Transcript
  • 8/7/2019 Presentazione__31_Marzo_2011

    1/32

    2. Natural and Cultural Resources andRisk PreventionPriority

    P O W E R E DP O W E R E DAcronim

    0 8 70 8 7Project code

    Project of Offshore Wind Energy:Research, Experimentation, DevelopmentProject title

    Italy (10) Albania (1)Croatia (1) Montenegro (1)Countries involved

    K I C K O F F M E E T I N GK I C K O F F M E E T I N G31 Marzo 2011

    POWERED: Le Ragioni e gli obiettivi del progetto

    Prof. Renato Ricci

    Dipartimento di Energetica

    Universit Politecnica delle Marche

  • 8/7/2019 Presentazione__31_Marzo_2011

    2/32

    INDICE

    Gli impegni del Governo Italiano nel campo delle Rinnovabili

    Le linee guida nazionali

    La situazione delleolico in Italia

    Perch operare in mare

    La tecnologia delleolico offshore I costi

    Le installazioni europee

    La conoscenza della risorsa eolica dellAdriatico

    Gli obiettivi generali del Progetto POWERED

    Pescara, 31 Marzo 2011 Prof. Ing. Renato RICCI - Kick off Meeting 2

  • 8/7/2019 Presentazione__31_Marzo_2011

    3/32

    Direttiva 2009/28/CEsulla promozione delluso dellenergia da fontirinnovabili, recante modifica e successivaabrogazione delle direttive 2001/77/CE e2003/30/CE

    Pescara, 31 Marzo 2011 Prof. Ing. Renato RICCI - Kick off Meeting 3

    Definisce energia da fonti rinnovabili l energia

    proveniente da fonti rinnovabili non fossili, vale a direenergia eolica, solare, aerotermica, geotermica,

    idrotermica e oceanica, idraulica, biomassa, gas di

    discarica, gas residuati dai processi di depurazione e

    biogas;

    Lobiettivo generale obbligatorio nel raggiungimentodi una quota pari almeno al 20 % di energia da fonti

    rinnovabili nel consumo finale lordo di energia della

    Comunit Europea nel 2020.

    Ogni Stato membro assicura che la propria quota dienergia da fonti rinnovabili in tutte le forme di trasporto

    nel 2020 sia almeno pari al 10 % del consumo finale di

    energia nel settore dei trasporti nello Stato membro.

    Ogni Stato Membro dovr incrementare la produzionedi energia da Fonte Rinnovabile secondo quanto

    riportato in Tabella e su un periodo di 10 anni: 2010-

    2020. Le percentuali sono basate sul Consumo Finale

    di ogni Stato ed accettata una messa in funzione

    degli impianti al massimo entro il 2022.

  • 8/7/2019 Presentazione__31_Marzo_2011

    4/32

    Position Paper dellItalia(10/09/2007)

    Pescara, 31 Marzo 2011 4

    Solare FV integratoSolare FV a terra (100 kmq di

    territorio)

    Solare Termodinamico (20 kmq di

    territorio)

    Geotermico a media temperatura ed

    alte profondit

    Biomasse da RSU e residui

    industriali

    Moto marino costiero

    Azioni per la produzione di

    elettricit da FER

  • 8/7/2019 Presentazione__31_Marzo_2011

    5/32

    Gazzetta Ufficiale 18 Settembre 2010 Serie Speciale n.219

    Pescara, 31 Marzo 2011 Prof. Ing. Renato RICCI - Kick off Meeting 5

    Linee guida per il procedimento di cui all'articolo 12 del decreto legislativo 29

    dicembre 2003, n.387 per l'autorizzazione alla costruzione e all'esercizio di impiantidi produzione di elettricit da fonti rinnovabili nonch linee guida tecniche per gli

    impianti stessi.

    Definisce dei criteri di inserimento Paesaggistico ed individua in termini generali la tipologia di

    Aree vietate alle Fonti Rinnovabili

    Ai fini dell'applicazione dell'articolo 12, commi I e 3, del decreto legislativo 387 del 2003, tra leopere connesse sono compresi anche i servizi ausiliari di impianto e le opere necessarie alla

    connessione alla rete elettrica, specificamente indicate nel preventivo per la connessione.

    Ovvero nella soluzione tecnica minima generale, redatti dal gestore della rete elettrica

    nazionale o di distribuzione ed esplicitamente accettati dal proponente.

