Platform Jacket and Deck for Nenè Oil Field - Congo

DESCRIPTIONSteel Structures:650 TonsPainting: 7,600 Sqm.

DATE OF AWARDJune 2016

READY FOR SAIL AWAYNovember 2016

TYPE OF CONTRACTEPC

WHP3 STRUCTURAL MODIFICATIONS – NENÈ OIL FIELD

Client:Location:Main Contractor:

PETROBELOffshore Egypt – Zohr FieldRosetti Marino

SCOPE OF WORKConstruction Engineering, Procurement and Fabrication activities of steel structures for Jacket, Foundation Piles, Pile Guide Frame (PGF) and Deck for ZOHR Central Control Platform.

DESCRIPTIONNr. 1 four legged Jacket, nr. 1 topside, nr.1 PGF structure and nr.4 foundation piles.Jacket 95 m (H)Weight: 1714 TonsDeck Weight: 1039 TonsPiles Weight: 927 TonsPGFWeight: 360 Tons

DATE OF AWARDApril 2016

READY FOR SAIL AWAYBatches between June -November 2016

TYPE OF CONTRACTUnit rates

ZOHR PROJECT

COMPLETED

Client:Location:Main Contractor:

CONSORZIO VENEZIA NUOVAVenice – ItalyRosetti Marino SPA

MOSE I – COMPLETION PROJECTCONSTRUCTION & COMMISSIONING

DESCRIPTION

Modifications on structures and hydraulicsystems

Technical assistance for Mechanical Completion, Pre-comm and Commissioning

Operations and Maintenance

Offshore Tests in November 2016; Operations andMaintenance program to be agreed (most probably3 years period starting from January 2017)

SCOPE OF WORKStructural modifications, commissioning and Start-up of 4 leg jack up installation vessel specially designed for the installation and maintenance of dams for Venice. Entire system is called MOSE.

TYPE OF CONTRACT AWARD DURATIONCost plus fee Feb 2016 1 year

COMPLETED

Client:Location:Main Contractor:Nominated Sub.:

Abu Qir PetroleumOffshore Egypt – North Abu Qir FieldPetrojetRosetti Marino

SCOPE OF WORKEngineering and Procurement activities.

ABU QIR DEVELOPMENT PROJECTNAQ Q PIII PLATFORM

DESCRIPTIONNr. 1 four legged Jacket,nr. 1 wellhead module andtopside, nr. 6 gas/oil wells (4 + 2future)Jacket40,5 m (H) –Weight: 550 TonsDeckWeight: 2040 TonsPilesWeight: 720 Tons

DATE OF AWARDOctober 2014

READY FOR SAIL AWAYJuly 2016

TYPE OF CONTRACTEP/Lump Sum

COMPLETED

Client:Final client:Project:

Location:Main Contractor:

SKEMA SpATENGIZCHEVROILFuture Growth Project, Wellhead Pressure Management Project (FGP/WPMP)

KAZAKHSTANRosetti Marino

LER SUBSTATIONS

DESCRIPTION110 kV Main substationWeight: 500 Tons110 kV Core substationWeight: 310 Tons

DATE OF AWARDOctober 2014

READY FOR SAIL AWAYDecember 2016

TYPE OF CONTRACTePC/Lump Sum

SCOPE OF WORKConstruction Engineering, Procurement, Fabrication, Transportation, Commissioning and Start-up Assistance.

COMPLETED

DP4 – FPSO INTERFACE WORKS

Client:Final Client:Location:Main Contractor:

STX Offshore & ShipbuildingMELLITAH OIL & GAS B.V.Bouri Field - Offshore LibyaRosetti Marino

SCOPE OF WORKProject Management, Engineering (Basic Design review, detailed engineering development & Risksassessment), Procurement & Inspection Fabrication, Offshore installation and Hook up, Dismantling, installation and Hook up, recommissioning & Commissioning activities.

DESCRIPTION:New FPSO will be installed nearthe platform . Modification and interface works on the platformto be done for new risersconnection (HV electrical powercable and 16’’ inc. process piping)

TECHNICAL DATAMain new equipment: Transformer, UTA, Switchboard, fiber optic, Control&Safetysystem extension, ESDV.E&I, mechanical, structural and piping works to perform.

DATE OF AWARDOctober 2014

READY FOR SAIL AWAYFebruary 2016

TYPE OF CONTRACTEPIC contract on Turn Key LumpSum basis

COMPLETED

Client:Location:

Main Contractor:

KOSSCO LTD (Owner: ENI Norge)Ulsan, South Korea (1° phase) Norway, Barents sea (2° phase Hook up)Rosetti Marino

SCOPE OF WORKProvision of Services for mechanical completion activities on Goliat FPSO (Precommissioning & commissioning– all disciplines).

