FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE AQUACULTURE MISSION THROUGH SPA (2011-12)
Area of the pond 0.1 Ha
Actual area constructed
0.15 Ha
Crest width >1.5M
Bottom width < 3 M
Slope 1:1
Depth < 1 M
Overflow canal 2-4 inch
Drain pipe 8 inch
Percentage of completion
100%
Shri Kederson Rengrin, Umdang
Area of the pond 0.1 Ha
Actual area constructed
0.1 Ha
Crest width 1-1.5 M
Bottom width < 3 M
Slope 1:1
Depth 1.5 M
Overflow pipe 2-4 inch
Drain pipe 4-6 inch
Percentage of completion
100%
Shri Makarius Amora, Riangba
Area of the pond 0.1 Ha
Actual area constructed
0.12 Ha
Crest width < 1 M
Bottom width 3-5 M
Slope 1:1
Depth 1.5 M
Overflow pipe 2-4 inch
Drain pipe 4-6 inch
Percentage of completion
100%
Shri Kyrmenlang Rasher, Riangwar
Area of the pond 0.1 Ha
Actual area constructed
0.1 Ha
Crest width 1-1.5 M
Bottom width < 3 M
Slope 1:1
Depth 1.5 M
Overflow pipe 4-5 inch
Drain pipe 4-6 inch
Percentage of completion
100%
Smt. Martina Nongsiej, Nongprut
Area of the pond 0.1 Ha
Actual area constructed
0.11 Ha
Crest width 1-1.5 M
Bottom width 3-5 M
Slope 1:1
Depth 1.5 M
Overflow pipe 4-5 inch
Drain pipe 4-6 inch
Percentage of completion
100%
Smt. Kronti Marngar, Rimardon
Area of the pond 0.1 Ha
Actual area constructed
0.2 Ha
Crest width 1-1.5 M
Bottom width 3-5 M
Slope 1:1
Depth 1.5 M
Overflow pipe 1 no.
Drain pipe 1 no.
Percentage of completion
100%
Smt. Krispina K. Snar, Nongjri
Area of the pond 0.1 Ha
Actual area constructed
0.12 Ha
Crest width 1-1.5 M
Bottom width 3-5 M
Slope 2:1
Depth 1.5 M
Overflow pipe 2-4 inch
Drain pipe 4-6 inch
Percentage of completion
100%
Smt. Markaret Iawren, Mawthawphet
Area of the pond 0.1 Ha
Actual area constructed
0.1 Ha
Crest width 1-1.5 M
Bottom width < 3 M
Slope 2:1
Depth 1-1.5 M
Overflow pipe 4-5 inch
Drain pipe 4-6 inch
Percentage of completion
100%
Shri Doloris Iawren, Sangriang
Area of the pond 0.1 Ha
Actual area constructed
0.13 Ha
Crest width 1-1.5 M
Bottom width 3-5 M
Slope 2:1
Depth 1-1.5 M
Overflow pipe > 5 inch
Drain pipe 4-6 inch
Percentage of completion
100%
Smt. Kristina Wanniang, Sangriang
Area of the pond 0.1 Ha
Actual area constructed
0.2 Ha
Crest width 1.5 M
Bottom width 3-5 M
Slope 1:1
Depth > 1.5 M
Overflow pipe 2-4 inch
Drain pipe 4-6 inch
Percentage of completion
100%
Smt. Banrishisha Wanniang, Sangriang