    Le presenti linee guida non si applicano agli impianti offshore per i quali l'autorizzazione

    rilasciata dal Ministero delle infrastrutture e dei trasporti, sentiti il Ministero dello sviluppoeconomico e il Ministero dell'ambiente e della tutela del territorio e del mare, con le modalit

    di cui all'articolo 12, comma 4, del decreto legislativo n. 387 del 2003 e previa concessione

    d'uso del demanio marittimo da parte della competente autorit marittima

  • 8/7/2019 Presentazione__31_Marzo_2011

    6/32

    Italian Regions Wind Power distribution (June 2010)

  • 8/7/2019 Presentazione__31_Marzo_2011

    7/32

    Vertic l i s eed gr dient nd s rf ce r ghness

    Geostrophic wind

    Moderate turbulences

    Boundary layer

    near the sea

    hardly anyturbulence

    Boundary

    layer near

    the ground

    High turbulences

    Geostrophic wind

    44 5 km5 km

  • 8/7/2019 Presentazione__31_Marzo_2011

    8/32

    Offs ore Wind Turbines

  • 8/7/2019 Presentazione__31_Marzo_2011

    9/32

    Turbine Transport

    WindACE, water depht > 15 mMonoACE Crossed Tension Legs

  • 8/7/2019 Presentazione__31_Marzo_2011

    10/32

    Foundations

    Monopile, is adopted in shallow water ( < 25 m); Pile diameter is generally 4 m and it is inserted 12-15 m inthe sea bed

    Tripdod or Four legs foundations are commonly used in deep water installations (> 30m)

    Gravity Foundations are in concrete or in steel, successively fulfilled by Ovuline.

    Vacuum Tripod

    Floating Systems, used in deep water ( 100 m)

  • 8/7/2019 Presentazione__31_Marzo_2011

    11/32

    Beatrice Wind Farm Project (UK)

    EU Project DOWNVInD(Distant Offshore Windfarms with No Visual Impact in Deepwater)

  • 8/7/2019 Presentazione__31_Marzo_2011

    12/32

    Grid Connection

    AC trasnmission in commonly used in moderate cable lenght ( < 60 km)

    DC power transmission is used for very long distance,

    36 kV

    36 kV

    150 kV

    Offshore

    SubstationOnshore

    Substation

  • 8/7/2019 Presentazione__31_Marzo_2011

    13/32

    Wind Energy Project Costs

    Source: B. Snyder, M.J. Kaiser / Renewable Energy 34 (2009) 15671578

    CAPITAL COSTSCAPITAL COSTSincluding wind turbines,

    foundations, road

    construction and grid

    connection, which can be

    as much as

    80% of the total cost of

    the project over its entire

    lifetime.VARIABLE COSTSVARIABLE COSTS

    the most significant

    being the operation and

    maintenance (O&M) of

    wind turbines, but also

    including other

    categories such as land

    rental, insurance and

    taxes or managementand administration.

    Variable costs are

    relatively low and

    will oscillate around a

    level of 20% of the total

    investment.

  • 8/7/2019 Presentazione__31_Marzo_2011

    14/32

    Estimate of capital cost breakdown for an offs ore wind farm

    Department of Trade and Industry, DTI. Study of the costs of offshore wind generation.

    A report to the Renewables Advisory Board (RAB) & DTI. URN Number 07/779; 2007b.

  • 8/7/2019 Presentazione__31_Marzo_2011

    15/32

    European Off-S ore Wind Farms (2008)

    Change Adopted: 1 [] = 1.3518 [$]

  • 8/7/2019 Presentazione__31_Marzo_2011

    16/32

    European Off-S ore Wind Farms (2009)

  • 8/7/2019 Presentazione__31_Marzo_2011

    17/32

    European Off-S ore wind farm under construction (2009)

  • 8/7/2019 Presentazione__31_Marzo_2011

    18/32

    European Off-S ore Wind Farms (2010) (Total Power:2946 MW)

  • 8/7/2019 Presentazione__31_Marzo_2011

    19/32

    Trend of t e Offs ore Capital Costs

    BEATRICE-

    Demonstator Project

    (UK)

  • 8/7/2019 Presentazione__31_Marzo_2011

    20/32

    T e cost of Wind Energy

    The cost of wind energy depend on the Capital and Variable costs but also by theproducibility of the wind farm. The latter is strongly connected with the annual wind

    resource and project quality.

    The Capacity Factor is a measurement of the wind farm producibility; it is defined as:

    and ranging from 0.18 to 0.29 for European on-shore wind farm. The CV value for off-

    shore wind farm is difficult to evaluate because of the small numbers of the plants but

    the EWEA (European Wind Energy Agency) set at 40% the CV value at 2020.