TECHNICAL DATAWeight approx. 60.000 Tons,diameter 120m, height 76m,FPSO with oil storage, seaballasting system, Gas TurbineGeneration and Living quarter

Manhours 1° phase: 82.795Manhours 2° phase: 26.977(as of 30 Nov. 2015)

DATE OF AWARDJanuary 2014

READY FOR SAIL AWAY1st Quarter 2016

HOOK UP: in progress

TYPE OF CONTRACTMSDaily rates

GOLIAT PROJECTGOLIAT FPSO

COMPLETED

Client:Location:Main Contractor:

LOTOS PETROBALTICPolandRosetti Marino

SCOPE OF WORKConversion of drilling rig from MODU to production center. Engineering, Procurement services, management and HUC works.

TECHNICAL DATAWeight: Approx. 3.000 tons new modules and removal and reconversion of drilling rig Hull and legs

DATE OF AWARDAugust 2013

READY FOR SAIL AWAYNovember 2015

TYPE OF CONTRACT EPMS

DRILLING RIG CONVERSION TO WHP PLATFORM

COMPLETED

Client:Location:Main Contractor:Fabrication site:

FOXTROT INTERNATIONAL LDCOffshore Ivory CoastRosetti MarinoPiomboni Yard, Marina di Ravenna (Italy)

COMPLETED

SCOPE OF WORKEngineering, Procurement and supply of all material and equipment, prefabrication, fabrication and assembly, precommissioning, commissioning load out, site hook-up, site commissioning and assistance for start-up of: One (1) 4-legged jacket, four (4) skirt piles, A Four (4) deck level Topside and a 20 POB Living Quarter

TECHNICAL DATATopside: LxWxH 54x31x20Weight: 4.500 tonsJacket: H 118 mWeight: 3.500 tons (+ 1.300 tons for piles)Living Quarter: 20 POBDATE OF AWARDDecember 2012

READY FOR SAIL AWAYJacket & piles: August 2014Deck: March 2015

TYPE OF CONTRACT EPC

MARLIN DEVELOPMENT PROJECT

Client:Location:Main Contractor:Fabrication site:

ENI SPAAdriatic SeaRosetti MarinoPiomboni Yard, Marina di Ravenna (Italy)

SCOPE OF WORKEngineering, procurement, construction, load-out and sea fastening, transportation to site, hook up, commissioning, preparation of the platform and assistance during dewatering operations, start up and performance tests of Elettra and Fauzia decks.

TECHNICAL DATADeck : 20x17x22 (LxWxH)Weight: Elettra – Approx. 450 tonsFauzia – Approx 610 tons

DATE OF AWARDApril 2013

READY FOR SAIL AWAYApril 2014

TYPE OF CONTRACT EPC

ELETTRA AND FAUZIA PLATFORMS

COMPLETED

Client:Location:Main Contractor:Fabrication site:

Inagip dooOffshore Adriatic Sea, Croatian SectorRosetti MarinoViktor Lenac yard - Croatia

SCOPE OF WORKEngineering, Procurement, Fabrication, Transportation, Offshore Hook-up and Commissioning and Start-up Assistance.

TECHNICAL DATADeck: LxWxH 54x31x20Weight: 510 tons Wellhead module: 78 tonsThree-legged jacket: H 72 m Weight: 735 tonsPiles: 690 tonsConductors:242 tons

DATE OF AWARDNovember 2012COMPLETION DATEJuly 2014

TYPE OF CONTRACTEPC contract

IKA & IVANA FIELD DEVELOPMENT PROJECTIKA JZ PLATFORM

COMPLETED

Client:Location:Main Contractor:Fabrication site:

SHELL UKNorth Sea UKCSRosetti MarinoPiomboni Yard, Marina di Ravenna (Italy)

COMPLETED

SCOPE OF WORKEngineering, procurement, fabrication, testing, onshore commissioning, load-out and sea fastening of the Clipper Accommodation Module with integral Utility Deck and Helideck, the link bridge, the jacket and piles.

