+ All Categories
Home > Documents > Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority...

Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority...

Date post: 02-Apr-2015
Category:
Upload: lamar-mahoney
View: 220 times
Download: 2 times
Share this document with a friend
Popular Tags:
24
presented by presented by Tim Murphy Tim Murphy , Senior Director Engineering and , Senior Director Engineering and Construction Construction Jacksonville Port Authority Jacksonville Port Authority Improvement Plans Improvement Plans
Transcript
Page 1: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

presented bypresented by

Tim MurphyTim Murphy, Senior Director Engineering and Construction, Senior Director Engineering and Construction

Jacksonville Port AuthorityJacksonville Port AuthorityImprovement PlansImprovement Plans

Page 2: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

JAXPORT’s VisionJAXPORT’s Vision

JAXPORT’s vision is “is to be

a major economic engine in

Northeast Florida by continuing

to be a premier diversified port

in the Southeastern United

States, with connections to

all major trade lanes

throughout the world.”

Page 3: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

Port of Jacksonville’s Economic ImpactPort of Jacksonville’s Economic Impact 50,000 Jobs

- 7,000 Direct Jobs- 43,000 Indirect + Induced jobs

$2.7 billion annually in dollar impact:

- $1.3 billion in wages & salaries

- $743 million in business revenue

- $340 million in local purchases

- $120 million in state and local taxes

- $258 million in U.S. Customs revenue

Page 4: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

JAXPORT FacilitiesJAXPORT Facilities

Page 5: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

Diversification:Diversification: Cargo TypesCargo Types

Containerized Breakbulk

VehiclesLiquid and Dry Bulk

People

Page 6: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

How JAXPORT How JAXPORT is changing to meet is changing to meet

future opportunitiesfuture opportunities

Page 7: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

JAXPORT Trading Partners, 2006JAXPORT Trading Partners, 2006

Page 8: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

JAXPORT Trading Partners, JAXPORT Trading Partners, 20162016

Page 9: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

Future Developments & Future Developments & InitiativesInitiatives

• Land

• Road Improvements

• Rail Improvements

• Harbor Deepening

Page 10: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

Expansion PlansExpansion Plans

Page 11: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

Mitsui O.S.K. Lines (MOL)Mitsui O.S.K. Lines (MOL)Ship Service to/from AsiaShip Service to/from Asia

Signed 30-year lease with JAXPORT in 2005

Will move 800,000 containers annually

Ships will sail between Jacksonville and ports in Asia beginning in late 2008.

Operations by Mitsui’s terminal operating Co., TraPac

Page 12: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

TraPac Terminal:TraPac Terminal:Artist’s ConceptionArtist’s Conception

State Road 9-A

Heckscher Drive

JAXPORT Cruise Terminal

Existing Cargo Berth

Page 13: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

MOL/TraPac Benefits for NE FloridaMOL/TraPac Benefits for NE FloridaECONOMICNEW JOBS   Direct Port-related Jobs 1,647 Induced + Indirect Jobs 4,019TOTAL NEW JOBS 5,666

PERSONAL INCOME ($millions)  Direct income and consumption $68.9Indirect income and respending $286.3TOTAL INCOME $355.2

 BUSINESS REVENUE ($Millions) $392.4LOCAL PURCHASES ($Millions) $151.8STATE & LOCAL TAXES ($Millions) $33.0

Source: Martin Associates, Projected Economic Impact Study, 2005

Page 14: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

Talleyrand NorthTalleyrand North

Page 15: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

Cruise TerminalCruise Terminal Length and Height Restrictions

Displacing Cargo Operations

Mayport Ferry

Facility to accommodate 4 vessels

Mayport Location

Page 16: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

Zion PropertyZion Property

Page 17: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

Road ImprovementsRoad ImprovementsRaising Heckscher Drive by Zion property

Page 18: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

Road ImprovementsRoad Improvements

Page 19: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

Road ImprovementsRoad Improvements

Page 20: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

Rail ImprovementsRail Improvements

Page 21: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

Harbor DeepeningHarbor Deepening St. Johns River main channel is currently 40 feet

To stay competitive and efficient, the Jacksonville Federal Channel must be deeper

Page 22: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

JAXPORT in 2017JAXPORT in 2017

5 – 6 container and mixed cargo terminals

• 3.2 million TEUs

• 650,000+ autos and heavy equipment

• 2.4 million tons of breakbulk

New cruise terminal

• 450,000 passengers annually

The East Coast’s premier post-panamax port

Page 23: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.

JAXPORT:JAXPORT:

• 75,000 – 100,000

port related jobs

• $5- 6 billion annual

economic impact

Jacksonville’s Economic Engine

Page 24: Presented by Tim Murphy, Senior Director Engineering and Construction Jacksonville Port Authority Improvement Plans.