    The Wind Energy Cost and Capacity Factor are inversely proportional

    Capacity factors based on yearly output do not reflect the long term potential of a region

    because they are likely to evolve. An 10% average wind speed error induces a 30% error of the wind power

    Sometimes CV is replaced by the Full-load hours parameter; the two parameter are

    related by:

    8760!

    Annual Energy ProductionCV= Capacity Factor =

    Max. Energy

    a

    n

    E

    P

    Ea = Annual Energy Production

    Pn = Turbine Nominal Power

    8760 F ll-L a rs = CV

  • 8/7/2019 Presentazione__31_Marzo_2011

    21/32

    Italian Capacity Factors for different energy tec nologies

  • 8/7/2019 Presentazione__31_Marzo_2011

    22/32

    Capacity Factors for Wind Energy (2003-2007)

    Source: N. Boccard / Energy Policy 37 (2009) 26792688

  • 8/7/2019 Presentazione__31_Marzo_2011

    23/32

    Long term wind evolution

    Danish monthly wind index

    North Atlantic Oscillation (NAO)

    Recent change in NAO index

    NAO index over 3 centuries

    One year moving average

  • 8/7/2019 Presentazione__31_Marzo_2011

    24/32

    Capacity Factor of t e Italian Wind Power plants

    Source: TERNA

  • 8/7/2019 Presentazione__31_Marzo_2011

    25/32

    Global view ofItaly

  • 8/7/2019 Presentazione__31_Marzo_2011

    26/32

    RISOE Offs ore Wind Map ofEurope (1989)

    Risoe National Lab.,

    Roskilde Denmark

  • 8/7/2019 Presentazione__31_Marzo_2011

    27/32

    Mediterranean Wind Map

    NOSTRUM EU Project by ENEA, Besel, Espace Eolienne Devellopment e CRESS

  • 8/7/2019 Presentazione__31_Marzo_2011

    28/32

    NOSTRUM Project results

    I dati relativi alle

    condizioni di vento sono

    stati derivati dai

    rilevamenti delle stazioni

    meteorologiche della

    rete I.S.W.O.

    (International Surface

    Weather Observations)

    nel periodo 1982-1997.

    E stata condotta

    unintegrazione con i dati

    provenienti dalla rete

    meteo European Net

    Buoys) e quelli raccolti,

    su base volontaria, dalle

    navi commerciali.

    La risoluzione della

    griglia di calcolo di 2

    km x 2 km e il codice di

    calcolo utilizzato WAsP

  • 8/7/2019 Presentazione__31_Marzo_2011

    29/32

    MeteorologicalData by offs ore platforms

  • 8/7/2019 Presentazione__31_Marzo_2011

    30/32

    A plan for offs ore wind energy in t e Adriatic Sea - 1

    Phase-1: The study of the wind resources study in the Adriatic

    sea and shores1. Numerical Mesoscale modelling of the complete study area for a long

    simulation period (5-10 year)

    2. To collect the meteorological data by the offshore oil plattforms

    3. To collect wind data by the commercial ships

    4. To collect wind measurements of the militar coastal stations and

    meteorological regional networks

    5. To define a common protocol to compare different data sources

    6. The validation of the numerical modelling by the experimental data

    7. To localized, numerically, the best places for anemometric masts devoted

    to wind energy measurements

    8. To install wind measurements facilities in coastal and sea sites.

    9. To define the Adriatic wind energy resources.

  • 8/7/2019 Presentazione__31_Marzo_2011

    31/32

    A plan for offs ore wind energy in t e Adriatic Sea 2

    Phase-2: The planning of the offshore development

    1. To localize main wind basins

    2. To investigate on the interference with the navigation

    3. To analyse the problems connected with main enviromental impacts

    4. To define a new common fishing Plan in order to satisfy the altereted

    fish presence, expecially during the foundations construction.5. To plan, if possible, a marine electrical grid, reducing the overall cost of

    the wind energy

    6. To determine the main connection points at the High Voltage on-shore

    electric network

    Phase-3: To define the common rules to evaluate wind projects

    Phase-4: To study solutions for the installations in deep waters

  • 8/7/2019 Presentazione__31_Marzo_2011

    32/32

    Brussels 6 May 2009

    The European Parliament passed 5 billion Recovery Plan at its plenary session.

    The Plan include offshore wind and electricity grids: 565 million are allocated to

    offshore wind energy projets and part of the 3.98 billion the Recovery Plan

    earmarks for energy projects will go towards interconneting Europes power grids,

    and initiating the first stage of an offshore electricity supergrid.

    This should speed up offshore development and network integration even

    further. As a result, it will also benefit consumers directly by improving cross-

    border electricity flow and driving down the power price.