TECHNICAL DATATopsides - Living Quarter (84 POB), Utility Deck and helideck: 50x25x25 (LxWxH)Four-legged jacket (weight: 800 tons)Weight: Approx. 3000 tons

DATE OF AWARDAugust 2012

READY FOR SAIL AWAYJune 2014

TYPE OF CONTRACTEPC

CLIPPER PLQ UPGRADE PROJECT

Client:Location:Main Contractor:Fabrication site:

ELF EXPLORATION UK LTD / TOTAL GroupNorth Sea, UKCS (240 Km East of Aberdeen)Rosetti MarinoPiomboni Yard, Marina di Ravenna (Italy)

SCOPE OF WORKEngineering, Procurement, Construction, Installation, Hook-up and Commissioning of Topsides for the West Franklin platform

DESCRIPTIONWest Franklin topside will be used in the extraction of gas and condensed crude oil, with 9 high-pressure and high-temperature wellheads, the estimatedproduction design rate of West Franklin platform is 40,000 barrels of oil equivalent per day.

TECHNICAL DATATopsideLxWxH: 40x40x20 mtWeight: 3.300 tons

DATE OF AWARDJuly 2011

READY FOR SAIL AWAYJune 2013

TYPE OF CONTRACT EPCI

WEST FRANKLIN PROJECT

COMPLETED

Client:Location:Main Contractor:Fabrication site:

ELF EXPLORATION UK LTD / TOTAL GroupNorth Sea, UKCS (240 Km East of Aberdeen)Rosetti MarinoPiomboni Yard, Marina di Ravenna (Italy)

SCOPE OF WORKEngineering, Procurement, Construction, Installation, Hook-up and Commissioning of Topsides for the Elgin B platform

DESCRIPTIONElgin B topside will be used in the extraction of gas and condensedcrude oil, with 12 high-pressure and high-temperature wellheads, the estimated production design rate of Elgin B platform is of 65,000 barrels of oil equivalentper day.

TECHNICAL DATATopsideLxWxH: 35x35x15mtWeight: 2.300 tons

DATE OF AWARDJuly 2011

READY FOR SAIL AWAYJune 2013

TYPE OF CONTRACT EPCI

ELGIN B PROJECT

COMPLETED

Client:Location:Main Contractor:Fabrication site:

MELLITAH OIL & GAS B.V.Bouri Field – Offshore LibyaRosetti MarinoDP3/DP4 (On board) & Fores Engineering warehouse (Italy)

COMPLETED

SCOPE OF WORKEngineering, Procurement, Fabrication, Transportation&Delivery, Off-shore installation, Testing, Precommissioning, Commissioning & assistance to the Company during Start-up

DESCRIPTIONDecommissioning and dismantling of Gas SweeteningUnit, Procurement of bulk material (structures, piping, E&I), Construction of 3 chemicaltransfer pump skids & 4 chemicalinjection skids.Offshore revamping worksonboard two platforms,Update of the DCS/ESD/PSD systemTECHNICAL DATADismantling of Unit 22 for a total weight of 240 tons (Columns, Piping and Structures)Cables: 3000m Piping: 60t

Scaffolding more than: 3500 m3Offshore works: 70.000 mhrs(SIMOPS)

DATE OF AWARDOctober 2012

PROVISIONAL ACCEPTANCENovember 2013

TYPE OF CONTRACTEPIC contract on Turn Key LumpSum basis

DP3/DP4 MODIFICATION & REVAMPING PROJECT

Client:Location:Main Contractor:Fabrication site:

ConocoPhillips UKCentral North SeaRosetti MarinoPiomboni Yard, Marina di Ravenna (Italy)

SCOPE OF WORKConstruction engineering, procurement, fabrication, load-out and sea-fastening.

DESCRIPTIONnr. 3 Jackets and piles

TECHNICAL DATAWHP Four-legged jacketWeight: 5.300 TeNr.9 skirt piles weighing 3.800 TeJRP Four-legged jacketWeight: 5.600 TeNr.8 skirt piles weighing 3.400 TeJLQ Four-legged jacketWeight: 3.400 TeNr.4 skirt piles weighing 1.700 Te

DATE OF AWARDFebruary 2010 (WHP)August 2010 (JLQ & JRP)

READY FOR SAIL AWAYApril 2011 (WHP)April 2012 (JLQ & JRP)

TYPE OF CONTRACT L/S

JASMINE DEVELOPMENT PROJECTJASMINE WHP, JLQ & JRP SUBSTRUCTURES

COMPLETED

Client:Location:Main Contractor:Fabrication site:

ConocoPhillips UKNorth Sea, UKCSRosetti MarinoPiomboni Yard, Marina di Ravenna (Italy)

SCOPE OF WORKProcurement, Construction and Commissioning of Topsides for the Jasmine platform

DESCRIPTIONThe Jasmine Gas SweeteningModule shall be installed on the Judy Riser Platform (JRP) on top of the structure housing the Jasmine HP Separator facilities. Designed to provide final gas treatment of Jasmine productprior to further downstream processing of the gas on the existing Judy Platform consistof two gas treatment trains, eachtrain equipped with a coalescerfilter, an electric heater, a gas sweetening bed and a fines filter, in that order.

TECHNICAL DATATopsideLxWxH: 11x17x11 mtWeight: 1000 tons

DATE OF AWARDSeptember 2011

READY FOR SAIL AWAYAugust 2012

TYPE OF CONTRACTPCC

JASMINE PROJECT

COMPLETED

Client:Location:Main Contractor:

Titan-Micoperi srlGiglio Island, ItalyRosetti Marino

COMPLETED

SCOPE OF WORKManagement, Construction Engineering, Procurement, Prefabrication, Assembly, Load-out and Seafastening of nr. 2 platforms for the wreck removal of Costa Concordia cruise ship.

TECHNICAL DATA45x25x12 Weight: 1.000 Tons each

DATE OF AWARDJuly 2012

READY FOR SAIL AWAYNovember 2012

TYPE OF CONTRACTPC/Lump Sum

COSTA CONCORDIAWRECK REMOVAL

Client:Location:Main Contractor:Fabrication site:

SEREPTAshtart Field – Offshore TunisiaRosetti MarinoSfax-Tunisia/Ashtart Field Offshore Tunisia

COMPLETED

SCOPE OF WORKConstruction engineering, procurement, fabrication, dismantling , load-out and offshore revamping works.

DESCRIPTION• Procurement of bulk material

(structures, piping, E&I)• Prefabrication of loose and

assembled structures and piping spools

• Offshore revamping worksonboard five platforms

• Dismantling & RelocationEngineering

PRELIMINARY TECHNICAL DATAPrefabricated structures: 1.350 tonsPiping spools & supports: 195 tonsElectrical & instrumentation cables: 25 km

Offshore works: approx. 1.200.000 mhrs

DATE OF AWARDSeptember 2010

COMPLETION DATEDecember 2013

TYPE OF CONTRACTProcurement and FabricationContract at Unit/Time rates

ASHTART REVAMPING PROJECT

Client:Location:Main Contractor:Nominated Sub.:

Abu Qir PetroleumOffshore Egypt – North Abu Qir FieldPetrojetRosetti Marino

COMPLETED

SCOPE OF WORKEngineering and Procurement activities.

DESCRIPTIONNr. 1 four legged Jacket,nr. 1 wellhead module andtopside, nr.6 gas wells 100MMSCFD@48 bar at 60°C.Jacket30 m (H) –Weight: 410 TonsTopside22x22.5x17m (LxWxH)-Weight: 780 TonsPilesWeight: 640 Tons

DATE OF AWARDDecember 2009

READY FOR SAIL AWAYDecember 2010

TYPE OF CONTRACTEP/Lump Sum

ABU QIR DEVELOPMENT PROJECTNAQ Q PII PLATFORM

Client:Location:Main Contractor:

TOTAL E&P CongoOffshore CongoConsortium Rosetti Marino (Italy) + SaiBos (France)

SCOPE OF WORKDetail design, Fabrication engineering, Procurement, Jacket prefabrication , Deck Construction, On-shoreCommissioning, Load-out, Sea Fastening, Hook-up, Commissioning, Revamping of two existing platforms, Assistance to Start up.

DESCRIPTIONWellhead platform with production facilities.

TECHNICAL DATATopsideLxWxH: 25x25x15 mtWeight: 800 tons

Wells: nr. 3 oil + nr. 1 water injection

JacketType: 4-legs Height: 120 mtWeight: 1.400 tons

DATE OF AWARDAugust 2008

READY FOR SAIL AWAYMarch 2010

TYPE OF CONTRACTEPCILump sum

LIBONDO FIELD DEVELOPMENT PROJECTLIBONDO PLATFORM

COMPLETED

Client:Location:Main Contractor:

EDINA d.o.o.Adriatic Sea – Croatian sectorRosetti Marino

COMPLETED

SCOPE OF WORKFabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Commissioning, Assistance to Start up.

TECHNICAL DATAJacket & wellhead platform with production and separation facilities. Water depth: 37 m.Integrated deckWeight: 355 tonsWellhead moduleWeight: 37 tonsJacketType: 3 legsWeight: 350 tonsPiles & conductorsWeight: 390 tons

DATE OF AWARDApril 2008

READY FOR SAIL AWAYAugust 2009

TYPE OF CONTRACTEPCLump sum

IZABELA FIELD DEVELOPMENT PROJECTIZABELA NORTH PLATFORM

Client:Location:Main Contractor:

EDINA d.o.o.Adriatic Sea – Croatian sectorRosetti Marino

COMPLETED

SCOPE OF WORKFabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Commissioning, Assistance to Start up.

TECHNICAL DATAWellhead platform with production facilities for 2+1 wells.

Topside:LxWxH: 22x22x7Weight: 570 tons

Wellhead module:Weight: 70 tons

Jacket :Type: 3-legsHeight: 100 mtWeight: 1.200 tons

PilesWeight: 770 tons

DATE OF AWARDApril 2008

READY FOR SAIL AWAYJuly 2009

TYPE OF CONTRACTEPCLump sum

IZABELA FIELD DEVELOPMENT PROJECTIZABELA SOUTH PLATFORM

Client:Location:Main Contractor:

ENI TUNISIA B.V.Offshore TunisiaATI Intermare Sarda-Saipem Energy Services-Rosetti Marino

COMPLETED

SCOPE OF WORKFabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Commissioning, Assistance to Start up.

TECHNICAL DATAWellhead platform with production facilities for 2+1 wells.Topside:LxWxH: 22x22x7Weight: 570 tonsWellhead module:Weight: 70 tonsJacket :Type: 3-legsHeight: 100 mtWeight: 1.200 tonsPilesWeight: 770 tons

L.O.I:17/04/2008

READY FOR SAIL AWAY:Jacket+Wellhead Module+Piles:March 2010

TYPE OF CONTRACT:Target price contract basedon risk and reward philosophy

BARAKA FIELD DEVELOPMENT PROJECTBARAKA PLATFORM

Client:Location:Main Contractor:

INAgip dooAdriatic Sea – Offshore CroatiaConsortium Rosetti Marino/Intermare Sarda/S.E.I.

COMPLETED

SCOPE OF WORKFabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening,Transportation to Site, Hook-up, Commissioning, Assistance to Start up.

TECHNICAL DATAWellhead platform and living quarter (19/10) with production and separation facilities for 6+2 wells, helideck.TopsideLxWxH: 21x8x10,6 mtWeight: 1900 tonsFour legged JacketHeight: 70 mtWeight: 980 tonsPilesWeight: 920 tons

DATE OF AWARDDecember 2007

READY FOR SAIL AWAYApril 2009

TYPE OF CONTRACTePCLump sum

ANNAMARIA FIELD DEVELOPMENT PROJECTANNAMARIA A PLATFORM

Client:Location:Main Contractor:

ENI SpAAdriatic Sea – Offshore ItalyConsortium Rosetti Marino/Intermare Sarda/S.E.I.

COMPLETED

SCOPE OF WORKFabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening,Transportation to Site, Hook-up, Commissioning, Assistance to Start up.

TECHNICAL DATAWellhead platform and living quarter (19/10) with production and separation facilities for 6+2 wells, helideck.TopsideLxWxH: 21x8x10,6 mtWeight: 1800 tonsFour legged JacketHeight: 70 mtWeight: 1020 tonsPilesWeight: 810 tons

DATE OF AWARDDecember 2007

READY FOR SAIL AWAYApril 2009

TYPE OF CONTRACTePCLump sum

ANNAMARIA FIELD DEVELOPMENT PROJECTANNAMARIA B PLATFORM

Client:Location:Main Contractor:

ENI CONGO SAOffshore CongoConsortium Rosetti Marino/Intermare Sarda/S.E.I.

SCOPE OF WORKFabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Revamping of nr.3 neighbouring platforms, Commissioning, Assistance to Start up.

DESCRIPTIONUnmanned wellhead platforms with production and separation facilities for 4 wells.

TECHNICAL DATATopsides IkalouLxWxH: 35x25x17 mtWeight: 1.050 tons

Jacket IkalouType: 3-legs Height: 90 mtWeight: 1.320 tons

Piles IkalouWeight: 890 tons

DATE OF AWARDSeptember 2006

READY FOR SAIL AWAYJune 2007

TYPE OF CONTRACTEPCAlliance Risk/Reward

IKALOU FIELD DEVELOPMENT PROJECTIKALOU SOUTH PLATFORM

COMPLETED

Client:Location:Main Contractor:

ENI CONGO SAOffshore CongoConsortium Rosetti Marino/Intermare Sarda/S.E.I.

COMPLETED

SCOPE OF WORKFabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Revamping of nr.3 neighbouring platforms, Commissioning, Assistance to Start up.

DESCRIPTIONUnmanned wellhead platforms with production and separation facilities for 4 wells.

TECHNICAL DATATopsides IkalouLxWxH: 35x25x17 mtWeight: 1.050 tons

Jacket IkalouType: 3-legs Height: 86 mtWeight: 1.290 tons

Piles IkalouWeight: 890 tons

DATE OF AWARDSeptember 2006

READY FOR SAIL AWAYJune 2007

TYPE OF CONTRACTEPCAlliance Risk/Reward

IKALOU FIELD DEVELOPMENT PROJECTIKALOU PLATFORM

Client:Location:Main Contractor:

MAERSK OLIE og GAS ASOffshore Denmark – North SeaRosetti Marino

COMPLETED

SCOPE OF WORKEngineering, Procurement, Construction, On-shore, Commissioning, Load-out, Sea Fastening

TECHNICAL DATALiving Quarter Module for 80people.5 floors of Accommodation, galleyand recreation area.2 Floors + Mezzanine of UtilitiesHelideck

Dimensions:Length: 46,6 mWidth: 27 mHeight: 35,2 mWeight: 2 800 Tons

DATE OF AWARDFebruary 2006

READY FOR SAIL AWAYJuly 2007

TYPE OF CONTRACTEPCLump sum

HALFDAN NORTH EAST PHASE 3 DEVELOPMENTHBC TOPSIDE ACCOMMODATION MODULE

Client:Location:Main Contractor:

INAGIP DOOAdriatic Sea – Croatian watersRosetti Marino

COMPLETED

SCOPE OF WORKDetail design, Engineering, Procurement, Fabrication, On-shore Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Offshore Commissioning, Assistance to Start up.

TECHNICAL DATAJacket & conductor pipesWeight: 1.160 tons

PilesWeight: 920 tons

Deck, Topside and Living QuarterWeight: 950 tons

DATE OF AWARDJuly 2005

READY FOR SAIL AWAYSeptember 2006

TYPE OF CONTRACTEPCLump sum

KATARINA FIELD DEVELOPMENT PROJECTKATARINA PLATFORM

Client:Location:Main Contractor:

ENI OIL CO. LTD - Libyan branchBouri Field - Offshore LibyaRosetti Marino

COMPLETED

SCOPE OF WORKProject Management, Engineering (Basic Design review, detailed engineering development & Risksassessment), Procurement & Inspection Fabrication, Offshore installation and Hook up, Dismantling, installation and Hook up, recommissionig & Commissioning activities.

DESCRIPTION:Topside flowlines (from riserscounter/top hubs to L&R traps)• Connections between new

flowlines and existing topsidewellheads

• New launching and receiving traps• Methanol and Wax inhibitor

injection package (new (MCC)• Interconnecting piping between

new facilities and existing utilities• Piping (accessories & supports),

Valves• Local instrumentation and control

panels• Power and control panels• Power & Control cables, electrical

& instrumental bulk materials• Structural extension (for methanol

and wax skid) and Reinf.• Fire&Gas system extension• Upgrading DCS ABB-INFI 90&ESD

system (new I/O cards & cabinet)TECHNICAL DATASteel structures: approx. 15 tonsPiping (carbon steel, stainless (316L), Cupro-Nichel, Duplex, Inconel 625, Inconel 825: approx. 60 tonsEquipment: approx. 10 tonsProject tot. manhours: approx. 50.000DATE OF AWARDDecember 2004READY FOR SAIL AWAYApril 2006

DP4 TOPSIDE MODIFICATIONS DP4 PLATFORM

Client:Owner:Location:Main Contractor:

BECHTEL LTD BG TUNISIA120 km Offshore Tunisia, Mediterranean SeaRosetti Marino

COMPLETED

SCOPE OF WORKConstruction Engineering, Partial Procurement, Fabrication. Onshore Construction, Onshore Commissioning, Load-out, Seafastening, Transport and Tow.

TECHNICAL DATATopside Compression Module23x40 (WxH) Weight: 1.500 Tons

DATE OF AWARDMarch 2003

READY FOR SAIL AWAYJuly 2004

TYPE OF CONTRACTepC/Lump Sum

MISKAR DEVELOPMENT PROJECTMISKAR COMPRESSION MODULE